To,

Erection Department

Document No:

RECORD OF INITIAL OPERATION


Contract: FIRE PROTECTION, DETECTION AND ALARM SYSTEM
Contract Ref:
Contractor1. Description and Location of Plant:- Hydrant Pump-5B (Location-Fire fighting pump house)
2. Initial Operation
The above plant completed its initial operation tests on 02-03-2013 in the presence of the
following witnesses. The defects and omissions noticed during this trial run that are to be
liquidated by the contractor are also attached.
For Erection Department
SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

NAME

SIGNATURE

NAME

SIGNATURE

NAME

SIGNATURE

For O&M Department


SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

For Contractor
SL

CONTRACTOR

1
2

Page
1

3. Defects or Omissions found on initial operation


Sl

Defects or Omissions

Contract Ref:

1.

NRV is not resting on the support PS-4.

2.

Support PS-4 is not as per drawing.

3.

Recirculation valve is having minor leakage.

4.

Valves movement is very hard i.e. require greasing.

5.

Motor space heater cabling work is pending.

Note:
a) To be issued only after the issue of SRCC.
b) All the maintenance as well as the equipment lubrication of the plant under consideration will
be the responsibility of the contractor even after issue of this document. Defects and omissions
noticed during the test run should be liquidated by contractor.
c) This document should be issued after obtaining all operation and maintenance
volumes erections/FQA log sheets pertaining to the equipment under consideration.
For Erection Department
SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

NAME

SIGNATURE

NAME

SIGNATURE

NAME

SIGNATURE

For O&M Department


SL

DEPARTMENT

MECHANICAL

ELECTRICAL

C&I

For Contractor
SL

CONTRACTOR

Page
2

1
2

Page
3

You might also like