Professional Documents
Culture Documents
Cert IV House Plans WK 1 - Afe - Hornsby
Cert IV House Plans WK 1 - Afe - Hornsby
Cert IV House Plans WK 1 - Afe - Hornsby
18390
2270
1810
2160
1810
2390
1230
6360
360
480
4000
90
1690
90
4000
90
2400
3857
600
90
2400
480
4013
240
D.P.
5630
5780
GARAGE
7160
FFL 96.264
D.P.
W1
R/H over
Oven under
bench
WIR
Bed 2
1460
4060
90
14260
DW
Bed 1
KITCH
W3 4150
1810
T&G prefinished
floating floor
90
Linen
960 90
WIR
Other
The applicant must construct each refrigerator space
in the development so that it is "well ventilated", as
defined in the BASIX definitions.
The applicant must install a fixed outdoor clothes
drying line as part of the development.
8150
900 x 2100mm Square set opening
1410
8630
90
D1
W2
1460
240
450
Natural lighting
The applicant must install a window and/or skylight
in the kitchen of the dwelling for natural lighting.
The applicant must install a window and/or skylight
in 2 bathroom(s)/toilet(s) in the development for natural
lighting.
D.P.
690
Hall
90
LOUNGE / DINING
4000
5290
wm
D.P.
Bath
240
W7
W6
3000
2270
1810
710
1210
1550
W4
240
1020
90
4000
90
240
D2
W5
D.P.
450
LDY
D.P.
W8
WC
4000
1580
90
7950
240
90
2500
Bed 3
FFL 96.780
610 377
1210
509
3584
1430
1810
1310
18390
PLAN VIEW
WINDOW AND DOOR SCHEDULE
W1,2,3,4,8
W5
W6
W7
D1
D2
BradnamsSlidingWindow1810x1210
BradnamsSlidingWindow1210x860
BradnamsSlidingWindow610x860
BradnamsSlidingWindow1210x1200
SingleTimberdoorandsidelight1230x2110
BradnamsSlidingDoor3584x2100
XO1218
XO0912
XO0906
XO1212
FSSF2136
Plan View
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
Scale 1:100
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
4146
4633
2750
2500
2150
2150
2750
2500
4633
4146
688
688
450
300
240
450
8150
5630
90
5290
8630
5780
1810
WEST ELEVATION
7160
14260
EAST ELEVATION
RL 101.500
70 x 35 T2 Pine Battens
T2 Truss roof Frame to Manafacturers details
FCL 99.530
2150
2750
Compressed
Sheet Flooring
20mm step down
2150
2750
2500
2500
4633
4146
4633
FFL 96.780
2400 x 2400
Rollerdoors
516
RL Footing 95.722
450 x 500 RC Footing
to Engineers Details
480
2400
600
6360
2400
480
360
1230
1810
2390
2160
1810
450 240
2270
2500
90
1410
90
4060
8630
18390
SECTION AA
2150
2750
2500
4633
NORTH ELEVATION
688
450
2270
1810
710
1210
1550
610
1210
377
3584
509
18390
SOUTH ELEVATION
1430
1810
1310
Scale 1:100
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
240
PACIFIC HIGHWAY
PACIFIC HIGHWAY
Landscape
The applicant must plant indigenous or low water use
species of vegetation throughout 63 square metres
of the site.
RL 96000 AHD
RL 96000 AHD
Fixtures
The applicant must install showerheads with a
minimum rating of 3 star (> 4.5 but <= 6 L/min)
in all showers in the development.
The applicant must install a toilet flushing system
with a minimum rating of 5 star in each toilet in
the development.
The applicant must install taps with a minimum rating
of 6 star in the kitchen in the development.
The applicant must install basin taps with a minimum
rating of 6 star in each bathroom in the development.
21000
96090
96020
96100
6300
6000
Stencil Crete
1180
Alternative water
Rainwater tank
The applicant must install a rainwater tank of at
least 5000 litres on the site. This rainwater tank must
meet, and be installed in accordance with, the
requirements of all applicable regulatory authorities.
The applicant must configure the rainwater tank to
collect rain runoff from at least 131 square metres of
the roof area of the development (excluding the area
of the roof which drains to any stormwater tank or
private dam).
The applicant must connect the rainwater tank to:
all toilets in the development
at least one outdoor tap in the development
(Note: NSW Health does not recommend that rainwater
be used for human consumption in areas with
potable water supply.)
Stormwater
Area: 34m2
Stormwater
1416
36000
35000
Linen
96 2
00
Rainwater
Tank 5000L
2000 dia x 2500h
Stormwater
745.5 m2
96300
95330
SEWER MAIN
SEWER MAIN
95300
21050
96360
96330
Site Plans
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
Scale 1:200
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
WIR
WIR
Bed 2
Linen
Bed 1
KITCH
Hall
Bed 3
Bath
WC
LDY
LOUNGE / DINING
Bracing Plan
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
Scale 1:50
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
Light Fitting
Hot water
The applicant must install the following hot water
system in the development, or a system with a
higher energy rating: electric heat
pump with a performance of more than 45 RECs.
Cooling system
The applicant must install the following cooling system,
or a system with a higher energy rating, in at least
1 living area: ceiling fans +1-phase airconditioning;
Energy rating: 4.5 Star (new rating)
The applicant must install the following cooling system,
or a system with a higher energy rating, in at least
1 bedroom: ceiling fans;
Energy rating: n/a
Ceiling Fan
Heating system
The applicant must install the following heating system,
or a system with a higher energy rating, in at least
1 living area: 1-phase airconditioning;
Energy rating: 4.5 Star (new rating)
The bedrooms must not incorporate any heating system,
or any ducting which is designed to accommodate
a heating system.
MSB
Spot Light
Smoke Detector
GARAGE
Ventilation
The applicant must install the following exhaust systems
in the development: At least 1 Bathroom: individual fan,
ducted to faade or roof;
Operation control: manual switch on/off
Kitchen: individual fan, ducted to faade or roof;
Operation control: manual switch on/off
Laundry: individual fan, ducted to faade or roof;
Operation control: manual switch on/off
n
n
WIR
R/H over
Oven under
bench
DW
n
Bed 2
hws
Linen
Bed 1
n
Artificial lighting
The applicant must ensure that the "primary type of
artificial lighting" is fluorescent or light emitting diode
(LED) lighting in each of the following rooms,
and where the word "dedicated" appears, the fittings
for those lights must only be capable of accepting
fluorescent or light emitting diode (LED) lamps:
WIR
KITCH
Hall
Bed 3
Bath
ac fan
unit
ac
wm
n
WC
LDY
LOUNGE / DINING
n
PACIFIC HIGHWAY
PACIFIC HIGHWAY
RL 96000 AHD
RL 96000 AHD
21000
Water Main
21000
6300
6000
6000
Floor Waste
Stencil Crete
Water Supply
6300
Area: 34m2
Area: 34m2
Sewer Connection
1180
Stencil Crete
Gully Trap
1180
D.P.
Stormwater
Stormwater
D.P.
Stormwater
1416
1416
Stormwater
D.P.
Reducer Fitting
Stormwater line
R/H over
DW
R/H over
R
wm
D.P.
36000
35000
36000
Linen
35000
Linen
DW
R
D.P.
wm
D.P.
Downpipes Connected to Watertank
Rainwater
Tank 5000L
2000 dia x 2500h
Rainwater
Tank 5000L
2000 dia x 2500h
Stormwater
745.5 m2
Stormwater
745.5 m2
95330
SEWER MAIN
95300
95330
SEWER MAIN
95300
21050
21050
STORMWATER DIAGRAM
DRAINAGE DIAGRAM
Drainage Diagram
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
Scale 1:200
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
6560
B
14460
SECTION CC
Expansion joint
2840
C
18590
Compacted fill between walls with 50mm min
Sand blinding layer
Engineers Details
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
SECTION BB
Scale 1:100
Drafted : D Hedge
Version 1 : 20/1/14 Northern Sydney Institute of TAFE 2014
90 x 45 LVL H2 Joist
90 x 70 LVL H2 Bearer
500um DPC
110mm Dwarf brick wall to
underside of bearer
150mm RC garage Slab
6360
D.P.
Section DD
D
D
8630
14260
2840
Brick Plan
Mr and Mrs T. Afe
207 Pacific Highway Hornsby NSW
18390
Scale 1:100
Drafted : D Hedge