Tie-In Schedule 2016.09.26 PDF
Tie-In Schedule 2016.09.26 PDF
Tie-In Schedule 2016.09.26 PDF
ID
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
1
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
EXECUTION
PIPING
44-TP-009 (WP-09)
1 hr
Unbolting existing flanges & remove existing pipe spool (tie-in connection
44-TP-009A_B_C_D
Connecting tie- in spool for 44-TP-009A_B_C_D. 1. Bolting Flange #1 to Existing 3 hrs 15 Oct '16 15 Oct '16 118,94 hrs
Gate Valve 3"-GA-AS- (3-2-44-003). 2. Bolting Flange #2 to Tie-in 44-TP-009B.
3. Bolting Flange #3 to Existing Flange Tie-in 44-TP-009D. 4. Bolting Flange #4
to Existing Gate
install new Blind flange at one - end of new valve 4"-GA-AS-3-2-44-3698 (For
1 hr 15 Oct '16 15 Oct '16 118,94 hrs
Safety reason, until continue spool is ready for installed)
15/10
15 Oct '16 15 Oct '16 118,94 hrs
YIN-1
YIN-1
YIN-1
YIN-1
10
1 hr
11
1 hr
12
1 hr
13
1 hr
YIN-1
YIN-1
PRECOM-1
PRECOM-1
14
3L-TP-001 (WP-10)
15
1 hr
16
17
19
1 hr
20
21
Flange Management
22
23
1 hr
31,5
hrs
1 hr
YIN-2;PRECOM-2
YIN-2
18
YIN-2
2 hrs 15 Oct '16 15 Oct '16 116,94 hrs
YIN-2
15 Oct '16 15 Oct '16 116,94 hrs
YIN-2
YIN-2
PRECOM-2
PRECOM-2
PRECOM-2
24
25-TP-020A/B/C (WP-11A)
25
26
27
Unbolting flanges & remove of existing spool : 1. Unbolting Flange 1 2. Unbolting 6 hrs 15 Oct '16 15 Oct '16 104,44 hrs
Tie-in connection 25-TP-020A 3. Unbolting Tie-in Connection 25-TP-020C 4.
Remove Pipe Spool Existing 5. Unbolting Tie-in Connection 25-TP-020B 6.
Remove Check Valve 7. Remov
Unbolting Flange 2 on ground
1 hr 15 Oct '16 15 Oct '16 104,44 hrs
28
29
Install and Connecting tie-in new spools sequencially : 1. Positioning pipe spool
#4. 2. Assembly Pipe spool #1, Check Valve, Pipe spool #2 for 25-TP-020B
(Include Bolting) 3. Bolting to 25-TP-020B & Valve 103-ESDV-101 4. Lifting
Pipe spool #3 for 25-T
Install ball valve at branch connection spools #1 & spool #4, Ball Valve
4"-BA-DR-3-1-25-4090. (Include accessories gasket, bolt and nuts)
31
32
Flange Management
33
High Pressure Leak Test 1250 Psi and blanket (After WP11B complete)
34
1 hr
PRECOM-7;YIN-3
YIN-3
YIN-3
YIN-3;YIN-10
30
YIN-10
3 hrs 16 Oct '16 16 Oct '16 104,44 hrs
YIN-10
YIN-3
YIN-3;PRECOM-7
PRECOM-1
16 Oct '16 16 Oct '16 104,44 hrs
PRECOM-1
35
25-TP-020D/E (WP-11B)
36
Unbolting 2ea flanges & remove of existing spool 25-TP-020D & E (tie-in
connection, include Check valve)
37
38
39
40
Install and Connecting tie-in new spools sequencially: 1. Bolting Pipe spool #7 to 4 hrs 16 Oct '16 16 Oct '16 101,94 hrs
25-TP-020E 2. Bolting 25-TP-020E to Check valve (existing) 3. Bolting Check
Valve to Pipe spool #6 4. Bolting spool #6 to 25-TP-020D (103-ESDV-1010)
Include Spacer (Include
Install ball valve 4"-BA-DR-3-1-25-4091 at branch connection spools #7 (Include 2 hrs 16 Oct '16 16 Oct '16 101,94 hrs
accessories gasket, bolt and nuts)
YIN-4
Civil Crew-1
YIN-4
YIN-4
41
YIN-4
YIN-4
42
1 hr
43
1 hr
44
YIN-4
YIN-4
YIN-4
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 1
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
45
Flange Management
46
High Pressure Leak Test 1250 Psi and blanket Include 25-TP-20A_B_C
47
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
PRECOM-1
PRECOM-1
18 Oct '16 18 Oct '16 82,97 hrs
PRECOM-1
48
3L-TP-027 (WP-12)
49
50
51
1 hr
52
1 hr
53
54
Flange Management
55
1 hr
YIN-5
YIN-5
YIN-5
YIN-5
YIN-5
PRECOM-3
15 Oct '16 15 Oct '16 20 hrs
PRECOM-3
56
43-TP-028 (WP-13)
57
58
59
60
61
62
Flange Management
63
1 hr
YIN-6
YIN-6
YIN-6
YIN-6
YIN-6
PRECOM-4
15 Oct '16 16 Oct '16 16 hrs
PRECOM-4
64
43-TP-045A/B (WP-14)
65
Open block valve at any point of existing pipe (drain or vent) & Loosen bolt Valve 2 hrs 15 Oct '16 15 Oct '16 1 hr
for drain point
66
67
Dismantle Manual Cold cutting machine after complete cut out of pipe spool at
43-TP-045A_B
1 hr
68
1 hr
69
1 hr
70
71
Weld Cooling down & Dismantle and remove Duct Seal at 43-TP-045A_B
72
Mechanical Cleaning
73
74
1 hr
75
Hydrotest (including existing pipe) : (filling water & Press up from up strem
check valve existing at line 1-GF-AA2-60-7003)
76
1 hr
77
78
1 hr
79
Flange Management
80
1 hr
PRECOM-4;YIN-7
YIN-7
YIN-7
YIN-7
YIN-7
YIN-11;YIN-7
YIN-11
PRECOM-4
NDE TTEAM
16 Oct '16 16 Oct '16 1 hr
YIN-7
PRECOM-5
16 Oct '16 16 Oct '16 1 hr
YIN-7
YIN-7
16 Oct '16 16 Oct '16 1 hr
YIN-7
PRECOM-4
16 Oct '16 16 Oct '16 1 hr
PRECOM-4
81
60-TP-021 (WP-15)
82
1 hr
83
Connecting tie-in spool for 60-TP-021 (Include install gate valve & accessories
gasket, bolt and nuts)
84
Re-install existing Blind flange at one - end of new valve (For Safety reason, until
continue spool is ready for installed)
1 hr
85
1 hr
86
1 hr
87
Flange Management
1 hr
88
50-TP-013A/B (WP-16)
YIN-1
YIN-1
YIN-1
YIN-1
PRECOM-5
PRECOM-5
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 2
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
89
1 hr
90
91
Connecting tie-in spool for 60-TP-013A & B (Include install gate valve &
accessories gasket, bolt and nuts)
92
1 hr
93
94
Flange Management
1 hr
95
67-TP-023A/B (WP-17)
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
YIN-8
YIN-8
15 Oct '16 15 Oct '16 126,94 hrs
YIN-8
PRECOM-5
15 Oct '16 15 Oct '16 126,94 hrs
PRECOM-5
96
98
Connecting tie-in new spool for 60-TP-023A & B: (Include install gate valves &
accessories - gasket, bolt and nuts) Note : New pipe spool already on site
99
Continue Connecting tie-in to new spools - PSV Lines (Include install PSV valve
& Accessories - gasket, bolt and nuts)
100
Install 2ea New Dummy Supports (pipe support to base plate) (welding)
101
1 hr
102
Flange Management
103
1 hr
97
YIN-9
1 hr
YIN-9
YIN-9
YIN-9
15 Oct '16 15 Oct '16 118,94 hrs
YIN-9
PRECOM-6
16 Oct '16 16 Oct '16 118,94 hrs
PRECOM-6
104
105
106
Loosen bolts to flanges 4ea for :o Replace and install permanent Blind & Spacer
(incld. Replacement of gasket for all opening (flanges) o Install Instrument item
(SC 8001 & TT 1015) o Adjustment Supoort 3ea
107
Install pipe Spool Sampling Connection- Include 1ea Double Block & Bleed
(1-VI-CS-A-3-20-4148), Accessories Bolts & Gaskets
108
109
Flange Management
110
111
1 hr
PRECOM-7;YIN-2
YIN-2
YIN-2
YIN-2
PRECOM-7
PRECOM-7
18 Oct '16 18 Oct '16 85,97 hrs
PRECOM-7
112
113
114
Unbolting flange 4ea Glycol contactor - TP-003 (tie-in spool, loosen at two sides) 3 hrs 16 Oct '16 16 Oct '16 84,96 hrs
115
116
117
Continues loosen bolts to other flanges for : o Alignment and corrective position
of tie-in spool TP-003 o Replace and install permanent Blind & Spacer o Install
Instrument item (SC 8002 & TT 2015) - (Include. Replacement of gasket for all
opening flanges
Install pipe Spool Sampling Connection- Include 1ea Double Block & Bleed
(1-GP-CS1-20-3417-A015), Accessories Bolts & Gaskets
119
120
Flange Management
121
122
1 hr
YIN-1
YIN-1
YIN-1
YIN-11
118
YIN-11
2 hrs 17 Oct '16 17 Oct '16 84,96 hrs
YIN-11
YIN-11
PRECOM-7
PRECOM-7
17 Oct '16 17 Oct '16 90,96 hrs
PRECOM-7
123
124
1 hr
125
1 hr
126
127
Fit-up and weld tie-in spool at position 1x3/4" Reducing Tee on 20-TP-048A &
20-TP-048B
128
1 hr
129
1 hr
130
1 hr
131
1 hr
YIN-5
YIN-5
YIN-5
YIN-5
YIN-5
YIN-5
YIN-5
YIN-5
132
69-TP-044A/B (WP-NS03)
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 3
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
133
1 hr
134
Field Measurement and marking for cutting position 69-TP-044A & 69-TP-044B
1 hr
135
136
1 hr
137
138
1 hr
139
Install tie-in spool pipe (Include gate valves & accessories Gasket, bolts and
nuts)
1 hr
140
1 hr
141
Install LOTO at new valve & Open block of existing valve (Open LOTO)
1 hr
142
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
YIN-6
YIN-6
YIN-6
16 Oct '16 16 Oct '16 106,96 hrs
YIN-6
YIN-6
YIN-6
YIN-6
YIN-6
YIN-6
YIN-6
143
50-TP-049A/B (WP-NS12)
144
1 hr
145
1 hr
146
147
148
Fit-up and weld tie-in spool at position 1x1 Reducing Tee on 20-TP-049A &
20-TP-049B
149
1 hr
150
1 hr
151
1 hr
152
Install LOTO at new valve & Open existing valve (and also Open LOTO of
existing valve)
1 hr
153
1 hr
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
YIN-8
154
155
156
ELECTRICAL
157
1 hr
158
PTW, PJSM
159
160
161
162
163
164
165
1 hr
166
167
168
Internal Wiring (Ethernet, RS-485, UPS supply dan existing internal wiring)
169
Continuity check
170
171
Quality Inspection
1 hr
172
House keeping
1 hr
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
15 Oct '16 15 Oct '16 7 hrs
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
173
174
175
PTW, PJSM
1 hr
176
TOP-2
15 Oct '16 15 Oct '16 7 hrs
TOP-2
TOP-2
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 4
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
177
178
179
180
181
182
1 hr
183
184
185
Internal Wiring (Ethernet, RS-485, UPS supply dan existing internal wiring)
186
Continuity check
187
188
Quality Inspection
1 hr
189
House keeping
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
TOP-2
TOP-2
TOP-2
TOP-2
TOP-2
15 Oct '16 15 Oct '16 126,94 hrs
TOP-2
TOP-2
TOP-2
TOP-2
TOP-2
TOP-2
TOP-2
TOP-2
190
191
192
PTW, PJSM
1 hr
193
194
195
196
197
198
1 hr
199
200
Internal Wiring (Ethernet, RS-485, UPS supply dan existing internal wiring)
201
Continuity check
202
203
Quality Inspection
1 hr
204
House keeping
1 hr
TOP-1
15 Oct '16 15 Oct '16 7 hrs
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
15 Oct '16 15 Oct '16 126,94 hrs
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
TOP-1
205
206
207
208
209
Continuity check
210
211
Quality Inspection
212
House keeping
1 hr
TOP
TOP
TOP
TOP
TOP
TOP
16 Oct '16 16 Oct '16 6,02 hrs
TOP
213
214
215
Continuity check
1 hr
216
Quality Inspection
1 hr
217
House keeping
1 hr
SKP 1
SKP 1
SKP 1
SKP 1
218
219
220
Terminasi Kabel pada PCR-1 & PCR-2 MCC C & D dan Switchgear 82ZEN-001
(WP-6)
Terminasi Kabel pada PCR-1 Switchgear 82ZEN-001 (WP-06A)
1 hr
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 5
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
221
1 hr
222
Continuity check
1 hr
223
Quality Inspection
1 hr
224
House Keeping
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
SKP 1
SKP 1
SKP 1
SKP 1
225
226
Glanding dan Terminasi Kabel dari PMS ke Fuel Gas Heater PCR-2
(C-I-60HEC001A)
227
Glanding dan Terminasi dari Kabel dari PMS ke Fuel Gas Heater PCR-2
(C-I-60HEC001B)
228
229
Glanding dan Terminasi Kabel dan Glanding dari PMS ke Enclosure Fan
PCR-2 (C-I-82VDE4031A)
230
231
232
233
234
235
Continuity check
236
Quality Inspection
237
238
239
240
241
Continuity check
242
Quality Inspection
243
House keeping
1 hr
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
16 Oct '16 16 Oct '16 111,94 hrs
SKP 1
244
245
246
PTW, PJSM
1 hr
247
248
249
250
Quality Inspection
1 hr
251
House keeping
1 hr
SKP 1
15 Oct '16 15 Oct '16 124,94 hrs
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
252
253
Synchronizing, Load Sharing GTG 403 - GTG 404 & GTG 405 (WP-8A)
254
255
256
257
Warming Up and Running Generator GTG 403 and connect to load bank
1 hr
258
259
260
Open bus tie breaker PCR 2 dan PCR 3, open feeder to load bank
261
262
Check parameter generator GTG 403, GTG 404 & 405 di PMS dengan
kondisi 403 masuk ke bus, 404 dan 405 tidak masuk ke bus.
263
264
TOP
TOP
TOP
17 Oct '16 17 Oct '16 0 hrs
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 6
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
265
266
267
1 hr
268
269
270
271
1,94
hrs
272
273
274
275
276
277
278
279
280
281
282
Shutdown Process
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
TOP
TOP
18 Oct '16 18 Oct '16 0 hrs
TOP
TOP
TOP
TOP
18 Oct '16 18 Oct '16 0 hrs
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
18 Oct '16 18 Oct '16 0 hrs
TOP
283
Synchronizing, Load Sharing GTG 403 - GTG 404- GTG 405 & EDG 406
(WP-8B)
284
1 hr
285
1 hr
286
1 hr
287
288
289
1 hr
290
1 hr
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
Shutdown process
1 hr
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
21 Oct '16 21 Oct '16 0 hrs
TOP
307
308
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 7
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
309
1 hr
310
311
Loop Check
312
Verifikasi HMI
1 hr
313
314
Loop check
315
Verifikasi HMI
316
317
Loop check
318
Verifikasi HMI
319
House Keeping
1 hr
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
TOP
TOP
19 Oct '16 19 Oct '16 70 hrs
TOP
TOP
TOP
TOP
TOP
TOP
TOP
19 Oct '16 19 Oct '16 0 hrs
TOP
320
321
1 hr
322
1 hr
323
1 hr
324
1 hr
325
1 hr
326
1 hr
327
328
1 hr
329
1 hr
330
1 hr
331
1 hr
332
333
1 hr
334
1 hr
335
1 hr
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
1 hr
351
Shutdown Process
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
22 Oct '16 22 Oct '16 0 hrs
TOP
0,5 hrs 22 Oct '16 22 Oct '16 0 hrs
TOP
352
Synchronizing, Load Sharing GEG 401 - GTG 404- GTG 405 (WP-8E)
15,5
hrs
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 8
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
353
1 hr
354
355
356
1 hr
357
1 hr
358
1 hr
359
1 hr
360
1 hr
361
1 hr
362
1 hr
363
1 hr
364
1 hr
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
Shutdown process
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
TOP
0,5 hrs 20 Oct '16 20 Oct '16 0 hrs
TOP
382
383
384
1 hr
385
386
Loop Check
387
Verifikasi HMI
388
389
Loop check
390
Verifikasi HMI
391
392
Loop check
393
Verifikasi HMI
394
House Keeping
1 hr
TOP
22 Oct '16 22 Oct '16 11 hrs
TOP
TOP
TOP
TOP
395
396
INSTRUMENT
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 9
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
397
PJSM
398
399
400
401
402
Disconnect and isolate all cables to existing ESD/EDP box. Also, disconnect and
isolate the cables at the other end too (SIS marshaliing, PCR-2 instrument
room).
403
404
405
406
Connect multipair cables at both ends, ones to ESD/EDP box and ones to
79-ZJM-002.
407
408
409
410
411
Isolate cable which are supplying power for new desk-3 at UPS PCR-2.
412
Connect cable jumper from feeder MCB new desk-3 to feeder MCB new desk-4. 0,5 hrs 15 Oct '16 15 Oct '16 125,44 hrs
Ensure that ferrule and shield tube are available.
413
414
415
416
Install 42 monitors.
417
Connect all ethernet and VGA cables to OWS4 monitors and KVMs on new
operator desk.
1 hr
418
419
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
SKP 1
SKP 1
SKP 1
SKP 1
1 hr
16/10
38 hrs 15 Oct '16 17 Oct '16 0 hrs
420
PJSM
421
Shutdown AWS1 and AWS2 servers, then disconnect all connecting cables
(ethernet and power) from them.
1 hr
422
Relocate and install AWS1 and AWS2 (including servers, monitors, KVMs,
2 hrs 15 Oct '16 15 Oct '16 0 hrs
keyboards, and mouses) to PCR-3 instrument room (87-ZJN-001 for servers and
workstation desk for monitors and KVMs). Previously, the servers are installed in
87-ZJN-002 (PCR-1 control
Connect ethernet cables at both ends, between: 1. AWS1 server and
0,5 hrs 15 Oct '16 15 Oct '16 0 hrs
SUM-CTRL-SW1 2. VIM switch and SUM-FTAC-01
PTCS,SKP (Worker)
15 Oct '16 15 Oct '16 0 hrs
PTCS,SKP (Worker)
423
PTCS,SKP (Worker)
PTCS,SKP (Worker)
424
Disconnect all existing patch cord at existing fiber optic patch panel inside
100-SIS-001 (PCR-2 instrument room).
425
Identify from-to of existing fiber optic (to PCR-1, to PCR-2, to well #6, and to well
#7). Reconnect patch cord from PCR-1 to well #6.
426
1 hr
427
Delete existing ESD & EDP tags from existing SLS and disable the channels at 0,5 hrs 15 Oct '16 15 Oct '16 127,94 hrs
EWS.
428
429
Commission, Auto Sense, and download SU_SIS05 and SU_SIS06 from EWS.
430
Commission and download all new SLS Cards on SU_SIS05 and SU_SIS06
from EWS.
431
432
433
Import the remaining 10 new affected new modules and the 20 new modules
which are assigned at the same SLS cards include named set.
1 hr
434
1 hr
435
Import SIS named sets of the 11 modified existing modules to existing database. 0,5 hrs 15 Oct '16 15 Oct '16 122,44 hrs
436
437
Import new graphics which are related to 11 modified existing module & 32 new
modules.
438
Verify diagnostic for all existing SLS cards before C&E test.
1 hr
439
1 hr
440
Add sumpal area ESD area to alarm and event to EWS, OWS4, and OWS5.
PTCS,SKP (Worker)
PTCS,SKP (Worker)
15 Oct '16 15 Oct '16 0 hrs
PTCS,SKP (Worker)
PTCS
PTCS
PTCS
2 hrs 15 Oct '16 15 Oct '16 0 hrs
PTCS
PTCS
PTCS
PTCS
PTCS
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 10
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
441
442
1 hr
443
444
445
1 hr
446
Verify existing AWS and AWS2 functional (alarm & events, DeltaV analyze, PI
OPC).
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
447
448
PJSM
449
Install cable-glands on top of the existing UCP GTG panel. Pass cables (coaxial
and ethernet) right through them.
1 hr
450
Crimp RJ-45 for ethernet cables and BNC for coaxial cables.
1 hr
451
Install/plug controlnet module at the existing UCP GTG and connect new
controlnet cable (to GTG-404) to the module.
452
Install/plug FMIM module at the existing UCP GTG and connect new ethernet
cable (from CMS) to the module.
453
Install/plug ethernet module at the existing UCP GTG and connect new ethernet 0,5 hrs 15 Oct '16 15 Oct '16 26 hrs
cables (from PMS) to the module.
454
All Parties
SKP 1
SKP 1
Vendor Solar
Vendor Solar
0,5 hrs 15 Oct '16 15 Oct '16 26 hrs
Vendor Solar
455
456
PJSM
457
Install new serial card (RS-485) at UCP GEG 401, GEG 402 and synchronizing
panel.
458
Connect new RS 485 cable from existing UCPs (synchronizing panel, GEG-2,
and GEG-2) to existing PCS cabinet with daisy chain configuration.
459
Modify DH+ daisy-chain wiring from BMS glycol package train #1 directly to KF2 0,5 hrs 15 Oct '16 15 Oct '16 25,5 hrs
in PCR-1
460
461
462
All Parties
Vendor TOP
464
PJSM
465
1 hr
466
467
Checking and ensure the process connection of field instrument which will be
installed in accordance with the requirement.
468
Close the existing 2-way valve manifold, then open the bleed of 2-way valve
manifold to ensure it is completely depressurized.
469
Close the existing valve in the upstream of PSH/L as a hydraulic supply line to
PSH/L and then start to bleed all pressure to zero.
470
Apply teflon tape and/or teflon (PTFE) paste to NPT mounting connection.
Apply only to the male threads. (Do not lap the Teflon tape over the end of the
threads. Do not apply pipe dope to the female threads of the block. Sensors
have small orifices than
Install new PSH/L and associated tubing and fitting as per hook-up for pressure
lead piping and tubing. Install the high and low pressure sensor in the top
female connection.
472
473
474
After test and everything working properly, then PSH/L ready to operate and
open the valve on the upstream of PSH/L to allow the line can be pressurized
and ready to operate.
All Parties
15 Oct '16 15 Oct '16 125,94 hrs
COPI Operation
COPI Operation
471
475
476
PJSM
477
1 hr
478
479
Checking and ensure the process connection of field instrument which will be
installed in accordance with the requirement.
480
Close the existing 2-way valve manifold, then open the bleed of 2-way valve
manifold to ensure it is completely depressurized.
481
Close the isolation valve/monoflange, then open the bleed valve to ensure it is
completely depressurized. And, close valve in upstream side of PSH/L as a
pneumatic supply line to PSH/L and bleed all pressure to zero.
482
483
Apply teflon tape and/or teflon (PTFE) paste to NPT mounting connection.
Apply only to the male threads. (Do not lap the Teflon tape over the end of the
threads. Do not apply pipe dope to the female threads of the block. Sensors
have small orifices than
Install new PSH/L and required associated tube and fitting as per hook-up for
pressure lead piping and tubing. Install test nipple and block valve in the top of
female connection.
All Parties
15 Oct '16 15 Oct '16 126,44 hrs
COPI Operation
COPI Operation
484
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 11
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
485
486
487
After test and everything working properly, then PSH/L ready to operate and
open the valve on the upstream of PSH/L to allow the line can be pressurized
and ready to operate.
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
488
489
490
PJSM
491
1 hr
492
493
494
495
496
497
Re-assembly the valve 3M-PCV-0002A by placing the new range spring and
upper spring guide.
498
Replace the spring housing and thread the SHCS into the body.
499
500
All Parties
15 Oct '16 15 Oct '16 108,94 hrs
Vendor Linkmet, SKP
502
503
504
505
506
507
Re-assembly the valve 3M-PCV-0002B by placing the new range spring and
upper spring guide.
508
Replace the spring housing and thread the SHCS into the body.
509
510
512
Block the isolation valve 1-GA-DF-4-1 (Pic. On Tag A,C-1, D-1, F-1 and
F-2) from process fluid.
513
Open the isolated valve 1-GA-DF-4-1 (Pic. 3 Tag B, C-2, D-2 and E).
514
Relax the range spring by turning the adjusting knob counter-clockwise until
there is no noticeable spring tension.
515
516
Remove existing pressure gauge and connect the calibrated test gauge and
use the existing vent line of N2 gas to safe location.
517
Set the required inlet pressure from the nitrogen bottle at 450 psig or up to
761 psig as the maximum inlet pressure.
518
Closely monitor outlet pressure via pressure gauge and calibrated test gauge
at the downstream of valve. Downstream pressure shall be maintained at 450
psig.
519
If the outlet pressure exceeds the desired pressure then reset the regulator
0,5 hrs 16 Oct '16 16 Oct '16 108,94 hrs
set point by turning the adjusting screw clockwise to increase outlet pressure
or counter-clockwise to reduce outlet pressure.
520
521
Reduce the pressure gradually. Disconnect the air supply from the nitrogen
bottle and calibrated test gauge as initial schematic of regulator valves.
Re-install existing pressure gauge.
522
524
Block the isolation valve 1-GA-DF-4-1 (Pic. 3 Tag A,C-2, D-2, F-1 and F-2) 0,5 hrs 16 Oct '16 16 Oct '16 108,94 hrs
from process fluid
525
Open the isolated valve 1-GA-DF-4-1 (Pic. 3 Tag B, C-1, D-1 and E)
526
Relax the range spring by turning the adjusting knob counter-clockwise until
there is no noticeable spring tension.
527
528
Remove existing pressure gauge and connect the calibrated test gauge and
use the existing vent line of N2 gas to safe location.
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 12
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
529
Set the required inlet pressure from the nitrogen bottle at 450 psig or up to
761 psig as the maximum inlet pressure.
530
Closely monitor outlet pressure via pressure gauge and calibrated test gauge
at the downstream of valve. Downstream pressure shall be maintained at 450
psig.
531
If the outlet pressure exceeds the desired pressure then reset the regulator
0,5 hrs 16 Oct '16 16 Oct '16 108,94 hrs
set point by turning the adjusting screw clockwise to increase outlet pressure
or counter-clockwise to reduce outlet pressure.
532
533
Reduce the pressure gradually. Disconnect the air supply from the nitrogen
bottle and calibrated test gauge as initial schematic of regulator valves.
Re-install existing pressure gauge.
534
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
536
PJSM
537
1 hr
538
539
Checking and ensure the process connection of field instrument which will be
installed in accordance with the requirement.
540
Close the existing 2-way valve manifold, then open the bleed of 2-way valve
manifold to ensure it is completely depressurized.
541
Close the isolation valve/ mono flange, then open the bleed valve to ensure it is
completely depressurized. And, Close valve in upstream side of PSH/L as
pneumatic supply to PSH/L and bleed all pressure to zero.
542
543
Apply teflon tape and/or teflon (PTFE) paste to NPT mounting connection.
Apply only to the male threads. (Do not lap the Teflon tape over the end of the
threads. Do not apply pipe dope to the female threads of the block. Sensors
have small orifices than
Install new PSH/L and required associated tube and fitting as per hook-up for
pressure lead piping and tubing. Install test nipple and block valve in the top of
female connection.
545
546
547
After test and everything working properly, then PSH/L ready to operate and
open the valve on the upstream of PSH/L to allow the line can be pressurized
and ready to operate.
All Parties
15 Oct '16 15 Oct '16 126,44 hrs
COPI Operation
COPI Operation
544
548
549
PJSM
550
551
552
553
554
Re-connect existing cable to solenoid and re-hookup tubing to air set regulator
after piping team has complish the relocation.
555
All Parties
SKP 1
SKP 1
SKP 1
SKP 1
SKP 1
1 hr
556
557
PJSM
558
559
560
Close the existing 2-way valve manifold B-1, then open the bleed of 2-way valve 0,5 hrs 15 Oct '16 15 Oct '16 24 hrs
manifold to ensure it is completely depressurized.
561
Ensure there is no electrical powered during this activity by disconnect the wires 0,5 hrs 15 Oct '16 15 Oct '16 24 hrs
at field instrument side only.
562
563
Before commence the adjustment activity, testing and recording the set point of
existing device shall be performed to ensure that existing device still working
properly.
564
1 hr
565
1 hr
All Parties
566
567
Final inspection, perform function test at least 3 times and record the result.
568
13,5
hrs
569
PJSM
570
571
572
Open drain valve 3/4-CA to ensure the line has completely depressurized.
All Parties
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 13
Task Name
Duration
Start
Finish
Total Slack
16 18 20 22
573
574
Connect the supply pressure from Nitrogen (N2) bottle by using the connector
and tubing from N2 bottle to the air set regulator on positioner
575
6 Set the pressure slowly until the air set regulator on positioner indicates
pressure required by Actuator (to push down the actuator) at 60 psig.
576
577
Turn travel stop stem (key 133 at picture-1b) counter-clockwise so that the
pusher plate is not causing any spring compression
578
579
1 hr
580
1 hr
581
Turn travel stop stem clockwise to 29% until control valve cannot open. Ensure
pusher plate touch the diaphragm plate at 29%.
582
583
Perform re-calibration after CVs valve has been limited by using current
injection.
584
585
Disconnect the nitrogen bottle, current loop and HART communicator from
device and reconnect existing tubing & signal cable as initial designed.
586
Sat 15 Oct
8 10 12 14 16 18 20 22
Sun 16 Oct
8 10 12 14 16 18 20 22
Mon 17 Oct
10 12 14 16 18 20 22
Tue 18 Oct
10 12 14 16 18 20 22
Wed 19 Oct
10 12 14 16 18 20 22
17 October 2016
Thu 20 Oct
8 10 12 14 16 18 20 22
Fri 21 Oct
10 12 14 16 18 20 22
Sat 22 Oct
10 12 14 16 18 20 22
Baseline
Split
Summary
External Tasks
Inactive Milestone
Manual Task
Start-only
External Tasks
Baseline Milestone
Critical
Progress
Task
Milestone
Project Summary
External Milestone
Inactive Summary
Duration-only
Manual Summary
Finish-only
External Milestone
Baseline Summary
Critical Split
Deadline
Page 14