As part of this work is described herein, the metallurgical process for this project, considering a
treatment level of 2014 t/d of ore from La Libertad, Otuzco assay on the order of 176.31g Ag/t
and recoveries 87.50%, with which occur monthly bullion.
The description is based on the flowcharts, mass balance, and balance metal.
1.2.0
OBJECTIVE
The aim of the project is the expansion of a plant of 378 t/d to 2014 t/d consisting of two phases:
- Dimensioning of basic equipment.
- Expand (or replace) the existing plant to a 2014 t/ d.
1.3.0
LOCATION
The project is located in the department of La Libertad. The area of operations of the company
is included in the high areas of this district an altitude 2641 meters above sea level in the
province of Otuzco.
Access to the area of work is done by routes Callancas districts and Charat.
1.4.0
BACKGROUND
The initial plant recovery of valuable minerals of gold and silver; especially silver, had a capacity
of 378 t d in the Cayancha location at an altitude of 3547 meters.
1.5.0
DESIGN CRITERIA
SECTION
0.1.0
0.2.0
0.3.0
0.4.0
0.5.0
0.6.0
PD
Rev: 0
Date: 22/11/16
DESCRIPTION
INDEX
UNITS AND
ABBREVIATION
SUMMARY OF CODES
BASIS OF DESIGN
ZONE CONDITIONS
GENERAL DATA
PROCESS DESCRIPTION
Abbreviation / Symbol
ave
Cp
m3/d
m3/h
d
dB
C
deg
dia
g
HP
h
kg
kg/m3
kPa
kWh
l
max
m
t
m
S/cm
mm
min
min
ppm
psi
rpm
ROM
s
st
SG
m2
t/h
V
vol
vol %
W
wt
wt %
y
PROCESS DESCRIPTION
Nominal value
Value of Design
Flow represents the maximum value for the design and selection
mechanical equipment by applying the nominal value of the safety factor
The design values are not related to the annual production nor are
cumulative to size equipment.
Security factor
Code
A
B
C
D
E
F
PD
Rev: 0
Date: 22/11/16
PROCESS DESCRIPTION
1. PROJECT LOCATION
Country
City
Province
District
Altitude
2. ACCES POINT
Land
Lima-La Libertad
La Libertad-Lima
3. WEATHER
Geographic Type
Average temperature
Precipitation
High
Less
Annual average
Annual average evaporation
PD
Rev: 0
Date: 22/11/16
UNIT
VALUE
CODE
m.s.n.m
Per
La Libertad
Otuzco
Cayancha
3547
A
A
A
A
A
A
A
Dry
17
A
A
Month
Month
mm/year
mm
March
July
21.4
542.7
A
A
A
A
PROCESS DESCRIPTION
VALUE
CODE
own
2014
%
t/m3
5
2.31
A
A
belts
24
2
7
365
A
A
A
A
1.5.1
h
shift/d
d/week
d/y
DESIGN DOCUMENTS
For the development of the detailed engineering process, it has considered the following
documents:
- DESIGN CRITERIA
- PLANES OF BALANCE
2.1.0
SCOPING STUDY
The next project is included designs:
- Flow diagram of the process plant
- Mass balance
- Flow diagram of preparation circuit
PD
Rev: 0
Date: 22/11/16
PROCESS DESCRIPTION
3.1.0
BALANCE FLOWSHEET
3.2.0
FLOWSHEET
Based on the information established design criteria; have developed 01 plane block diagram General process, plans flowchart, corresponding to washing, milling, cyanidation, CCD, supply
and distribution of water and plant facilities.
Updating section planes of the respective processes flowcharts, mass balance is. On the next
page you will appreciate the general diagram summarized the metallurgical process.
3.3.0
MASS BALANCE
To prepare the mass balance throughout the system criteria established design and diagram
respective flow is taken have developed the following tables mass balances which involve:
overall cash balance, balance sheet cyanidation, balance sheet clarification and overall balance
of Merril Crowe.
PD
Rev: 0
Date: 22/11/16
PROCESS DESCRIPTION
with a pulp density of 1600 g /l and a % solids of 61%, will feed the ball mill 10' diameter x 12'
length, thus closing the grinding circuit.
During grinding, lime slurry will be added to raise the pH to 11.5, thus giving the necessary
conditions to start the leaching.
4.5.0 CYANIDATION
The ore from the grinding circuit will be sent to the cyanidation circuit composed of 6 agitators
tanks 23' diameter x 20' height with a capacity of 317 m 3 each. The pulp will be transferred from
one agitator tank to another by gravity, whose residence time in each of the tanks is 9 hours,
with a total of 54 hours of leaching.
In this circuit, cyanide solution will be added in order to obtain a constant cyanide force.
The cyanide pulp will be sent to the washing and countercurrent decantation circuit for its solidliquid separation and recovery of solution for its subsequent treatment.
4.6.0 COUNTER CURRENT DECANTATION
The pulp from the cyanidation circuit will be washed in a counter current decantation (CCD) for
the solid liquid separation; the circuit is formed by 4 high-speed thickeners, the washing will be
carried out at a rate of 3.2 tons of washing solution per ton of solution in the food. The discharge
of each thickener will be pumped to the next upstream stage. The solution overflowing from
each thickener is directed to the above downstream stage.
The overflow of the first thickener will be sent to the pregnant solution tank and then sent to the
Merrill Crowe plant. The discharge of the thickener 4 will be sent to a Deep cone with a solids
percentage of 52.7%, for its subsequent treatment and disposal.
FIGURE N 01: Counter Current Decantation
PROCESS DESCRIPTION
Once the solutions precipitation has finished, it will be sent to two press filter to obtain the
precipitate which will basically silver.
PD
Rev: 0