The document outlines upcoming work for an elevated U-turn project, including awarding contracts for street lightings and drainage by mid-November. It also provides a to-do list of 8 items for the project to be completed as soon as possible, such as coordinating a site meeting, awarding drainage and retaining wall contracts, revising telecom designs, and scheduling a crane rental with Mr. Chong.
The document outlines upcoming work for an elevated U-turn project, including awarding contracts for street lightings and drainage by mid-November. It also provides a to-do list of 8 items for the project to be completed as soon as possible, such as coordinating a site meeting, awarding drainage and retaining wall contracts, revising telecom designs, and scheduling a crane rental with Mr. Chong.
The document outlines upcoming work for an elevated U-turn project, including awarding contracts for street lightings and drainage by mid-November. It also provides a to-do list of 8 items for the project to be completed as soon as possible, such as coordinating a site meeting, awarding drainage and retaining wall contracts, revising telecom designs, and scheduling a crane rental with Mr. Chong.
The following works are to be awarded by mid-November:
1) Street lightings 2) Drainage.
TO DO LIST -= ASAP ! 1. 2. 3. 4. 5. 6. 7. 8.
Site coordination meeting
Award for drainage and re wall Telekom 7 copper BQ by consultant to telekom approval contract revise Shop drawing and telekom submission copy Method statement-consultant approval Second beam casting schedule Project video presentation (u turn and mrt link bridge ) Mr chong crane rental revise DO