Professional Documents
Culture Documents
Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8
Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8
Column1 Column2 Column3 Column4 Column5 Column6 Column7 Column8
Column2
Company Name
Izhar Group
Column3
Column4
Column5
Estimated Covered Area Sq. Meters
Column6
Column7
Column8
Estimated Covered Area Sq. foot
3573.42
38,450
3406.6
36655
Power China
3405
36637.8
Kirby DQ.
2592
27889.92
Banu Mukhtar
Column9
ered Area Sq. foot
Column11
Column12
Estimated Weight (Kg)
Column14
Total Price
Column16
Column17
Column18
Design, supply & Erection cost Per Sq. Meter
199100
PKR 38,601,330.00
PKR 7270.62
250056
PKR 48,091,000.00
PKR 11902.22
252000
USD
USD 1038.4
258370
PKR 60,417,120.00
6,615,290.01
PKR 24832.85
Column19
er Sq. Meter
Column21
Column22
Column23
Column24
Design, supply & Erection cost Per Sq. foot
Column26
Column27
Design, supply Cost per Kg
PKR 675.70
PKR 143.30
PKR 1106.15
PKR 165.40
USD
USD
96.50
PKR 2308
14.03
PKR 248.83
Column28
Column30
Column31
Column32
Column33
Column35
Roof Insulation& Installation cost of fiber Glass (per M2)
Column36
Painting and Sand Blasting Cost
PKR 1232.71
PKR 458.47
PKR 867.43
PKR 1347.38
PKR 904.41
Included in Design, supply and Erection cost
Column37
inting and Sand Blasting Cost (Per M2)