Professional Documents
Culture Documents
Asturi Company Profile
Asturi Company Profile
Company Profile
@ September 2016
Insulation
Pneumatic
Test
Welding
Blasting &
Painting
Inspection
Manufacturing Process
of Process Skid
www.asturi.com.my
Front View
Rear View
Contents
1. Corporate Information :
1.1 Asturi Growth
10. Products :
2-6
11
5. Design Capabilities
12
10.1
10.2
10.3
10.4
Pressure Vessels
Heat Exchangers
Process Skids
Non Pressure Vessel
6. Asturi Progress :
Before & Present
19 - 23
24 - 36
13 & 14
7. Completed Products
15
12. Manpower
37
3. Structures :
3.1 Organisation Structure
3.2 Corporate Structure
3.3 Monitoring & Operation
Structure
8. Manufacturing
Experience
16
8 - 10
38- 40
17 & 18
1. Corporate
1.1 Asturi
Information
Growth
19
94
December
1994
Company was incorporated.
19
95
1995
December
Office building and Block 1
of the factory were completed.
19
96
1996
June
Commencement of Operation.
19
98
December
Extension of Block 2 & 3
factory buildings.
19
99
1999
August
Visit by The Right Honourable
Dato Sri Adnan Yaakob,
Chief Minister of Pahang.
20
00
20
02
20
03
1998
2000
February
Authorization of U,U2,S,R
STAMPS from the American Society
of Mechanicals Engineer (ASME).
September
Certified ISO 9001 : 2000
by BVQI.
2002
2003
February
Visit by The Right Honourable
Dato Sri Mohd Najib Tun Razak,
Minister of Defence, currently
Prime Minister of Malaysia.
October
Obtained Civil Class A License
from the Malaysian Government
(PKK).
20
04
20
05
20
06
June
2004
Obtained Manufacturing License
of Special Equipment
(Pressure Vessel) from
Peoples Republic of China.
2005
February
Awarded as Vendor to PETRONAS
for Shell & Tube Heat Exchanger.
2006
May
Winner of National Productivity
Award 2005 (Ministry of International
Trade & Industry).
September
Winner of Human Resource
Minister Award 2006 (Human Resource
Development Council).
December
Certified 5S Japanese Management
System (National Productivity
Corporation).
20
07
April
2007
Awarded as Vendor to PETRONAS
for Unfired Pressure Vessel
Class II and III.
November
Winner of Pahang Chief Minister
Quality Award 2007.
20
08
July
2008
Visit by Honourable Tan Sri
Muhyiddin Yassin, Minister of
International Trade and Industry.
20
08
September
2008
20
10
factory buildings.
October
Winner of National Quality
Environment (5S) Award 2008
(Malaysia Productivity Corporation).
December
Winner of National
Occupational Safety &
Health Malaysia (DOSH).
20
11
November
Winner Petronas Best Vendor
in Continuous Improvement for
2007 - 2008.
20
09
March
2009
April
Certified ISO 14001:2004,
UKAS, DSM,
OHSAS 18001:2007 by BVQI
September
Formation of first 2 subsidiaries
1. Asturi Truck & Crane.
(Rental of Hydraulic Multi Axle
Trailer, Heavy Truck & Crane
Services).
2. Lapisan Warna.
(Blasting & Painting Works).
January
2010
First incubator programme
company was launched
(Siklon Separators).
20
12
January
2011
Extension of Block 9,10,11,
12 and 13 factory building.
January
2012
Establishment of
Asturi Well Services Division.
March
Opening of Asturi Labuan Office :
Well Services Division.
June
Establishment of Property Division.
First project is development of
72 units of houses at Pekan, Pahang
August
Establishment of subsidiary
Everest Roofing.
November
Winner of Petronas Vendor
Development Programme (VDP)
Special Award.
20
13
February
Establishment of Asturi
Maintenance Services.
2013
July
Establishment of subsidiary
Gebeng Engineering
Service Centre.
October
Establishment of subsidiary
Cross Border Inspection Services.
20
14
2014
January
Establishment of subsidiary
Trinum Steel Structure.
September
Commissioning of CNC Auto
Pipe Cutting and Welding machine.
August
Commissioning of Auto Blasting
machine.
March
Commissioning of 150mm
thickness Plate Rolling machine
from Italy.
1994- 2014
1.2 Financial
A trusted fabricator
for oil & gas and
energy industry
Performance
- By our clients
23
20
20
20
23.3
23.3
23
20
15
10
RM
8.8
5
0
2.8
2005
PAID UP CAPITAL
TOTAL
PROJECT
FUNDING
RM
94 M
2.8
2.8
2006
2007
ASSET
VALUE
250M
@
2016
2008
2009
2010
2011
2012
2013
2014 2015
HSBC
RHB
OCBC
Hong Leong
CIMB
Hydraulic Multi Axle Trailer
1.3 Mission
Statement
1.5 Organisation
Board of Directors
Marketing
Design
1.4 Asturi
2006
2010 - 2012
2012 - 2016
QA/QC
3. CIVIL ENGINEERING
WORKS
4. ENGINEERING DESIGN
SERVICES
5. MANPOWER SUPPLY
6. HEAVY TRANSPORT,
MULTI AXLE & CRANE
SERVICES
9. ENGINEERING SERVICE
CENTRE
7. PLANT MAINTENANCE
SERVICES
8. WELL MAINTENANCE
SERVICES
Finance
Tender
Project
Management
Purchasing
Health, Safety
& Environment
starts
1. FABRICATION
OF PROCESS
EQUIPMENTS
Structure
Maintenance
Services
Well Services
11
10
Civil Works
12
Admin & IT
11. PROPERTY
DEVELOPMENT
- Managing Director
Policy
1.7 Quality
Certifications
Products
ASME 'U', 'U2', 'S', 'R',NB Stamps by ASME.
DOSH Malaysia.
Systems
ISO 9001 : 2008, by BVQI
ASME
U, U2,S,R,NB Stamps
DOSH Malaysia
1.8 Accreditation
In Progress
N Stamps
OHSAS 18001:2007
ISO 14001:2004
(UKAS, DSM)
5S Management
System
1.9
2006
2007
2008
NPC
Productivity Award
Human Resource
Minister Award
National Quality
Environment (5S)
Award
2008
2008
Industry
Excellence
Award
2009
National Occupational
Safety & Health (DOSH)
Award
Asturi staffs with the longest Pressure Vessel, Splitting Column (2007)
2012
Petronas Vendor
Development
Programme (VDP)
Special Award
2. Safety
& Health
- Managing Director
Certified ISO 14001 : 2004 (UKAS, DSM), OHSAS 18001 : 2007 and 5S Management System from
Malaysia Productivity Corporation (MPC).
2.1 HSE
Policy
Asturi is committed towards maintaining of Occupational Safety and Health Management System (OHSAS 18001).
We are committed to :
Prevention of Pollution and Injuries
Communication
Environment
Promote green and healthy environment for the staffs.
Awareness of Employees
Legal Compliance
Commit to comply with all Environment & Occupational Safety and
Health laws, regulation and other requirements.
Continual Improvement
Implement and periodically review our HSE Management
System for continual improvemet.
Project Cumulative
Safe Manhour
7.2 m
@ September 2016
3. Structures
3.1
Board of Directors
Organisation Structure
Chairman
Executive Director
Director
Managing Director
Technical Director
Tender
6 QA / QC
Design
Purchasing
Picture 2013
Ms. Fatiha Sharif (Executive Director), Dato Dr. Yahya Nordin (Director),
Ms. Teoh (Secretary), Mr. Kamal Nor (Technical Director)
Sitting From Left :
Manager : Mahamud
Manager : Rashita
ST 01- 16 (R19)
Effective Date : August 2016
5 Project Management
1 Marketing
Board of Directors
Manager : Mokhtar
Manager : Firdaus
7 HSE
Manager : Andy
8 Finance
9 Admin & IT
10 Well Services
11 Civil Engineering
Manager : Mokhtar
12 Maintenance Services
Manager : Zakarno
3.2 Corporate
Structure
SPECIALISATION
1. Fabrication
Clove Avenue
of Process Equipments
2. Civil
INCUBATORS
SUBSIDIARIES
Engineering
LOCAL
WORLDWIDE
MUSANDUM
GROUP OF
COMPANY
Heavy Lifting
and Transport
EDES TECHNOLOGY
Sdn.Bhd. 891026 K
Engineering Support
Services
NDE / NDT
Inspection Services
Design Engineering
Services
WILD WELL
SERVICES
112036-P
17861-V
Logistic
Logistic
TOTAL LOGISTICS
RESOURCES (KL) SDN.BHD. 713788-T
Logistic
Logistic
Specialized in
Blasting &
Painting
Plant Maintenance
Services
KEJURUTERAAN PERKUAT
Property &
Development
SDN.BHD. 980969-D
Construction &
Project Management
SDN.BHD. 771613-X
Design, Manufacturing
& Installation of
Roof Truss
Burgan Combined
General Trading &
Constructing
Kuwait
SDN.BHD. 510506-D
DEDARI
PROPERTY
Saudi Arabia
143951-P
Logistic
Libya
3.3 Monitoring
&
Operation Structure
MANAGING DIRECTOR
BOARD OF DIRECTORS
Approved by MD
Dato Sri Sharif Shamsuddin
ST 2 - 16(R18)
Effective date : June 2016
TECHNICAL DIRECTOR
KAMAL
QUALITY
ASSURANCE
LEVEL
QUALITY
ASSURANCE
ISO 9001 : 2008 | ISO 14001 : 2004 | OHSAS 18001 : 2007 |5S
Lead Auditor : FN Manager (Zakarno)
Secretary
: TN Manager (Mahamud)
TOP MANAGEMENT
LEVEL
DEPARTMENTAL
LEVEL
DEPARTMENT
& OPERATION
LEVEL
HEAD OF DEPARTMENT
MEETING
Every 3 months
MANAGEMENT
RECOVERY MEETING
MDR
MEETING
(MRM)
FINANCE MEETING
CH : Managing Director
Sec : MDs Special Asst. (Muaz)
CH : TN Manager (Mahamud)
Sec : TN Engineer (Baihaqi)
CH : Managing Director
Sec : MDs Special Asst. (Muaz)
CH : Managing Director
Sec : FN Manager (Zakarno)
Every week
PROJECT TEAM
MEETING
DEPARTMENT MEETING
TOOLBOX MEETING
HSE MEETING
HSE DAY
TRAINING DAY
CH : Head of Departments
Sec : DCC
Every Wednesday
Every Friday
MARKETING
Mgr : Fatiha
2 Executives
TENDER
Mgr : Mahamud
3 Engineers
2 Executives
10
CERTIFICATION
MR : Managing Director
Sec : MDs Special Asst. (Muaz)
NUCLEAR
ASME
(QA)
DESIGN
Mgr
: Rashita
Asst. Mgr : Nazeer
5 Engineers
4 Draughtmans
1 Executive
PURCHASING
Mgr : Nazif
3 Engineers
1 Executive
STORE
3 Storekeepers
PROJECT
Mgr : Mokhtar
6 Engineers
1 Executive
QA/QC
Mgr
: Firdauz Monir
Asst. Mgr : Hafizul
3 Engineers
6 QC Inspectors
6 QA
1 Executive
7
SAFETY
3 Safety Officer
1 Executive
16 Security Guards
TRANSPORTATION
1 Engineer
1 Executives
8 Drivers - office
14 Drivers - trucks
& cranes
HSE
FACTORY
MAINTENANCE
8 Technicians
MACHINING
Exec. : Faizul
4 Machinists
UTILITY
7 Utility Workers
FINANCE
ADMIN & IT
11
CIVIL ENGINEERING
Mgr : Fatiha
3 Executives
2 Utility Worker
Mgr : Mokhtar
3 Engineers
20 Operation Staffs
10
12
WELL SERVICES
Mgr : Samsudin
3 Engineer
2 Senior Wireline
2 Wireline Asst.
2 Senior Slickline
1 Slickline Asst.
1 Executive
1 Warehouse /
Logistic
PLANT MAINTENANCE
SERVICE
Mgr : Ezuan
4 Operation Staffs
& Licensing
- Managing Director
1. PETRONAS (L-326994-M)
2. ASME U (31,613) , U2 (31,614), S (31,612), R (R-5885), NB
3. Department of Occupational Safety and Health (DOSH)
- Manufacturing of Pressure Vessel (JKKP IS 127/682/1-320)
- Manufacturing of Heat Exchanger (JKKP IS 127/682/1-320)
4. Ministry of Finance (MOF) :
- Sijil Akuan Pendaftaran Syarikat Bumiputra (357-00038134)
- Sijil Akuan Pendaftaran Syarikat Awam (357-00038134)
5. Sijil Perolehan Kerja Kerajaan (SPKK) (1970305 PH 024261)
DOSH
MOF
Petronas
SPKK Class A
CIDB G7
FGV
TNB
Johor Port
11
5. Design
Capabilities
Our design capabilities are supported by our in-house design department and our subsidiary company, EDES Technology
which are able to perform complete process facilities design for on shore and off shore.
Our softwares include :
Mechanical Software:
Engineering Software:
Engineering Scope:
3 Softwares
3 Softwares
Software Structure:
8 Softwares
12
9 Softwares
6. Asturi
Progress
1. Fabrication Facilities
Fabrication Area
Asturi Before
1996 - 2006
Asturi Present
2007 - 2016
13,635m
33,000m
Land Area
81, 000m
110,000 m
Fabrication
Workshop (unit)
Bay 1, 2, 3,4, 5
(covered)
Clean Room
Asturi Progress
7. Material of
Construction
Asturi Before
1996 - 2006
Asturi Present
2007 - 2016
Carbon Steel
Stainless Steel
Duplex / Clad
8. Welding Procedure
100 WPS
430 WPS
2. Plate Rolling
85mm thickness
150mm thickness
9. Welding Repair
5% - 7%
Less than 5%
3. Piping Capabilities
Manual
10. MDR
20 - 30 weeks
3 - 6 weeks
4. Coating Capabilities
Manual
5. Fabrication Scope
Category
PV / Column :
- Class I
(thick <32mm)
- Class II
(33mm < thick <
50mm)
1 department only
Weekly Project
meeting
Pre-Tender meeting
Progress meeting
Post Kick-off-meeting
Mechanical Design
Structural Design
Process Design :
- Thermal HEX
- Thermal Air Cooled
- Hysis /Hysim (Plant Design)
- Package Design
(Produce Water / Deareator)
Piping Design :
- Ceaser II 5.3
Advanced Structural :
- Modelling 3D Rhinoceros
- Building Information Modelling
- Telka
Transportation / Heavy Haulage
Analysis
Kick-off-meeting
Pre-Hydrotest meeting
Delivery meeting
Collection meeting
13. DCC
Project basis
Based on ISO
Project basis
Dedicated expeditor
Store inside
workshop
Centralised documentation
13
Asturi Progress
16. Transportation
Asturi Before
1996 - 2006
3T Lorry
Asturi Present
2007 - 2016
7T Lorry
Asturi Before
1996 - 2006
Asturi Progress
18. Quality System
Low Loader
- 4 units 5 axle
- 1 unit 3 axle
ASME U,U2,S,R
Stamps
Mobile crane
- 1 unit 25T
Mobile crane
- 3 units 25T
- 2 units 45T
- 1 unit 120T
5S Management System
19. Strength
AMB alone
SUBSIDIARIES
EDES TECHNOLOGY
Sdn.Bhd. 891026 K
Heavy Lifting
and Transport
Specialized in
Blasting &
Painting
14
Asturi Present
2007 - 2016
Engineering Support
Services
Plant Maintenance
Services
NDE / NDT
Inspection Services
Design Engineering
Services
KEJURUTERAAN PERKUAT
DEDARI
PROPERTY
Property &
Development
SDN.BHD. 980969-D
Construction &
Project Management
WILD WELL
SERVICES
5/16 Braided Line
Fishing & Slickline
Services
SDN.BHD. 771613-X
Design, Manufacturing
& Installation of
Roof Truss
Domestic only
2 National Awards
(Quality, Productivity
and Management)
7 National Awards
(Quality, Productivity and
Management)
7. Completed
Pressure
Vessels
Products
622
59
1,303
Process
Skids
400
128
Others
Piping &
Structure
20 73
Tank Launcher &
Receiver
Process
Skids Structural
Maintenance 3%
2%
8%
Heat Exchangers
37%
Pressure Vessel
48%
Type of Products
Delivery of Inlet Separator at Pasir Gudang Port, Johor, Malaysia
15
8. Manufacturing
THICKEST
Experience
PRESSURE VESSEL
200 mm thick x 2,500 mm ID x 4,000 mm TL
with 90 tons at 4,167 psi test pressure,
ASME Section VIII, DIV.2
CLADDED PRESSURE VESSEL
140 + 3 mm thick x 3,450 mm ID x 9,000 mm TL
with 160 tons at 1,885 psi test pressure,
ASME
Section VIII, DIV.2
HEAVIEST
PRESSURE VESSEL
148 mm thick x 5,300 mm ID x 19,000 mm TL
with 470 tons
LARGEST
HEX
LARGEST
PROCESS
SKID
LARGEST
QUANTITY OF
HEX DELIVERY
SCOPE OF
WORK
18 units of
Heat Exchangers
SIZING
PRESSURE VESSEL
29+3 clad mm thick x 6,040 mm ID x 9,500 mm TL
with 110 tons
LARGEST
QUANTITY OF
PV DELIVERY
LONGEST
16
SPECIAL
MATERIALS
18 units of
Pressure Vessel
Forging materials
inside Material Store
(Bay 13)
CLADDED MATERIALS
Cladded SS304L/SS316L/ SS317L
Cladded Duplex 2205 (UNS31803)
Cladded Super Duplex 2507 (UNS32750)
Cladded Inconel 600
MODIFIED AUSTENISTIC
MATERIALS
SS316L (2.5% >mo)
SS321
SS410
DUPLEX MATERIALS
Solid Duplex 2205 (UNS31803)
Solid Super Duplex 2507 (UNS32750)
NON FERROUS
MATERIALS
Inconel 600/625/825
CuNi SB 70600
HastelloyB/C
CHROMO MATERIAL
Solid SA387Gr5
9. Records
Item
: Slug Catcher
Dimension : 148 mm Thick x 5,300 mm ID
x 19,000 mm TL
Weight
: 470 tons
Delivery : September 2010
Item
: Recycle Gas Compressor
Dimension : 200mm Thick x 2,500 mm ID
x 4,000 mm TL
Weight
: 90 tons
Delivery : June 2009
Item
: Splitter Reboiler Heat Exchanger (5000
tubes)
Dimension : 32 mm Thick x 1,950 mm ID
x 12,390 mm TL
Weight
: 65.5 tons
Delivery : June 2006
Item
: Flash KO Drum
Dimension : 29+3 clad mm Thick x 6,040 mm ID
x 9,500 mm TL
Weight
: 110 tons
Delivery : August 2002
Item
: Splitting Column
Dimension : 39+3 clad mm Thick x 1,800 mm ID
x 56,000 mm OL
Weight
: 106 tons
Delivery : April 2007
17
LARGEST: DELIVERY
Item
: Pressure Vessel
Quantity : 18 units
Delivery : February 2012
Delivery
: April 2007
: Rotary Kiln
18
Weight
: 210 tons
Delivery
: July 2012
Item
: Heat Exchanger
Quantity : 18 units
Delivery : September 2008
10. Product
10.1 Pressure
Experience
Vessel 1/2
Recycle KO Drum
Dehydrator
Guard Bed
Splitting Column
Fractionation Column
Dearator ET-V-703
Flash Drum
Reactor Vector
Amine Stripper
19
10.1
20
Gas Scrubber
Inlet Separator
Stabilization Column
Suction Scrubber
Slug Catcher
Slug Receiver
10.2
Heat Exchanger
Gas Cooler
Depropanizer
Reboiler
Tube Bundle HE
MPA/Steam Exchanger
Splitter Reboiler
Feed/Steam/Viss Exchangers
Tube Bundle
LP Production Cooler
HP Gas Cooler
21
10.3
Process Skids
Reboiler Skid
Membrane Skids
22
Test Separator
10.4
HP / LP Flare Stack
Reheating Furnace
23
11. Assets
& Equipments
11.1 Machineries
& Equipments
3. Turn Table :
1. 1 t
2. 3 t
3. 5 t
units
4. 30 t
6. Cutting Machines :
1. CNC Auto Pipe Cutting
2. CNC Double Coloumn Drilling
3. CNC Profile Cutting
4. CNC Hydraulic Guillotine Shear
5. CNC Komatsu NTC Laser Two Dimensional
6. OTC Plasma Cutting Machine
7. "Hypertherm Hyperformance Plasma HPR XD 400"
8. Hypertherm Powermax 200
9. Hypertherm Powermax 45
10. PC-Dash Portable OXY Straight Line Cutter
units
11. Electric Saw Machine
13
2. Rotator :
1.
5t
2.
10 t
3.
30 t
4.
40 t
5.
45 t
6.
60 t
7.
90 t
8. 100 t
9. 150 t
10. 180 t
11. 200 t
12. 300 t
13. 600 t
24
83
units
10
units
4. Overhead Crane :
1. 5 t
2. 10 t
3. 20 t
4. 25 t
units
5. 50 t
32
25
284
7. Jacking Equipments:
1. 50 t
2. 100 t
3. 150 t
4. Hydraulic Jacking System 1200 t
19
units
8. Machining Equipments :
1. Manual Drilling Machine
2. Vertical Lathe Machining - Up to 3m
3. Horizontal Lathe Machining - Up to 2m
4. Pipe Bevelling Machine - Up to 2''
5. Flange Facing Machine - 2'' - 75''
6. Double Cyclinder Press Machine - 350 t
7. Vertical Milling Machine - Up to 1.5m
8. Hydraulic Ironworker Machine
30
units
33
units
93
units
20
units
12
units
263
units
25
Hyperthem Machine
Welding Generator
26
150 mm
thickness
Plate Rolling
machine
Gouging Machine
27
CNC
equipments
Machineries & Equipments
Pictures 3/5
28
SAFAN M-Shear
Tube Expander
Tube Puller
45 tons
Bundle Puller
Machineries & Equipments
Pictures 4/5
Bundle Puller
Torque Wrench
29
30
UT Thickness Gauge
Temperature Infrared
Digital Caliper
Densito Meter
11.2 Heavy
Hydraulic
Multi Axle with
Self Propelled
Facilities
Equipments
Equipments
MOBILE CRANE
1.
120T
2.
45T
3.
25T
4.
9.
10.
11.
LORRY
7T
5T
3T
units
12.
13.
SKYLIFT
25 m
18 m
units
1
14.
15.
16.
17.
FORKLIFT
5T
3T
2.5T
1.5T
units
5
LOW LOADER
5.
6.
7.
8.
511
units
311
1
21
42
5
3
units
2
MANPOWER
Cometto Team
2 teams
(6 personnels
per team)
14
40
Management &
Technical Staff
PERSONNELS
Skylift
Operator
3
4
Low
Loader
Driver
Crane
Operator
5
Forklift
Operator
Delivery of Cargo Structure using Hydraulic Multi Axle Trailer with Self Propelled Modular
31
32
Forklift 1, 3, 5 tons
11.3 Plant
Maintenance Services
FACILITIES
Equipments
SERVICES
Capacity
1. On Site Machining
1. Bundle Extractor
45 tons
2. Pipe Cutting
2. Tube Puller
5.5mm to 79.5mm
3. Line Boring
4. Torque Wrench
Max 14000 Nm
5. Flange Facing
6. Stud Drilling
13
0 72
8. Valve Servicing
1200 MT
9. Gen Set
5500 MW
10.Habitat
4m x 4m
15
Complete Set
12.Mobilization /Transport
Lorry
Bundle Puller
52
units
1
4
Hydraulic Jacking
33
11.4 Habitat
& Scaffolding
Habitat :
Tubular Scaffolding :
1.
Habitat Size: ( 3m x 2m x 2m )
1.
Tube
2.
Blower
2.
Ladder 3.0 m
3.
Hose Spiral
3.
Ladder 3 - 9 m
4.
4.
5.
5.
6.
Explosion Lamp
6.
7.
Clamps
7.
8.
Reducer Blower
8.
Swiwel Clamp
9.
9.
Double Clamp
34
35,000
1,036
items
items
Scaffolding Pictures
Scaffolding Store
Put Log
Limpet Clamp
Beam Clamp
Swivel Clamp
Sleeve Clamp
Double Clamp
Ladder Clamp
35
11.5 Well
Services
Equipments :
1. Downhole Slickline Tools
2. Hydraulic Telescopic
Wireline Mast Unit
5/16 Braided
Line Fishing
& Slickline
Solution
3. Grease Module
Portable Wellhead
Control Panel
36
2,837
items
Tools
My task as MD is to ensure
product to be delivered on time
with full compliance to
customer requirements
12. Manpower
List of Manpower
- Managing Director
WORKSHOP
OFFICE
Top Management
Management (Head of Department)
HSE
Supporting Staff
3
10
4
51
ENGINEER
Design Engineer
Production Engineer
QC Engineer
Tender Engineer
Purchasing Engineer
QC Inspector
Draftman
8
11
6
5
3
7
5
113
Welders
Foreman
Helpers
Fitters
Machinist
Semi Skill
Scaffolders
25
5
30
25
7
6
4
102
Office
Staff
52%
Workshop
Staff
48%
Asturi staffs with the largest Process Skid, Asid Gas Removal Skid (2007)
37
13. Growth
Factory
Layout Plan
& Expansion
DEPARTMENT :
QA / QC (2nd floor)
PROJECT (1st floor)
MDR ROOM (ground floor)
TNB
P3
DEPARTMENT :
DESIGN (1st floor)
HSE (2nd floor)
OFFICE
605 m2
FABRICATION AREA :
SPECIAL MATERIALS
1280 m2
FIRE
CHEMICAL
WATER & WASTE
PUMP 100 m2
FABRICATION AREA :
SPECIAL MATERIALS
1680 m2
EMERGENCY
ASSEMBLY
POINT B
CABIN AREA
FABRICATION AREA :
STAINLESS STEEL
2400 m2
FABRICATION AREA :
STAINLESS STEEL
2160 m2
COVERED STORAGE AREA
1920 m2
SCAFFOLDING
STORE
340 m2
SCRAP
YARD
3100 m2
Bay 14 and 15 at
Gebeng Engineering
Services Centre
BLASTING &
PAINTING
720 m2
OPEN
STORAGE
AREA
PWHT
720 m2
TUBE
BENDING
720 m2
OPEN
STORAGE
AREA
FABRICATION AREA :
CARBON STEEL
3795 m2
WELD
OVERLAY
FABRICATION AREA :
CARBON STEEL
3430 m2
MARKING
CUTTING
ASTURI
TOWER
1190 m2
1790 m2
FABRICATION AREA :
CARBON STEEL
3430 m2
EMERGENCY
ASSEMBLY
POINT A
MAIN ENTRANCE
CAFE2
295 m
WORKERS
FACILITIES
160 m2
SURAU
REST
AREA
160 m2
P2
DEPARTMENT :
MARKETING
TENDER
PURCHASING
15
14
38
BALANCE
PLATE
STORAGE
P1
OFFICE
GUARD
HOUSE
920 m2
TNB
DEPARTMENT :
FINANCE
Block 1 :
Storage/Receiving Material Area
(1190m)
Block 6 :
Tube Bending Area
(720m)
- By our clients
Buildings
Block 2 :
Marking & Cutting Area, Store & DN
(1790m)
Block 7 :
Post Weld Heat Treatment (PWHT)
(720m)
Block 3 :
Fabrication Workshop
(3420m)
Block 8 :
Blasting & Painting
(720m)
Block 4 :
Fabrication Workshop
(3420m)
Block 5 :
Fabrication Workshop
(3795m)
39
13.2 Incubators
Factory
40
45,000 sqm
CONTACT
KL Office
C1-3-2-10, Level 2, Block C3,
Solaris Dutamas, Jln. Dutamas 1,
50480 Kuala Lumpur,
MALAYSIA
Managing Director
M : +6(019) 986 6027
E : msharif@asturi.com.my
Executive Director
M : + 6(012) 989 0800
E : fatiha@asturi.com.my
Technical Director
M : +6(013) 980 0150
E : tender@asturi.com.my
Project Management
M : +6(013) 997 8170
E : team1@asturi.com.my
QC & QA
M : +6(012) 989 0700
E : qc@asturi.com.my
I N T E G R AT E D
QUALITY SYSTEMS
ISO 9001 : 2008
ISO 14001 : 2004
OHSAS 18001 : 2007
ASME U, U2, S, R Stamps
5S Management System
41
R3/16,may