Project Title: FPGA Based Time Proportional PID Controller with Zero Crossing Detector
Progress from 24.10.2016 to 30.10.2016
1. What we did this past week (start with copy pasting TODO list from the previous progress report):
What
Percent
done
100%
Looking for
components for
zero crossing
detector in the
online shop
100%
0%
Determine
which
temperature
sensor is
needed to be
used
0%
When
Where/How (optional)
31.10.2016-6.11.2016