Aurangabad DSR - 2015-16 PDF
Aurangabad DSR - 2015-16 PDF
Aurangabad DSR - 2015-16 PDF
(2015-16)
1.
The Schedule of rates prepared for the year 2015-16 are operative from
01/07/2015 and is applicable for Aurangabad & Jalna district.
2.
For the Rates in notified Tribal Area, Hilly and inaccessible Areas, Corporation Areas,
and jail Premises, an increase of percentage over the normal Schedule of Rates
prescribed for the year 2015-16 is allowed as follows :
a. Notified Tribal Area, Hilly and Inaccessible areas
10%
(Govt. circular of Planning Department No. 1089 / CR-66
/ Plan-19 dated 23/11/1990 which notify the villages
are shown on Page No. 460 to 463 of this DSR)
b. Munciple Corporation area
05%
c. Inside High Security wall of Jail Premises.
15%
The increase in rates as above should be applicable only one at a time, that is, if jail
premises is situated in Corporation Areas, an increase of only 15% for the jail
premises is to be considered and not 20% (15%+5%) on the basic rate of the items
in this DSR.
The above percentage should be applied on the cost of items after deducting the
cost of Specified materials as stated below at Sr. No. 4 if issued on Schedule 'A'.
Schedule of rates is based on the following basic rates of materials:
3.
4.
Sr.
Items
No.
1)
Cement
Rs 6,500/-
Per M.T.
2)
Mild Steel
Rs 48496 /-
3)
T.M.T.
Rs 48496/-
4)
Rs. 61646/-
5)
Rs. 57956/-
6)
Rs. 56772/-
7)
Rs. 52504/-
8)
Rs. 55341/-
9)
Rs. 51477/-
10)
CRMB- 50
Rs. 56936/-
11)
CRMB- 55
Rs. 56261/-
12)
CRMB- 60
Rs. 56685/-
13)
14)
Sand
Per M.T.
Per M.T.
a)
Ordinary Sand
b)
Screened Sand
c)
Crushed Sand
Note:
a) Since the Basic rate of Materials adopted while preparing the rate abstract of Items
are as per Market Rates which includes VAT and other Taxes, no separate provision
is required to be made in the D.S.R. items i.e. rate considered in the D.S.R. are
inclusive of VAT.
b) The rates of bulk/ packed bitumen, bitumen emulsion, and Rubber modified
bitumen, adopted for the items of bituminous works are based on the rates
prevailing at ex-refinery Mumbai. The rates are inclusive of excise duty 16% addl.
Educational Cess 2% on excise duty and VAT 12.50% subsequent increase/
decrease, if any, in these rates shall be accounted for in the analysis of the items
while framing the estimate.
c) While preparing the estimate of B.T. works separate provision for difference between
prevailing actual costs of bitumen which includes actual costs, excise duty of 16%
additional cess at 2.% on excise duty, VAT Tax at 12.5%, should be accounted.
d) While preparing the estimates, the above values may be treated as basic values and
all calculations should be performed accordingly.
e) The modified rubber bitumen shall be used in wearing course with specific
permission of Superintending Engineer, The bitumen shall confirm to IRC SP. 532002.
5. For cost towards procurement and temporary storage of water for construction purpose
provision of 1% in rate analysis is made.
6. a) As per Govt. Circular No. DSR 1090/CR-6453/PLN-3 Dt.:14-07-1993 1% for labour
amenity is considered while arriving at the rates.
6.b) As per Govt. Of Industries and Power Department s G.R. No. BCA 2009/CR -108/
Labour -7-A Dated 17/06/2010 1 % cess on on labour welfare should be added in the
rate analysis of the individual items while framing the estimate and the amount shall
be deducted from the contractors bill as prescribed in the G.R.
7. a) Quality control testing charges should be considered while preparing estimate as per
norms specified on page No. 310 to 324
b) The job mix design items like GSB asphaltic concrete SDBC or
Cement concrete
mix design, etc. shall inversely got from the laboratory of V.Q.C.C.
8. Item required for testing of soil, road, building material test bores, load test, plate load
test etc., DSR of Maharashtra Engineering Research Institute (MERI) Nashik shall be
adopted.
9. Items required for water supply and sanitary works, which are not included in this
DSR, The DSR of Maharashtra Jeevan Pradhikarn in the District is to be adopted.
10. The rates of machinery hire charges shall be as per the machinery use rates of
Irrigation. Department issued by the Chief Engineer, (Mech.) Nashik.
13. BUILDING WORKS:
a. For all completed items initial lead up to 5 kms. is considered.
b. The floor is designed by the space contained within the top of the vergin slab/roof
covering below to the top of the vergin slab / roof covering above.
c. For every additional floor percentage increase in rate shall be considered for the
items in the following section, as given in the table. Floor height shall be up to 3.80
meters or roof height whichever is less :
Sr No.
d.
Section
Items
Percentage
Up to 4th
floor
Percentage
Increase Above
4th Floor.
BDF, BDG
3.00
1.00
BDF
M.S./H.Y.S.D. Reinforcement
1.00
0.25
BDJ
3.00
1.00
BDL
3.00
1.00
BDM
3.00
1.00
BDO
Flooring,
paving
treads(except
white glazed, ceramic marbles
tiles)
External Painting
3.00
1.00
BDR
3.00
1.00
BDT
1.00
0.25
BDU/BDC
1.00
0.25
10
BDV
1.00
0.25
11
BDW
External Guniting
3.00
1.00
For the items of oil painting & distempering under BDO, BDP & fixtures & fastening
for doors, windows & ventilators. The sample should be approved by the executive
engineer.
e.
f.
The Fly ash bricks, tiles or similar products shall be used in construction within
radial distances of 100 Km from Thermal Power station.
g.
Items of doors and windows with iron oxidized fixture and fastening with butt
hinges are provided for other type of fixtures and fastening and percentage as
given below per sqm. rate.
Particulars
Butt Hings
Parliamentary
Hings
Butt
Hings
Parliamentary
Hings
1%
1%
5%
6%
3%
4%
Brass
35%
38%
30%
33%
Brass Oxidised
40%
44%
35%
38%
1%
3%
4%
22%
25%
30%
34%
For Doors
Iron Oxidised
Aluminium Oxidised
For Windows
Iron Oxidised
Aluminium Oxidised
Brass Oxidised
14.
h) The dewatering rates mentioned in bridge sections includes post monsoon flow of
river /nalla and general seepage of water only and does not include provision of
cofferdam, casing etc. For standing water if felt essential for dewatering then
separate rate analysis for that particular items shall be prepared and got
approved from competent Authority and shall be included in the estimate and
tender.
15.
TRANSPORTATION CHARGES.
a) Lead charges for various materials are given in statement C2 and these charges
are include loading and unloading charges. Hence. Loading and unloading charges
should not be separately added.
b) Statement C-1 is for loading, unloading and stacking charges. Loading and
unloading charges to be deducted from transportation charges in statement C-2,
wherever transportation charges without loading and unloading are required.
c) Rate of transportation of bulk bitumen from refinery to the plant site is Rs. 7.00
M.T./km. Rate of heating and unloading bulk bitumen is Rs. 110.00 M.T.
16. HOT MIX HOT LAID BITUMINOUS WORKS.
a. The rates of 80/100,60/70,30/40 grade bitumen are separate. Hence specify the
grade accordingly, in items of work to be executed.
b. References of PWD standard specifications, MORTH specification are mentioned in
bracket below descriptions of items.
17. For Specific tests like taking bores, span load tests, plate load test etc. which are not
included in the rate analysis of item, the payment /estimates for these tests will be
prepared on the basis of rates approved by Superintending Engineer, Vigilance &
Quality Control Circle, Aurangabad or DSR approved by M.E.R.I.
18. Royalty charges for supply of materials: As per instructions issued vide Govt. of
Maharashtra Resolution of Revenue and Forest Department No. Gaun khanij 10/1012/CR-603/Kh (i) dated 11/05/2015 while framing the estimates, Royalty
charges for the items of supply of materials like the rubble, metal, crushed metal,
soft murum/hard murum, sand and soil shall be considered in the rate analysis of
respective items @ Rs. 141.34/ cubic Metre (Rs. 400.00 per brass) and shall be
recovered.
18.a Sale Tax for supply of materials as per instructions issued vide Govt. of Maharashtra
Resolution of Revenue and forest department No. muwak- 1514/CR-68/KRADHAN-1
date 21/08/2014 while framing the estimates sale tax charges for items of supply of
materials like the Rubble, Crushed Metal, Soft Murum/ Hard Murum/ Sand and Soil
shall be considered in the rate analysis of respective items at rate 14.13 per cum
(10% of Rs.400 per Brass) and shall be recovered .
19. The Contractor has to pay these charges directly to Revenue Dept. and original
Challans; permission documents shall be produced to concerned Executive Engineer.
If Contractor fails to produce these original documents the Royalty Charges shall be
recovered from contractor bill. This condition shall be incorporated in every tender
document.
20. Conversion of units for the items described in this DSR is not allowed for use in any
other item where R.A. is necessary.
21. The use of wooden centering and form work including wooden props is prohibited.
Only ply wood or steel form shall be used with steel props.
B. Site Clearance
1. Unless otherwise stated, the rates include sorting and disposal of unserviceable material
and stacking of serviceable material with all lifts and upto a lead of 50 m.
2. The rates include T&P and scaffolding required for items of dismantling
3. Carriage of dismantled materials, bushes, branches of tree, etc., has been catered with a
tractor -trolley of 3 tonnes capacity with manual loading and unloading @ 2 trips per hour
within a lead of 1000 m. This will be economical for such works as compared with a
tipper.
4. For cutting of trees above 1800 mm girth, 4 mazdoors have been considered to cater for
large size trees, which will fall in this category.
5. Where only grass/wild growth is met,(Item No. 2) i.e. clearing grass and removal of
rubbish can be applied. As regards wild growth disposal of grass, the same can be dried
and burnt.
6. Dismantling of Hume pipes has been catered manually as pipes can be easily rolled by
men to a suitable stacking place within the right of way.
7. For dismantling of structures, which remain submerged in water, the cost may be
enhanced by 50 per cent.
13. In case excavated rock is found suitable for incorporation in works, suitable credit for the
available rock shall be given.
14. The possibility of using the blasted rock fragments for backfilling behind structures or
backfilling of foundation pits or filling in medians / separators or use in service road shall
be examined before proposing disposal of excavated rock.
15. In case of hill roads, the cut earth can be pushed down the valley in case there is no
objection. In that case, cost of disposal is not required to be provided.
16. 'L' represents lead in km one way. This will vary from project-to-project and is required to
be ascertained ' at site at the time of estimation.
17. For inhabited areas, controlled blasting with limited charges of explosives has been
provided. This involves smaller drill holes and additional requirement of electric
detonators. Provision has accordingly been made.
18. Any work involved for water courses at culverts (Clause 312) will be priced under
respective items, like, excavation, grubbing, clearing, etc. for which rate analysis have
separately been made.
19. In the case of embankment made from earth taken from roadway cutting, the input of
dozer for spreading earth can be deleted as the same is already provided in the cost of
excavation.
20. Earth excavated from drains can be used in roadway berms. Hence, carriage for disposal
of same is not provided.
21. In the rate analyses of some items, the quantities of sub-items involved in that analyses,
like, excavation for foundation, foundation concrete, painting, lettering, etc. have been
given. The rates for such items shall be taken from relevant chapters where the same
have already been analysed.
22. In case of rock fill embankment, it is assumed that material is available at site from rock
cutting.
23. The item of preparation and surface treatment of formation (Clause 310) is required to be
added in the cost estimate only if there is substantial time lag between completion of subgrade and laying of sub-base. As this item is incidental to works, it is not required to be
included in BOQ.
5. While providing for the rate of materials, detailed local enquiries should be made and
prevailing market rates ascertained from concerned suppliers in the area keeping in view
the location of crushing plants and lead involved.
6.
In the rate analyses for crushing of aggregates (has also been included in Chapter-1)
The cost of procured aggregates and crushed aggregates by own crusher should be
compared and economic alternative adopted. It has generally been observed in practice
that contractors are setting up their own crushing plants where quantities of aggregates
are large specially for projects above Rs.50 crores)
7. The quantity considered in the output is the compacted quantity. The quantities of
aggregates provided in the rate analysis under the head material are the uncompacted
quantities.
MORT&
H Speci.
4.1
401
Unit
Quantity
Day
Day
Day
0.40
2.00
8.00
Hour
6.00
Hour
Hour
6.00
4.50
Hour
6.00
450xL
Hour
6.00
Hour
6.00
b) Machinery
Wet mix plant @ 75 tonne capacity
per hour
Electric generating set, 125 KVA
Water tanker 6 KL capacity 5 km lead
with one trip per hour
Front end loader 1 cum bucket capacity
Tipper 10 tonne
Add 10 per cent of cost of carriage to cover
loading and unloading
Rate
Rs.
14. The guidelines given vide Annexure-A to Clause 501 of MORT&H Specifications in
regard to protection of environment shall be followed for a particular situation.
15. The quantities taken as output of the item in the rate analysis are the compacted
quantities and the quantities of aggregates taken under the head 'material' are the uncompacted quantities for the procurement purposes.
10
16. The approximate proportions by weight of different aggregates and bitumen (or by
volume in unavoidable cases) necessary to produce the intended mix satisfying the
job requirements and meeting the designated specifications are for estimating
purpose only. The actual quantities should be worked out on the basis of job mix
formula adopted for the job after working out the same in the laboratory for particular
aggregates and bitumen approved by the Engineer
H. Pipe Culverts
1. Pipe culverts of size (1000 mm and 1200 mm) dia in single row and double row which
are generally used on roads, have been included. Only laying of pipe has been
included in the rate. Auxiliary works such as excavation, backfilling, concrete and
masonry shall be paid for separately, as provided under the respective clauses.
2. In case of RCC culverts, rates for various items of work involved such as excavation,
backfilling, masonry, cement concrete etc. have been provided under respective
clauses in the chapters on foundations, sub-structures, super-structures and river
training and protection works in bridge section of this book.
11
3. Any river training and protection work like stone pitching, apron, rivetment, curtain
wall etc. may be provided under the respective clauses included in Chapter of bridge
section. & CD Works.The jointing of pipes is proposed by collar joints.
4. Backfilling upto 300 mm above top of the pipe shall be carefully done and the soil
thoroughly rammed, tamped or vibrated in layers not exceeding 150 mm.
5. Head walls and other ancillary works shall be costed under respective lauses.
6. The height of filling above the top of pipe shall not be less than 600 mm. for MSH &
SH work and 45 cms for MDR, Standard roods upto.
I. Maintenance of Roads
1. In the case of rain cuts, it has been assumed that some material cut by rain,
approximately 25 per cent, will be available at site which can be retrieved and re-used
and the balance 75 per cent is required to be provided as fresh material.
2. For making up earthen shoulders, it has been assumed that on an average 150 mm
filling will be required. Similarly, for stripping of excess soil from the shoulder, an
average depth of 75 mm has been assumed.
3. In the case of chocking of drain, it has been assumed that half the depth of drain has
been filled with earth/debris, which requires clearance.
4. During the process of landslide clearance on hill roads, it has been assumed that
earth will be disposed off by the dozer on the valley side. In case there is any
objection to this arrangement due to particular site conditions, resources like loader
and tipper will have to be provided for disposal of earth/debris for the lead involved.
5. Pot-hole repair and patchwork are provided to be done by mechanical means.
6. The items like slurry seal, fog spray, crack prevention courses, surface dressing for
maintenance works have already been included in Chapter-5 and are not being
repeated in this chapter.
7. The cost of other items like repair of ruts and undulation maintenance of earthen
shoulders, cross drainage works, minor and major bridges and miscellaneous items
like turfing and arboriculture, painting and lettering on km stones, repair to signage,
repair to footpath, street lighting, railing, dividers, separators and under passes for
pedestrians has been given in the "Report of the Committee on Norms for
Maintenance of Roads in India" published by IRC in January 2001 which may be
referred for guidance.
J. Sub-Structure
1.
Bridge bearing, being commercial items produced by specialized firms with imported
technology and parts, the rates for the same are required to be ascertained from the
market for the approved design and technical specifications.
2.
Filter media and backfilling behind abutments are required to be provided as per
guidelines given in IRC: 78-2000.
3.
4.
5.
All bearings shall be set truly level so as to have full and even seating.
12
6.
For elastomeric bearing pads, the concrete surface shall be levelled such that the
variation is not more than 1.5 mm from a straight edge placed in any direction across
the area.
7.
The bearing should be procured only from those manufacturers who have been prequalified by the Ministry of Road Transport and Highways.
8.
The bottoms of girders resting on the bearing shall be plane and truly horizontal.
9.
For spans in grade, the bearing shall be placed horizontal by using sole plates for
suitably designed RCC pedestals.
K. Superstructure
1.
The rate for the wearing coat has been analysed as under:
a)
b)
c)
The item may be selected as per approved design. In case the thickness of wearing
coat is different from that analysed, the rate for the desired thickness may be worked
out on pro-rata basis.
2.
The rate analysis has been done both for RCC Railing and M.S. Railing, which can
be adopted as per approved design.
3.
The length of drainage spout has been provided in such a way that it is connected to
the drainage system on the ground in case of flyovers and there is no splashing of
water on the structure in case of bridges.
5.
For bridges having wide deck/span length of more than 120 m or/and involving
complex movements/ rotations in different directions/planes, provision of special type
of modular expansion joints such as swivel joists joints are required for which firms
specialised in this field may be consulted.
13
Output of
Machine
Description of
Machine
Activity
Unit
Output
Unit
1.
Dozer D-50-A15
Spreading
Cutting
Clearing
cum/hour
cum/hour
cum/hour
200
100
150
per hour
2.
Dozer D-80-A12
Spreading
Cutting
Clearing
cum/hour
cum/hour
cum/hour
300
150
250
per hour
3.
Clearing
Spreading
GSB WMM
cum/hour
cum/hour
cum/hour
cum/hour
200
200
50
50
per hour
4.
Soil Ordinary
Hydraulic Excavator of
Soil Marshy
1 cum bucket
Soil Unsuitable
cum/hour
cum/hour
cum/hour
60
60
60
per hour
cum/hour
cum/hour
60
25
5.
Sr.
No.
Output of
Machine
Description of
Machine
6.
Soil loading
Aggregate loading
Tipper-5 cum
Activity
Unit
Transportation of
soil, GSB, WMM,
Hotmix etc.
Capacity in
cum
per hour
Usage Rates in
Rs.
Output
Unit
per km
5.5
Per
Tonne km
per hour
7.
Earth/Soil
Vibratory Roller 8 tonne GSB
WMM
cum/hour
cum/hour
cum/hour
100
60
60
per hour
8.
Smooth Wheeled
Roller 8 tonne
cum/hour
cum/hour
70
25
per hour
Soil Compaction
BM Compaction
14
Rates
Rates
Water Tanker
10.
Tractor
Pulling
Capacity
in HP
50
per hour
11.
Rotavator
Scarifying
cum/hour
25
Per hour
12.
Ripper
Scarifying
cum/hour
60
per hour
13.
Air Compressor
General Purpose
capacity
in cfm
14.
Wet Mix
cum/hour
25
per hour
15.
Mechanical Broom
Hydraulic
Surface Cleaning
sqm/hour
1250
per hour
16.
Bitumen Pressure
Distributor
Applying
bitumen tack
coat
sqm/hour
1750
Per hour
17.
Emulsion Pressure
Distributor
sqm/hour
1750
Per hour
cum/hour
40
per hour
18.
Water Transport
capacity
in KL
9.
Hotmix Plant-120
TPH capacity
Sr.
No.
Applying
emulsion tack
coat
DBM/BM/SDC/
Premix
170/
250
Output of
Machine
Description of
Usage Rates in
Rs.
Activity
19.
Hotmix Plant-100
TPH capacity
DBM/BM/SDC/
Premix
cum/hour
30
Per hour
20.
Hotmix Plant-60 to
90 TPH capacity
DBM/BM/SDC/
Premix
cum/hour
25
Per hour
21.
Hotmix Plant-40 to
60 TPH capacity
DBM/BM/SDC/
Premix
cum/hour
17
per hour
Paving of DBM/
BM/SDC/Premix
cum/hour
40
per hour
Paving of
WMM Paving
of DLC
cum/hour
Cum/hour
40
30
per hour
per hour
22.
23.
15
Output
per hour
Machine
Paver Finisher
Hydrostatic with
sensor control 100
TPH
Paver Finisher
Mechanical 100TPH
Unit
per km
Unit
Rates
24.
Hydraulic Chip
Spreader
Surface Dressing
sqm/hour
1500
per hour
25.
Rolling of Aspalt
Surface
cum/hour
30
per hour
26.
Rolling of Asphalt
Surface
cum/hour
25
per hour
27.
Pot-Hole Repair
Machine
Repair of pot-holes
cum/hour
per hour
28.
capacity
in litre
1500
per hour
29.
Producing GSB
cum/hour
40
per hour
30.
Mastic Cooker
Mastic Wearing
Coat
capacity
in tonne
per hour
31.
32.
Transit Mixer
Transportation of
Concrete Mix to
Site
cum/hour
cum/hour
33.
Concrete Pump of
45 & 30 cum
capacity
Pumping of
Concrete
cum/hour
cum/hour
Sr.
No.
cum/hour
cum/hour
4.5
3
33
22
Output of
Machine
Description of
Machine
20
13
Activity
Unit
per hour
per hour
per hour
per hour
per hour
Usage Rates in
Rs.
Output
Unit
34.
Cranes
a)80 tonnes
b) 35 tonnes
c) 3 tonnes
Lifting Purpose
Lifting Purpose
Lifting Purpose
35.
Concrete Bucket
For Pouring
Concrete
capacity in
cum
per hour
36.
Kerb Making
Rm/hour
80
per hour
37.
Concrete Mixer
a) 0.4/0.28 cum
b) 01 cum
Concrete Mixing
Concrete Mixing
cum/hour
cum/hour
2.5
7.5
per hour
per hour
38.
Rm/hour
2 to 3
per hour
16
per hour
per hour
per hour
Rates
39.
Concrete Paver
Finisher with 40 HP
Motor
Paving of Concrete
Surface
cum/hour
20
40.
Integrated Stone
Crusher
Crushing of Spalls
Crushing of Spalls
TPH
TPH
41.
Stressing of Steel
Wires/Stands
42.
Generator
a) 100KVA
b) 33 KVA
Generation of
Electri Energy
43.
Pneumatic Sinking
Plant
44.
45.
46.
per hour
per hour
; KVA
KVA
Pneumatic Sinking
of Wells
cum/
hour
1.5 to
per hour
2 00
Material Transport
capacity/
cum
4.5
Sqm/hour
100
per km
per tonne
krr
per hour
Mobile
Slurry Seal
Equipment
Sqm/hour
2700
per hour
Note : The usage rates given above are for the base year 2015-16. For subsequent years,
escalation is required to be added depending upon the market situation.
17
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
2. : BUILDING WORKS
2.1 Bd.A- EXCAVATION:
1
BDA 1
CU.M.
140.00
140.00
2
BDA
1A
CU.M.
152.00
152.00
3
BDA 2
CU.M.
158.00
158.00
4
BDA
2A
CU.M.
175.00
175.00
18
Item .No.
& Code
Description
Unit
5
BDA 3
CU.M.
183.00
183.00
6
BDA
3A
CU.M.
202.00
202.00
7
BDA 4
CU.M.
347.00
347.00
8
BDA
4A
CU.M.
374.00
374.00
19
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
9
BDA 5
CU.M.
660.00
430.00
10
BDA
5A
CU.M.
625.00
430.00
11
BDA 6
CU.M.
682.00
570.00
12
BDA
6A
CU.M.
700.00
575.00
20
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
13
BDA 7
CU.M.
213.00
213.00
14
BDA
7A
CU.M.
313.00
313.00
15
BDA
10
CU.M.
55.00
55.00
16
BDA
11
CU.M.
265.00
82.00
17
BDA
12
CU.M.
405.00
58.00
18
BDA
13
CU.M.
307.00
46.00
19
BDA
14
CU.M.
434.00
121.00
21
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
M.T.
67616.00
6760.00
21
BDC 3
M.T.
68705.00
6870.00
22
BDC 6
M.T.
67755.00
6775.00
23
BDC 8
M.T.
76188.00
7950.00
22
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
24
Anchoring roof trusses by 16mm diameter
BDsteel bars in position including all fixtures and
ADL 26 fastening etc. complete.
As directed by Engineer in charge
RG.M.
107.00
50.00
25
BDC 9
SQ.M.
2569.00
256.00
5.00
2.50
MT
82381.00
12550.00
26
BDC
12 A
27
28
23
C.M.
No. 203460.00
No. 600702.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
CU.M.
4010.00
480.00
30
cum
4287.00
480.00
cum
4819.00
480.00
CU.M.
3954.00
580.00
cum
4248.00
480.00
31
32
BDE 1
33
24
Item .No.
& Code
Description
Unit
34
cum
4779.00
480.00
35
BDE
1A
CU.M.
4167.00
555.00
36
Providing and laying in situ cement concrete M15/1:2:4 of trap / granite / quartzite / gneiss
metal for foundation and bedding including
form work, dewatering, compacting, roughening
them if special finish is to be provided, finishing
if required and curing with fully automatic
microprocessor based PLC with SCADA
enabled reversible drum type Mixer etc.
complete.
Spec. No. Bd.E.3 No 287.
cum
4491.00
555.00
37
Providing and laying in situ cement concrete M15/1:2:4 of trap / granite / quartzite / gneiss
metal for foundation and bedding including
form work, dewatering, compacting, roughening
them if special finish is to be provided, finishing
if required and curing with fully automatic
microprocessor based PLC with SCADA
enabled concrete Batch mix plant (Pan mixer)
etc
complete
Spec. No. Bd.E.3 No 287.
cum
5078.00
555.00
25
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
38
BDE
1B
CU.M.
3116.00
555.00
39
cum
3485.00
555.00
40
cum
4012.00
555.00
41
BDE
1C
CU.M.
2700.00
480.00
42
cum
3173.00
480.00
26
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
43
cum
3699.00
480.00
44
BDE
1D
CU.M.
2441.00
555.00
cum
2936.00
555.00
46
cum
3462.00
555.00
47
BDE 2
CU.M.
4787.00
620.00
45
27
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
48
cum
5041.00
620.00
49
cum
5574.00
620.00
50
BDE
2A
CU.M.
4123.00
585.00
51
cum
4442.00
585.00
28
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
cum
4968.00
585.00
53
BDE 3
CU.M.
4202.00
585.00
54
cum
4640.00
585.00
29
Item .No.
& Code
Description
Unit
55
cum
5033.00
585.00
56
BDE
3A
CU.M.
4819.00
585.00
57
cum
5187.00
585.00
30
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
58
cum
5727.00
585.00
59
BDE 4
CU.M.
4204.00
585.00
60
cum
4466.00
585.00
31
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
61
cum
5005.00
585.00
CU.M.
4656.00
585.00
cum
4870.00
585.00
62
BDE
4A
63
32
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
64
cum
5410.00
585.00
65
BDE 5
CU.M.
4545.00
585.00
66
cum
4738.00
585.00
33
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
67
cum
5311.00
585.00
68
BDE
5A
CU.M.
5455.00
585.00
69
cum
5844.00
585.00
34
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
70
cum
6436.00
585.00
71
BDE 7
CU.M.
2716.00
362.00
72
BDE 8
CU.M.
2710.00
450.00
35
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
RG.M.
814.00
205.00
74
BDF
39
RG.M.
1068.00
260.00
75
BDF
40
RG.M.
610.00
240.00
76
BDF
40
RG.M.
1100.00
350.00
CU.M.
4210.00
610.00
77
BDF 1
36
Item .No.
& Code
Description
Unit
78
cum
4340.00
610.00
79
cum
4867.00
610.00
80
BDF
1A
CU.M.
4819.00
630.00
81
cum
5139.00
630.00
37
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
82
cum
5716.00
630.00
83
BDF 3
CU.M.
4554.00
640.00
84
Providing and laying in situ cement concrete M20 of trap / granite / quartzite / gneiss metal for
Reinforced Cement Concrete work in
foundation like raft, grillage, strip foundation
and footings of Reinforced Cement Concrete
columns and steel stanchion including bailing
out water, formwork, compaction and finishing,
curingwith fully automatic microprocessor
based PLC with SCADA enabled reversible
drum type Mixer etc. complete. (excluding steel
reinforcement
and
structiral
steel)
Spec. No. Bd.F.3 NO.298
cum
5132.00
640.00
85
Providing and laying in situ cement concrete M20 of trap / granite / quartzite / gneiss metal for
Reinforced Cement Concrete work in
foundation like raft, grillage, strip foundation
and footings of Reinforced Cement Concrete
columns and steel stanchion including bailing
out water, formwork, compaction and finishing,
cum
5655.00
640.00
38
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
86
BDF 4
Rate 2015-16
Completed Labour
4
CU.M.
3909.00
300.00
87
cum
4133.00
300.00
88
cum
4133.00
300.00
39
Item .No.
& Code
Description
Unit
89
BDF 5
CU.M.
6782.00
1150.00
90
cum
6901.00
1150.00
91
cum
7519.00
1150.00
40
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
92
BDF
5A
CU.M.
7455.00
1139.00
93
cum
7922.00
1139.00
94
cum
8597.00
1139.00
95
BDF
6A
CU.M.
6749.00
1050.00
41
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
96
Providing & casting in situ cement concrete M20 of trap/granite/quartzite/ gneiss metal for
R.C.C. beams and lintels as per detailed
designs & drawings or as directed including
centering, formwork of plywood / steel,
compaction and roughening the surface if
special finish is to be provided & curing etc.
complete (excluding reinforcement) with fully
automatic microprocessor based PLC with
SCADA enabled reversible drum type Mixer
etc. complete. (excluding settl reinforcement)
Spec. No. Bd.F.6 Page No.300
cum
7063.00
1050.00
97
Providing & casting in situ cement concrete M20 of trap/granite/quartzite/ gneiss metal for
R.C.C. beams and lintels as per detailed
designs & drawings or as directed including
centering, formwork of plywood / steel,
compaction and roughening the surface if
special finish is to be provided & curing etc.
complete (excluding reinforcement) with fully
automatic microprocessor based PLC with
SCADA enabled reversible drum type Mixer
etc. complete. (excluding settl reinforcement)
Spec. No. Bd.F.6 Page No.300
cum
7644.00
1050.00
98
BDF
6B
CU.M.
7323.00
1100.00
99
cum
8240.00
1100.00
42
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
cum
8931.00
1100.00
101
BDF
8A
CU.M.
6819.00
1120.00
cum
7175.00
1120.00
102
43
Item .No.
& Code
Description
Unit
103
cum
7715.00
1120.00
104
BDF 9
CU.M.
6325.00
2175.00
105
cum
6563.00
2175.00
cum
7056.00
2175.00
106
44
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
CU.M.
6910.00
1420.00
108
cum
7263.00
1420.00
cum
7809.00
1420.00
109
45
Item .No.
& Code
Description
Unit
110
BDF
10A
CU.M.
6903.00
1475.00
111
cum
7297.00
1475.00
112
cum
7843.00
1475.00
113
BDF
11A
CU.M.
7318.00
1450.00
46
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
114
cum
7667.00
1450.00
115
cum
8207.00
1450.00
116
BDF
12
CU.M.
4439.00
790.00
47
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
117
cum
5077.00
790.00
cum
5472.00
790.00
CU.M.
7014.00
1465.00
118
119
BDF
13A
48
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
120
cum
7447.00
1465.00
121
cum
8026.00
1465.00
122
BDF
14A
CU.M.
7353.00
1495.00
49
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
123
cum
7785.00
1495.00
124
cum
8391.00
1495.00
125
BDF
15A
CU.M.
7277.00
1500.00
50
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
126
cum
7607.00
1500.00
127
cum
6490.00
1500.00
128
BDF
16
CU.M.
8418.00
1750.00
51
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
129
cum
8964.00
1750.00
130
cum
9596.00
1750.00
131
BDF
16
CU.M.
8425.00
1724.00
52
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
132
cum
8972.00
1724.00
133
cum
9663.00
1724.00
134
4990.00
4690.00
725.00
688.00
53
Cum
Cum
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
135
136
Cum
Cum
5413.00
5179.00
780.00
750.00
Cum
Cum
6030.00
5735.00
865.00
820.00
Cum
Cum
6259.00
6030.00
900.00
860.00
138
Rate 2015-16
Completed Labour
54
Item .No.
& Code
Description
Unit
139
BDF
17
M.T.
66514.00
6651.00
140
BDF
17A
M.T.
66695.00
6669.00
141
BDF
19
SQ.M.
572.00
120.00
142
BDF
19
SQ.M.
545.00
120.00
55
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
143
BDF
27
SQ.M.
159.00
51.00
144
BDF
43
SQ.M.
1092.00
337.00
56
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
145
BDG 1
CU.M.
4454.00
750.00
146
BDG 1
CU.M.
4630.00
765.00
147
BDG 3
CU.M.
4500.00
675.00
148
BDG 3
CU.M.
4701.00
675.00
149
BDG 3
CU.M.
5325.00
945.00
57
Item .No.
& Code
Description
Unit
150
BDG 3
CU.M.
6060.00
950.00
151
BDG
5A
CU.M.
5252.00
910.00
152
BDG
5A
CU.M.
5325.00
910.00
153
BDG 6
CU.M.
5314.00
925.00
154
BDG 6
CU.M.
5510.00
925.00
155
BDG 7
SQ.M.
607.00
105.00
58
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
156
BDG 7
SQ.M.
671.00
105.00
157
BDG 8
SQ.M.
531.00
106.00
158
BDG 8
SQ.M.
598.00
106.00
159
BDG
10A
CU.M.
5022.00
1050.00
59
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
160
BDG
10A
CU.M.
5236.00
1050.00
161
BDG
20
CU.M.
5310.00
975.00
162
7.00
1.50
60
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
CU.M.
2270.00
505.00
164
BDH 4
CU.M.
2481.00
545.00
165
BDH
11
CU.M.
3273.00
730.00
166
BDH
12
CU.M.
3762.00
770.00
167
BDH
13
CU.M.
3717.00
760.00
61
Item .No.
& Code
Description
Unit
168
BDH
14
CU.M.
3938.00
810.00
169
BDH
15
CU.M.
3630.00
750.00
170
BDH
16
CU.M.
3547.00
750.00
171
BDH
40
CU.M.
3562.00
730.00
62
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
471.00
217.00
533.00
41.00
559.00
41.00
585.00
41.00
611.00
41.00
63
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
662.00
41.00
SQ.M.
678.00
58.00
b) 150 mm thick
SQ.M.
982.00
58.00
c) 200 mm thick
SQ.M.
1046.00
58.00
Cum
226.00
226.00
Per
Cm
depth
6.00
6.00
Cum
5984.00
598.00
64
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
680.00
69.00
SQ.M.
735.00
69.00
SQ.M.
1034.00
69.00
SQ.M.
836.00
84.00
SQ.M.
5239.00
524.00
65
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
251.00
57.00
185
BDJ 3
SQ.M.
138.00
32.00
186
BDJ 4
SQ.M.
144.00
69.00
187
BDJ
4A
RG.M.
183.00
43.00
188
BDJ 7
SQ.M.
582.00
138.00
66
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
472.00
115.00
67
SQ.M.
Item .No.
& Code
Description
Unit
190
BDJ 9
Rate 2015-16
Completed Labour
4
CU.M.
3013.00
710.00
191
Providing water proof bedding for flooring of
BDJ 10 Bath and WC 25 mm thick in C.M.1:3 including
using 1 kg of water proof compound per bag of
cement including leveling curing etc. complete.
As directed by Engineer in charge
SQ.M.
230.00
97.00
192
Providing and laying 3 course water proofing
BDJ 20 treatment on terrace slab with tar felt without
B.B. coba as per I.S.I. code of practice. Spec :
As directed by Engineer in charge
SQ.M.
230.00
74.00
193
Providing and applying two layers of liquid
BD(acrylic based vinyl modified) water proof
ADL 22 material (alike full stop) by air less spray gun,
so as to dry and form a 05mm thick seamless,
joint free coating including labour and material
(excluding surface preparation) etc. complete.
As directed by Engineer in charge
SQ.M.
400.00
115.00
SQ.M.
400.00
115.00
194
BDADL
23
Item .No.
& Code
Description
Unit
195
BDADL
24
196
Providing and applying one coat of water
BDproofing chemical treatment of approved
ADL 60 make and quality like Sanjivani lep and
paste to concrete or plastered surface
including scaffolding if necessary, cleaning the
surface, brushing and dust removing, filling the
cracks and making the surface leak proof and
water proofing test for five days etc. complete,
curing a guarantee for a period of seven years.
Spec: As directed by Engineer in charge
197
69
Rate 2015-16
Completed Labour
4
SQ.M.
571.00
115.00
SQ.M.
397.00
101.00
SQ.M.
1771.00
570.00
Item .No.
& Code
Description
Unit
198
199
70
Rate 2015-16
Completed Labour
4
SQ.M.
917.00
230.00
SQ.M.
664.00
220.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
378.00
38.00
200
201
BD J2/P355
SQ.M.
360.00
45.00
202
BD J2/P355
SQ.M.
791.00
172.00
203
SQ.M.
188.00
40.00
204
SQ.M.
946.00
399.00
71
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
520.00
86.00
206
SQ.M.
356.00
174.00
207
Cum
4147.00
1746.00
72
Item .No.
& Code
Description
Unit
208
209
Rate 2015-16
Completed Labour
4
SQ.M.
454.00
237.00
SQ.M.
458.00
130.00
210
SQ.M.
40.00
40.00
211
Lowering
down
the
debris
obtained
from
Cum. breaking and removing the
cement plaster / burnt brick masonary of the
first floor by any means
without
causing
dust
nuisance
and damage to structure,
stacking the same as and where
directed
including cleaning the site complete. (Rate
for loose material) :
Spec :(As directed by Engineer in Charge)
Cum
481.00
481.00
73
Item .No.
& Code
Description
Unit
212
213
214
Rate 2015-16
Completed Labour
4
SQ.M.
22.00
22.00
SQ.M.
373.00
45.00
SQ.M.
1230.00
610.00
74
Item .No.
& Code
Description
Unit
215
216
Rate 2015-16
Completed Labour
4
SQ.M.
238.00
123.00
Cum
566.00
566.00
217
SQ.M.
569.00
151.00
218
SQ.M.
668.00
167.00
75
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Cum
600.00
150.00
220
SQ.M.
988.00
250.00
76
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Kg.
809.00
200.00
SQ.M.
338.00
85.00
222
77
Item .No.
& Code
Description
Unit
223
224
Rate 2015-16
Completed Labour
4
SQ.M.
1287.00
300.00
SQ.M.
250.00
80.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
828.00
200.00
Providing
and
installing
INTEGRAL
CRYSTALINE waterproofing treatment by using
Penetron Plus for basement horizontal area
(Dry Shake System if raft thickness is more
than 400mm) to horizontal surface of
basement, raft, walls etc. having speed
of penetration of 31 Cm in 56 days and
resistance to 16 bar hydrostatic water head and
capable of reducing permeability of concrete by
more than 90%, compared with control
concrete, when tested as per DIN 1048 (after
applying 4 cycles of hydrostatic pressure) and
permeability co-efficient calculated as per
Valenta / Darcy's formula to be carried out as
per the manufacturer's specifications and as
detailed in technical specification, complete.
Work shall be carried out as per the approved
method of waterproofing accepted by the
Engineer in-charge. Using Penetorn Plus @ 0.5
Kg per SQ.M. in dry shake application below
raft just before concreting and above the raft on
horizontal green concrete. Work shall be
executed by certified applicator only and shall
be guaranteed for 10 years against any
leakages and guarantee shall be provided on
Rs.500/- stamp paper in approved proforma.
Spec : (As directed by Engineer in Charge)
79
SQ.M.
Item .No.
& Code
Description
Unit
226
227
Rate 2015-16
Completed Labour
4
Rmt.
495.00
125.00
SQ.M.
1332.00
325.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
674.00
170.00
81
SQ.M.
Item .No.
& Code
Description
Unit
229
Providing
and
applying
specialized
waterproofing
treatment
to
HEAVILY
LEAKAGE AFFECTED AREA OF EXTERNAL
WALL by Using Polymeric Cementitious
Membrane with a coat of anti fungal treatment
(SUNANTIFUNGAL SP SUNANDA MAKE) to
entire surface of wall, Applying one coat of
polymeric water proofing coating (POLYALK
WP - SUNANDA MAKE) having a breathable
non toxic acrylic polymer liquid and grey
cement mix in proportion 1:1 by weight with
coat interval as 24 hours. Air curing shall be
done for 24 hours. Before giving this treatment
the entire surface of wall shall be thoroughly
clean to remove existing paint, dust, dirt, etc.
The cracks, if any, shall be filled with acrylic
polymeric non shrink crack filler putty(POLYFILL AR - SUNANDA MAKE), before
giving waterproofing treatment to the external
surfaces.
Applying
Waterproof,
anti
carbonation, anti fading, mould resistant, heat
insulating, and 100% acrylic breathable
decorative external coating (SUNEXT 8 SUNANDA MAKE) Mix 1 L of with 400ml of
water, stir well and apply by brush for two
coats. Applying two coats at an interval of 4-6
hours between each coat, work shall be
executed by certified applicator only and work
shall be guaranteed for 3 years and guarantee
shall be provided on Rs. 500 /- stamp paper
Spec : (As directed by Engineer in Charge)
230
SQ.M.
Rate 2015-16
Completed Labour
4
284.00
71.00
Item .No.
& Code
Description
Unit
231
Providing
and
applying-water
proofing
treatment to exposed
reinforcement portion
with one coat of alkaline RUST CONVERTER
feouert/ Rusticide or equivalent on exposed
83
SQ.M.
SQ.M.
Rate 2015-16
Completed Labour
4
1043.00
1163.75
260.00
290.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
232
A) Slab
B) Beam / Column
SQ.M.
SQ.M.
250.00
302.00
60.00
75.00
SQ.M.
1617.00
405.00
84
Item .No.
& Code
Description
Unit
233
234
Rate 2015-16
Completed Labour
4
No.
931.00
226.00
SQ.M.
749.00
150.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
249.00
63.00
236
SQ.M.
549.00
140.00
86
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
SQ.M.
399.00
498.00
100.00
125.00
SQ.M.
599.00
150.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
SQ.M.
418.00
519.00
405.00
130.00
SQ.M.
799.00
200.00
Item .No.
& Code
Description
Unit
91
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
1901.00
365.00
242
BDK
1B
SQ.M.
2287.00
165.00
243
BDK
1C
SQ.M.
2733.00
365.00
244
BDK
1C
SQ.M.
4509.00
600.00
245
SQ.M.
1410.00
130.00
92
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
74.00
35.00
247
BDL
1A
SQ.M.
81.00
35.00
248
BDL 2
SQ.M.
110.00
48.00
249
BDL 2
SQ.M.
124.00
54.00
SQ.M.
123.00
53.00
SQ.M.
135.00
65.00
250
BDL
2A
251
BDL
2B
93
Item .No.
& Code
Description
Unit
252
BDL
2B
253
BDL 3
Rate 2015-16
Completed Labour
4
SQ.M.
135.00
48.00
SQ.M.
198.00
63.00
254
BDL 4
SQ.M.
176.00
68.00
255
BDL 4
SQ.M.
166.00
68.00
256
BDL
4A
SQ.M.
180.00
69.00
257
BDL
4B
SQ.M.
189.00
69.00
94
Item .No.
& Code
Description
Unit
258
BDL 5
259
BDL 7
Rate 2015-16
Completed Labour
4
SQ.M.
189.00
71.00
SQ.M.
240.00
122.00
260
BDL 7
SQ.M.
220.00
115.00
261
BDL 8
SQ.M.
202.00
88.00
95
Item .No.
& Code
Description
Unit
262
BDL 9
263
Providing neeru finish to plastered surfaces
BDL 10 in all positions including scaffolding and curing
complete.
Bd.L.10 Page No.370
Rate 2015-16
Completed Labour
4
SQ.M.
292.00
118.00
SQ.M.
25.00
12.00
264
BDL
15A
SQ.M.
56.00
25.00
265
BDL
15B
SQ.M.
56.00
37.00
266
Providing tuck pointing with cement mortar
BDL 16 1:3 for stone masonry including scaffolding and
curing complete.
Bd.L.16 Page No.373
SQ.M.
76.00
36.00
267
Providing weathered pointing with cement
BDL 17 mortar 1:3 for stone masonry including
scaffolding and curing complete.
Bd.L.17 Page No.373
SQ.M.
73.00
36.00
268
Providing vee pointing with cement mortar
BDL 18 1:3 for stone masonry including scaffolding and
curing complete.
Bd.L.18 Page No.373
SQ.M.
56.00
36.00
96
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
269
Providing flush pointing with cement mortar
BDL 19 1:3 for stone masonry including scaffolding and
curing complete.
Bd.L.19 Page No.373.
SQ.M.
51.00
36.00
270
Providing fine cement finish 1.5 mm thick
BDL 20 over green plaster surface including scaffolding
curing etc. complete.
As directed by Engineer in charge
SQ.M.
49.00
18.00
271
BDL
SQ.M.
45.00
25.00
272
BDL
SQ.M.
755.00
125.00
273
BD L1
SQ.M.
72.00
28.00
SQ.M. 132.00
S.Q.M 200.00
69.00
86.00
(New Items)
Note : The following all new items may be
used on experimental basis for one year
only)
274
97
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
346.00
55.00
276
BDM
1A
SQ.M.
379.00
70.00
277
BDM
1B
SQ.M.
421.00
89.00
278
BDM 3
SQ.M.
455.00
92.00
279
BDM
3A
SQ.M.
539.00
92.00
98
Item .No.
& Code
Description
Unit
280
BDM
3B
281
BDM
Rate 2015-16
Completed Labour
4
SQ.M.
620.00
115.00
SQ.M.
753.00
120.00
282
BDM
3C
SQ.M.
758.00
120.00
283
BDM 4
SQ.M.
541.00
105.00
284
BDM 5
SQ.M.
600.00
121.00
99
Item .No.
& Code
Description
Unit
285
BDM
5A
286
BDM
5B
Rate 2015-16
Completed Labour
4
SQ.M.
593.00
121.00
SQ.M.
757.00
121.00
287
BDM 6
SQ.M.
227.00
72.00
288
BDM
6A
SQ.M.
256.00
72.00
289
ADL
SQ.M.
331.00
28.00
100
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
657.00
28.00
291
ADL
SQ.M.
596.00
28.00
101
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
853.00
28.00
293
BDM 7
SQ.M.
207.00
62.00
102
Item .No.
& Code
Description
Unit
294
BDM
7A
295
BDM 8
Rate 2015-16
Completed Labour
4
SQ.M.
239.00
70.00
SQ.M.
304.00
79.00
296
BDM 9
SQ.M.
332.00
88.00
297
BDM
10
SQ.M.
330.00
80.00
298
BDM
11
SQ.M.
351.00
80.00
103
Item .No.
& Code
Description
Unit
299
BDM
12
300
BDM
12A
Rate 2015-16
Completed Labour
4
SQ.M.
788.00
100.00
SQ.M.
784.00
111.00
301
BDM
13
SQ.M.
740.00
115.00
302
BDM
13A
SQ.M.
970.00
135.00
303
BDM
14
SQ.M.
390.00
85.00
104
Item .No.
& Code
Description
Unit
304
BDM
14A
305
BDM
15
Rate 2015-16
Completed Labour
4
SQ.M.
459.00
85.00
SQ.M.
401.00
109.00
306
BDM
15A
SQ.M.
514.00
85.00
307
BDM
19
SQ.M.
562.00
174.00
105
Item .No.
& Code
Description
Unit
308
BDM
20
309
BDM
21
Rate 2015-16
Completed Labour
4
SQ.M.
416.00
245.00
SQ.M.
455.00
174.00
310
BDM
22
SQ.M.
574.00
135.00
311
BDM
22A
SQ.M.
639.00
135.00
106
Item .No.
& Code
Description
Unit
312
BDM
22B
313
BDM
22C
Rate 2015-16
Completed Labour
4
SQ.M.
832.00
167.00
SQ.M.
684.00
167.00
314
BDM
23
SQ.M.
339.00
126.00
315
BDM
24
SQ.M.
370.00
126.00
107
Item .No.
& Code
Description
Unit
316
BDM
25
317
BDM
28
Rate 2015-16
Completed Labour
4
SQ.M.
511.00
126.00
SQ.M.
324.00
82.00
318
BDM
29
SQ.M.
592.00
120.00
319
BDM
29 A
SQ.M.
629.00
120.00
SQ.M.
746.00
120.00
SQ.M.
528.00
120.00
320
BDM
29 B
321
BDM
29 C
108
Item .No.
& Code
Description
Unit
322
BDM
33 A
323
BDM
33 B
324
BDM
33 C
325
BDM
35 A
Rate 2015-16
Completed Labour
4
SQ.M.
370.00
120.00
SQ.M.
400.00
120.00
SQ.M.
472.00
120.00
SQ.M.
562.00
130.00
109
Item .No.
& Code
Description
Unit
326
BDM
35 B
327
BDM
36
Rate 2015-16
Completed Labour
4
SQ.M.
615.00
125.00
SQ.M.
36.00
17.00
328
BDM
42
SQ.M.
28.00
14.00
329
BDM
43
SQ.M.
745.00
120.00
330
BDM
44
SQ.M.
920.00
162.00
331
BDM
45
SQ.M.
936.00
193.00
110
Item .No.
& Code
Description
Unit
332
BDM
45
333
BDM
Rate 2015-16
Completed Labour
4
SQ.M.
1026.00
162.00
SQ.M.
585.00
68.00
334
BDM
SQ.M.
645.00
68.00
335
BDM
48
SQ.M.
364.00
73.00
SQ.M.
1555.00
180.00
SQ.M.
1610.00
195.00
336
BDM
ADL
337
BDM
ADL
111
Item .No.
& Code
Description
Unit
338
339
Rate 2015-16
Completed Labour
4
SQ.M.
1576.00
285.00
SQ.M.
1601.00
342.00
340
SQ.M.
2529.00
411.00
341
4347.00
320.00
342
3784.00
320.00
112
SQ.M.
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
SQ.M.
4849.00
980.00
344
SQ.M.
1400.00
280.00
345
SQ.M.
957.00
200.00
346
SQ.M.
3704.00
740.00
347
SQ.M.
4787.00
960.00
348
Rgm.
400.00
80.00
113
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
SQ.M.
1590.00
320.00
350
SQ.M.
6068.65
1200.00
351
SQ.M.
4851
1034
SQ.M.
5009
1163
352
Item .No.
& Code
Description
Unit
SQ.M.
5397
1176
353
115
Rate 2015-16
Completed Labour
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
18.00
8.00
355
BDN
11 B
SQ.M.
23.00
9.00
356
BDN
12 A
SQ.M.
40.00
13.00
357
BDN
12 B
SQ.M.
24.00
13.00
358
BDN
13 A
SQ.M.
51.00
22.00
SQ.M.
100.00
34.00
SQ.M.
174.00
36.00
359
BDN
13 B
116
Item .No.
& Code
Description
Unit
361
BDN
14A
SQ.M.
17.00
7.00
362
BDN
14 B
SQ.M.
28.00
11.00
363
BDN
16 A
SQ.M.
10.00
4.00
364
BDN
16 B
SQ.M.
17.00
8.00
365
SQ.M.
866.00
384.00
117
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
366
BDO 8
B1
Rate 2015-16
Completed Labour
4
SQ.M.
18.00
15.00
367
BDO 8
B2
SQ.M.
8.00
7.00
368
BDO 1
SQ.M.
46.00
11.00
369
BDO
1A
SQ.M.
63.00
16.00
370
BDO 2
SQ.M.
28.00
9.00
371
BDO
2A
SQ.M.
41.00
11.00
118
Item .No.
& Code
Description
Unit
372
BDO 3
SQ.M.
42.00
11.00
373
BDO
3A
SQ.M.
53.00
15.00
374
BDO 4
SQ.M.
38.00
9.00
375
BDO
4A
SQ.M.
46.00
11.00
376
BDO
4B
SQ.M.
51.00
11.00
119
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
377
BDO 5
SQ.M.
55.00
11.00
378
BDO
5A
SQ.M.
59.00
15.00
379
BDO 6
SQ.M.
35.00
9.00
380
BDO
6A
SQ.M.
47.00
11.00
381
BDO 7
SQ.M.
32.00
9.00
120
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
382
BDO
7A
SQ.M.
46.00
11.00
383
BDO
7B
SQ.M.
55.00
11.00
384
BDO 8
SQ.M.
32.00
11.00
385
BDO
8A
SQ.M.
36.00
14.00
386
BDO
8C
SQ.M.
20.00
6.00
121
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
387
BDO
8D
SQ.M.
15.00
6.00
388
BDO
8E
SQ.M.
21.00
7.00
389
SQ.M.
13.00
6.00
390
Providing and applying three coats of texture
BDpaint of approved manufactures and approved
ADL 13 colour and shade to plastered surface including
scaffolding if necessary and preparing the
surface etc. complete.
As directed by Engineer in charge
SQ.M.
86.00
15.00
391
Providing and applying three coats of Appex
BDpaint of approved manufactures and approved
ADL 13 colour and shade to plastered surface including
scaffolding if necessary and preparing the
surface etc. complete As directed by Engineer
in charge
SQ.M.
107.00
41.00
122
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
4.00
2.00
393
BDP
1A
SQ.M.
6.00
4.00
394
BDP 2
SQ.M.
8.00
5.00
395
BDP
2A
SQ.M.
8.00
4.00
396
BDP
2B
SQ.M.
10.00
5.00
397
BDP 3
SQ.M.
5.00
3.00
123
Item .No.
& Code
Description
Unit
398
BDP
3A
SQ.M.
5.00
3.00
399
BDP 4
Providing
and
applying
dry
powder
distemper of approved colour and shade to
old & new surfaces in one coat including
scaffolding, preparing the surfaces (excluding
the priming coat.) complete.
Bd.P.4 Page No.413.
SQ.M.
13.00
5.00
400
BDP
4A
Providing
and
applying
dry
powder
distemper of approved colour and shade to old
and new surfaces in two coats including
scaffolding, preparing the surfaces. (excluding
the primer coat) complete.
Bd.P.4 Page No.413.
SQ.M.
14.00
5.00
401
BDP 5
SQ.M.
20.00
9.00
402
BDP
5A
SQ.M.
30.00
15.00
403
BDP
5B
SQ.M.
43.00
18.00
124
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
404
BDP 6
SQ.M.
62.00
16.00
405
BDP
6A
SQ.M.
70.00
18.00
406
BDP
7A
SQ.M.
5.00
5.00
125
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
RG.M.
847.00
175.00
408
BDQ
8A
RG.M.
83.00
32.00
409
BDQ
11
RG.M.
658.00
205.00
410
BDQ
13
SQ.M.
1134.00
354.00
411
BDQ
13A
SQ.M
688.00
206.00
412
BDQ
13A
SQ.M.
859.00
363.00
126
Item .No.
& Code
Description
Unit
413
BDQ
18
SQ.M.
926.00
224.00
414
BDQ
19
RG.M.
333.00
65.00
415
BDQ
21
RG.M.
374.00
71.00
416
BDQ
22
RG.M.
129.00
15.00
417
BDQ
26
SQ.M.
1593.00
191.00
127
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
418
BDQ
26
SQ.M.
918.00
274.00
419
BDQ
26A
SQ.M.
1907.00
274.00
420
BDQ
27
SQ.M.
649.00
155.00
SQ.M.
591.00
155.00
128
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
458.00
56.00
423
BDR 3
RG.M.
125.00
40.00
424
BDR
5A
SQ.M.
668.00
42.00
425
BDR 7
SQ.M.
439.00
54.00
426
BDR 8
SQ.M.
488.00
66.00
129
Item .No.
& Code
Description
Unit
427
BDR 9
RG.M.
313.00
37.00
428
BDADL 43
SQ.M.
771.00
47.00
429
Providing and fixing valley gutter of 22
BDR 10 B.W.G. (0.63mm) plain galvanized iron
sheets 120 cm wide with country teak wood
planking 20 mm thick including two coats of
coal-taring the upper surface of plank
(excluding painting to under side of plank)
Bd.R.10 Page No.455.
RG.M.
2019.00
129.00
430
Providing and fixing glass Mangalore tiles
BDR 11 type at required places in Mangalore tile roof
including scaffolding if necessary.
Bd.R.11 Page No.456.
No.
332.00
18.00
431
Providing and fixing asbestos cement cowl
BDR 14 ventilators in asbestos cement sheet
roofing at required places, including all fixing
accessories and scaffolding necessary.
Bd.R.14 Page No.459.
No.
113.00
26.00
432
Providing and fixing false ceiling of plain
BDR 16 asbestos cement sheets 4mm thick with
country teak wood beadings 45 X 12 mm with
frame work of country teak wood battens of
size 70 X 60 mm at 1.00 M center to center
including scaffolding, if necessary, all iron
work and painting (visible surfaces) to A.C.
sheet and beading in two coats complete
(excluding T.W. runner to be paid separately).
Bd.R.16 Page No.460.
SQ.M.
928.00
129.00
130
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
433
Providing and fixing false ceiling of T.W.
BDR 17 partical board half perforated sheet 12mm
thick with frame work of country teak wood
battens of size 70 X 45 mm and 35 X 35 mm
at 60 cm center to center including
scaffolding, if necessary, all iron work and two
coats of painting to boards and beading i.e.
visible surface (excluding runner to be paid
separately). Bd.R.17 Page No.461
SQ.M.
1063.00
146.00
434
Providing and fixing false ceiling of
BDR 18 15/20mm thick decorative boards of
fibrous plaster of Paris including scaffolding,
if necessary, frame work of teak wood battens
of size 70 X 45 mm and 35 X 35 mm at 45 cm
center to center without beading, all
architectural work like mouldings, cornices
caves, domes, cups as per detailed drawings
and three coats of painting to boards and one
coat to wood work (excluding runner and
mild steel suspender).
Bd.R.18 Page No.461.
SQ.M.
1017.00
125.00
435
Providing and fixing false ceiling of 12 mm
BDR 19 thick acoustic boards of approved make,
with shape and sizes as per drawings
including scaffolding if any frame work of teak
wood battens of size 70 x 45mm and 35 x 35
mm of 60 cm c/c all screws and fastening and
finishing complete (excluding runner to be
paid separately).
Bd.R.19 Page No.462.
SQ.M.
1271.00
125.00
436
BDADL
18
SQ.M.
1104.00
260.00
Item .No.
& Code
Description
Unit
437
BBDADL
18
SQ.M.
172.00
17.00
438
BDADL-50
SQ.M.
1174.00
205.00
439
BDADL-51
SQ.M.
1174.00
205.00
440
Providing and replacing new Mangalore
BDR 31 tiles with class "A" class tiles including
scaffolding complete.
As directed by Engineer in charge
SQ.M.
163.00
22.00
441
Providing and fixing asbestos cement
BDR 36 (60cm. x 15cm. x 23cm.) valley gutters and
Eaves of approved size and make including
drop ends, stop ends, necessary fixtures &
fastening the same as per code of standard
practice complete.
As directed by Engineer in charge
RG.M.
323.00
300.00
132
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
442
Providing and fixing valley gutters of 24
BDR 37 B.W.G. G.I. sheet 120 cm. with 20 mm thick
country
cut
teak
wood
planking
underneath coal tarring etc. complete.
As directed by Engineer in charge
RG.M.
1271.00
109.00
443
Providing and fixing valley gutters of 22
BDR 37 B.W.G. G.I. sheet 120 cm. with 20 mm thick
country
cut
teak
wood
planking
underneath coal tarring etc. complete.
As directed by Engineer in charge
RG.M.
1399.00
129.00
444
SQ.M.
2205.00
530.00
445
SQ.M.
768.00
38.00
446
SQ.M.
592.00
29.00
447
SQ.M.
680.00
34.00
133
Item .No.
& Code
Description
Unit
448
SQ.M.
713.00
36.00
449
SQ.M.
770.00
39.00
450
SQ.M.
798.00
40.00
451
17450.00
18956.00
20589.00
700.00
707.00
720.00
134
No.
No.
No.
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
452
Rate 2015-16
Completed Labour
4
No.
No.
No.
11785.00
12241.00
13260.00
700.00
707.00
720.00
SQ.M.
4033.00
1210.00
SQ.M.
5075.00
1015.00
453
454
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
95.00
36.00
456
SQ.M.
190.00
72.00
457
SQ.M.
29.00
17.00
458
Providing
and
fixing
Proflex
(POLYCARBONATE) Roof Sheets 2 mm
thick Plain/Corrugated of standard make
and quality or of Tuflite make to Domes,
shades, roofing at required places,
including all fixing accessories and scaffolding
neccessary complete as directed by Engineer
incharge (Sheets should be approved from
Executive Engineer)
SQ.M.
1955
427
459
SQ.M.
1700
427
136
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
137
SQ.M.
4321
434
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
462
CU.M.
64440.00
8608.00
463
BD
ADL 37
CU.M.
38002.00
5474.00
464
Providing and fixing in position cold rolled
BDT 2A pressed steel sheet door of size 100mm x
60mm x 1.25mm and window frame of 18
BWG thickness including accessories treating
the frame work with electrostatic powder
coating as directed etc. complete single
rebate 90mm x 50mm cross section including
concrete in frame profile.
As directed by Engineer in charge.
RG.M.
371.00
96.00
138
Item .No.
& Code
Description
Unit
465
BDT 2
A1
RG.M.
369.00
102.00
466
RG.M.
336.00
22.00
467
Providing and fixing in position mild steel
BDT 2C angle iron door / window frame of section
40mm x 40mm x 6mm thick including
provision for fixing aldrops, tower bolts and
hinges with one coat of anticorrosive red
oxide primer as per detailed drawings and as
directed complete.
As directed by Engineer in charge.
SQ.M.
232.00
28.00
468
Providing and fixing in position PVC door /
BDT 2D window frame of approved quality and make
as per detailed drawing and as directed
complete.
As directed by Engineer in charge.
SQ.M.
1431.00
50.00
139
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
469
Providing and fixing country teak wood 2nd
BDT 4B class fully glazed ventilator rectangular in
shape as per detailed drawing with shutter
scantlings of size 70mm x 30mm thick and
glass panels of 3mm thick plain / frosted
including iron oxidized fixtures and fastening
and finishing the wood work with one coat of
primer (without mild steel bar and frame)
complete (for span up to 1400mm x 1800mm)
Bd.T.4 Page No.479.
SQ.M.
2859.00
474.00
470
Providing and fixing country teak wood 2nd
BDT 4A class fully glazed ventilator rectangular in
shape as per detailed drawing with shutter
scantlings of size 70mm x 30mm thick and
glass panels of 3mm thick plain / frosted
including iron oxidized .fixtures and fastening
and finishing the wood work with one coat of
primer (with mild steel bars necessary flat)
complete. Spec No. Bd.T.4 Page No.479,
SQ.M.
4294.00
637.00
471
BDT 4
A A
SQ.M.
3572.00
646.00
140
Item .No.
& Code
Description
Unit
SQ.M.
3621.00
673.00
SQ.M.
3398.00
666.00
SQ.M.
3160.00
618.00
472
BDT 4
A1
473
BDT 4
A2
474
BDT 4
A3
141
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
475
BDT 4
A-B
SQ.M.
3847.00
706.00
476
BDT 4
B-1
SQ.M.
3709.00
687.00
477
BDT 4
B-2
SQ.M.
3654.00
687.00
142
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
SQ.M.
3435.00
728.00
479
Providing and fixing country teak wood
BDT 4C double leaf second class partly panelled
door without ventilator / fanlight as per
detailed drawing including sizes of style, top
rail, frieze rail 95mm x 40mm thick with lock
and bottom rail 195mm x 40mm thick with
panels of 30mm thickness and glass 5mm
thick plain / frosted panels including iron
oxidized fixtures and fastening and finishing
the wood work with one coat of primer
(excluding door frame) complete (for span of
1400mm x 2000mm to 1400mm x 2800mm).
Bd.T.4 Page No.479, 480
SQ.M.
3698.00
728.00
480
BDT 4
C-1
SQ.M.
3435.00
728.00
478
BDT 4
B-3
143
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
481
BDT 4
C-2
SQ.M.
3709.00
728.00
482
BDT 4
C-3
SQ.M.
3160.00
728.00
483
Providing and fixing country teak wood
BDT 4D second class partly panelled and partly
glazed door with 5mm glass single / double
leaf with ventilator / fanlight shutter as per
detailed drawing including sizes of style, top
rail, frieze rail 95mm x 40mm thick with lock
and bottom rail 195mm x 40mm thick with
panels of 35mm thickness including iron
oxidized , fixtures and fastening and finishing
the wood work with one coat of primer
(excluding door frame) complete (for span of
1400mm x 2800mm to 1000mm x 2100mm).
Bd.T.4 Page No.479, 480
SQ.M.
3572.00
728.00
144
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
484
BDT 4
D-1
SQ.M.
3451.00
728.00
485
BDT 4
D-2
SQ.M.
3311.00
632.00
486
BDT 4
D-3
SQ.M.
3187.00
693.00
145
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
487
BDT 30
SQ.M.
2730.00
503.00
488
BDT 30
SQ.M.
3276.00
604.00
489
BDT
30A
SQ.M.
2702.00
572.00
146
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
490
BDT
30A
SQ.M.
3242.00
687.00
491
BDT
30AB
SQ.M.
2427.00
412.00
492
BDT
30B
SQ.M.
2912.00
494.00
147
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
493
BDT
30-C
SQ.M.
2844.00
494.00
494
BDT 31
SQ.M.
2415.00
412.00
495
BDT 31
SQ.M.
2899.00
494.00
148
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
496
BDT
31-A
SQ.M.
2347.00
429.00
497
BDT
31-A
SQ.M.
2816.00
515.00
498
BDT
31-B
SQ.M.
2610.00
515.00
149
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
499
BDT
31-C
SQ.M.
27869.00
515.00
500
BDT 34
SQ.M.
3043.00
246.00
501
SQ.M.
3998.00
666.00
150
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
502
BDT 42
SQ.M.
2885.00
632.00
503
BDT
42A
SQ.M.
2844.00
561.00
504
BDT
42B
SQ.M.
2631.00
561.00
151
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
505
BDT
42C
SQ.M.
3105.00
625.00
506
BDT
42D
SQ.M.
2926.00
625.00
507
BDT
42E
SQ.M.
2686.00
625.00
152
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
508
BDT
42F
SQ.M.
3654.00
625.00
509
BDT
42G
SQ.M.
3544.00
687.00
510
BDT
42H
SQ.M.
3297.00
687.00
511
BDT 42
I
SQ.M.
3833.00
687.00
153
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
512
BDT
42J
SQ.M.
3682.00
728.00
513
BDT 42
K
SQ.M.
3544.00
728.00
514
BDT
42L
SQ.M.
3180.00
659.00
515
BDT
42M
SQ.M.
3002.00
659.00
154
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
516
BDT
42N
Rate 2015-16
Completed Labour
4
SQ.M.
2823.00
659.00
517
BDT
42O
SQ.M.
3256.00
673.00
518
BDT
42P
SQ.M.
3180.00
673.00
155
Item .No.
& Code
Description
Unit
519
BDT
42Q
SQ.M.
2974.00
638.00
520
BDT
42R
SQ.M.
3180.00
673.00
521
BD
ADL
21
SQ.M.
2878.00
480.00
522
BD
ADL
30
SQ.M.
2273.00
346.00
156
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
523
BD
ADL
31
SQ.M.
1424.00
222.00
524
BD
ADL
33
SQ.M.
2411.00
322.00
525
BD
ADL
38
SQ.M.
1654.00
497.00
526
BD
ADL
39
SQ.M.
1511.00
476.00
157
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
527
BD
ADL
40
SQ.M.
1103.00
81.00
528
BD
ADL
40
SQ.M.
1248.00
85.00
529
BD
ADL
52
SQ.M.
2383.00
364.00
530
BD
ADL
53
SQ.M.
3830.00
522.00
158
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
531
BD
ADL
54
SQ.M.
3809.00
437.00
532
BD
ADL
SQ.M.
2924.00
451.00
533
SQ.M.
2619.00
451.00
159
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
534
SQ.M.
3005.00
129.00
535
BDT
53A
SQ.M.
2503.00
225.00
536
BDT
53B
SQ.M.
2865.00
225.00
160
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
537
BD
ADL 36
SQ.M.
2749.00
150.00
538
BD
ADL
36A
SQ.M.
2865.00
150.00
539
BD
ADL 29
SQ.M.
1963.00
280.00
161
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
540
BDT 55
SQ.M.
2183.00
142.00
541
BDT 56
SQ.M.
2485.00
142.00
542
BDT 57
SQ.M.
2137.00
182.00
543
BDT
66A
SQ.M.
2180.00
231.00
544
BDT
66A
SQ.M.
2378.00
2429.00
162
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
2623.00
223.00
546
BDT 79
SQ.M.
1739.00
214.00
547
BDT 79
SQ.M.
1897.00
235.00
548
BDT 80
SQ.M.
1962.00
223.00
163
Item .No.
& Code
Description
Unit
549
BDT 80
SQ.M.
2141.00
244.00
550
BDT 81
SQ.M.
1925.00
223.00
551
BDT 81
SQ.M.
2100.00
244.00
552
BDT 82
SQ.M.
2158.00
253.00
164
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
553
BDT 83
SQ.M.
1654.00
211.00
554
BDT 84
SQ.M.
2149.00
253.00
555
BDADL-17
SQ.M.
1693.00
602.00
556
BDADL-19
SQ.M.
2295.00
447.00
557
BDADL-20
SQ.M.
2565.00
618.00
165
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
558
BDADL-32
SQ.M.
1451.00
177.00
559
BDADL-48
SQ.M.
1539.00
143.00
560
BDADL-49
SQ.M.
1984.00
148.00
561
SQ.M.
2065.00
561.00
166
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
562
BDT 88
SQ.M.
1019.00
75.00
563
SQ.M.
882.00
75.00
564
BDT 91
SQ.M.
1039.00
75.00
565
BDT 93
SQ.M.
615.00
75.00
566
BDT 94
SQ.M.
255.00
66.00
167
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
567
BDT 95
SQ.M.
834.00
246.00
568
BDT
SQ.M.
419.00
150.00
569
BDT
97A
SQ.M.
3516.00
547.00
570
BDT
97A
SQ.M.
2941.00
456.00
168
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
571
SQ.M.
2941.00
421.00
572
SQ.M.
3516.00
442.00
573
SQ.M.
4389.00
456.00
169
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
4964.00
456.00
575
BDT
97B
SQ.M.
3841.00
552.00
576
BDT
97B
SQ.M.
3186.00
581.00
577
BDT
107
SQ.M.
3180.00
492.00
170
Item .No.
& Code
Description
Unit
578
BDT
108
Rate 2015-16
Completed Labour
4
SQ.M.
3317.00
471.00
579
BDADL-14
SQ.M.
2531.00
86.00
580
SQ.M.
4007.00
581.00
581
SQ.M.
3351.00
582.00
171
Item .No.
& Code
Description
Unit
582
BDADL-15
SQ.M.
2497.00
78.00
583
BDT
114
SQ.M.
554.00
100.00
584
BDT
117
SQ.M.
464.00
69.00
585
BDT
121
SQ.M.
1029.00
189.00
SQ.M.
403.00
73.00
SQ.M.
384.00
47.00
586
587
.
Providing and fixing obscured glass 5 mm
thick including putty etc. complete of various
approved size for doors and windows As
directed by Engineer in charge.
Providing and fixing plain glass 5 mm thick
including putty etc. complete of various
approved size for doors and windows As
directed by Engineer in charge.
As directed by Engineer in charge.
172
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
588
BDT
123
SQ.M.
1787.00
88.00
589
BDT
124
RG.M.
20.00
5.00
590
BDT
125
RG.M.
15.00
5.00
591
BDT
130
SQ.M.
4689.00
874.00
592
BDT
SQ.M.
2341.00
454.00
173
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
593
BDT
SQ.M.
3194.00
115.00
594
BDT
SQ.M.
3387.00
170.00
174
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
4033.00
200.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
2849.00
560.00
SQ.M.
5968.00
596.00
597
176
Item .No.
& Code
Description
Unit
598
SQ.M.
2580.00
258.00
599
SQ.M.
4113.00
411.00
600
SQ.M.
2766.00
276.00
177
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
601
602
603
Rate 2015-16
Completed Labour
4
NOS.
NOS.
NOS.
104
210
275
40
40
40
NOS.
NOS.
1754
2105
220
220
NOS.
1273
200
178
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
1698.00
153.00
605
BDU
1A
SQ.M.
1305.00
129.00
SQ.M.
2122.00
188.00
SQ.M.
2278.00
227.00
SQ.M.
1765.00
201.00
606
BDU
1B
607
BDU 2
608
BDU
2A
179
Item .No.
& Code
Description
Unit
609
BDU
2B
SQ.M.
2905.00
255.00
610
BDU
2C
SQ.M.
3304.00
293.00
611
BDU 3
SQ.M.
1607.00
132.00
612
BDU
122
SQ.M.
1805.00
170.00
613
BDU
122
SQ.M.
6482.00
1295.00
180
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
RG.M.
479.00
54.00
615
Providing and laying cast iron pipes of `A'
BDV 1A class of 100mm diameter with sockets and
spiget ends/ flanges and cast centrifugally/
vertically including specials, laying pipes and
back filling the trench complete (excavation to
be paid separately).
Bd.V.1 Page No.547.
RG.M.
625.00
81.00
616
Providing and laying cast iron pipes of `A'
BDV 1B class of 150mm diameter with sockets and
spiget ends/ flanges and cast centrifugally/
vertically including specials, laying pipes and
back filling the trench complete (excavation to
be paid separately).
Bd.V.1 Page No.547.
RG.M.
821.00
104.00
No.
267.00
78.00
618
Providing and making lead joints for 100mm
BDV 2A diameter cast iron pipes line including lead
and testing.
Bd.V.2 Page No.549.
No.
340.00
78.00
619
Providing and making lead joints for 150mm
BDV 2B diameter cast iron pipe line including lead and
testing.
Bd.V.2 Page No.549.
No.
481.00
103.00
617
BDV 2
181
Item .No.
& Code
Description
Unit
RG.M.
RG.M.
141.00
175.00
31.00
46.00
RG.M.
RG.M.
169.00
211.00
51.00
51.00
RG.M.
RG.M.
150.00
185.00
28.00
28.00
620
BDV 5
621
BDV 5a
622
BDV 5
A1
182
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
RG.M.
RG.M.
171.00
215.00
28.00
46.00
RG.M.
RG.M.
215.00
268.00
40.00
57.00
RG.M.
RG.M.
208.00
259.00
40.00
40.00
623
BDV 5
A
624
BDV 5
AB
625
BDV 5
AC
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
RG.M.
RG.M.
251.00
315.00
46.00
86.00
RG.M.
RG.M.
343.00
430.00
110.00
110.00
RG.M.
RG.M.
464.00
581.00
86.00
114.00
626
BDV 5
AD
627
BDV 5
A E1
628
BDV 5
AF
184
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
RG.M.
RG.M.
688.00
865.00
135.00
135.00
630
Providing and fixing on walls/ceiling/floors
BDV 5B 25 mm dia having embossed as ISI Mark
galvanized iron pipes with screwed, sockets,
joints and necessary galvanized iron fittings
such as sockets, back nuts, elbows, bends,
tees, reducers, enlargers, plugs, clamps etc.
including necessary drilling holes in walls,
slabs etc. & remaking good the demolished
portion to restore the same in original
condition neatly & providing & applying anti
corrosive primer oil paint & 2 coats of oil
paintings complete. Bd.V.5 Page No.551
25 mm dia light grade
25 mm dia. medium grade
RG.M.
RG.M.
224.00
278.00
47.00
88.00
RG.M.
230.00
51.00
629
BDV 5
A G1
631
BDV
5C1
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
632
BDV
5D
633
BDV
5E1
634
Providing and fixing on walls/ ceiling/ floors
BDV 5F 80mm dia having embossed as ISI Mark
galvanized iron pipes with screwed, sockets,
joints and necessary galvanized iron fittings
such as sockets, back nuts, elbows, bends,
tees, reducers, enlargers, plugs, clamps etc.
including necessary drilling holes in walls,
slabs etc.& remaking good the demolished
portion to restore the same in original
condition neatly & applying anti corrosive
primer oil paint and 2 coats of oil paintings
complete. Bd.V.5 Page No.551.
80 mm dia light grade
80 mm dia. medium grade
186
Rate 2015-16
Completed Labour
4
RG.M.
RG.M.
279.00
340.00
51.00
103.00
RG.M.
RG.M.
343.00
450.00
62.00
115.00
RG.M.
RG.M.
556.00
631.00
74.00
132.00
Item .No.
& Code
Description
Unit
RG.M.
RG.M.
781.00
998.00
149.00
252.00
635
BDV
5G1
Rate 2015-16
Completed Labour
4
636
BDV 6
No.
2400.00
102.00
637
BDV 6
A
No.
2532.00
123.00
No.
3523.00
140.00
No.
4365.00
182.00
638
BDV
6
639
BDV
6
187
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
640
BDV
6
No.
5324.00
228.00
641
DV
6
No.
7485.00
574.00
642
BDV
8
No.
201.00
19.00
643
BDV
8A
No.
248.00
28.00
644
BDV
8B
No.
309.00
28.00
No.
265.00
57.00
No.
388.00
57.00
645
BDV
9
646
BDV
9A
188
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
647
BDV
9B
No.
501.00
57.00
648
BDV
9C
No.
368.00
39.00
649
BDV
9D
No.
1259.00
114.00
650
BDV
9E
No.
1689.00
114.00
651
BDV
9F
No.
3108.00
139.00
652
BDV
9G
No.
4790.00
166.00
653
BDV
10
No.
1288.00
137.00
654
No.
578.00
135.00
189
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
BDV
10
655
BDV
10A
No.
1404.00
142.00
656
BDV
10
No.
742.00
137.00
657
BDV
10
No.
1486.00
154.00
658
BDV
10
No.
956.00
161.00
659
BDV
10
No.
1509.00
129.00
660
BDV
10
No.
1856.00
51.00
190
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
661
BDV
11
No.
388.00
168.00
662
BDV
10
No.
2345.00
168.00
663
BDV
11A
No.
426.00
50.00
664
BDV
11B
No.
456.00
50.00
665
BDV
11C
No.
478.00
50.00
666
BDV
12
No.
449.00
63.00
667
No.
667.00
98.00
191
Item .No.
& Code
Description
Unit
668
BDV 14
No.
178.00
32.00
669
BDV
14
No.
315.00
40.00
670
BDV
14
No.
2015.00
217.00
671
BDV
No.
678.00
113.00
672
BDV
No.
1135.00
168.00
673
BDV
47
Litres
Litres
Litres
Litres
Rate 2015-16
Completed Labour
4
9.30
9.30
8.40
7.90
Item .No.
& Code
Description
Unit
674
BDV 71
Litres
675
BDV 20
A
No.
3758.00
384.00
676
BDV 20
B
No.
3789.00
386.00
193
Rate 2015-16
Completed Labour
4
7.60
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
No.
4256.00
580.00
678
BDV 22
No.
5532.00
605.00
194
Item .No.
& Code
Description
Unit
679
BDV 22
No.
4450.00
605.00
680
BDV 22
No.
4868.00
605.00
681
BDV 22
No.
4315.00
605.00
195
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
No.
5046.00
618.00
683
BDV
No.
2788.00
325.00
684
BDV
No.
3247.00
327.00
196
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
No.
2879.00
452.00
686
BDV
No.
3389.00
452.00
687
BDADL
41
No.
1432.00
272.00
197
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
688
BDV 26
Providing
and
fixing
white
glazed
earthenware lipped flat back/corner type
Urinal with inlet pipe with stop tap slit
capacity PVC high level flushing cistern,
brackets for fixing the cistern, 32 mm
diameter lead/brass/brass oxidised/ brass
chromium plated flush pipe with fitting
including lead soil pipe, lead trap & soil pipe
connection upto the outside face of wall.
Bd.V.26 Page No.564
No.
2271.00
264.00
689
BDV 28
No.
3471.00
493.00
690
BDV
110A
No.
8204.00
408.00
691
BDV
110B
No.
2301.00
228.00
No.
4487.00
278.00
198
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
693
BDV
111
No.
1502.00
201.00
694
BDVADL 56
No.
754.00
321.00
695
BDADL 57
No.
880.00
245.00
696
BDADL 42
No.
812.00
114.00
697
BDADL
No.
965.00
114.00
698
BDV 29
RG.M.
196.00
62.00
199
Item .No.
& Code
Description
Unit
699
BDV 30
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of
55cm.x40cm.size including single cold water
pillar tap/brackets, rubber plugs and brass
chain, stop tap and necessary PVC pipe and
bottled trap upto the outside face of the wall.
Bd.V.30 Page No.565
No.
3142.00
305.00
700
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of
55cm.x40cm.size including single cold water
pillar tap/brackets, rubber plugs and brass
chain, stop tap and necessary PVC pipe and
without bottled trap upto the outside face of
the wall.
Bd.V.30 Page No.565
No.
2016.00
302.00
701
BDV
30A
No.
2850.00
349.00
702
BDV
30B
No.
2225.00
352.00
703
BDV
30B
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of 45 cm
x30 cm size including single cold water pillar
tap/brackets, rubber plugs and brass chain,
stop tap and necessary PVC pipe connection
including PVC waste pipe and bottled trap
upto the outside face of the wall.
Bd.V.30 Page No.565
No.
2485.00
353.00
200
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
704
BDV 30
C
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin of 45cm
x30cm size including single cold water pillar
tap/brackets, rubber plugs and brass chain,
stop tap and necessary PVC pipe connection
including PVC waste pipe and without bottled
trap upto the outside face of the wall.
Bd.V.30 Page No.565
No.
1647.00
354.00
705
BDV
30D
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin 63cm x
45cm size including single cold water pillar
tap/brackets, rubber plugs & brass chain, stop
tap & necessary PVC pipe connection
including PVC waste pipe and bottled trap
upto the outside face of wall.
Bd.V.30 Page No.565
No.
2870.00
390.00
706
BDV
30D
Providing
and
fixing
white
glazed
earthenware Wash Hand Basin 63cm x
45cm size including single cold water pillar
tap/brackets, rubber plugs & brass chain, stop
tap & necessary PVC pipe connection
including PVC waste
pipe and without
bottled trap upto the outside face of wall.
Bd.V.30 Page No.565
No.
2076.00
390.00
707
BDV
30D
No.
2875.00
350.00
708
BDV
30 D
No.
2090.00
530.00
201
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
709
BDV 31
Providing
and
fixing
white
glazed
earthenware sink 60cm x 45cm x 20cm
size including all connection of the G.I. supply
and PVC waste pipes upto outside face of
wall, cold water chromium plated screw down
bib tap, rolled steel or C.I. brackets stop tap
complete.
Bd.V.31 Page No.566.
No.
2690.00
380.00
710
No.
2500.00
380.00
711
No.
2045.00
175.00
712
BDV 32
No.
572.00
103.00
713
BDV
32 A
No.
630.00
103.00
202
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
714
BDADL 1
No.
377.00
82.00
715
BDV 33
RG.M.
344.00
48.00
RG.M.
355.00
63.00
716
BDV
33B
717
BDV 34
RG.M.
150.00
80.00
718
BDV
34A
RG.M.
145.00
80.00
203
Item .No.
& Code
Description
Unit
719
BDADL 4
RG.M.
320.00
34.00
720
BDV 35
RG.M.
680.00
96.00
721
BDV
35A
RG.M.
742.00
96.00
722
BDV
35B
RG.M.
1516.00
96.00
204
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
723
BDV 36
RG.M.
172.00
97.00
724
RG.M.
144.00
22.00
725
BDADL
5
RG.M.
336.00
48.00
205
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
726
BDADL
7
RG.M.
560.00
74.00
727
BDV 37
RG.M.
220.00
32.00
728
BDV 38
No.
775.00
144.00
729
BDV 39
RG.M.
200.00
39.00
730
BDV
39A
RG.M.
275.00
56.00
206
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
731
BDV
41A
RG.M.
236.00
41.00
732
BDV
41B
RG.M.
287.00
41.00
733
BDV
41C
RG.M.
408.00
63.00
734
BDV 43
No.
2935.00
420.00
207
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
735
BDV
43A
No.
3154.00
461.00
736
BDV 44
No.
4060.00
425.00
737
BDV
112 A
No.
486.00
111.00
738
BDV
112 A
No.
630.00
71.00
739
BDV 45
No.
6985.00
493.00
208
Item .No.
& Code
Description
Unit
740
BDV 46
741
BDV
60A
Rate 2015-16
Completed Labour
4
No.
591.00
151.00
RG.M.
27.00
8.00
742
BDV
60B
RG.M.
35.00
4.00
743
BDV
60C
RG.M.
42.00
6.00
744
BDV
60D
RG.M.
56.00
6.00
745
BDV
60E
RG.M.
71.00
11.00
209
Item .No.
& Code
Description
Unit
746
BDV
60F
RG.M.
88.00
8.00
747
BDV
60G
RG.M.
166.00
8.00
748
BDADL
2
No.
602.00
82.00
749
BDADL
3
No.
571.00
77.00
210
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
750
BDADL
8
RG.M.
110.00
28.00
751
BDADL
9
RG.M.
120.00
28.00
752
BDADL
10
RG.M.
128.00
28.00
RG.M.
153.00
29.00
753
BDADL
11
211
Rate 2015-16
Completed Labour
4
Item .No.
& Code
Description
Unit
754
BDV 67
Rate 2015-16
Completed Labour
4
No.
120.00
10.00
No.
49.00
6.00
No.
64.00
11.00
No.
41.00
6.00
756
BDV 70
757
BDADL 6
758
BDV 69
No.
285.00
68.00
759
No.
690.00
172.00
760
No.
6473.00
1200.00
212
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
No.
9050.00
1800.00
762
No.
876.00
175.00
763
No.
1701.00
340.00
No.
655.00
300.00
764
213
Item .No.
& Code
Description
Unit
765
Rate 2015-16
Completed Labour
4
No.
1104.00
85.00
b) 40 mm dia
No.
838.00
85.00
c) 25 mm dia
No.
328.00
85.00
d) 20 mm dia
No.
260.00
85.00
e) 15 mm dia
No.
220.00
85.00
766
No.
249.00
50.00
767
No.
4592.00
1359.00
768
No.
2933.00
687.00
No.
4580.00
673.00
No.
5697.00
673.00
769
770
214
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Providing
and
fixing single lever high
flow concealed diverter decorative stealth
series ivory gold or chromium plated with
flange and revolving joint with hot and cold
water arrangement of approved Jaguar or
equivalent make including necessary washer
taplon tape etc. complete. (As directed by
Engineer in Charge}
No.
5892.00
673.00
772
No.
3241.00
673.00
773
Kg.
150.00
15.00
774
Kg.
120.00
12.00
215
Item .No.
& Code
Description
Unit
775
Rate 2015-16
Completed Labour
4
Supplying,
installation,
testing
and
commissioning of Hubless centrifugally Cast
iron pipes as per ISI 15905 equivalent to
NECO inclusive of all necessary special
Fittings like bends, tees, and caps, Y bends
for cleaning, offsets, junctions, cowls, etc., lad
under floor / fixed on walls, and in pipe shafts
etc., complete. The quoted rate should
include lead and lifting charges to all levels,
necessary scaffolding and supports like
hanger supports, grip bolts and clamps etc.,
a) 50 mm dia
Rmt
1100.00
110.00
b) 65 mm dia
Rmt
1280.00
128.00
c) 75 mm dia
Rmt
1380.00
138.00
d) 100 mm dia
Rmt
1600.00
160.00
e) 150 mm dia
Rmt
2850.00
285.00
f) 200 mm dia
Rmt
4750.00
475.00
216
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
192.00
115.00
777
BDW
2A
SQ.M.
324.00
128.00
778
BDW
2B
SQ.M.
357.00
150.00
779
BDW
2D
SQ.M.
327.00
94.00
780
BDW
2E
SQ.M.
339.00
93.00
217
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
781
BDW
2H
SQ.M.
335.00
69.00
782
BDW 3
RG.M.
445.00
115.00
783
BDW 4
RG.M.
385.00
114.00
784
BDW 7
No.
346.00
64.00
SQ.M.
269.00
98.00
218
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
786
BDW
10
SQ.M.
253.00
98.00
787
BDW
80
SQ.M.
44.00
17.00
788
BDW
81
SQ.M.
88.00
32.00
789
BDW
82
SQ.M.
46.00
17.00
219
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
790
BDW
83
SQ.M.
98.00
29.00
791
BDW
84
SQ.M.
38.00
18.00
792
BDW
86
13.00
6.00
793
BDW
18.00
6.00
220
SQ.M.
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
794
BDADL
16
SQ.M.
552.00
150.00
795
BDADL
34
RG.M.
41.00
41.00
796
BDADL
35
RG.M.
20.00
20.00
797
BDADL
61
SQ.M.
897.00
50.00
798
BDADL
62
SQ.M.
1358.00
56.00
799
BDADL
63
SQ.M.
1306.00
56.00
221
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
800
BDADL
64
SQ.M.
2083.00
63.00
801
SQ.M.
817.00
83.00
SQ.M.
5300.00
780.00
802
803
SQ.M.
4800.00
72.00
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
Rgm
1015.00
150.00
805
Cum.
406.00
102.00
806
SQ.M.
29.00
13.00
807
SQ.M.
849.00
700.00
223
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
808
No.
450.00
100.00
809
No.
428.00
107.00
810
No.
4592.00
1359.00
811
No.
2933.00
687.00
812
Ltr.
0.11
0.11
224
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
813
Nos.
6068.00
663.00
814
Rgm.
1448.00
310.00
225
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
SQ.M.
41.00
41.00
816
BDW 82
SQ.M.
41.00
41.00
817
BDW 83
SQ.M.
24.00
24.00
818
BDW 84
SQ.M.
24.00
24.00
819
BDW 86
No.
664.00
228.00
820
BDW 86
No.
1010.00
445.00
821
BDW 86
No.
1610.00
665.00
226
Item .No.
& Code
Description
Unit
822
BDW 88
823
BDW 810
Rate 2015-16
Completed Labour
4
SQ.M.
23.00
23.00
CU.M.
97.00
97.00
824
BDW 811
CU.M.
129.00
129.00
825
BDW 812
CU.M.
90.00
90.00
826
BDW 813
CU.M.
162.00
162.00
827
BDW 814
CU.M.
309.00
309.00
828
BDW 815
CU.M.
603.00
603.00
829
BDW 816
CU.M.
126.00
126.00
227
Item .No.
& Code
Description
Unit
830
BDW 817
831
BDW 818
Rate 2015-16
Completed Labour
4
No.
143.00
143.00
No.
103.00
103.00
SQ.M.
19.00
19.00
SQ.M.
12.00
12.00
SQ.M.
26.00
26.00
835
BDW 823
SQ.M.
28.00
28.00
836
BDW 824
SQ.M.
15.00
15.00
837
BDW 825
SQ.M.
13.00
13.00
832
BDW 819
833
BDW 820
834
BDW 822
228
Item .No.
& Code
Description
Unit
838
BDW 826
839
BDW 827
Rate 2015-16
Completed Labour
4
SQ.M.
6.00
6.00
RG.M.
18.00
18.00
840
BDW 828
RG.M.
26.00
26.00
841
BDW 829
RG.M.
25.00
25.00
842
BDW 830
No.
11.00
11.00
843
BDW 831
RG.M.
11.00
11.00
844
BDW 834
CU.M.
615.00
615.00
845
BDW 835
SQ.M.
22.00
22.00
229
Item .No.
& Code
Description
Unit
846
BDW 836
847
BDW 837
Rate 2015-16
Completed Labour
4
RG.M.
4.00
4.00
SQ.M.
7.00
7.00
SQ.M.
10.00
10.00
RG.M.
10.00
10.00
849
BDW 839
850
BDR 22
SQ.M.
45.00
45.00
851
BDR 25
SQ.M.
26.00
26.00
852
BDR 26
SQ.M.
40.00
40.00
853
BDR 28
M.T.
724.00
724.00
230
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
854
BDW
15
No.
61.00
61.00
855
BDW
16
No.
153.00
153.00
856
CU.M.
181.00
181.00
SQ.M.
23.00
23.00
857
231
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
CU.M.
137.00
137.00
859
BDADL
66
CU.M.
158.00
158.00
860
BDADL
67
CU.M.
178.00
178.00
861
BDADL
68
CU.M.
6.00
6.00
862
BDADL
69
CU.M.
345.00
345.00
232
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
863
BDADL
70
CU.M.
602.00
602.00
864
BDADL
71
CU.M.
679.00
679.00
865
BDADL
72
CU.M.
10.00
10.00
866
ADL
RG.M.
206.00
21.00
233
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
867
ADL
RG.M.
255.00
21.00
868
ADL
RG.M.
320.00
23.00
869
ADL
RG.M.
420.00
25.00
234
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
870
ADL
RG.M.
545.00
28.00
871
ADL
RG.M.
248.00
30.00
872
ADL
RG.M.
280.00
30.00
235
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
873
ADL
RG.M.
345.00
30.00
874
ADL
RG.M.
425.00
30.00
875
ADL
RG.M.
555.00
30.00
236
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
876
ADL
RG.M.
190.00
27.00
877
ADL
RG.M.
224.00
28.00
878
ADL
RG.M.
275.00
31.00
237
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
879
ADL
RG.M.
380.00
33.00
880
ADL
Providing
and
fixing
Polyethylene
Aluminum - Polyethylene (PE-AL-PE)
composite pressure 3240 (32mm ID & 40mm
OD) pipes as per IS 15450-2004 U.V.
stabilized with carbon black having thermal
stability for hot and cold water supply with all
compression type composite internal seal
fitting (e.g. elbows, tees, reducers, couplers,
connectors etc all type of specials) with clamps
at 1.00mtr. spacing, cutting through walls &
making good the same etc. (External work)
As directed by Engineer in charge.
RG.M.
488.00
34.00
238
Item .No.
& Code
Description
Unit
Rate 2015-16
Completed Labour
4
No.
5000.00
1000.00
882
No.
400.00
80.00
883
PER
KG.
25.00
25.00
239
Item No.
Description
Unit
Labour
No.
201.00
141.00
No.
350.00
172.00
No.
500.00
240.00
No.
2000.00
320.00
No.
4200.00
360.00
No.
5800.00
550.00
RD-ROAD WORKS
884
885
886
887
888
889
240
Item No.
Description
Unit
1
890
2
Cutting down the road side thorny bushes
(Wali babule etc.) having girth from 5 cm to 20
cm including removing their roots, stacking and
conveying the materials upto 1.00 km,
removing vegetation including levelling ground
as directed for both sides of road etc. complete
as directed by Engineer in charge.
Spec. No. As directed by Engineer in charge.
891
892
893
A) Manually
B) Mechanically
Excavation for roadway in hard murum and
boulders including dressing section to the
required grade, camber and side slopes and
conveying the excavated materials with all lifts
upto a lead of 50m. and spreading for
embankment or stacking as directed by
Engineer in charge.
Spec. No. Rd.4. Page No.184.
A) Manually
B) Mechanically
241
Labour
3
Sqm
9.50
9.50
Cum
Cum
90.00
55.00
90.00
16.00
Cum
Cum
139.00
75.00
139.00
24.00
Cum
Cum
125.00
90.00
125.00
30.00
Item No.
Description
Unit
1
894
895
896
897
898
2
Excavation for roadway in soft rock, including
dressing section to the required grade, camber
and side slopes and conveying the excavated
materials with all lifts upto a lead of 50m. and
spreading or stacking as directed by Engineer
in charge.
A) Manually
B) Mechanically
Excavation for roadway in hard rock by blasting
including dressing section to the required
grade, camber and side slopes and conveying
the excavated materials in all lifts upto a lead of
50m. and spreading or stacking as directed by
Engineer in charge.
Spec. No. Rd.6. Page No.185
Excavation for roadway in hard rock by
controlled blasting wedging chiseling or line
drilling including dressing section to the
required grade, camber and side slopes and
conveying the excavated materials with all lifts
upto a lead of 50m. and spreading or stacking
as directed by Engineer in charge.
Spec. No. Rd.7. Page No.186
Excavation for roadway in
laterite rock
including dressing section to the required
grade, camber and side slopes and conveying
the excavated materials with all lifts upto a lead
of 50m. and spreading or stacking as directed
by Engineer in charge.
Spec. No. Rd.8. Page No.186
Excavation by for catch / road side water gutter
/ jungle gutter in all sorts of soils strata to the
specified section including stacking the
excavated stuff in a regular bund and disposing
of unsuitable or excess stuff beyond 50m from
place of excavation as directed by Engineer in
charge.
(By mechanical means)
Spec. No. Rd.9. Page No.187.
242
Labour
Cum
Cum
Cum
160.00
125.00
330.00
160.00
45.00
122.00
Cum
360.00
316.00
Cum
338.00
169.00
Cum
66.00
18.00
Item No.
Description
Unit
Labour
1
899
2
Excavation for catch / side water gutter in hard
murum strata to the specified section including
stacking the excavated stuff in a regular bund
and disposing of unsuitable or excess stuff as
directed by Engineer in charge.
(By mechanical means)
Spec. No. Rd.9. Page No.187.
3
Cum
80.00
25.00
900
Cum
96.00
80.00
901
Cum
187.00
165.00
902
Cum
453.00
377.00
903
Sqm
4.60
0.70
Cum
28.00
8.00
904
243
Item No.
Description
Unit
1
905
906
907
908
Labour
2
Watering and compacting of embankment to
95% of standard proctor density after laying
them in layers of 20cm.to 30cm with vibratory
roller etc.
Spec.No. : Rd.10 Page No. 188
Providing earth work in embankment with
approved materials obtained from excavation
from departmental land or other sources
including all lifts and leads upto 50m, laying in
layers of 20cm to 30cm thickness, breaking
clods, dressing to the required lines, curves,
grades and sections, watering and compaction
etc. complete as directed by Engineer in
charge.
Spec. No. Rd.12. Page No.189.
Providing Earth Work in Embankment with
approved materials obtained from excavation
from departmental land or other sources
including all lifts and leads upto 50m, laying in
layers of 20cm to 30cm thickness, breaking
clods, dressing to the required lines, curves,
grades and sections, watering and compaction
With Power Roller to 95% of standard proctor
density etc. complete as directed by Engineer
in Charge.
Spec. No. As per MORTH Specification
3
Cum
42.00
11.00
Cum
55.00
14.00
Cum
62.00
14.00
Cum
67.00
14.00
244
Item No.
Description
Unit
Labour
1
909
2
Providing Earth Work in Embankment with
approved materials obtained from excavation
from departmental land or other sources
including all lifts and leads upto 50m, laying in
layers of 20cm to 30cm thickness, breaking
clods, dressing to the required lines, curves,
grades and sections, watering and compaction
With Vibratory Roller with SCADA complete.
to 95% of standard proctor density etc.
complete as directed by Engineer in charge.
Spec. No. As per MORTH 2001 Clause No.
305 Page No. 67
3
Cum
69.00
14.00
910
Cum
94.00
21.00
911
Cum
128.00
21.00
912
Cum
124.00
55.00
245
Item No.
Description
Unit
Labour
1
913
2
Supplying 15cm. to 23 cm.trap / granite /
quartzite / gneiss stone rubble at the road side
for soling including conveying & stacking etc.
complete as directed by Engineer in charge
(By blasting).
Spec. No. Rd.19 Page No.197
3
Cum
410.00
146.00
914
Cum
457.00
204.00
915
Cum
516.00
168.00
Cum
418.00
156.00
Cum
585.00
176.00
Cum
469.00
188.00
Cum
135.00
89.00
916
917
918
919
246
Item No.
Description
Unit
Labour
1
920
2
Supplying soft murum / kankar at the road
side, including conveying and stacking etc.
complete as directed by Engineer in charge.
Spec. No. Rd.24 Page No.203.
3
Cum
106.00
73.00
921
Cum
749.00
389.00
922
Cum
40.00
40.00
Cum
27.00
27.00
Cum
32.00
32.00
Cum
1088.00
239.00
923
924
925
247
Item No.
Description
Unit
1
926
2
Providing, laying, spreading and compacting
specified graded sand, gravel or any other
course material in sub-base course including
pre-mixing the material at OMC in mechanical
mixer (Plug Mill) mannualy carriage of mixed
material, spreading in uniform layers with
Mortar grader on a prepared base and
compacting to achieve the desired density
including all material, labour, machinery,
lighting, guarding, barricating and maintenance
of diversions complete.
By Manual means with vibratory roller
Spec. No. MORTH
927
928
Grade-I
Grade-II
Grade-III
248
Labour
3
Cum
250.00
110.00
Cum
Cum
Cum
975.00
1013.00
868.00
13.00
13.00
13.00
Cum
Cum
Cum
926.00
956.00
911.00
19.00
19.00
22.00
Item No.
Description
Unit
1
929
930
2
Construction of granular sub-base by
providing coarse graded material, spreading
in uniform layers with motor grader on prepared
surface, mixing by mix in place method with
rotavator at OMC, and compacting with
vibratory roller to achieve the desired density,
complete as per clause 401. Spec MORT&H
2001 Cl 401 P. 101
Grade-I
Grade-II
Grade-III
Providing, laying, spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber,
applying and brooming requisite type of
screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density.as per
clause 401. Spec. MORT&H 2001 Cl 404 P.
112. By Manual Means
Grade-I
A-I.1) Using Scrining Crushable type such as
Moorum or Gravel
A-I.2)Using Scrining Type-A (13.2mm agg.)
Grade-II
A-II.1)Using Scrining Crushable type such as
Moorum or Gravel
A-II.2)Using Scrining Type-A (13.2mm agg.)
A-II.3)Using Scrining Type-B (11.2mm agg.)
Grade-III
A-III.1)Using Scrining Crushable type such as
Moorum or Grave
A-III.2)Using Scrining Type-B (11.2mm agg.)
249
Labour
Cum
Cum
Cum
1094.00
1126.00
897.00
16.00
17.00
17.00
Cum
1036.00
232.00
Cum
1179.00
229.00
Cum
1000.00
216.00
Cum
1074.00
215.00
Cum
1125.00
215.00
Cum
1245.00
232.00
Cum
1369.00
229.00
Item No.
Description
Unit
1
931
2
Providing, laying, spreading and compacting
stone aggregates of specific sizes to water
bound macadam specification including
spreading in uniform thickness, hand packing,
rolling with 3 wheeled steel/ vibratory roller 8-10
tonnes in stages to proper grade and camber,
applying and brooming requisite type of
screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density.as per
clause 401.Spec. MORT&H 2001 Cl 404 P.
112. By Mechanical Means
Grade-I
A-I.1) Using Scrining Crushable type such as
Moorum or Gravel
A-I.2)Using Scrining Type-A (13.2mm agg.)
Grade-II
A-II.1)Using Scrining Crushable type such as
Moorum or Gravel
A-II.2)Using Scrining Type-A (13.2mm agg.)
A-II.3)Using Scrining Type-B (11.2mm agg.)
Grade-III
A-III.1)Using Scrining Crushable type such as
Moorum or Grave
A-III.2)Using Scrining Type-B (11.2mm agg.)
932
Cum
854.00
3.00
Cum
966.00
3.00
Cum
818.00
3.00
Cum
891.00
3.00
Cum
942.00
3.00
Cum
1062.00
3.00
Cum
1187.00
3.00
1170.00
14.00
250
Labour
Item No.
Description
Unit
1
933
Labour
3
Cum
1177.00
6.00
Sqm
6.00
5.00
Sqm
13.00
2.00
Sqm
17.00
2.00
2
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers with paver in sub- base
/ base course on well prepared surface and
compacting with vibratory roller to achieve the
desired density.
Note:
1. Though vibratory roller is required only for 3
hours as per norms, the same is required to be
available at site for 6 hours to match with other
machines. The usage rates of vibratory roller may
be multiplied with a factor of 0.65
2. As three wheeled smooth steel rollers are
commonly in use, the same has been provided as
an alternative which can be used if the thickness of
individual layer does not exceed 100 mm..
934
935
936
251
Item No.
Description
Unit
Labour
1
937
2
Compacting the subgrade / gravel / 60mm
oversize metal (200mm loose) / 40mm size
metal (100mm loose) layers 2.00m to 7.00m
wide with power roller including necessary
labour, materials and artificial watering etc.
complete as directed by Engineer in charge.
With power roller
Spec. No. Rd.32 and 35 Page No. 206 and
209.
3
Sqm
14.00
3.00
938
Sqm
19.00
3.00
939
Sqm
7.00
3.00
Cum
895.00
224.00
Cum
950.00
188.00
Cum
663.00
211.00
940
941
942
252
Item No.
Description
Unit
1
943
944
945
946
947
Labour
3
Cum
500.00
250.00
Cum
482.00
210.00
Sqm
241.00
32.00
A sqm
B sqm
Constructionof Modified Penetration Macadam sqm
50mm thick over WMB suface by providing a
layer of compacted crushed coarse aggregate
using chips spreader with alternate application
of bitumen binder (Grade VG-30) and key
aggregate and rolling with three wheel 80100KN static roller to achive the desired drgree
of compaction as per technical specification
Clause 506 (IRC-SP20-2002-Appendix-8,4)
354.00
477.00
137.00
31.00
2
Breaking and removing the existing bitumen
pavement to full width and depth and disposal
of the material to 2 kms, compaction with power
roller etc complete.
Spec. No. MORTH 2001 clause No. 202.3
page No. 45
Supplying crusher broken 6 mm trap / granite
/ quartzite / gneiss stone metal at the road side
including conveying and stacking for use in
bituminous road surface work etc. complete as
directed by Engineer in charge
Spec. No. Rd.41 Page No.215.
Providing 50mm thick semi grout bituminous
road surface including supplying all materials,
preparing the existing road surface, laying the
required thickness of metal layer, heating and
spraying bitumen, spreading chips, laying seal
coat and compacting complete as directed by
Engineer in charge. (By using Bulk Asphalt
60/70 grade)
Spec. No. Rd.60 Page No.232.
Bituminous Penetration Macadam Construction
of penetration macadam over prepared Base by
providing a layer of compacted crushed coarse
aggregate using chips spreader with alternate
applications of bituminous binder and key
aggregates and rolling with a smooth wheeled
steel roller 8-10 tonne capacity to achieve the
desired degree of compaction)
253
Item No.
Description
Unit
Labour
163.00
36.00
154.00
32.00
180.00
37.00
1
948
2
3
Constructionof Modified Penetration Macadam sqm
75mm thick over WMB suface by providing a
layer of compacted crushed coarse aggregate
using chips spreader with alternate application
of bitumen binder (Grade VG-30) and key
aggregate and rolling with three wheel 80100KN static roller to achive the desired drgree
of compaction as per technical specification
Clause 506 (IRC-SP20-2002-Appendix-8,4)
949
950
254
Item No.
Description
Unit
Labour
1
951
2
Providing and laying 20mm thick open graded
bituminous carpet including supplying all
materials, preparing and cleaning the base,
heating bitumen and chips, mixing bitumen and
chips in hot mix plant, applying tack coat
30kg/100sqm, laying the carpet layer and
compacting without seal coat on black top
surface with paver finisher (Hot Mix Hot Laid)
etc. complete as directed by Engineer in charge
(using bulk bitumen 60/70 grade).
Spec. No. MORTH 2001 Cl.No. 511 Page
No.192
3
Sqm
225.00
23.00
952
Sqm
237.00
22.00
953
Sqm
211.00
18.00
255
Item No.
Description
Unit
1
954
2
Providing 20mm. thick open graded premix
bituminous carpet, including suppplying all
materials, including as directed preparing and
cleaning the base, heating bitumen and chips,
mixing bitumen and chips in hot mix plant, applying
tack coat 30 Kg./100 Sqm. Laying the carpet layer
and compacting without seal coat on Black Top
surface with paver finisher. (Hot mix hot laid) etc.
complete as directed by Engineer in-charge. Spec.
No.M.O.S.T. 1995 Cl.No. 509 Page No.159 ( Using
Bulk Asphalt 60/70 Grade ) USING Asphalt Drum
mix plant with SCADA, Sensor Paver, Intelligent
Compactor with compaction analyzer and VNet
attachment.
Spec. No. As per MORTH 2001 Clause No. 511
Page No. 192
Labour
3
Sqm
228.00
22.00
955
Sqm
213.00
22.00
956
Sqm
134.00
13.00
256
Item No.
Description
Unit
1
957
2
Providing and laying single coat surface
dressing including supplying all materials,
cleaning the road surface, heating and applying
bitumen by self propelled pressure sprayers at
the rate of 12.50kg/10sqm to the water bound
macadam road surface, spreading chips at the
rate of 0.105cum/10sqm by using necessary
tools, plants and equipments and rolling etc.
complete as directed by Engineer in charge (by
using bulk bitumen 60 / 70 grade).
Spec. No. RD 64 Page No.233
Labour
3
Sqm
103.00
13.00
958
Sqm
190.00
16.00
959
Sqm
76.00
9.00
257
Item No.
Description
Unit
Labour
1
960
2
Providing and laying bituminous liquid seal
coat to the black topped surface including
supplying all materials, preparing existing road
surface, heating and applying bitumen by self
propelled / towed bitumen pressure sprayer for
uniform spraying at specified temperature at
9.8kg / 10sqm, spreading chips at 0.09cum /
10sqm and rolling etc. complete (using bulk
asphalt) as directed by Engineer in charge (by
using bulk bitumen 60 / 70 grade).(Using
vehicle tracking system)
Spec. No. RD 66 Page No.233
3
Sqm
79.00
1.00
961
Sqm
82.00
6.00
962
Sqm
164.50
0.70
258
Item No.
Description
Unit
Labour
1
963
2
Closed Graded Premix Surfacing- Providing
and Laying CGC 20 mm thickness composed of
11.2 mm to 0.09 mm aggregates Type A
premixed with bituminous binder @ 22 kg/10
sqmt transported to site with VTS , laid over a
previously prepared surface, finished to the
required grade, level, alignment, and rolling to
achieve the desired compaction VG-30
Bitumen,Excluding prime / tack coat. For
Bitumen VG-30 bulk -- USING 80 TPH Batch
mix type hot mix plant with SCADA, Sensor
Paver,
Intelligent
Compactor
with
compaction analyzer and V-Net attachment.
Spec. No. As per MORTH 2001 Clause No.
512
3
Sqm
192.50
0.90
964
Cum
28.00
28.00
965
Sqm
142.00
43.00
Cum
370.00
120.00
Cum
480.00
133.00
966
967
259
Item No.
Description
Unit
Labour
1
968
2
Picking up loose metal including stacking at
the road side neatly etc complete as directed by
Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Sqm
1.50
1.50
969
Sqm
3.50
3.50
970
Cum
5379.00
409.00
Cum
6567.00
464.00
971
260
Item No.
Description
Unit
Labour
1
972
2
Providing and laying 75mm thick Built Up
Spray Grout on WBM surface (Excluding
Tack Coat), including supplying all materials,
preparing and cleaning the base, laying the
required thickness of metal in two layers,
heating and spreading bitumen, spreading
chips, compacting both layers with power roller
etc complete as directed by Engineer in charge.
(using bulk bitumen 60/70 grade)
Spec. No. MORTH 2001 Clause No. 506 Page
No. 167
3
Sqm
277.00
29.00
973
Sqm
323.00
34.00
974
Sqm
227.00
16.00
261
Item No.
Description
Unit
Labour
1
975
2
Providing and laying Hot Mix Hot Laid Semi
Dense Carpet / Bituminous concrete 25mm
thick bitumen 5.25% by weight of total mix
including bitumen and chips in hot mix plant,
laying semi dense carpet / bituminous concrete
with paver finisher, compacting with vibratory
roller (excluding tack coat) etc complete as
directed by Engineer in charge (using bulk
bitumen 60/70 grade).
Spec. No. MORTH 2001 Clause No. 508 Page
No. 179
3
Sqm
234.00
21.00
976
Providing and laying hot mix hot laid semidence bituminous concrete 25mm. thick
bitumen 5.25% by weight of total mix including
supplying all materials, heating bitumen and
chips, in batch type or continuous or drum type
hot mix plant, laying semi dense concrete with
self propelled paver finisher including
compacting Vibratory Roller etc. complete
(Excluding tack coat at 5 Kg./10 Sqm.)Etc.
complete as directed by Engineer in-charge (
By Using Bulk Asphalt 60/70 Grade ) USING 80
TPH Batch mix type hot mix plant with
SCADA,
Sensor
Paver,
Intelligent
Compactor with compaction analyzer and VNet attachment.
Spec. No. MORTH 2001 Cl. No. 508 Page No.
179
sqm
261.00
21.00
262
Item No.
Description
Unit
228.00
17.00
Sqm
25.00
3.00
Sqm
30.00
2.00
1
977
2
Providing and laying hot mix hot laid semidence bituminous concrete 25mm. thick
bitumen 5.25% by weight of total mix including
supplying all materials, heating bitumen and
chips, in batch type or continuous or drum type
hot mix plant, laying semi dense concrete with
self propelled paver finisher including
compacting Vibratory Roller etc. complete
(Excluding tack coat at 5 Kg./10 Sqm.)Etc.
complete as directed by Engineer in-charge (
By Using Bulk Asphalt 60/70 Grade ) USING 80
TPH Drum Mix Type hot mix plant with
SCADA,
Sensor
Paver,
Intelligent
Compactor with compaction analyzer and VNet attachment.
Spec. No. MORTH 2001 Cl. No. 508 Page No.
179
978
979
263
Labour
Item No.
Description
Unit
Labour
1
980
2
Providing and applying tack coat by self
propelled or towed bitumen pressure sprayer
for uniform spraying at specified temperature at
the specified rate of 4kg / 10sqm on existing
water bound macadam surface etc complete as
directed by Engineer in charge. (using bulk
bitumen 60/70 grade)
Spec. No. MORTH 2001 Clause No. 503 Page
No. 157
3
Sqm
28.00
2.00
981
Cum
6539.00
38.00
264
Item No.
Description
Unit
Labour
1
982
2
Providing and laying Hot Mix Hot Laid
Bituminous Macadam 50mm / 75mm thick
(average) with 3.30 percent bitumen by weight
of total mix for overlay course to remove
irregularities including diversion of traffic,
supply of all materials, heating bitumen and
chips, mixing bitumen and chips in drum mix
type hot mix plant, laying bituminous macadam
by self propelled paver finisher with hydrostic
controls and automatic sensor device including
compacting with vibratory roller (excluding tack
coat) etc complete as directed by Engineer in
charge (using bulk bitumen 60/70 grade).
USING 80 TPH Batch mix type hot mix plant
with SCADA, Sensor Paver, Intelligent
Compactor with compaction analyzer and VNet attachment.
Spec. No. MORTH 2001 Clause No. 504 Page
No. 160
3
Cum
7055.00
35.00
983
Cum
6572.00
40.00
265
Item No.
Description
Unit
Labour
1
984
2
Providing and laying Hot Mix Hot Laid
Bituminous Macadam 50mm / 75mm thick
(average) with 3.40 percent bitumen by weight
of total mix for overlay course to remove
irregularities including diversion of traffic,
supply of all materials, heating bitumen and
chips, mixing bitumen and chips in drum mix
type hot mix plant, laying bituminous macadam
by self propelled paver finisher with hydrostic
controls and automatic sensor device including
compacting with vibratory roller (excluding tack
coat) etc complete as directed by Engineer in
charge (using bulk bitumen 60/70 grade).
USING 80 TPH Batch mix type hot mix plant
with SCADA, Sensor Paver, Intelligent
Compactor with compaction analyzer and VNet attachment.
Spec. No. MORTH 2001 Clause No. 504 Page
No. 160
3
Cum
7197.00
35.00
985
Cum
7969.00
300.00
266
Item No.
Description
Unit
Labour
1
986
2
Providing and laying Hot Mix Hot Laid Dense
Bituminous Macadam 50mm / 75mm thick
(average) with 4.5 percent bitumen by weight
of total mix for overlay course including
removing irregularities including diversion of
traffic, supply of all materials, heating bitumen
and chips, mixing bitumen and chips in drum
mix type hot mix plant, laying bituminous
macadam by self propelled paver finisher with
hydrostic controls and automatic sensor device
including compacting with vibratory roller
(excluding tack coat) etc complete as
directed by Engineer in charge (using bulk
bitumen 60/70 grade). (By using Grade II 19mm
nominal size metal) USING 80 TPH Batch mix
type hot mix plant with SCADA, Sensor
Paver,
Intelligent
Compactor
with
compaction analyzer and V-Net attachment.
Spec. No. MORTH 2001 Clause No. 507 Page
No. 170
3
Cum
8237.00
50.00
987
Cum
9791.00
50.00
267
Item No.
Description
Unit
Labour
1
988
2
Providing and laying in situ controlled cement
concrete of M-20 grade of trap metal for
cement
concrete
pavement
including
necessary joints with bituminous pad and
bitumen, dowel bars and tie bars as per design
and including mixing in a mixer compaction by
vibrating, steel formwork, finishing, curing etc.
complete and including covering of newly laid
concrete by gunny bags, plastic shets, tarpulin
etc. as directed by Engineer in charge
(excluding cost of reinforcement) for light traffic.
Spec. No. As directed by Engineer in charge
3
Cum
4100.00
351.00
989
Cum
4318.00
351.00
268
Item No.
Description
Unit
1
990
2
Providing and laying in situ controlled cement
concrete of M-20 grade of trap metal for
cement
concrete
pavement
including
necessary joints with bituminous pad and
bitumen, dowel bars and tie bars as per design
and including mixing in a mixer compaction by
vibrating, steel formwork, finishing, curing etc.
complete and including covering of newly laid
concrete by gunny bags, plastic shets, tarpulin
etc. as directed by Engineer in charge
(excluding cost of reinforcement) for light
traffic.With Fully Automatic Micro Processor
based PLC with SCADA enabled concrete
Batch Mix Plant (PAN Mixer).
Spec. No. As directed by Engineer in charge
991
269
Labour
3
Cum
5083.00
351.00
Cum
Cum
6090.00
6490.00
1,096.00
1,154.00
Item No.
Description
Unit
1
992
2
Construction of unreinforced / reinforced
cement concrete apvement in M-20 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) .Using fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer. (Excluding
surface reinforcement but including raising of
manholes if necessary
(With Prior permission of S.E.)
270
Labour
Cum
Cum
6222.00
6618.00
1096.00
1154.00
Item No.
Description
Unit
1
993
2
Construction of unreinforced / reinforced
cement concrete apvement in M-20 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) With Fully Automatic Micro
Processor based PLC with SCADA enabled
concrete Batch Mix Plant (PAN Mixer).
(Excluding surface reinforcement but including
raising of manholes if necessary
(With Prior permission of S.E.)
271
Labour
Cum
Cum
6997.00
7397.00
1096.00
1154.00
Item No.
Description
Unit
1
994
2
Construction of unreinforced / reinforced
cement concrete apvement in M-30 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge. (Using tre-mix
method) (Excluding surface reinforcement but
including raising of manholes if necessary
With Dowel bars and pipes
272
3
Cum
Labour
6611.00
1,094.00
Item No.
Description
Unit
1
995
2
Construction of unreinforced / reinforced
cement concrete apvement in M-30 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge. (Using tre-mix
method) Using fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer. (Excluding
surface reinforcement but including raising of
manholes if necessary
With Dowel bars and pipes
273
3
Cum
Labour
6738.00
1094.00
Item No.
Description
Unit
1
996
2
Construction of unreinforced / reinforced
cement concrete apvement in M-30 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge. (Using tre-mix
method) With Fully Automatic Micro
Processor based PLC with SCADA enabled
concrete Batch Mix Plant (PAN Mixer).
(Excluding surface reinforcement but including
raising of manholes if necessary
With Dowel bars and pipes
274
3
Cum
Labour
7489.00
1094.00
Item No.
Description
Unit
1
997
2
Construction of unreinforced / reinforced
cement concrete apvement in M-35 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) (Excluding surface reinforcement but
including raising of manholes if necessary
With Dowel bars and pipes
275
3
Cum
Labour
6798.00
1,110.00
Item No.
Description
Unit
1
998
2
Construction of unreinforced / reinforced
cement concrete apvement in M-35 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) Using fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer.(Excluding
surface reinforcement but including raising of
manholes if necessary
With Dowel bars and pipes
276
3
Cum
Labour
6925.00
1110.00
Item No.
Description
Unit
1
999
2
Construction of unreinforced / reinforced
cement concrete apvement in M-35 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) With Fully Automatic Micro
Processor based PLC with SCADA enabled
concrete
Batch
Mix
Plant
(PAN
Mixer)(Excluding surface reinforcement but
including raising of manholes if necessary
With Dowel bars and pipes
277
3
Cum
Labour
7676.00
1110.00
Item No.
Description
Unit
1
1000
2
Construction of unreinforced / reinforced
cement concrete apvement in M-40 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) (Excluding surface reinforcement but
including raising of manholes if necessary
With Dowel bars and pipes
278
3
Cum
Labour
6985.00
1,113.00
Item No.
Description
Unit
1
1001
2
Construction of unreinforced / reinforced
cement concrete apvement in M-40 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method) Using fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer.(Excluding
surface reinforcement but including raising of
manholes if necessary
With Dowel bars and pipes
279
3
Cum
Labour
7113.00
1113.00
Item No.
Description
Unit
1
1002
2
Construction of unreinforced / reinforced
cement concrete apvement in M-40 grade
concrete with 43/53 Grade cement, fine
aggregate and coarse aggregate of metal of
trap/ granite/ quartzite/ mixer of appropriate
capacity with weigh batcher as per approved
mix design, laid with a fixed form or slip form
paver, spread compacted and finished in
continuous operation including provision of
contraction, expansion, construction and
logitudinal joints, joints filler, seperation
membrane, sealant primer, joint sealant,
debonding strip, dowel bar, tie rod, admixtures
as approved, curing, etc. finishing to lines and
grades including transportation of mix if done
through batching plant etc. complete as
Directed by Engineer-in-charge.(Using tre-mix
method)
With Fully Automatic Micro
Processor based PLC with SCADA enabled
concrete Batch Mix Plant (PAN Mixer)
(Excluding surface reinforcement but including
raising of manholes if necessary
With Dowel bars and pipes
1003
280
Labour
3
Cum
7864.00
1113.00
Sq.M
Sq.M
Sq.M
109.00
120.00
139.00
12.00
12.00
12.00
Item No.
Description
Unit
Labour
ROAD FURNITURE
1004
No.
842.00
291.00
1005
No.
938.00
302.00
1006
No.
975.00
293.00
1007
No.
2655.00
376.00
1008
No.
1812.00
340.00
281
Item No.
Description
Unit
1
1009
1010
2
Providing and fixing Cautionary / Warning sign
board shape of equilateral triangle of 90 cm
sides made out of 14 guage (2 mm) thick
aluminium
sheet
bonded with white full
retroreflective sheeting of engineering grade having
pressure sensitive / heat activated adhesive,
retroreflective or screen printed transparent red
coloured border, black coloured cutout symbols of
non reflective sheeting having pressure sensitive
adhesive or screen printed symbols in black opaque
colour with non pealable crystal clear transparent
protective coat including one M.S. angle iron post of
size 65 mm x 65 mm x 6 mm, 3.65 m long painted
with one coat of epoxy primer and two coats of
epoxy finish paint having black and white bands of
25 cm width including tack welding to G.I. fixtures
etc. and fixing the boards in 1:4:8 concrete block of
size 60 cm x 60 cm x 75 cm including transportation
etc. complete.Spec. No. As per IRC-67, 1977 and
M.O.S.T. Circular No. RW / NH-33023/31/88
D.O.III. Dated 2/11-5-1994.
282
Labour
3
No.
3888.00
529.00
No.
2060.00
334.00
Item No.
Description
Unit
1
1011
1012
2
Providing and fixing Cautionary / Warning sign
board having shape of equilateral triangle of 60
cm sides made out 16 gauge (1.6 mm) thick mild
steel sheet painted with one coat of Zinc chromate
stoving primer and two coats of green stove enamel
paint on front side and grey stove enamel on back
side and border / messages / symbols etc. with cut
out of retroreflective sheeting of engineering grade,
complete bound coated with non pealable crystal
clear transparent protective coat including one M.S.
angle iron post of size 65 mm x 65 mm x 6 mm,
3.65 m long painted with alternate black and white
bands of 25 cm width including tack welding to G.I.
fixtures etc. and fixing the boards in 1:4:8 concrete
block of size 60 cm x 60 cm x 75 cm including
transportation etc. complete. Spec.No. IRC 67
1977 & MOST Circular No. RW/NH-33023/31/88
DO-III Dated 2/11/5/94.
283
Labour
3
No.
1720.00
333.00
No.
3828.00
556.00
Item No.
Description
Unit
1
1013
1014
2
Providing and fixing Mandatory / Regulatory sign
board of 60cm diameter made out of 16 gauge
(1.6 mm) thick galvanised iron sheet painted with
one coat of Zinc chromate stoving primer and two
coats of green stove enamel paint on front side and
grey stove enamel on back side and border /
messages / symbols etc. with cut out of
retroreflective sheeting of engineering grade,
complete bound coated with non pealable crystal
clear transparent protective coat including one M.S.
angle iron post of size 65 mm x 65 mm x 6 mm,
3.65 m long painted with alternate black and white
bands of 25 cm width including tack welding to G.I.
fixtures etc. and fixing the boards in 1:4:8 concrete
block of size 60 cm x 60 cm x 75 cm including
transportation etc. complete.
Spec. No. As per IRC-67, 1977 and M.O.S.T.
Circular No. RW / NH-33023/31/88 D.O.III. Dated
2/11-5-1994.
Providing and fixing Mandatory / Regulatory sign
board of 40cm diameter made out of 16 gauge
(1.6 mm) thick galvanised iron sheet painted with
one coat of Zinc chromate stoving primer and two
coats of green stove enamel paint on front side and
grey stove enamel on back side and border /
messages / symbols etc. with cut out of
retroreflective sheeting of engineering grade,
complete bound coated with non pealable crystal
clear transparent protective coat including one M.S.
angle iron post of size 65 mm x 65 mm x 6 mm,
3.65 m long painted with alternate black and white
bands of 25 cm width including tack welding to G.I.
fixtures etc. and fixing the boards in 1:4:8 concrete
block of size 60 cm x 60 cm x 75 cm including
transportation etc. complete.
Spec. No. As per IRC-67, 1977 and M.O.S.T.
Circular No. RW / NH-33023/31/88 D.O.III. Dated
2/11-5-1994.
284
Labour
3
No.
1948.00
334.00
No.
1630.00
334.00
Item No.
Description
Unit
1
1015
1016
1017
2
Providing and fixing R.C.C. pre-cast road
divider of required shape and size having
hight 1.07m, top width 0.30 m, intermediate
width 0.40m at 0.74m hight from top, bottom
width 0.82m, having vertical base base of
0.075m. including surface reinforcement at the
rate of 10.21Kg per meter. Including supplying
of all materials, transportation, loading,
unloading, removing existing B.T. surface,
fixing in line-level and finishing etc. complete as
directed by Engineer In charge.
Providing and fixing R.C.C. pre-cast Gutter of
0.15m thick wall, one side vertical having height
0.65m, bottom width 0.45m clear, other side
having same height with the slope 1:1 including
surface reinforcement at 6.40kg per meter
lenth. including excavation in different strata,
supplying of all materials, transportation,
loading, unloading, fixing in line - level and
finishing etc. complete as directed by Engineer
In charge.
3
One
Meter
One
Meter
285
Labour
4180.00
1,250
2925.00
880
4557.00
1,370
Item No.
Description
Unit
Labour
1
1018
4
2
3
Providing and Fixing of Retro Reflectorised 300 Per Number3649.00
x 900 mm Hazard market boards made out of
retro refflective sheeting of High Intensity
prismatic grade conforming to IRC-67: 2012 &
Type IV standards of ASTM D4956-09
specification, fixed over 4mm thick ACP sheet
supported with Back support frame of 25x 25x 3
mm mild steel angle as approved supported on
a mild steel agle iron post 75 mm x 75 mm x 6
mm-3.5 mtr height,, firmly fixed to the ground
by means of prpoerly designed foundation with
M-20 grade cement concrete 45 cm x 45 cm x
60 cm. 60 cm below ground level as per
approved drawings. 7 years Warranty for Retro
Reflective Sheeting from the original sheeting
manufacturer & a certified copy of three years
outdoor exposure report from an independent
test lab for the product offered shall be
submitted by the contractor (Bottom of board
shall be at least 2.6 mtr. above ground level)
1019
No.
7.00
4.00
1020
No.
16.00
4.00
1021
No.
104.00
44.00
1022
No.
200.00
120.00
286
75
Item No.
Description
Unit
Labour
1
1023
2
Painting Ordinary KM Stone with approved
enamel paint in two coats and lettering
including cleaning surface etc. complete.
Spec. No. As directed by Engineer in charge
3
No.
160.00
100.00
1024
No.
40.00
16.00
1025
No.
4.00
2.00
1026
No.
20.00
10.00
1027
No.
675.00
80.00
287
Item No.
Description
Unit
Labour
1
1028
2
Providing oil painting white / black / yellow in
alternative bands as per MOST 1995 with
approved
oil
paint,
labour,
material,
transportation etc. complete.
Spec. No. As directed by Engineer in charge
3
Sqm
40.00
25.00
1029
Cum
2774.00
533.00
1030
Cum
4630.00
740.00
1031
Rgm
12.00
4.00
288
Item No.
Description
Unit
Labour
1
1032
2
Providing
and
applying
thermoplastic
reflective paint of apprived colour or
compound for traffic lane strips of 3 mm thick of
pigment 10%, on clean, dry and good road
surface with 30 to 40 percent glass beads, 20
percent binder and 40 percent of filler material
etc complete. (Rate is for actual painted
length). For 10 cm width of strip
Spec. No. MORTH 2001, clause No. 803.4
Page No. 321
3
Rgm
70.00
27.00
1033
Providing
and
applying
thermoplastic
reflective paint of apprived colour or
compound for traffic lane strips of 3 mm thick of
pigment 10%, on clean, dry and good road
surface with 30 to 40 percent glass beads, 20
percent binder and 40 percent of filler material
etc complete. (Rate is for actual painted
length). For 15 cm width of strip
Spec. No. MORTH 2001, clause No. 803.4
Page No. 321
Rgm
105.00
39.00
1034
Sqm
45.00
15.00
Each
325.00
1035
289
Item No.
Description
Unit
1
1036
2
Providing and fixing board displaying
information, such as Name of work, Tender
cost, Name of Contractor, Work completion and
liability period etc, having rectangular shape of
1.20m x 0.90m size made out 18 gauge
(1.25mm) thick mild steel sheet painted with
one coat of Zinc chromate stoving primer and
two coats of enamel paint on front side and
grey stove enamel on back side and border /
messages / symbols etc. with approved colour
shade paint complete, on M.S.angle of size 35
x 35 x 3 mm frame with properly cross braced
M.S. angles of size 35mmx35mmx3mm duly
painted including Two M.S. angle iron posts of
size 65 mm x 65 mm x 6 mm, 3.65 m long
painted with alternate black and white bands of
25 cm width including all fixtures etc.and fixing
the boards in 1:4:8 concrete block of size 60
cm x 60 cm x 75 cm including, excavation,
refilling, transportation, and labour etc
complete.
Spec. No. As directed by Engineer in Charge
290
3
Each
Labour
5275.00
777.00
Item No.
Description
Unit
1
1037
1038
1039
1040
1041
2
CD- CROSS DRAINAGE WORK
Providing & laying in situ cement concrete
grade M-10 with trap/ granite/ quartzite gneiss
metal in foundation including necessary
compacting and curing including form work for
work if required etc. complete as directed by
Engineer in charge
Spec. No. CD.3 Page No.160
Providing and laying in situ cement concrete of
1:4:8 proportion with trap/ granite/ quartzite/
gneiss metal in foundation including necessary
compacting and curing including form work if
required etc. complete as directed by Engineer
in charge
Spec. No. CD.3 Page No.160
Providing and laying in situ cement concrete of
1:5:10 proportion with trap/ granite/ quartzite/
gneiss metal in foundation including
necessary compacting and curing including
form work if required etc. complete as directed
by Engineer in charge
Spec. No. CD.3 Page No.160
Providing uncoursed rubble trap / granite /
quartzite / gneiss stone masonry in cement
mortar 1:5 for piers, abutments, wings, returns,
headwalls, parapet etc. including striking joints
of the non exposed faces and pointing the
exposed faces with cement mortar (1:3)
including scaffolding and curing masonry
complete (including bailing out of water) as
directed by Engineer in charge.
Spec. No. CD.6 Page No.162
Providing & laying in situ cement concrete M-10
for piers, abutments, wings, returns,
headwalls, parapet etc. including striking joints
of the non exposed faces and pointing the
exposed faces with cement mortar (1:3)
including scaffolding and curing masonry
complete (including bailing out of water) as
directed by Engineer in charge
Spec. No. As Directed by Engineer in charge.
291
Labour
Cum
3098.00
548.00
Cum
2621.00
533.00
Cum
2312.00
516.00
Cum
1950.00
450.00
Cum
2837.00
567.00
Item No.
Description
Unit
Labour
2
Laying in position,jointing in line,level as
directed reinforced cement concrete pipes of
class and diameter (excluding cost of pipe)
A) NP-2 class I.S. 456-2000 (For light traffic
road upto ODR standard.
1) 450 mm diameter
2) 600 mm diameter
3) 800 mm diameter
4) 900 mm diameter
5) 1000 mm diameter
6) 1200 mm diameter
B) NP-3 class I.S. 456-2000 (For heavy traffic
road of MDR & SH standard.
1) 800 mm diameter
2) 900 mm diameter
3) 1000 mm diameter
4) 1200 mm diameter
C) NP-4 class I.S. 456-2000 (For heavy traffic
road of MSH & NH standard.
1) 1000 mm diameter
2) 1200 mm diameter
Providing selected hard murum filling
including laying in layers of 15cm.to 20cm. thick
layers including watering and compacting etc.
complete as directed by Engineer in charge.
Spec. No. CD.14 Page No.167
Rgm
Rgm
Rgm
Rgm
Rgm
Rgm
282.00
334.00
380.00
442.00
496.00
542.00
113.00
135.00
150.00
175.00
201.00
216.00
Rgm
Rgm
Rgm
Rgm
430.00
463.00
525.00
547.00
161.00
176.00
200.00
251.00
Rgm
Rgm
Cum
655.00
755.00
165.00
353.00
453.00
60.00
1044
Cum
3150.00
630.00
1045
Sqm
4601.00
621.00
1
1042
1043
292
Item No.
Description
Unit
Labour
1
1046
2
Providing and fixing stream lined reinforced
cement concrete 1:2:4 guard stone including
mild steel bar reinforcement etc. complete as
directed by Engineer in charge.
Spec. No. CD.20 Page No.169
3
No.
403.00
81.00
1047
No.
408.00
82.00
1048
No.
472.00
107.00
1049
Cum
2827.00
416.00
293
Item No.
Description
Unit
1
1050
2
Providing and casting in situ cement concrete
M15 of trap / granite / quartzite / gneiss metal
for coping to CD work / Bridge parapets
moulded or chamfered as per drawing or as
directed including centering, form work,
compacting, finishing the exposed faces with
sufficient minimum thickness of 1:3 cement
plaster to give a smooth and even surface or
roughening them if special finish is to be
provided and curing etc. complete as directed
by Engineer in charge.
Spec. No. As directed by Engineer in charge.
294
3
Cum
Labour
4121.00
443.00
Item No.
Description
Unit
Labour
BR - BRIDGE WORK
1051
Cum
510.00
408.00
1052
Cum
474.00
383.00
1053
Cum
458.00
356.00
1054
Job
0.20 % Cost
of bridge
proper
1055
Job
0.10 % Cost
of bridge
proper
295
Item No.
Description
Unit
Labour
1
1056
2
Excavation for foundation including shoring
and strutting as necessary and disposing off
excavated stuff as directed in earth soils of
all types sand, gravel, soft murum etc.
cpmplete (excluding dewatering if separately
provided) etc. complete as directed by Engineer
in charge (for depth of 1.5m).
Spec. No. BR-3 Page No.102
Note : Add 5 % depth for 1.50 to 3.00 m . Add
10 % for depth for 3.00 to 6.00 m . Add 15 %
for depth above 6.00 m (With reference to
average ground level for that particular
structural component).
3
Cum
121.00
105.00
1057
Cum
148.00
128.00
1058
Cum
168.00
144.00
1059
Cum
196.00
172.00
296
Item No.
Description
Unit
Labour
1
1060
2
Excavation for foundation in hard murum and
boulders (upto 0.2cum to 0.5cum size)
including shoring and strutting as necessary
and disposing off excavated stuff as directed
excluding dewatering if seperately provided etc.
complete as directed by Engineer in charge.
Spec. No. BR-3 Page No.102
3
Cum
242.00
242.00
1061
Cum
324.00
291.00
Cum
520.00
450.00
Cum
689.00
563.00
1064
Cum
330.00
296.00
1065
Cum
824.00
200.00
1062
1063
297
Item No.
Description
Unit
Labour
1
1066
2
Providing and fixing pressure relief pipes of
100mm diameter of PVC as per drawing for
RCC raft, galaries etc. complete as directed by
Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Rgm
95.00
30.00
1067
Cum
400.00
168.00
1068
Cum
427.00
177.00
1069
1070
a) Abutment Retutrns
b) Pier / Bandhara pier / Weir
c) Raft, cut off Walls
d) V.C. & Toe wall, Aprons
Note : 70 % pay ment willl be released after
completion of foundation up to L.W.L. remaning
30 % will be released after completion of whole
work. This note be given in DTPs/ tender
Schedule "C"
Providing and laying in situ controlled
reinforced cement concrete of M-20 for raft
including form work, scaffolding, compaction
by vibrating, finishing, curing etc. complete as
directed by Engineer in charge.
Spec. No. As directed by Engineer in charge
298
Non
Perinial
Cum
Cum
Cum
Cum
132.00
316.00
259.00
95.00
Perinial
392.00
632.00
778.00
357.00
Cum
4763.00
677.00
Item No.
Description
Unit
Labour
1
1071
2
Providing and laying in situ controlled
reinforced cement concrete of M-20 for raft
including form work, scaffolding, compaction
by vibrating, finishing, curing with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. As directed by Engineer in charge
3
Cum
4870.00
677.00
1072
Cum
5538.00
677.00
1073
Cum
6057.00
1,652.00
1074
Cum
6462.00
1652.00
299
Item No.
Description
Unit
Labour
1
1075
2
Providing and laying in situ controlled
reinforced cement concrete of M-20 for cut off
walls including form work, scaffolding,
compaction by vibrating, finishing, curingWith
Fully Automatic Micro Processor based PLC
with SCADA enabled concrete Batch Mix
Plant (PAN Mixer). etc. complete as directed
by Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Cum
7114.00
1652.00
1076
Rgm
103.00
36.00
1077
Cum
2811.00
630.00
1078
Cum
2980.00
630.00
300
Item No.
Description
Unit
Labour
1
1079
2
Providing and laying in situ cement concrete
M15 proportion of trap / granite / quartzite /
gneiss metal for annualar filling around
abutment, piers for foundation including
necessary formwork, scaffolding, bailing out
water, compacting, curing
With Fully
Automatic Micro Processor based PLC with
SCADA enabled concrete Batch Mix Plant
(PAN Mixer). etc. complete as directed by
Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Cum
3509.00
630.00
1080
M.T.
49538.00
5,785.00
1081
Cum
2621.00
307.00
M.T.
53424.00
5,440.00
Cum
4132.00
633.00
1082
1083
301
Item No.
Description
Unit
1
1084
2
Providing and laying in situ M.20 cement
contrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete well curbs
including necessary shuttering, compacting by
vibrating, finishing and curing (excluding
reinforcement and including shuttering) etc.
complete as directed by Engineer in charge.
Spec. No. BR-12 Page No.112
Labour
3
Cum
5958.00
1,283.00
1085
Cum
5205.00
911.00
1086
Cum
6414.00
907.00
1087
Cum
3742.00
556.00
1088
302
Item No.
Description
Unit
Labour
Rgm
Rgm
Rgm
Rgm
145,009
159,510
188,511
217,513
0.00
0.00
0.00
0.00
Rgm
Rgm
Rgm
Rgm
36,252
43,502
65,253
101,508
0.00
0.00
0.00
0.00
Notes :
A) Depth upto 10m add 30% extra.
B) Depth upto 15m add 40% extra.
C) Depth upto 20m add 60% extra.
D) Depth upto 20m & above add 100 % extra.
1089
303
Item No.
Description
Unit
1
1090
2
Providing sacrificial well for adequate depth
and diametre safely designed and constructed
RCC well (CC minimum M15 grade) and
sinking the sacrificial well in soil / murum / sand
and such material which can be removed by
grabbing, cheselling, including necessary
dewatering required for sinking the well in land
and proper setting of wells including all
materials except pneumatic sinking (depth upto
5m) etc. including dismantalling of RCC well
upto the bed level after completion of main
work etc. complete as directed by Engineer in
charge. (The dewatering is considered only for
sacrificial well. Dewatering for foundation of
substructure below the bottom of sacrifical well
shall be separately considered) For Non
Perenial River :- (a) For 5m diameter of well
Spec. No. BR-14 Page No.113
Notes :
a) Add Rs. 3500/- per meter increase in
diameter of well upto 9.0 m diameter
a) Add Rs. 4600/- per meter increase in
diameter of well above 9.0 m and up to 15.0 m
diameter
304
3
Rgm
Labour
23,121.00
4,904.00
Item No.
Description
Unit
1
1091
1092
2
Providing sacrificial well for adequate depth
and diametre safely designed and constructed
RCC well (CC minimum M15 grade) and
sinking the sacrificial well in soil / murum / sand
and such material which can be removed by
grabbing, cheselling, including necessary
dewatering required for sinking the well in land
and proper setting of wells including all
materials except pneumatic sinking (depth upto
5m) etc. including dismantalling of RCC well
upto the bed level after completion of main
work etc. complete as directed by Engineer in
charge. (The dewatering is considered only for
sacrificial well. Dewatering for foundation of
substructure below the bottom of sacrifical well
shall be separately considered) For Perenial
River (a) For 5m diameter of well
Spec. No. BR-14 Page No.113
Notes :
Add Rs. 4400/- upto 9m & 6600/- from 9m to
15m per meter increase in diameter of well.
Notes :
a) Add Rs. 4600/- per meter increase in
diameter of well upto 9.0 m diameter
a) Add Rs. 6800/- per meter increase in
diameter of well above 9.0 m and up to 15.0 m
diameter
Providing steel anchor dowels at the base of
the well including drilling holes upto 2.5 M.
depth in rock, placing the dowels in position
and effectively grouting the holes. (32mm dia
steel Rod of 4.0 m. length effectively grouted
upto 2.5 m depth.)etc. complete as directed by
Engineer in charge.
Spec. No. BR-16 Page No.120
305
Labour
3
Rgm
33,744.90
5,460.00
No.
3809.00
1,231.00
Item No.
Description
Unit
Labour
1
1093
2
Providing steel anchor dowels through
staining of the well, at the base of the well in
position and including drilling holes upto 2.5 M.
depth in rock, placing the dowels in position
and effectively grouting the holes. (32mm dia
steel Rod of 4.0 m. length effectively grouted
upto 2.5 m depth.)etc. complete as directed by
Engineer in charge.
Spec. No. BR-16 Page No.120
3
No.
5714.00
882.00
1094
Cum
4231.00
632.00
1095
Cum
310.00
123.00
Cum
3320.00
538.00
Cum
4237.00
734.00
1096
1097
306
Item No.
Description
Unit
1
1098
1099
Labour
5
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
2125.00
2252.00
2385.00
2526.00
2673.00
3240.00
3835.00
4007.00
5177.00
5566.00
5966.00
6556.00
7094.00
8999.00
9512.00
10215.00
11621.00
18940.00
490.00
490.00
622.00
607.00
640.00
1079.00
1079.00
1087.00
1304.00
1397.00
1463.00
622.00
622.00
2322.00
2448.00
2621.00
2919.00
4749.00
a)
b)
c)
d)
e)
f)
g)
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
2259.00
2398.00
2545.00
2699.00
2861.00
3981.00
4165.00
332.00
332.00
407.00
432.00
458.00
532.00
574.00
450 mm dia
475 mm dia
500 mm dia
525 mm dia
550 mm dia
600 mm dia
625 mm dia
307
Item No.
Description
Unit
1100
Labour
5
h) 650 mm dia
i) 750 mm dia
j) 800 mm dia
k) 825 mm dia
l) 900 mm dia
m) 975 mm dia
n) 1000 mm dia
o) 1050 mm dia
p) 1100 mm dia
q) 1200 mm dia
r) 1500 mm dia
Providing M-35 R.C.C. cast in situ for following dia.
bored piles each of load capacity as per design and
of specified diameter of as directed, placed through
steel shell sunk to the required depth through all
strata
except
rock,
excluding
provision
of
reinforcement including placing concrete by tremie
arrangement compaction of concrete and withdrawal
of steel shall etc. complete with fully automatic micro
processor based PLC with SCADA enabled with
reversible
Drum
Type
mixer.
Specifications: BR-21 Page 124, MORTH - 1100 and
1700
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
4358.00
6143.00
6620.00
6867.00
7653.00
8501.00
10493.00
11109.00
11764.00
13862.00
21677.00
617.00
860.00
927.00
961.00
1148.00
1359.00
1469.00
1620.00
1804.00
2108.00
3296.00
a) 450 mm dia
b) 475 mm dia
c) 500 mm dia
d) 525 mm dia
e) 550 mm dia
f) 600 mm dia
g) 625 mm dia
h) 650 mm dia
i) 750 mm dia
j) 800 mm dia
k) 825 mm dia
l) 900 mm dia
m) 975 mm dia
n) 1000 mm dia
o) 1050 mm dia
p) 1100 mm dia
q) 1200 mm dia
r) 1500 mm dia
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
2238.00
2317.00
2407.00
2576.00
2811.00
3759.00
3970.00
4277.00
5406.00
5698.00
5991.00
7262.00
8271.00
9231.00
9703.00
10352.00
13142.00
19416.00
308.00
490.00
622.00
607.00
640.00
1079.00
1079.00
1087.00
1304.00
1397.00
1463.00
1639.00
1799.00
2322.00
2448.00
2621.00
2919.00
4749.00
308
Item No.
Description
Unit
1
1101
1102
1103
Labour
5
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Metric
Tonne
Cum
2320.00
2465.00
2618.00
2780.00
2950.00
4086.00
4281.00
4482.00
6308.00
6808.00
7067.00
7892.00
8781.00
10788.00
11434.00
12121.00
14286.00
22339.00
66081.00
3592.00
332.00
332.00
407.00
432.00
458.00
532.00
574.00
617.00
860.00
927.00
961.00
1148.00
1359.00
1469.00
1620.00
1804.00
2108.00
3296.00
8588.00
708.00
Item No.
Description
Unit
1
1104
1105
1106
1107
2
Providing and laying in situ M.20 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete well /pile
cap including necessary formwork, compaction
by vibration, finishing and curing (excluding
reinforcement) etc. complete as directed by
Engineer in charge.
Spec. No. BR-24 Page No.124
Providing coursed rubble trap/ granite/
quartzite/ gneiss stone masonry in cement
mortar 1:5 for abutment, returns, wings, head
walls etc. with khandki facing and rubble facing
including pointing with cement mortar 1:3 for
khandki faces and struck joints for rubble
backing including scaffolding, bailing out water
& watering masonry etc. complete as directed
by Engineer in charge.
Spec. No. BR-25 Page No.125
Providing coursed rubble trap/ granite/
quartzite/ gneiss stone masonry in cement
mortar 1:5 for piers with Khandki facing and
pointing with cement mortar 1:3 on all sides
including cut and ease water, necessary
scaffolding, bailing out water & watering
masonry etc. complete as directed by Engineer
in charge.
Spec. No. BR-26 Page No.127
Providing and laying M.15 cement concrete of
trap granite /quartzite /gneiss metal for cast in
situ piers, abutments, returns, wings etc.
including with necessary centering, shuttering,
scaffolding, compacting by vibrating, finishing
with cement plaster and formwork, curing,
dewatering, bailing out water etc. complete as
directed by Engineer in charge.
Spec. No. BR-27 Page No.127
310
Labour
3
Cum
4909.00
745.00
Cum
1971.00
648.00
Cum
2110.00
726.00
Cum
3710.00
739.00
Item No.
Description
Unit
1
1108
1109
1110
Labour
2
Providing and laying M.15 cement concrete of
trap granite /quartzite /gneiss metal for cast in
situ piers, abutments, returns, wings etc.
including with necessary centering, shuttering,
scaffolding, compacting by vibrating, finishing
with cement plaster and formwork, curing,
dewatering, bailing out water with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. BR-27 Page No.127
3
Cum
3806.00
739.00
Cum
4394.00
739.00
Cum
5036.00
1,062.00
311
Item No.
Description
Unit
1
1111
1112
1113
Labour
2
Providing and laying M.20 cement concrete of
trap granite /quartzite /gneiss metal for cast in
situ piers, abutments, returns, wings etc.
including with necessary centering, shuttering,
scaffolding, compacting by vibrating, finishing
with cement plaster and formwork, curing,
dewatering, bailing out water ( up to 4.0 m
height ) with fully automatic micro processor
based PLC with SCADA enabled with
reversible Drum Type mixer. etc. complete
as directed by Engineer in charge.
Spec. No. BR-27 Page No.127
3
Cum
5355.00
1062.00
Cum
6110.00
1062.00
Cum
5397.00
1,042.00
312
Item No.
Description
Unit
1
1114
1115
1116
Labour
2
Providing and laying M.20 cement concrete of
trap granite /quartzite /gneiss metal for cast in
situ reinforced cement concrete Solid piers,
columns etc. including with necessary
centering, shuttering, scaffolding, compacting
by vibrating, finishing with cement plaster and
formwork, curing, dewatering, bailing out water
( up to 4.0 m height ) (excluding steel
reinforcement) with fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer. etc.
complete as directed by Engineer in charge.
Spec. No. BR-27 Page No.127
3
Cum
5497.00
1042.00
Cum
6268.00
1042.00
Cum
4028.00
830.00
313
Item No.
Description
Unit
1
1117
1118
1119
Labour
2
Providing and laying M.15 cement concrete of
trap granite /quartzite /gneiss metal for cast in
situ reinforced cement concrete Solid piers,
columns etc. including with necessary
centering, shuttering, scaffolding, compacting
by vibrating, finishing with cement plaster and
formwork, curing, dewatering, bailing out water
( up to 4.0 m height ) (excluding steel
reinforcement) with fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer. etc.
complete as directed by Engineer in charge.
Spec. No. BR-27 Page No.127
3
Cum
4283.00
830.00
Cum
4939.00
830.00
Cum
5776.00
1,076.00
314
Item No.
Description
Unit
1
1120
1121
1122
Labour
2
Providing and laying in situ M:15 cement
concrete of trap/ granite/ quartzite/ gneiss metal
for reinforced cement concrete caps over piers
and abutments, returns, dirt walls including
necessary scaffolding, formwork, compacting
by vibrating, finishing and curing with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge. (excluding reinforcement)
Spec. No. BR-29 Page No.129
3
Cum
5910.00
1076.00
Cum
6732.00
1076.00
Cum
6090.00
1,080.00
315
Item No.
Description
Unit
1
1123
1124
1125
Labour
2
Providing and laying in situ M:20 cement
concrete of trap/ granite/ quartzite/ gneiss metal
for reinforced cement concrete caps over piers
and abutments, returns, dirt walls with
projection including necessary scaffolding,
formwork, compacting by vibrating, finishing
and curing (excluding reinforcement) with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. BR-29 Page No.129
3
Cum
6223.00
1080.00
Cum
7003.00
1080.00
Cum
6202.00
1,085.00
316
Item No.
Description
Unit
1
1126
1127
1128
1129
2
Providing and laying in situ M.25 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) with fully automatic
micro processor based PLC with SCADA
enabled with reversible Drum Type mixer.
etc. complete as directed by Engineer in
charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.25 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding
reinforcement)
With
Fully
Automatic Micro Processor based PLC with
SCADA enabled concrete Batch Mix Plant
(PAN Mixer). etc. complete as directed by
Engineer in charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.30 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) etc. complete as
directed by Engineer in charge. (for height upto
4m)
Spec. No. BR-30 Page No.130
Providing and laying in situ M.30 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) (for height upto 4m)
.with fully automatic micro processor based
PLC with SCADA enabled with reversible
Drum Type mixer. etc. complete as directed
by Engineer in charge.
Spec. No. BR-30 Page No.130
317
Labour
3
Cum
6342.00
1085.00
Cum
7201.00
1085.00
Cum
6502.00
1,082.00
Cum
6640.00
1082.00
Item No.
Description
Unit
1
1130
1131
1132
2
Providing and laying in situ M.30 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) (for height upto 4m)
With Fully Automatic Micro Processor based
PLC with SCADA enabled concrete Batch
Mix Plant (PAN Mixer). etc. complete as
directed by Engineer in charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.35 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) etc. complete as
directed by Engineer in charge. (for height upto
4m)
Spec. No. BR-30 Page No.130
Providing and laying in situ M.35 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) (for height upto
4m).with fully automatic micro processor
based PLC with SCADA enabled with
reversible Drum Type mixer. etc. complete
as directed by Engineer in charge.
Spec. No. BR-30 Page No.130
318
Labour
3
Cum
7482.00
1082.00
Cum
6612.00
1,083.00
Cum
6748.00
1083.00
Item No.
Description
Unit
1
1133
1134
1135
1136
2
Providing and laying in situ M.35 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) (for height upto 4m)
With Fully Automatic Micro Processor based
PLC with SCADA enabled concrete Batch
Mix Plant (PAN Mixer). etc. complete as
directed by Engineer in charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.40 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) etc. complete as
directed by Engineer in charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.40 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding reinforcement) with fully automatic
micro processor based PLC with SCADA
enabled with reversible Drum Type mixer.
etc. complete as directed by Engineer in
charge.
Spec. No. BR-30 Page No.130
Providing and laying in situ M.40 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete block below
the bearing including scaffolding, form work,
compaction by vibrating, finishing and curing
(excluding
reinforcement)
With
Fully
Automatic Micro Processor based PLC with
SCADA enabled concrete Batch Mix Plant
(PAN Mixer). etc. complete as directed by
Engineer in charge.
Spec. No. BR-30 Page No.130
319
Labour
3
Cum
7546.00
1083.00
Cum
6793.00
1,085.00
Cum
6926.00
1085.00
Cum
7709.00
1085.00
Item No.
Description
Unit
1
1137
1138
1139
1140
1141
1142
1143
Labour
3
Kg.
133.00
30.00
Kg.
115.00
27.00
Sqm
59.00
5.00
Cum
1.73
0.00
M.T.
61623.00
5,336.00
M.T.
58199.00
5,292.00
No.
166.00
55.00
2
Providing and fixing cast steel roller rocker
bearing including mild steel plate, grease box
as per detailed drawings etc. complete as
directed by Engineer in charge.
Spec. No. BR-31 Page No.131
Providing and fixing mild steel fixed and
sliding plate bearing as per detailed drawings
with 12mm thick lead sheet between fixed
bearing etc. complete as directed by Engineer
in charge.
Spec. No. BR-32 Page No.133
Providing and fixing in position Tar Paper
bearing as per detailed drawings etc. complete
as directed by Engineer in charge
Spec. No. As directed by Engineer in charge
320
Item No.
Description
Unit
1
1144
1145
1146
Labour
2
Providing welded joints for Mild/ TMT steel
reinforcement bars of 25mm diameter &
above etc. complete as directed by Engineer in
charge.
Spec. No. BR-36 Page No.134
Providing and laying in situ controlled cement
concrete of trap/ granite/ quartzite/ gneiss
metal for reinforced cement concrete work
including centering, formwork, scaffolding,
ramming, vibrating, finishing with cement
mortar if required and curing complete in solid /
deck slab (excluding reinforcement) etc.
complete as directed by Engineer in charge
Spec. No. BR-38 Page No.135
3
No.
180.00
62.00
a) M 20
b) M 25
c) M 30
d) M 35
e) M40
Providing and laying in situ controlled cement
concrete of trap/ granite/ quartzite/ gneiss
metal for reinforced cement concrete work
including centering, formwork, scaffolding,
ramming, vibrating, finishing with cement
mortar if required and curing complete in solid /
deck slab (excluding reinforcement) with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. BR-38 Page No.135
Cum
Cum
Cum
Cum
Cum
6320.00
6704.00
7116.00
7313.00
7509.00
1,885.00
1,893.00
2,030.00
2,057.00
2,064.00
a) M 20
b) M 25
c) M 30
d) M 35
e) M40
Cum
Cum
Cum
Cum
Cum
6655.00
6840.00
7245.00
7442.00
7639.00
1885.00
1893.00
2030.00
2057.00
2064.00
321
Item No.
Description
Unit
1
1147
1148
1149
1150
1151
Labour
2
Providing and laying in situ controlled cement
concrete of trap/ granite/ quartzite/ gneiss
metal for reinforced cement concrete work
including centering, formwork, scaffolding,
ramming, vibrating, finishing with cement
mortar if required and curing complete in solid /
deck slab (excluding reinforcement) With
Fully Automatic Micro Processor based PLC
with SCADA enabled concrete Batch Mix
Plant (PAN Mixer). etc. complete as directed
by Engineer in charge
Spec. No. BR-38 Page No.135
a) M 20
b) M 25
c) M 30
d) M 35
e) M40
Providing Elastometric expansion joints as
per detailed drawings (MOST specifications).
Spec. No. MOST
Cum
Cum
Cum
Cum
Cum
Rgm
7447.00
7674.00
8037.00
8234.00
8431.00
1885.00
1893.00
2030.00
2057.00
2064.00
15953.00
Sqm
1411.00
261.00
Sqm
1534.00
254.00
Cum
5110.00
726.00
322
Item No.
Description
Unit
1
1152
1153
2
Providing and laying in situ controlled
cement concrete of trap /granite /quartzite
/gneiss metal for reinforced cement concrete in
deck slab and main girder / cross girder
including centering, form work, scaffolding,
vibrating, ramming, finishing by cement mortar,
curing etc. complete as directed by Engineer in
charge.
Spec. No. BR-47 Page No.140
i) M- 20
ii) M- 25
iii) M- 30
iv) M- 35
v) M- 40
Providing and laying in situ controlled
cement concrete of trap /granite /quartzite
/gneiss metal for reinforced cement concrete in
deck slab and main girder / cross girder
including centering, form work, scaffolding,
vibrating, ramming, finishing by cement mortar,
curing with fully automatic micro processor
based PLC with SCADA enabled with
reversible Drum Type mixer. etc. complete
as directed by Engineer in charge..
Spec. No. BR-47 Page No.140
i)
ii)
iii)
iv)
v)
M- 20
M- 25
M- 30
M- 35
M- 40
323
Labour
Cum
Cum
Cum
Cum
Cum
6659.00
6891.00
7280.00
7311.00
7425.00
2,032.00
1,994.00
2,125.00
2,105.00
2,090.00
Cum
Cum
Cum
Cum
Cum
6909.00
7073.00
7475.00
7675.00
7795.00
2032.00
1994.00
2125.00
2105.00
2060.00
Item No.
Description
Unit
1
1154
2
Providing and laying in situ controlled
cement concrete of trap /granite /quartzite
/gneiss metal for reinforced cement concrete in
deck slab and main girder / cross girder
including centering, form work, scaffolding,
vibrating, ramming, finishing by cement mortar,
curing With Fully Automatic Micro Processor
based PLC with SCADA enabled concrete
Batch Mix Plant (PAN Mixer). etc. complete
as directed by Engineer in charge.
Spec. No. BR-47 Page No.140
i)
ii)
iii)
iv)
v)
M- 20
M- 25
M- 30
M- 35
M- 40
Labour
Cum
Cum
Cum
Cum
Cum
7703.00
7868.00
8269.00
8470.00
8589.00
2032.00
1994.00
2125.00
2105.00
2060.00
1155
8826.00
1274.00
1156
8486.00
1274.00
324
Item No.
Description
Unit
1
1157
Labour
5
9628.00
609.00
1158
9288.00
609.00
1159
1302.00
167.00
1160
1161
325
Cum
4209.00
645.00
Cum
4314.00
645.00
Item No.
Description
Unit
Labour
1
1162
2
Providing and laying in situ M:15 cement
concrete of trap /granite /quartzite /gneiss metal
including compacting by vibrating. centering,
finishing, curing and filling in joints with bitumen
for approach slab (excluding reinforcement)
With Fully Automatic Micro Processor based
PLC with SCADA enabled concrete Batch
Mix Plant (PAN Mixer). etc. complete as
directed by Engineer in charge.
Spec. No. BR-47 Page No.140
3
Cum
4958.00
645.00
1163
Cum
4716.00
846.00
Cum
4822.00
846.00
Cum
5445.00
846.00
1164
1165
326
Item No.
Description
Unit
1
1166
1167
1168
1169
2
Providing and laying in position vent holes,
water spout 100mm diameter in the slab and
wearing course with iron grill at the top and
galvanised iron pipe at bottom as per drawing
etc. complete as directed by Engineer in
charge.
Spec. No. BR-48 Page No.142
Providing and laying in situ M.15 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work of ballast
walls,
kerbs
etc.
including
centering,
scaffolding, compaction, form work, finishing
and curing (excluding reinforcement) etc.
complete as directed by Engineer in charge
Spec. No. BR-50 Page No.143
Providing and laying in situ M.15 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work of ballast
walls,
kerbs
etc.
including
centering,
scaffolding, compaction, form work, finishing
and curing (excluding reinforcement) with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. BR-50 Page No.143
Providing and laying in situ M.15 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work of ballast
walls,
kerbs
etc.
including
centering,
scaffolding, compaction, form work, finishing
and curing (excluding reinforcement) With
Fully Automatic Micro Processor based PLC
with SCADA enabled concrete Batch Mix
Plant (PAN Mixer). etc. complete as directed
by Engineer in charge
Spec. No. BR-50 Page No.143
327
Labour
3
No.
336.00
47.00
Cum
4153.00
671.00
Cum
4256.00
671.00
Cum
4892.00
671.00
Item No.
Description
Unit
1
1170
1171
2
Providing and laying in situ M.15 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work for box
returns including centering, scaffolding,
compaction, form work, finishing and curing
(excluding reinforcement) etc. complete as
directed by Engineer in charge (upto 4m height
above bed)
Spec. No. BR-50 Page No.143
Providing and laying in situ M.15 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work for box
returns including centering, scaffolding,
compaction, form work, finishing and curing
(excluding reinforcement) (upto 4m height
above bed).with fully automatic micro
processor based PLC with SCADA enabled
with reversible Drum Type mixer. etc.
complete as directed by Engineer in charge.
Spec. No. BR-50 Page No.143
Labour
3
Cum
4715.00
946.00
Cum
4817.00
946.00
1172
Cum
5443.00
946.00
1173
Cum
5938.00
972.00
328
Item No.
Description
Unit
1
1174
2
Providing and laying in situ M.20 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work for ballast
walls,
kerbs
etc.
including
centering,
scaffolding, compaction, form work, finishing
and curing (excluding reinforcement) with fully
automatic micro processor based PLC with
SCADA enabled with reversible Drum Type
mixer. etc. complete as directed by Engineer
in charge.
Spec. No. BR-50 Page No.143
Labour
3
Cum
6054.00
972.00
1175
Cum
6768.00
972.00
1176
Cum
6627.00
1,179.00
Cum
6762.00
1179.00
1177
329
Item No.
Description
Unit
1
1178
2
Providing and laying in situ M.20 cement
concrete of trap /granite /quartzite /gneiss metal
for reinforced cement concrete work for box
returns including centering, scaffolding,
compaction, form work, finishing and curing
(excluding
reinforcement)
With
Fully
Automatic Micro Processor based PLC with
SCADA enabled concrete Batch Mix Plant
(PAN Mixer). etc. complete as directed by
Engineer in charge.
Spec. No. BR-50 Page No.143
Labour
3
Cum
7584.00
1179.00
1179
Rgm
1375.00
365.00
1180
Rgm
1639.00
249.00
330
Item No.
Description
Unit
Labour
1
1181
2
Providing collapsible railing with mild steel
channel posts and removable galvanised iron
pipes as per the detailed drawings including
scaffolding and painting etc. complete as
directed by Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Rgm
1481.00
328.00
1182
Sqm
4240.00
1,097.00
Cum
356.00
51.00
1183
1184
Cum
650.00
100.00
1185
Sqm
989.00
165.00
1186
Rgm
190.00
190.00
331
Item No.
Description
Unit
Labour
1
1187
2
Refixing collapsible railing of mild steel /
angle / tees / channels posts and galvanized
iron pipes which removed before mansoon
(including necessary nut, bolt and new fitting)
etc. complete as directed by Engineer in
charge. Spec.No. : As directed by Engineer in
charge.
Spec. No. As directed by Engineer in charge
3
Rgm
228.00
228.00
1188
Cum
6246.00
1,861.00
1189
Sqm
142.00
30.00
1190
Sqm
325.00
55.00
1191
No.
80.00
27.00
332
Item No.
Description
Unit
Labour
1
1192
2
Providing grouting with cement slurry under
pressure of 5kg to 6kg per sqm with high
alumna powder including all materials,
machinerys, labours etc. complete as directed
by Engineer in charge.
Spec. No. As directed by Engineer in charge
3
Kg.
25.00
6.00
1193
Sqm
700.00
270.00
1194
Sqm
310.00
105.00
1195
Sqm
625.00
141.00
333
Item No.
Description
Unit
1
1196
1197
334
Labour
5
Running
metre
1391.00
145.00
Running
metre
1574.00
412.00
Item No.
Description
Unit
Labour
5
GEOSYNTHETIC ITEMS
1198
1199
22.5
22.5
22.5
Sqmt
Sqmt
Sqmt
98
112
124
22.5
22.5
22.5
Sqmt
Sqmt
Sqmt
175
216
22.5
22.5
1200
125
115
104
335
Item No.
Description
Unit
1
1201
1202
2
Providing & fixing Metal Gabions-TechBoxof of
Techfab India of required section including
boxes made of mechanically woven hexagonal
shaped wire mesh of type, 10 x 12cm as per
EN 10223, edges mechanically selvedged
made of heavily (Zinc + PVC) coated G.I. wires
as per BS:443, mesh wire 2.70mm $, edge wire
3.40mm cj) of TechFab type and filled with 20
to 50kg weight trap
stones including conveying with all leads and
a)Size1Mx1Mx1M
b)Size1Mx1Mx2M
c)Size1Mx1Mx3M
No.
No.
No.
Labour
5
1599
2850
4135
45
90
135
126
205
22.5
22.5
Sqm
Sqm
336
Item No.
Description
Unit
1
1203
2
Providing and Laying CE marked Knitted and
PVC coated Polyester Uniaxial GeogridTechgrid of Techfab
India indigenously
manufactured from selected high tenacity
polyester yarn with high molecular weight (>
25000 g/mol), and low carboxyl end group
(<30mmol/kg) for Reinforced soil wall (extruded
PP geogrids & Polyester strips & Geostrips,
Steel Strips not allowed & not accepted) with
granular fill of PHi-32 degree (design is to be
carried out in accordance with BS-8006 /
FHWA) with concrete block (M35) as facia,
casting & erection of blocks with Techgrid,
providing & laying of leveling pad of M15,
providing and laying coping beam (M35),
providing and laying 300mm thick filter media
etc. completed as per the necessary drawing
and instruction of Engineer In Charge.
Excluding providing, laying and compacting
selected backfill and retained fill behind
the
wall,
excavation
and
ground
improvement, if any. The reinforced earth
wall and slope should have 1.00% coverage
of 5m width Knitted and PVC coated Polyester
Geogrid.
(Coating of Geogrid/ Reinforcing geosynthelic
material with LDPE, Latex, Bitumen and any
other coaling will not be allowed and will not be
accepted).
RE Wall Height 1 to 4 meter
RE Wall Height 4 to 6 meter
RE Wall Height 6 to 8 meter
RE Wall Height 8 to 10 meter
RE Wall Height 10 to 12 meter
RE Wall Height 12 to 14 meter
337
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
3341
3661
3855
4531
5394
5930
Labour
5
0
0
0
0
0
0
ROAD SURVEY
Item Item
No. Code
1
8
9
9A
10
Description
Unit
ROAD SURVEY
Carriying out survey of alignment in plain
/ hilly country including taking three
dimensions of apxes asceraining type of
land and fixing wooden pege etc .
Complete.
a) In plain country
b) In Hilly country
Carrying out chain and compass survey
of new alignment for road direction, river
flow direction etc. complete or cross staff
survey
a) In Plain country
b) in Hilly country
c) Along existing earth work
Taking longitudinal section and cross
section on alignment including fly levels at
closer of day workl.
a) In Plain country
b) in Hilly country
c) Along existing earth work
Fixing change apex, stones and bench
mark stones of trap of cement concrete
1:3:6: of size 0.15 mx 0.15 m X 0.6 m along
the alignment ( average 4 to 5 ) chainage
stones and 5 to 6 apex stones.
Taking tiral pits 1 m x 1m x 1.50 m in soft
strata upto hard murum and boulder at 200
m interval at 5 per Km .
Taking trial pits 1m x 1m x 1.50 m 5 Nos.
in soft strata upto hard murum and
boulders at 200m. in terval at 5 per km .
Samll streams.
Providing and fixing wooden pegs
including painting by chunum including
carting them on site
Carrying out fly leveling if required to carry
out bench mark
Taking trial bore 8 to 10 cm. (4") in all
strata without core including transportation
of machinery and platorm etc. Complete
a) 0 to 5m
b) 5 to 15m
c) 15 to 25m
d) 25 to 35m
Providing Casing Pipe for 4" bore MS pipe
etc. Complete
Taking trial bore 8 to 10 cm. (4") in all
strata
with
hard
core
including
transportation of machinery and platform
etc. complete.
a) 0to 5 m.
b) 5 to 15 m.
338
4 Nos
4 Nos
2.0 KM / DAY
1.50KM / DAY
4 Nos
4 Nos
3 Nos
1.00 Km / Day
0.50 Km / Day
1.00 Km / Day
5.0 Km / Day
2 Nos
3 Nos.
5 Nos
946.00
985.00
1025.00
1065.00
575.00
Per Rmt
Per Rmt
Per Rmt
Per Rmt
Per Rmt
Item Item
No. Code
Description
Unit
c) 15 to 25m
d) 25 to 35m
Taking trial bore 8 to 10 cm. (4") in all
strata with hard core by double tube
method with att .ending specialcare for
collecting bore data, maintaining accurate
results with the low speed operating bore
machinery using diamond drill core
platrorm calculating water losses and
preparing water loging by presenting results
in core boxes ete. complete.
11
12
13
a)
b)
c)
14
a)
b)
c)
d)
15
16
339
RG.M.
RG.M.
RG.M.
RG.M.
RG.M.
SAMPLE
TUBE
305.00 per
sample
SAMPLE
305.00 per
sample
SAMPLE
BOX
Nos.
Item Item
No. Code
17
18
19
20
21
Description
Unit
135.00 per Km
1050.00 per Km
9 Nos.
0.80 Km / Day
3000.00 per Km
6 Nos.
1.0 Km / Day
1620.00 per Km
22
23
10800.00 per Km
24
2430.00 per Km
25
26
27
28
29
340
Item Item
No. Code
30
Unit
31
a)
b)
c)
32
Description
Supply of Material
Oil paint (white) one tin of 100 ml.
White Lime powder
Supply of flag readymade size of any colour
and size 36 cm x 50 cm
Providing reconnaissance survey of
alignment in plain / hilly country,
including taking three dimensions of
apexes ascertaining type of land and fixing
wooden pegs ets. Item includes the chain
and compass or cross staff surveu for
longitudinal / cross section of road and
cross section at 30 m. interval it includes
fixing chainages, apex, stone and B.M.
stone of trap or C.C. 1::3:6 of size 0.15 x
0.15 x 0.60 m. along the alignment average
4 to 5 chainages stone and 5 to 6 apex
stones per kilometre item also includes
preparing drawing, tracing and submission
of chaingage book original tracing. drawing
sheets etc. complete.
7300.00 per Km
12200.00 per Km
33
Per K.M.
34
Per
341
Item Item
No. Code
Description
Unit
35
1250.00 per
Culvert
36
1050.00 per
Culvert
37
KM
200.00 Per Km
38
KM
5800.00 Per Km
KM
1050.00 Per Km
KM
300.00 Per Km
39
40
342
Item Item
No. Code
41
42
43
44
45
A)
B)
Description
Unit
343
Per set
200.00
Per set
No
No
No
No.
No.
Item Item
No. Code
Description
Unit
46
No.
47
1 set of two
C.D.
48
Providing
and
carrying
out
video
shoooting of roads, bridges, buildings,
other programmes including hiring of
vehicle equipment for video shooting, titling.
Lightening. Mixing, lettering, editing,
including cost of two colour CD's of
approved make and quality etc. complete.
Spec. No.: As directed by Engineer in
charge.
i) Within 50 Kms. Per day
Set of 3 Cpies
Set of 3 Cpies
Set of 3 Cpies
344
Item Item
No. Code
50
51
52
53
54
Description
Unit
345
250.00
150.00
75.00
50.00
20.00
Per No.
Per No.
Per No.
Per No.
Per No.
150.00
100.00
50.00
40.00
15.00
Per No.
Per No.
Per No.
Per No.
Per No.
2500.00
1600.00
1200.00
900.00
600.00
Per No.
Per No.
Per No.
Per No.
Per No.
200.00
160.00
120.00
80.00
60.00
15610.00
Per No.
Per No.
Per No.
Per No.
Per No.
Per
Hector.
Item Item
No. Code
55
A)
B)
56
57
58
59
Description
Unit
346
290.00
580.00
290.00
15.00
Per Km
Per Km
Per Km
Per Km
One
28000.00 Per Km
Item Item
No. Code
60
61
62
63
64
Description
Unit
347
16000.00 Per Km
17130.00 Per Km
19775.00 Per Km
25000.00 Per Km
Item Item
No. Code
65
66
67
68
Description
Unit
348
9550
Per Day
34617
Per Day
34617
Per Day
140
Sqm
RC-2014-15/CR-9-II/Solar/635
To
Chief Executive Officer,
Zilla Parishad
District - (All)
Subject: Rate Contract for the year 2014-15 valid from the date of issue of Rate
Contract upto 31st March, 2015 for Design, Manufacture, Supply,
Installation, Testing and Commissioning, with Comprehensive
Maintenance Contract (CMC) for 5 years, of various Renewable Energy
Systems in the state of Maharashtra.
Ref erence: - Tender Document No. REN1RES/ 0071RC12014 - 15
1. MEDA has made a Rate Contract for Design, Manufacture, Supply, Installation, Testing and
Commissioning, with Comprehensive Maintenance Contract for 5 years, of various Renewable
Energy Systems in the state of Maharashtra for the year 2014-15, valid up to 31st March, 2015.
a) The details of the systems and rates are as given below :Rate with CMC for 5 years
Sr. No.
Name of the Systems
in Rs. (per No.) *
1
2
3
a
b
c
d
4
a
b
c
d
5
a
b
c
d
e
f
6
a
b
7
8
a
b
2370
1730
2545
5300
8230
8680
6340
9810
16760
16600
79000
150000
300000
350000
775000
1350000
172000
197750
225000
300000
355000
Sr. No.
9
10
11
12
a
i
13
A
a
i
ii
iii
iv
v
vi
vii
viii
ix
b
i
ii
iii
iv
v
vi
vii
viii
ix
c
i
ii
iii
B
i
ii
iii
iv
v
4 - Pots
Solar Water Heating System (ISI Mark Only)
Flat Plat Collector (FPC)
Natural Circulation (Thermosyphon)
125 LPD
250 LPD
375 LPD
500 LPD
1000 LPD
1500 LPD
2000 LPD
2500 LPD
3000 LPD
Pressurized System
125 LPD
250 LPD
375 LPD
500 LPD
1000 LPD
1500 LPD
2000 LPD
2500 LPD
3000 LPD
Forced Flow Circulation System
3000 LPD
4000 LPD
5000 LPD
Evacuated Tube Collector (ETC)
100 LPD (1.5 sq.m.)
150 LPD (2.25 sq.m.)
200 LPD (3.0 sq.m.)
300 LPD (4.5 sq.m.)
500 LPD (7.5 sq.m.)
19250
7500
2750
4500
29000
48000
81000
50950
161000
238000
315000
181000
425000
For Soft Water
475000
625000
752000
33000
52000
84000
97000
180000
255000
335000
410000
450000
12600
18800
23500
37500
58800
*The above rates are inclusive of all taxes, duties, transportation and insurance.
350
The rate for Solar Power Plant does not include cost of wiring from
control room to user point.
The rate does not include the cost of any extra length of pipeline
which will be supplied by the Rate Contract Holder as per site
requirement for cold water and insulated hot water pipeline.
2. b) The list of "Rate Contract Holders (RCH)" and the systems fo r which
they hold the Rate Contract, along with other details (such as Bank
Account Number, Type of Exemption Certificate, Name of Contact
Person 81, his Mobile No. etc), is appended herewith as Annexure-I.
3. The above rate contract rate is for Design, Manuf acture, Supply,
Installation,
Testing
and
Commissioning,
with
Comprehensive
4. T h e t er m " O r d er I ss u i n g O r g a n i za t i o n ( 0 I 0 ) " m e a ns Ma h a r a s h t r a
E n e r g y Development Agency (MEDA) or any other Govt. Organization or
Local Body, Municipal Corporation, Municipal Council, Zilla Parishad,
Gram Panchayat etc. who may issue order on the basis of this Rate
351
5. The 0I0 shall get all the re quired systems installed 86 commissioned
as per MNRE / MEDA specifications as per the above rate fixed by
MEDA, only from among the Rate Contract Holders (RCH) of the relevant
systems as per the list enclosed at Annexure-I.
It is the responsibilit y of the 0I0 to take the undertaking f rom the RCH in
regards to the period 86 eligible quantity of supply mentioned in the certificate of
D. G .S 85 D. /Director of Industries/ NSIC.
6. The MO / MEDA at their discretion may visit the RCH facilities for testing /
inspection at any time during the period of rate contract. The testing shall be
carried out in RCH premises and / or at Authorized Testing Centers of MNRE
(List available on MNRE website), at the cost of the RCH.
7. The system of Solar Power Plant is included in t his rate contract. If any 0I0
wishes to install Solar Power Plant system other than mentioned capacity at any
location; it may take the necessary technical guidance from MEDA, Pune.
8. As per MNRE policy the use of relevant IEC standards along with RFID is
mandatory for all capacities of PV module. Also the RCH has to make
embossing on the frame of module mentioning the name of the institution / firm
and year of installation.
10.a) The scope of work of the RCH would include, among other things,
Ma n u f a c t u r i n g, S u p p l y a n d I n s t a l l a t i o n o f s u i t a b l e s u p p o r t f or t h e P V
panels and other components, whichever and wherever required, with the
accessories.
b) Civil work (grouting) f or PV structure, poles and other systems as per
the site requirements are inclusive in the rate contract. Only f or Solar
Power Fencing, the civil work rate may be charged extra, depending on
particular site condition.
352
11. a) The 0I0 shall be responsible to place work order, inspect material as per the
MNRE / MEDA specifications enclosed with the rate contract 86 follow-up
with
the
Rate
Contract
Holders
for
Comprehensive
Maintenance
b ) T h e 0 I 0 s h a l l i n s p e ct t h e s ys t em s a s p er t h e e n c l o s e d MN R E / ME D A
specifications (Annexure-II).
c ) The OM shall be responsible to get proper and timely supply of material
from the RCH. The 0I0 will take care of the same by making suitable
provisions in the work order.
d ) The 0I0 shall be responsible to ensure that the ent ire work order allotted
will be as per MNRE / MEDA technical specifications and norms.
e) The 010 shall ensure that the concerned RCH to whom the work order is
being issued is taking appropriate responsibility of comprehensive
maintenance contract of previously supplied systems / devices to various
organizations before issuing the work order. In this context the 0I0 shall
procure quarterly 86 annual maintenance certificates of supplied devices from
concerned RCH.
f) T h e 0 I 0 s h a l l c o n t a c t , i n c a s e o f n o n - f u n c t i o n i n g o f a n y s y s t e m , t h e
concerned RCH and get the system attended to within 15 days. If the
RCH fails to repair / restore the system the 0I0 shall take action against the
RCH concerned including legal actions wherever necessary.
g) The 0I 0 shall ensur e t hat the work or der issued by t he 0I 0 shall, am ong
other things, incorporate appropriate provisions in respect of (a) to (e)
above.
h) The legal responsibility arising out of placing of work order, implementation
of work & release of payment lies with the 0I0, an d the legal
complications, if any, pertaining to any aspect of the work order shall be
resolved by the 010.
i) MEDA shall not be responsible for any breach of provisions contained in the
work order issued by the OM. The rates mentioned in the rate contract ar e
indicative.
353
j) MEDA reserves the right to inspect the systems at any stage at its
discretion.
12. It is mandatory that the 0I0 sends a copy of the work order to MEDA, Pune for
information, and the RCH should also ensure that a copy of the work order is
sent to MEDA. Also 0I0 to issue quarterly 86 annual maintenance certificates
to the RCH for performing necessary maintenance. It will be the responsibility
of RCH to obtain such certificate from 0I0.
13. It is m andat or y f or the RCH f or the off -gr id SPV Power Plant sys t ems f or
capacities mentioned in the rate contract, that they should install the systems
in the following manner :a) S yst em s m ent ion ed shou ld n ot be us ed in m ult ip les in a singl e bu ild ing
either on terrace or at ground level.
For instance, for requirement of 10 kWp system for one building, a system
of 10 kWp should be installed, where as systems of 1 kWp X 10 nos. will not
be allowed.
b) In the premises / campus (having more than one building) the number of
mentioned capacity systems will be only one per building.
For instance, 1 kWp SPV System on one building terrace / ground level
and, say, 2 kWp system on another building terrace / ground level.
In other words, the number of SPV Power Plants / Systems, of capacity
(size)
as
mentioned
in
rate
contract,
w hich
can
be
installed
&
commissioned, will b e r e s t r i c t e d t o o n l y o n e p e r b u i l d i n g . T h e 0 1 0 /
u s e r w i l l v e r i f y t h e compliance of this aspect.
14. The items of minor nature, which are not mentioned in the Rate Contract, but
which are necessar y f or the f unctionin g of the system and which required
as per specifications, shall be considered by the RCH.
15. The material used for the work shall be new 8E, best quality available and it
shall be car r ied out wit h best wor k m anship. T he m at er ial used and wor k s
c a r r i e d o u t s h a l l b e a s p e r I S wh e r e e ve r a p p l i c a b l e . T h e c o m p r e h e n s i ve
maintenance to be done by the RCH should include all kinds of guarantee 86
warranty pertaining to the system.
16. The RCH will be responsible for any damage caused to any other installation
during the course of work and he shall make good the damage.
354
17. The approval of mater ials or workm anship or appr oval of par t of t he work
dur ing t he progr ess of execut ion, if any, obtained f rom 010 / user , will not
take away the right of MEDA / 010 to reject the work which is alleged to be
c om pl et ed o r t o su sp e nd t he iss u e of ce r t if ic at e of com p let i o n u nt i l su ch
alteration and modification or reconstruction have been effected at the cost
of the RCH, which will enable them to certify that the work has been
completed to his satisfaction.
18. The RCH will inform the 010 in writing as soon as any portion of the work is
ready for inspection, giving sufficient notice to enable them to appoint their
represent ative to inspect the same without aff ecting f urther progress of the
work. The work shall not be considered to have been completed in
accordance with the terms of the contract until the competent person from
the 010 shall have certified in writing to that effect.
19. Dur ing t he course of comm issioning the inspect ion of the mat er ial will b e
carried out by the 010, and the RCH shall make all necessary arrangement
for the inspection.
RCH
under
this
Rate
Contract
are
bound
to
work
as
per
g u i d e l i n e s provided by MNRE / MEDA and 0I0 from time to time. If the RCH
refuses to carry out the given work or fails to carry out the work as per
specifications and gui delines, his EMD and S.D. ar e liable t o be f orf eited.
Com pliant will be registered by 0I0 at concerned institutions such as
D.G.S & D. /Director of Industries/ NSIC with a copy to MEDA in case of
exemption certificate hold by RCH and who has taken exemption under these
categories.
22. The RCH shall ensure training to at least one person authorized by the
0I0 / user f or Operation and Maintenance of the system / systems. A
certif icate in t his r e gar d shoul d be g i ve n b y t he R CH on co m m issioning
of t he syst em / s y s t e m s , a n d t h e r e a f t e r , a n n u a l l y t o t h e 0 I 0 / u s e r .
355
23. The RCH shall ensure supply of manual for Operation and Maintenance in two
languages i.e. in English and in Marathi to M EDA. In addition, the RCH shall
hand over
the related
24. The RCH shall provide appropriate tools and equipments to his workmen
and ensure that those are in prop er working condit ion and the workmen
use the appr opr iat e t ools and t ak e pr ec aut ion. I t is t o be n ot ed t hat any
accident t o the work men / public / animals / property both movable and
immovable shall be the entire and sole responsibility of the RCH and any
proceeding arising out of the same will be at the risk and cost of the RCH.
The 0I0 or its employees or any user shall not be responsible for any such
incident.
25. It is mandatory for the RCH to have a service centre in the respective district
in which he is going to procure work orders based on this rate contract. The
010 should verify the service centre list of the RCH before issuing work order.
p er io d
of
ye a r s .
During
t h is
period
any
d e f ec t s
and
357
32. The RCH shall comply with the provisions of the Minimum Wages Act,
1948; Payment of W ages Act, 1963; W orkmen's Compensation Act, 1961;
Contract Labour (Regulation and Abolition) Act, 1979 and all other related
Acts and any amendments thereof, or any law re lating there to and rules
made there under from time to time.
33. The 010 shall ensure that appropriate provisions in respect of points 1 to
35 of this Rate Contract order, are incorporated, wherever appropriate and
relevant, in the work order to be issued to the RCH.
34. a) T he t er m s of paym ent as per r at e cont r act wil l be as f ollo ws : i.
90% of the total cost will be paid after Supply, Installation &
Successful Comm issioning of t he system / syst ems, af t er obtaining
com m issioning report. Such commissioning report al ongwith the
photogr aphs of systems s h a l l b e j o i n t l y s i g n e d b y t h e a u t h o r i z e d
person
of
the
RCH
and
commissioning and
b) The 0I 0 shall carr y out tr ansact ions / paym ent s t hr ough t he given
bank accounts only. The bank account details and account numbers
given by the RCH under this Rate Contract are given in Annex ure-I.
c) P e n a l t y f or d e l a y : 358
In case the RCH fails to complete the work within the time period
specified
in the work order placed by 0I0 / MEDA, 0.5% of the total cost of the work
Item no.
Description
Unit
Material
Labour
Total
Each
32123
2211
34334
20647
250
20897
359
9. Testing Charges
Government of Maharashtra
Vigilance & Quality Control Circle, Pune
Schedule of Testing charges for construction- material used for Government
works for the year 2015-16
Effective from 01.07.2015
Sr.
No.
Name of Tests
Test
Rate
Sanctioned Rs.
1 Test
2800.00
1 Test
2000.00
crushing value.
3
Sieve Analysis.
1 Test
500.00
Abrasion Value
1 Test
900.00
1 Test
325.00
Stripping value.
1 Test
600.00
Soundness
1 Test
1900.00
Bulk Density
1 Test
275.00
1 Test
12000.00
1 Test
12000.00
1 Test
1000.00
MIX DESIGN
9
10
FINE AGGREGATES
11
Fineness
Modulus
(Sieve
Analysis),
Silt
&
clay
content
12
1 Test
600.00
13
Moisture content.
1 Test
325.00
14
Bulkage of sand
1 Test
375.00
15
Silt Factor.
1 Test
650.00
BRICKS
16
1 Test
1600.00
17
1 Test
1900.00
360
Sr.
Name of Tests
Test
No.
Rate
Sanctioned Rs.
GLAZED TILES
18
1 Test
1250.00
19
1 Test
600.00
20
1 Test
1000.00
1 Test
1250.00
22
1 Test
1000.00
1 Test
1150.00
1 Test
800.00
MANGLORE TILES
23
24
25
1 Test
500.00
26
1 Test
10000.00
27
1 Test
600.00
28
Permiability test
1 Test
1250.00
29
1 Mix
Design
12000.00
30
1 Test
2200.00
Per
KM
15.00
31
all
tests
on
basic
pavement
1 Test
3000.00
33
1 Test
500.00
1 Test
1500.00
STONE/ RUBBLE
34
Crushing
Value/
Compressive
Absorption & specific Gravity.
SOIL / MURUM
35
Sieve Analysis
1 Test
500.00
36
1 Test
325.00
37
1 Test
850.00
38
1 Test
1400.00
strength
361
water
Sr.
No.
39
40
Name of Tests
Test
1 Test
Rate Sanctioned
Rs.
3900.00
1 Test
2000.00
Per KM
15.00
42
Per KM
54.00
43
1 Test
900.00
44
1 Test
600.00
45
Mechanical Analysis.
1 Test
1700.00
46
Plate
1 Test
25000.00
1 Test
750.00
1 Test
2300.00
Load
Bearing
test
(Excluding
Transportation)
47
48
49
Viscosity.
1 Test
1500.00
50
1 Test
650.00
51
Extraction Test
1 Test
1100.00
52
1 Test
700.00
750.00
of 3 moduls)
54
55
1 Test
1 Mix
750.00
12000.00
Design
1 Mix
5500.00
Design
57
1 Test
500.00
58
1 Test
2500.00
modified bitumen.
59
1 Test
1300.00
60
1 Test
900.00
362
Sr.
No.
61
1 Test
Rate Sanctioned
Rs.
900.00
62
1 Test
400.00
63
1 Test
2200.00
Per Km
15.00
64
Name of Tests
Test
BITUMINOUS EMULSION
65
% Residue test
1 Test
450.00
66
1 Test
300.00
67
Sieve Test
1 Test
450.00
1 Test
1500.00
1 Test
850.00
1 Test
800.00
1 Test
2000.00
69
70
71
72
1 Test
2600.00
73
1 Test
400.00
1 Test
1200.00
1 Test
500.00
1 Test
600.00
1 Test
700.00
PARTICAL BOARD
74
75
POLYMER MATERIAL
76
363
Sr.
No.
Name of Tests
Test
Rate Sanctioned
Rs.
A.C. PIPES
77
Water Absorption
1 Test
550.00
78
Bursting Strength
1 Test
400.00
A.C. SHEETS
79
Water Absorption
1 Test
550.00
80
Load Bearing
1 Test
300.00
G.I. PIPES
81
1 Test
200.00
82
1 Test
250.00
1 Test
200.00
1 Test
900.00
1 Test
2500.00
86
1 Test
450.00
87
1 Test
1900.00
88
1 Test
250.00
89
1 Test
1200.00
1 Test
900.00
1 Test
3100.00
1 Test
3100.00
84
85
91
Above 16 mm (set of 3
Bars) (Tensile
93
1 Test
3100.00
94
1 Test
900.00
95
1 Test
800.00
96
1 Test
800.00
97
Drying Time
1 Test
650.00
364
Sr.
No.
Name of Tests
Test
Rate Sanctioned
Rs.
Drying Time
1 Test
650.00
99
1 Test
600.00
100
Flexibility
1 Test
250.00
101
Gel Time
1 Test
400.00
102
Pot life.
1 Test
400.00
103
Volume of solid
1 Test
850.00
1 Test
3200.00
INDEX/
ROAD
UN-
EVENNESS TEST
105
Per km
560.00
106
Per km
1120.00
7.00 m)
107
Per km
560.00
108
Per km
15.00
1 Test
11300.00
OVERLAY DESIGN
109
Benkelman
Beam
test
(Excluding
Dead
Journey Charges)
NON-DESTRUCTIVE TEST
110
1 point
150.00
111
1 point
250.00
Important Note : The above rates are applicable for all division & subdivision under
P.W.D. & Z.P. in Maharashtra and for other Government / Private Orgnization the
rates shall be twice as mentioned in DSR.
365
TRANSPORTATION
Material
Unit
Loading
Unloading
Steel
M.T.
60.50
48.50
M.T.
18.00
15.00
Cement
M.T.
18.00
15.00
Metal 40 mm and
above
CU.M.
16.50
14.00
CU.M.
15.00
13.00
366
Cement
M.T.
Stacking
charges
24.00
Steel
M.T.
53.00
M.T.
30.00
1000 Nos.
60.50
Bricks
1000 Nos.
30.00
Blasted Boulders,
Rubble Single
Cu.M.
15.00
Metal
Cu.M.
12.00
M.T.
36.00
Cu.M.
12.00
10
Timber
Cu.M.
10.00
Shahabad stone,
slabs or other
paving materials
Sq.M.
15.00
11
12
Material
Headers, Corner
Stones, Boundary
stone, 200 mm
stone, Ridge Tiles.
Unit
1000 Nos.
367
36.00
368
Kg
Litre
Kg
LEAD IN
KM
16
0.50
15.00
2.00
7.50
13.50
4.50
293.09
0.096
25.56
1620
1800
3738.65
373.87
4112.52
548.34
0.50
1.00
16.00
2.00
7.11
20.22
6.74
438.98
0.144
38.28
1620
1800
3897.26
389.73
4286.99
602.95
1.00
1.50
16.50
2.00
6.77
26.31
8.77
571.19
0.188
49.81
1620
1800
4041
404.10
4445.10
656.59
1.50
2.00
17.00
2.00
6.48
31.92
10.64
692.98
0.228
60.43
1620
1800
4173.41
417.34
4590.75
708.45
2.00
2.50
17.25
2.00
6.20
37.00
12.33
803.27
0.264
70.05
1620
1800
4293.32
429.33
4722.65
761.72
2.50
3.00
17.50
2.00
5.96
41.76
13.92
906.61
0.298
79.06
1620
1800
4405.67
440.57
4846.24
813.13
3.00
3.50
17.75
2.00
5.74
46.18
15.39
1002.57
0.330
87.43
1620
1800
4510
451.00
4961.00
864.29
3.50
4.00
18.00
2.00
5.54
50.32
16.77
1092.45
0.360
95.27
1620
1800
4607.72
460.77
5068.49
914.89
4.00
4.50
18.25
2.00
5.36
54.24
18.08
1177.55
0.388
102.69
1620
1800
4700.24
470.02
5170.26
964.60
4.50
5.00
18.50
2.00
5.19
57.90
19.30
1257.01
0.414
109.62
1620
1800
4786.63
478.66
5265.29
1014.51
5.00
5.50
18.50
2.00
5.02
61.22
20.41
1329.09
0.437
115.91
1620
1800
4865
486.50
5351.50
1066.04
5.50
6.00
18.75
2.00
4.88
64.56
21.52
1401.60
0.461
122.23
1620
1800
4943.83
494.38
5438.21
1114.39
6.00
6.50
18.85
2.00
4.73
67.49
22.50
1465.21
0.482
127.78
1620
1800
5012.99
501.30
5514.29
1165.81
6.50
7.00
19.00
2.00
4.61
70.54
23.51
1531.42
0.504
133.55
1620
1800
5084.97
508.50
5593.47
1213.33
7.00
7.50
19.15
2.00
4.49
73.35
24.45
1592.43
0.524
138.87
1620
1800
5151.3
515.13
5666.43
1262.01
7.50
8.00
19.30
2.00
4.37
75.92
25.31
1648.22
0.542
143.74
1620
1800
5211.96
521.20
5733.16
1311.94
8.00
8.50
19.45
2.00
4.27
78.59
26.20
1706.19
0.561
148.79
1620
1800
5274.98
527.50
5802.48
1358.89
8.50
9.00
19.60
2.00
4.17
81.06
27.02
1759.81
0.579
153.47
1620
1800
5333.28
533.33
5866.61
1406.86
9.00
9.50
19.80
2.00
4.08
83.52
27.84
1813.22
0.597
158.13
1620
1800
5391.35
539.14
5930.49
1453.55
9.50
10.00
20.00
2.00
4.00
86.00
28.67
1867.06
0.614
162.82
1620
1800
5449.88
544.99
5994.87
1498.72
10.00
369
LEADS
AV.
FACTOR NO. OF
KMS
IN
SPEED
TRIPS 8 DONE
KMS KM/HR
N= ________
2NL + 6
L
S
F
F*(L/S) + 1
1
2
3
4
5
QTY OF
DIESEL
RS.
6
COST
OF
DIESEL
RS.
7
QTY OF
MOBILE
OIL
RS.
8
COST
COST
HIRE
TOTAL
OF
OF 6
CHARGE
COST
MOBILE OIL MAZDOOR OF TRUCK
RS.
200
1274 RS.
9
10
11
12
ADD 10%
OVERHEAD
CHARGES
RS.
13
TOTAL
OF
(12 + 13)
RS.
14
COST
LEAD
PER TRIP IN
(14/3)
KMS
RS.
15
16
11.00
21.00
2.00
3.91
92.02
30.67
1997.75
0.657
174.22
1620
1800
5591.97
559.20
6151.17
1573.19
11.00
12.00
22.00
2.00
3.83
97.92
32.64
2125.84
0.700
185.39
1620
1800
5731.23
573.12
6304.35
1646.05
12.00
13.00
23.00
2.00
3.76
103.76
34.59
2252.63
0.741
196.44
1620
1800
5869.07
586.91
6455.98
1717.02
13.00
14.00
24.00
2.00
3.69
109.32
36.44
2373.34
0.781
206.97
1620
1800
6000.31
600.03
6600.34
1788.71
14.00
15.00
25.00
2.00
3.64
115.20
38.40
2500.99
0.823
218.1
1620
1800
6139.09
613.91
6753.00
1855.22
15.00
20.00
25.00
2.00
3.08
129.20
43.07
2804.93
0.923
244.61
1620
1800
6469.54
646.95
7116.49
2310.55
20.00
25.00
25.00
2.00
2.67
139.50
46.50
3028.55
0.997
264.11
1620
1800
6712.66
671.27
7383.93
2765.52
25.00
30.00
30.00
2.00
2.67
166.20
55.40
3608.20
1.187
314.66
1620
1800
7342.86
734.29
8077.15
3025.15
30.00
35.00
30.00
2.00
2.40
174.00
58.00
3777.54
1.243
329.43
1620
1800
7526.97
752.70
8279.67
3449.86
35.00
40.00
30.00
2.00
2.18
180.40
60.13
3916.48
1.289
341.54
1620
1800
7678.02
767.80
8445.82
3874.23
40.00
45.00
30.00
2.00
2.00
186.00
62.00
4038.06
1.329
352.15
1620
1800
7810.21
781.02
8591.23
4295.62
45.00
50.00
30.00
1.75
2.04
210.00
70.00
4559.10
1.500
397.59
1620
1800
8376.69
837.67
9214.36
4516.84
50.00
60.00
35.00
1.75
2.00
246.00
82.00
5340.66
1.758
465.74
1620
1800
9226.4
922.64
10149.04
5074.52
60.00
70.00
35.00
1.75
1.78
255.20
85.07
5540.39
1.823
483.16
1620
1800
9443.55
944.36
10387.91
5835.90
70.00
80.00
35.00
1.75
1.60
262.00
87.33
5688.02
1.872
496.03
1620
1800
9604.05
960.41
10564.46
6602.78
80.00
90.00
35.00
1.75
1.45
267.00
89.00
5796.57
1.908
505.5
1620
1800
9722.07
972.21
10694.28
7375.36
90.00
100.00
35.00
1.75
1.33
272.00
90.67
5905.12
1.943
514.97
1620
1800
9840.09
984.01
10824.10
8138.42
100.00
125.00
40.00
1.50
1.41
358.50
119.50
7783.04
2.561
678.73
1620
1800 11881.77
1188.18
13069.95
9269.47
125.00
150.00
40.00
1.50
1.21
369.00
123.00
8010.99
2.636
698.61
1620
1800
12129.6
1212.96
13342.56
11026.91
150.00
175.00
40.00
1.25
1.24
440.00
146.67
9552.40
3.144
833.04
1620
1800 13805.44
1380.54
15185.98
12246.76
175.00
200.00
40.00
1.25
1.10
446.00
148.67
9682.66
3.186
844.39
1620
1800 13947.05
1394.71
15341.76
13947.05
200.00
250.00
40.00
1.25
0.91
461.00
153.67 10008.31
3.294
872.79
1620
1800
14301.1
1430.11
15731.21
17287.04
250.00
300.00
40.00
1.25
0.77
468.00
156.00 10160.28
3.344
886.05
1620
1800 14466.33
1446.63
15912.96
20666.19
300.00
350.00
40.00
1.25
0.67
475.00
158.33 10312.25
3.394
899.3
1620
1800 14631.55
1463.16
16094.71
24021.95
350.00
400.00
40.00
1.25
0.59
478.00
159.33 10377.38
3.415
904.98
1620
1800 14702.36
1470.24
16172.60
27411.18
400.00
500.00
40.00
1.25
0.48
486.00
162.00 10551.06
3.472
920.13
1620
1800 14891.19
1489.12
16380.31
34125.64
500.00
370
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
12.00
13.00
14.00
15.00
20.00
COST
LIME
PER TRIP MURUM
COL.
BUILDING
(14/3)
RUBBISH
EARTH
15
UNIT CUM
L.F.
5.75
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
1646.05
1717.02
1788.71
1855.22
2310.55
95.36
104.86
114.19
123.21
132.47
141.41
150.31
159.11
167.76
176.44
185.40
193.81
202.75
211.01
219.48
228.16
236.33
244.67
252.79
260.65
273.60
286.27
298.61
311.08
322.65
401.83
FUEL
COMP.
4.33
6.85
9.36
11.86
14.37
16.87
19.37
21.87
24.37
26.86
29.37
31.86
34.35
36.85
39.34
41.83
44.32
46.81
49.29
51.77
56.67
61.57
66.45
71.34
76.21
101.01
MANURE OF
SLUDGE
UNIT CUM
L.F.
5.45
UNIT CUM
L.F.
5.75
100.61
110.63
120.47
129.99
139.76
149.20
158.58
167.87
176.99
186.15
195.60
204.47
213.91
222.63
231.56
240.72
249.34
258.14
266.71
274.99
288.66
302.03
315.05
328.20
340.41
423.95
FUEL
COMP.
4.57
7.22
9.87
12.52
15.16
17.80
20.44
23.08
25.71
28.34
30.98
33.61
36.25
38.88
41.51
44.13
46.76
49.38
52.00
54.62
59.79
64.96
70.11
75.26
80.41
106.57
95.36
104.86
114.19
123.21
132.47
141.41
150.31
159.11
167.76
176.44
185.40
193.81
202.75
211.01
219.48
228.16
236.33
244.67
252.79
260.65
273.60
286.27
298.61
311.08
322.65
401.83
FUEL
COMP.
4.33
6.85
9.36
11.86
14.37
16.87
19.37
21.87
24.37
26.86
29.37
31.86
34.35
36.85
39.34
41.83
44.32
46.81
49.29
51.77
56.67
61.57
66.45
71.34
76.21
101.01
STONE AGGRE.
40MM, NORMAL
SIZE & ABOVE
UNIT CUM
L.F.
5.5
99.70
109.63
119.38
128.81
138.49
147.84
157.14
166.34
175.38
184.46
193.82
202.62
211.97
220.61
229.46
238.53
247.07
255.79
264.28
272.49
286.03
299.28
312.18
325.22
337.31
420.10
FUEL
COMP.
4.53
7.16
9.78
12.40
15.02
17.64
20.25
22.87
25.48
28.08
30.70
33.31
35.92
38.52
41.13
43.73
46.33
48.94
51.53
54.12
59.25
64.37
69.47
74.58
79.68
105.61
EXCAVTED ROCK
SOLING STONE
UNIT CUM
L.F.
4.70
116.67
128.29
139.70
150.73
162.07
173.01
183.89
194.66
205.23
215.85
226.82
237.10
248.05
258.16
268.51
279.14
289.13
299.33
309.27
318.88
334.72
350.22
365.32
380.58
394.73
491.61
FUEL
COMP.
5.30
8.38
11.45
14.51
17.58
20.64
23.70
26.76
29.81
32.86
35.93
38.97
42.03
45.08
48.13
51.18
54.22
57.26
60.30
63.34
69.33
75.32
81.30
87.27
93.24
123.58
371
LEADS
IN
KMS
L
1
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
LIME
PER TRIP MURUM
COL.
BUILDING
(14/3)
RUBBISH
EARTH
15
UNIT CUM
L.F.
5.75
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
480.96
526.11
599.98
673.78
747.06
785.54
882.53
1014.94
1148.31
1282.67
1415.38
1612.08
1917.72
2129.87
2425.57
3006.44
3594.12
4177.73
4767.16
5934.89
FUEL
COMP.
125.82
149.89
174.58
199.26
223.94
247.87
296.18
345.24
394.30
443.36
492.43
612.26
734.35
854.46
976.27
1219.89
1463.51
1707.12
1950.74
2437.97
MANURE OF
SLUDGE
UNIT CUM
L.F.
5.45
UNIT CUM
L.F.
5.75
507.43
555.07
633.00
710.87
788.19
828.78
931.10
1070.81
1211.52
1353.28
1493.29
1700.82
2023.29
2247.11
2559.09
3171.93
3791.96
4407.70
5029.57
6261.59
FUEL
COMP.
132.74
158.15
184.19
210.23
236.27
261.51
312.48
364.24
416.01
467.77
519.53
645.96
774.77
901.50
1030.01
1287.04
1544.07
1801.09
2058.12
2572.17
480.96
526.11
599.98
673.78
747.06
785.54
882.53
1014.94
1148.31
1282.67
1415.38
1612.08
1917.72
2129.87
2425.57
3006.44
3594.12
4177.73
4767.16
5934.89
FUEL
COMP.
125.82
149.89
174.58
199.26
223.94
247.87
296.18
345.24
394.30
443.36
492.43
612.26
734.35
854.46
976.27
1219.89
1463.51
1707.12
1950.74
2437.97
STONE AGGRE.
40MM, NORMAL
SIZE & ABOVE
UNIT CUM
L.F.
5.5
502.82
550.03
627.25
704.41
781.02
821.24
922.64
1061.07
1200.51
1340.98
1479.71
1685.36
2004.89
2226.68
2535.83
3143.10
3757.49
4367.63
4983.85
6204.66
FUEL
COMP.
131.53
156.71
182.51
208.32
234.12
259.14
309.64
360.93
412.22
463.52
514.81
640.09
767.73
893.30
1020.65
1275.34
1530.03
1784.72
2039.41
2548.79
EXCAVTED ROCK
SOLING STONE
UNIT CUM
L.F.
4.70
588.41
643.65
734.01
824.30
913.96
961.03
1079.69
1241.68
1404.85
1569.23
1731.58
1972.23
2346.15
2605.69
2967.46
3678.09
4397.06
5111.05
5832.17
7260.78
FUEL
COMP.
153.92
183.38
213.58
243.77
273.97
303.24
362.35
422.37
482.39
542.41
602.44
749.04
898.41
1045.36
1194.38
1492.42
1790.46
2088.50
2386.54
2982.63
372
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
COST
CONCRETE BLOCK
PER TRIP (FORM)
COL.
(14/3)
15
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
UNIT M.T
L.F.
6
91.39
100.49
109.43
118.07
126.95
135.52
144.05
152.48
160.77
169.08
177.67
185.73
194.30
202.22
210.34
218.66
226.48
234.48
242.26
249.79
262.20
FUEL
COMP.
4.15
6.56
8.97
11.37
13.77
16.17
18.57
20.96
23.35
25.74
28.14
30.53
32.92
35.31
37.70
40.09
42.47
44.86
47.24
49.61
54.31
AURANGABAD REGION
2.77
4.37
5.98
7.58
9.18
10.78
12.38
13.97
15.57
17.16
18.76
20.35
21.95
23.54
25.13
26.72
28.32
29.90
31.49
33.08
36.21
12.19
13.40
14.59
15.74
16.93
18.07
19.21
20.33
21.44
22.54
23.69
24.76
25.91
26.96
28.04
29.15
30.20
31.26
32.30
33.30
34.96
STEAM
COAL
FUEL
COMP.
0.55
0.87
1.20
1.52
1.84
2.16
2.48
2.79
3.11
3.43
3.75
4.07
4.39
4.71
5.03
5.34
5.66
5.98
6.30
6.62
7.24
UNIT 1 NO.
L.F.
9.00
60.93
66.99
72.95
78.72
84.64
90.35
96.03
101.65
107.18
112.72
118.45
123.82
129.53
134.81
140.22
145.77
150.99
156.32
161.51
166.52
174.80
FUEL
COMP.
2.77
4.37
5.98
7.58
9.18
10.78
12.38
13.97
15.57
17.16
18.76
20.35
21.95
23.54
25.13
26.72
28.32
29.90
31.49
33.08
36.21
373
12.00
13.00
14.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
CONCRETE BLOCK
PER TRIP (FORM)
COL.
(14/3)
15
1646.05
1717.02
1788.71
1855.22
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
UNIT M.T
L.F.
6
274.34
286.17
298.12
309.20
385.09
460.92
504.19
574.98
645.71
715.94
752.81
845.75
972.65
1100.46
1229.23
1356.40
1544.91
1837.82
2041.13
2324.51
2881.17
3444.36
4003.66
4568.53
5687.61
FUEL
COMP.
59.00
63.69
68.36
73.04
96.80
120.57
143.65
167.30
190.96
214.61
237.54
283.84
330.85
377.87
424.89
471.91
586.75
703.75
818.86
935.60
1169.06
1402.53
1635.99
1869.46
2336.39
39.33
42.46
45.58
48.69
64.54
80.38
95.77
111.53
127.30
143.07
158.36
189.22
220.57
251.92
283.26
314.61
391.17
469.17
545.91
623.73
779.37
935.02
1090.66
1246.31
1557.59
36.58
38.16
39.75
41.23
51.35
61.46
67.23
76.66
86.09
95.46
100.37
112.77
129.69
146.73
163.90
180.85
205.99
245.04
272.15
309.93
384.16
459.25
533.82
609.14
758.35
STEAM
COAL
FUEL
COMP.
7.87
8.49
9.12
9.74
12.91
16.08
19.15
22.31
25.46
28.61
31.67
37.84
44.11
50.38
56.65
62.92
78.23
93.83
109.18
124.75
155.87
187.00
218.13
249.26
311.52
UNIT 1 NO.
L.F.
9.00
182.89
190.78
198.75
206.14
256.73
307.28
336.13
383.32
430.47
477.29
501.87
563.84
648.43
733.64
819.48
904.27
1029.94
1225.21
1360.75
1549.67
1920.78
2296.24
2669.11
3045.69
3791.74
FUEL
COMP.
39.33
42.46
45.58
48.69
64.54
80.38
95.77
111.53
127.30
143.07
158.36
189.22
220.57
251.92
283.26
314.61
391.17
469.17
545.91
623.73
779.37
935.02
1090.66
1246.31
1557.59
374
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
12.00
13.00
14.00
COST
BAMBOOS, MATTING
BRICKS
PER TRIP THATCHING & BALLIES
COL.
RUBBER, PVC PIPES & FITTINGS
(14/3)CELLING BOARDS
15
UNIT M.T
UNIT 1000
L.F.
FUEL
L.F.
FUEL
3.30
COMP.
3.5
COMP.
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
1646.05
1717.02
1788.71
166.16
182.71
198.97
214.68
230.82
246.40
261.90
277.24
292.30
307.43
323.04
337.69
353.28
367.68
382.43
397.56
411.79
426.32
440.47
454.16
476.72
498.80
520.31
542.03
7.55
11.93
16.31
20.67
25.04
29.40
33.76
38.11
42.46
46.80
51.17
55.51
59.86
64.20
68.55
72.89
77.22
81.56
85.88
90.21
98.75
107.28
115.79
124.30
156.67
172.27
187.60
202.41
217.63
232.32
246.94
261.40
275.60
289.86
304.58
318.40
333.09
346.67
360.57
374.84
388.26
401.96
415.30
428.20
449.48
470.30
490.58
511.06
7.12
11.25
15.37
19.49
23.61
27.72
31.83
35.93
40.03
44.13
48.25
52.34
56.44
60.54
64.63
68.72
72.81
76.90
80.98
85.05
93.11
101.15
109.17
117.19
ROOFING TILES
MANGLORE TILES
UNIT 1000
L.F.
5.00
109.67
120.59
131.32
141.69
152.34
162.63
172.86
182.98
192.92
202.90
213.21
222.88
233.16
242.67
252.40
262.39
271.78
281.37
290.71
299.74
314.64
329.21
343.40
357.74
FUEL
COMP.
4.98
7.87
10.76
13.64
16.52
19.40
22.28
25.15
28.02
30.89
33.77
36.64
39.51
42.38
45.24
48.10
50.97
53.83
56.68
59.54
65.17
70.80
76.42
82.04
FLOORING TILES
MARBLE MOSSAIC/
CEMENT TILES ETC.
UNIT 1000
L.F.
3.00
182.78
200.98
218.86
236.15
253.91
271.04
288.10
304.96
321.53
338.17
355.35
371.46
388.60
404.44
420.67
437.31
452.96
468.95
484.52
499.57
524.40
548.68
572.34
596.24
FUEL
COMP.
8.31
13.12
17.94
22.74
27.54
32.34
37.13
41.92
46.71
51.48
56.29
61.06
65.85
70.63
75.40
80.17
84.95
89.71
94.47
99.23
108.62
118.00
127.37
136.73
375
LEADS
IN
KMS
L
1
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
BAMBOOS, MATTING
BRICKS
PER TRIP THATCHING & BALLIES
COL.
RUBBER, PVC PIPES & FITTINGS
(14/3)CELLING BOARDS
15
UNIT M.T
UNIT 1000
L.F.
FUEL
L.F.
FUEL
3.30
COMP.
3.5
COMP.
1855.22
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
562.19
700.17
838.03
916.71
1045.41
1174.01
1301.70
1368.74
1537.73
1768.46
2000.84
2234.96
2466.19
2808.93
3341.49
3711.14
4226.38
5238.50
6262.48
7279.38
8306.42
10341.10
132.79
176.01
219.22
261.18
304.19
347.19
390.20
431.89
516.07
601.55
687.04
772.53
858.01
1066.81
1279.55
1488.84
1701.08
2125.57
2550.05
2974.53
3399.02
4247.99
530.06
660.16
790.15
864.33
985.67
1106.92
1227.32
1290.53
1449.86
1667.40
1886.51
2107.25
2325.26
2648.42
3150.55
3499.07
3984.87
4939.16
5904.62
6863.41
7831.77
9750.18
125.20
165.95
206.70
246.26
286.80
327.35
367.90
407.21
486.58
567.18
647.78
728.38
808.99
1005.85
1206.43
1403.76
1603.88
2004.11
2404.33
2804.56
3204.79
4005.24
ROOFING TILES
MANGLORE TILES
UNIT 1000
L.F.
5.00
371.04
462.11
553.10
605.03
689.97
774.85
859.12
903.37
1014.90
1167.18
1320.56
1475.07
1627.68
1853.89
2205.38
2449.35
2789.41
3457.41
4133.24
4804.39
5482.24
6825.13
FUEL
COMP.
87.64
116.17
144.69
172.38
200.76
229.15
257.53
285.05
340.60
397.03
453.45
509.87
566.29
704.10
844.50
982.63
1122.71
1402.87
1683.03
1963.19
2243.35
2803.67
FLOORING TILES
MARBLE MOSSAIC/
CEMENT TILES ETC.
UNIT 1000
L.F.
3.00
618.41
770.18
921.84
1008.38
1149.95
1291.41
1431.87
1505.61
1691.51
1945.30
2200.93
2458.45
2712.81
3089.82
3675.64
4082.25
4649.02
5762.35
6888.73
8007.32
9137.06
11375.21
FUEL
COMP.
146.07
193.61
241.15
287.30
334.60
381.91
429.22
475.08
567.67
661.71
755.75
849.78
943.82
1173.50
1407.50
1637.72
1871.19
2338.12
2805.06
3271.99
3738.92
4672.78
376
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
12.00
13.00
14.00
15.00
COST
S.W.PIPES
PER TRIP 100MM DIA .M.
COL.
(14/3)
15
UNIT 100 RMT
L.F.
FUEL
5.20
COMP.
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
1646.05
1717.02
1788.71
1855.22
105.45
115.95
126.27
136.24
146.48
156.37
166.21
175.94
185.50
195.10
205.01
214.31
224.19
233.33
242.69
252.30
261.33
270.55
279.53
288.21
302.54
316.55
330.20
343.98
356.77
4.79
7.57
10.35
13.12
15.89
18.66
21.42
24.19
26.95
29.70
32.47
35.23
37.99
40.75
43.50
46.25
49.01
51.76
54.50
57.25
62.67
68.08
73.48
78.88
84.27
S.W.PIPES
150MM DIA .M.
S.W.PIPES
200MM DIA .M.
S.W.PIPES
230MM DIA .M.
S.W.PIPES
250MM DIA .M.
198.67
218.46
237.89
256.68
275.98
294.61
313.15
331.48
349.49
367.58
386.24
403.76
422.40
439.61
457.25
475.34
492.35
509.73
526.65
543.01
570.00
596.39
622.11
648.08
672.18
9.03
14.27
19.50
24.71
29.94
35.15
40.36
45.57
50.77
55.96
61.18
66.37
71.57
76.77
81.96
87.15
92.33
97.52
102.69
107.86
118.07
128.26
138.45
148.62
158.77
365.56
401.97
437.73
472.30
507.81
542.08
576.19
609.93
643.07
676.34
710.69
742.93
777.21
808.89
841.34
874.62
905.93
937.91
969.03
999.14
1048.79
1097.36
1144.68
1192.47
1236.81
16.61
26.25
35.87
45.47
55.08
64.68
74.27
83.84
93.41
102.97
112.57
122.12
131.69
141.25
150.80
160.35
169.89
179.43
188.95
198.46
217.25
236.01
254.74
273.45
292.14
476.81
524.31
570.95
616.04
662.36
707.07
751.55
795.56
838.78
882.18
926.99
969.03
1013.75
1055.07
1097.40
1140.81
1181.65
1223.36
1263.96
1303.23
1367.99
1431.34
1493.06
1555.40
1613.23
21.67
34.24
46.79
59.31
71.85
84.36
96.87
109.36
121.84
134.31
146.84
159.29
171.77
184.24
196.70
209.15
221.60
234.04
246.45
258.85
283.36
307.83
332.27
356.68
381.06
571.18
628.07
683.95
737.97
793.46
847.01
900.30
953.01
1004.79
1056.78
1110.45
1160.82
1214.39
1263.89
1314.59
1366.60
1415.51
1465.48
1514.11
1561.16
1638.74
1714.63
1788.56
1863.24
1932.52
25.96
41.01
56.05
71.05
86.07
101.06
116.04
131.01
145.95
160.89
175.90
190.81
205.77
220.70
235.63
250.55
265.46
280.36
295.23
310.09
339.45
368.76
398.03
427.27
456.48
377
LEADS
IN
KMS
L
1
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
S.W.PIPES
PER TRIP 100MM DIA .M.
COL.
(14/3)
15
UNIT 100 RMT
L.F.
FUEL
5.20
COMP.
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
444.34
531.83
581.76
663.43
745.04
826.08
868.62
975.87
1122.29
1269.77
1418.34
1565.08
1782.59
2120.56
2355.15
2682.13
3324.43
3974.27
4619.61
5271.38
6562.62
S.W.PIPES
150MM DIA .M.
S.W.PIPES
200MM DIA .M.
S.W.PIPES
230MM DIA .M.
S.W.PIPES
250MM DIA .M.
111.70
837.16
139.12 1002.00
165.75 1096.07
193.04 1249.95
220.33 1403.71
247.63 1556.38
274.09 1636.54
327.50 1838.59
381.76 2114.46
436.01 2392.31
490.26 2672.23
544.51 2948.70
677.02 3358.50
812.02 3995.26
944.84 4437.23
1079.53 5053.28
1348.92 6263.42
1618.30 7487.75
1887.69 8703.60
2157.07 9931.59
2695.84 12364.36
210.44
262.12
312.28
363.70
415.12
466.54
516.39
617.04
719.25
821.46
923.67
1025.89
1275.54
1529.89
1780.14
2033.90
2541.44
3048.97
3556.51
4064.04
5079.11
1540.37
1843.68
2016.77
2299.91
2582.82
2863.74
3011.23
3383.01
3890.60
4401.86
4916.91
5425.61
6179.64
7351.27
8164.51
9298.03
11524.70
13777.46
16014.63
18274.12
22750.43
387.22
482.29
574.60
669.21
763.82
858.43
950.16
1135.35
1323.42
1511.49
1699.56
1887.63
2346.99
2815.01
3275.45
3742.38
4676.25
5610.11
6543.97
7477.84
9345.57
2009.17
2404.80
2630.56
2999.88
3368.90
3735.32
3927.69
4412.63
5074.70
5741.55
6413.36
7076.89
8060.41
9588.62
10649.36
12127.87
15032.21
17970.60
20888.65
23835.81
29674.47
505.07
629.08
749.47
872.88
996.29
1119.70
1239.34
1480.89
1726.20
1971.51
2216.82
2462.13
3061.29
3671.75
4272.32
4881.37
6099.45
7317.54
8535.62
9753.70
12189.87
2406.82
2880.75
3151.20
3593.61
4035.66
4474.60
4705.04
5285.96
6079.06
6877.90
7682.67
8477.52
9655.69
11486.36
12757.04
14528.18
18007.34
21527.28
25022.86
28553.31
35547.55
605.03
753.58
897.81
1045.64
1193.47
1341.30
1484.63
1773.98
2067.84
2361.70
2655.56
2949.43
3667.18
4398.45
5117.89
5847.47
7306.63
8765.80
10224.96
11684.12
14602.45
378
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
12.00
13.00
14.00
COST
S.W.PIPES
PER TRIP 300MM DIA .M.
COL.
(14/3)
15
UNIT 100 RMT
L.F.
FUEL
0.75
COMP.
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
1646.05
1717.02
1788.71
731.11
803.94
875.45
944.60
1015.62
1084.17
1152.38
1219.85
1286.14
1352.68
1421.38
1485.85
1554.42
1617.78
1682.68
1749.25
1811.86
1875.81
1938.07
1998.29
2097.58
2194.73
2289.35
2384.95
33.23
52.50
71.75
90.95
110.16
129.36
148.53
167.69
186.82
205.94
225.15
244.24
263.39
282.50
301.61
320.70
339.78
358.86
377.89
396.91
434.49
472.01
509.48
546.41
S.W.PIPES
350MM DIA .M.
S.W.PIPES
400MM DIA .M.
SHAHBAD
TANDOOR
KOTA
1192.03
1310.76
1427.36
1540.11
1655.91
1767.67
1878.88
1988.89
2096.96
2205.45
2317.47
2422.58
2534.37
2637.68
2743.50
2852.03
2954.12
3058.39
3159.89
3258.08
3419.97
3578.36
3732.64
3888.50
54.18
85.60
116.98
148.28
179.61
210.91
242.17
273.40
304.60
335.77
367.09
398.21
429.44
460.60
491.75
522.88
553.99
585.10
616.13
647.14
708.41
769.59
830.68
891.69
1827.78
2009.84
2188.63
2361.50
2539.06
2710.42
2880.95
3049.63
3215.34
3381.69
3553.45
3714.63
3886.04
4044.44
4206.70
4373.12
4529.65
4689.53
4845.17
4995.72
5243.96
5486.82
5723.38
5962.37
83.07
131.25
179.36
227.37
275.41
323.40
371.33
419.22
467.06
514.85
562.87
610.60
658.47
706.25
754.01
801.75
849.46
897.15
944.73
992.28
1086.23
1180.03
1273.71
1367.26
4.98
5.48
5.97
6.44
6.92
7.39
7.86
8.32
8.77
9.22
9.69
10.13
10.60
11.03
11.47
11.93
12.35
12.79
13.21
13.62
14.30
14.96
15.61
16.26
0.23
0.36
0.49
0.62
0.75
0.88
1.01
1.14
1.27
1.40
1.54
1.67
1.80
1.93
2.06
2.19
2.32
2.45
2.58
2.71
2.96
3.22
3.47
3.73
379
LEADS
IN
KMS
L
1
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
S.W.PIPES
PER TRIP 300MM DIA .M.
COL.
(14/3)
15
UNIT 100 RMT
L.F.
FUEL
0.75
COMP.
1855.22
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
2473.63
3080.73
3687.35
4033.53
4599.82
5165.64
5727.49
6022.46
6766.03
7781.20
8803.71
9833.82
10851.23
12359.29
14702.55
16329.02
18596.07
23049.39
27554.91
32029.26
36548.24
45500.86
584.29
774.44
964.58
1149.19
1338.42
1527.64
1716.87
1900.32
2270.70
2646.84
3022.98
3399.12
3775.26
4693.99
5630.01
6550.90
7484.76
9352.49
11220.22
13087.95
14955.68
18691.14
S.W.PIPES
350MM DIA .M.
S.W.PIPES
400MM DIA .M.
SHAHBAD
TANDOOR
KOTA
4033.09
5022.93
6011.99
6576.41
7499.70
8422.24
9338.29
9819.22
11031.57
12686.74
14353.88
16033.40
17692.22
20151.01
23971.54
26623.39
30319.67
37580.53
44926.49
52221.63
59589.52
74186.18
952.65
1262.67
1572.69
1873.69
2182.20
2490.74
2799.24
3098.35
3702.22
4315.50
4928.77
5542.05
6155.32
7653.24
9179.37
10680.81
12203.42
15248.63
18293.84
21339.05
24384.26
30474.68
6184.07
7701.83
9218.38
10083.83
11499.54
12914.10
14318.72
15056.14
16915.07
19453.01
22009.28
24584.54
27128.07
30898.22
36756.36
40822.54
46490.17
57623.48
68887.29
80073.16
91370.60
113752.15
1460.72
1936.09
2411.46
2872.99
3346.05
3819.11
4292.17
4750.81
5676.74
6617.10
7557.45
8497.81
9438.16
11734.96
14075.03
16377.24
18711.91
23381.23
28050.55
32719.87
37389.20
46727.84
16.87
21.01
25.14
27.50
31.36
35.22
39.05
41.06
46.13
53.05
60.03
67.05
73.99
84.27
100.24
111.33
126.79
157.15
187.87
218.38
249.19
310.23
3.98
5.28
6.58
7.84
9.13
10.42
11.71
12.96
15.48
18.05
20.61
23.18
25.74
32.00
38.39
44.67
58.03
63.77
76.50
89.24
101.97
127.44
0.50
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00
11.00
COST
BITUMEN PACKED
PER TRIP
COL.
(14/3)
15
UNIT M.T
L.F.
FUEL
7.50
COMP.
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
73.11
80.39
87.55
94.46
101.56
108.42
115.24
121.99
128.61
135.27
142.14
148.59
155.44
161.78
168.27
174.92
181.19
187.58
193.81
199.83
209.76
3.32
5.25
7.17
9.09
11.02
12.94
14.85
16.77
18.68
20.59
22.51
24.42
26.34
28.25
30.16
32.07
33.98
35.89
37.79
39.69
43.45
GLASS BLOCKS
150MM DIA .M.
UNIT M.T.
L.F.
4.50
548.34
602.95
656.59
708.45
761.72
813.13
864.29
914.89
964.60
1014.51
1066.04
1114.39
1165.81
1213.33
1262.01
1311.94
1358.89
1406.86
1453.55
1498.72
1573.19
24.92
39.37
53.81
68.21
82.62
97.02
111.40
125.77
140.12
154.45
168.86
183.18
197.54
211.88
226.20
240.52
254.84
269.14
283.42
297.68
325.87
274.17
301.48
328.29
354.22
380.86
406.56
432.14
457.45
482.30
507.25
533.02
557.19
582.91
606.67
631.01
655.97
679.45
703.43
726.78
749.36
786.59
380
12.46
19.69
26.90
34.11
41.31
48.51
55.70
62.88
70.06
77.23
84.43
91.59
98.77
105.94
113.10
120.26
127.42
134.57
141.71
148.84
162.93
121.85
133.99
145.91
157.43
169.27
180.69
192.06
203.31
214.36
225.45
236.90
247.64
259.07
269.63
280.45
291.54
301.98
312.64
323.01
333.05
349.60
FUEL
COMP.
5.44
8.75
11.96
15.16
18.36
21.56
24.76
27.95
31.14
34.32
37.52
40.71
43.90
47.08
50.27
53.45
56.63
59.81
62.98
66.15
72.42
LEADS
IN
KMS
L
1
12.00
13.00
14.00
15.00
20.00
25.00
30.00
35.00
40.00
45.00
50.00
60.00
70.00
80.00
90.00
100.00
125.00
150.00
175.00
200.00
250.00
300.00
350.00
400.00
500.00
COST
BITUMEN PACKED
PER TRIP
COL.
(14/3)
15
UNIT M.T
L.F.
FUEL
7.50
COMP.
1646.05
1717.02
1788.71
1855.22
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
219.47
228.94
238.49
247.36
308.07
368.74
403.35
459.98
516.56
572.75
602.25
676.60
778.12
880.37
983.38
1085.12
1235.93
1470.25
1632.90
1859.61
2304.94
2755.49
3202.93
3654.82
4550.09
47.20
50.95
54.69
58.43
77.44
96.46
114.92
133.84
152.76
171.69
190.03
227.07
264.68
302.30
339.91
377.53
469.40
563.00
655.09
748.48
935.25
1122.02
1308.79
1495.57
1869.11
GLASS BLOCKS
150MM DIA .M.
UNIT M.T.
L.F.
4.50
1646.05
1717.02
1788.71
1855.22
2310.55
2765.52
3025.15
3449.86
3874.23
4295.62
4516.84
5074.52
5835.90
6602.78
7375.36
8138.42
9269.47
11026.91
12246.76
13947.05
17287.04
20666.19
24021.95
27411.18
34125.64
354.01
382.11
410.18
338.22
580.83
723.44
861.90
1003.81
1145.73
1287.65
1425.24
1703.02
1985.13
2267.24
2549.34
2831.45
3520.49
4222.51
4913.17
5613.57
7014.37
8415.17
9815.96
11216.76
14018.35
823.02
858.51
894.36
927.61
1155.28
1382.76
1512.57
1724.93
1937.12
2147.81
2258.42
2537.26
2917.95
3301.39
3687.68
4069.21
4634.73
5513.45
6123.38
6973.53
8643.52
10333.09
12010.97
13705.59
17062.82
381
177.00
191.06
205.09
219.11
290.41
361.72
430.95
501.91
572.87
643.83
712.62
851.51
992.56
1133.62
1274.67
1415.72
1760.24
2111.26
2456.59
2806.79
3507.18
4207.58
4907.98
5608.38
7009.18
365.79
381.56
397.49
412.27
513.46
614.56
672.26
766.64
860.94
954.58
1003.74
1127.67
1296.87
1467.29
1638.97
1808.54
2059.88
2450.42
2721.50
3099.34
3841.57
4592.49
5338.21
6091.37
7583.48
FUEL
COMP.
78.67
84.91
91.15
97.38
129.07
160.76
191.53
223.07
254.61
286.14
316.72
378.48
441.14
503.83
566.52
629.21
782.33
938.34
1091.82
1247.46
1558.75
1870.04
2181.32
2492.61
3115.19
The transportation tables have been prepared as per guidelines received from
Government. The data has been adopted as per mode specified in the All India
standard schedule of Rates by National Building Organization (N.B.O.).
1. The rates are derived including loading and unloading charges and some
other minutes considerations for extra kilometers covered for obtaining
diesel etc. The rate is worked out and prescribed on trip basis in the lead
statement taking into consideration the pay load for lorry of 9.00 tones as
prescribed in the accompanying table.
2. A notable change that has to be exercised is to adopt various payload factors
depending upon the types of commodity to be transported either on
volumetric basis or weight basis. The details on the basis of pay load of 9.00
M.T. capacity lorry for various material is given below as prescribed in the All
India Standard Schedule of rate by N.B.O. and any be adopted for computing
the rate on Cum/M.T./Number basis./RMT.
Sr.
No.
1
3
4
Material
Pay load
factor
5.75
5.75
5.45
4.70
cum
cum
cum.
cum
Unit of
rates
Cum.
Cum
Cum
Cum
5.75 cum
Cum.
5.50 cum
5.50 cum.
6.00 cum
Cum.
3500
3500
5000
5000
1000
1000
1000
1000
Nos.
Nos.
Nos.
Nos.
Cum.
Nos.
Nos.
Nos.
Nos.
1000 Nos.
1 Tonnes
Steel
1 Tonnes
9.0 Tonnes
382
1000 Nos.
Sr.
No.
8
Material
Pay load
factor
5.75 cum.
Unit of
rates
1 cum.
4.5 Tonnes
1 Tonnes
9A
Bitumen bulk
9.0 M.T.
1 M.T.
10
Stearns coal
9.0 Tonnes
1 Tonnes
11
12
S.W. pipes
a) 100 mm dia
520 Mtr..
1 Mtr..
b) 150 mm dia
276 Mtr..
1 Mtr.
c) 200 mm dia
150 Mtr..
1 Mtr..
d) 230 mm dia
115 Mtr.
1 Mtr..
e) 250 mm dia
96 Mtr..
1 Mtr..
f) 300 mm dia
75 Mtr.
1 Mtr..
g) 350 mm dia
46 Mtr..
1 Mtr..
h) 400 mm dia
30 Mtr..
1 Mtr..
292.80 Mtrs.
219.60 Mtrs.
183.00 Mtrs.
109.80 Mtrs.
80.52 Mtrs.
62.22 Mtrs.
54.92 Mtrs.
29.28 Mtrs.
30.00 Mtrs.
15.00 Mtrs.
15.00 Mtrs.
15.00 Mtrs.
1
1
1
1
1
1
1
1
1
1
1
1
13
Timber
383
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Mtr.
Sr.
No.
14
Material
Pay load
factor
Unit of
rates
50 mm dia
80 mm dia
100 mm dia
150 mm dia
658.80
402.60
292.80
183.00
Mtrs
Mtrs
Mtrs
Mtrs
15
16
17
110 Sqm.
384
1
1
1
1
Mtr.
Mtr.
Mtr.
Mtr.
1 MT
1 Sqm.
Sr.
No.
Item
Rate
2015-16
Unit
A) Road work
1(a)
Improvements
to
existing road
as per
Rs. 400000/-
One Km.
One Km.
1-bii
Rs. 455000/-
One km.
1-c
One km.
1-b-i
385
One Km.
One km.
Rs. 890000/One km.
Rs. 830000/Rs. 10150000/-
Bridge Works
C.D. Works with NP-2 pipes
Details of Culvert
1
a
b
c
d
e
f
g
h
i
j
For 7.50 m
width / No.
Rs. 60000/-
Major Bridges :
(7.50 m width) cost per Rmt. As
under
With open foundation
With raft foundation
With well foundation
Minor Bridge/ slab drains for
7.50 m width cost per Rmt. As
under :
With open foundation
With Raft foundation
a
b
c
5
a
b
6
c
d
7
a
b
Approaches :
Non submersible approaches / m
With submersible approaches / m
386
For 10.00 m
width/ No.
Rs.
Rs
Rs
Rs
Rs
Rs
Rs
Rs
Rs
Rs
Rs
Rs
Rs.
105000/
140000/185000/
116000/160000/225000/140000/180000/216000/142000/205000/265000/-
3
8
7
LABOUR DESCRIPTION
UNIT
RATE
DAY
500.00
ASSISTANT PLUMBER,SKILLED.
DAY
400.00
BANDHANI,SEMI-SKILLED.
DAY
328.00
BAR BENDER,SKILLED.
DAY
393.00
BHISTI(MIXING/CURING),SEMI-SKL.
DAY
328.00
DAY
500.00
BOREMAN SKILLED.
DAY
358.00
DAY
358.00
BREAKER,SEMI-SKILLED.
DAY
297.00
10
DAY
400.00
11
DAY
450.00
12
CHISELER,SEMI-SKILLED.
DAY
328.00
13
COMPRESSOR OPERATER/DRIVER.
DAY
500.00
14
ELECTRICIAN.
DAY
358.00
15
DAY
358.00
16
EXCAVATOR,HEAVY,UNSKILLED.
DAY
312.00
17
FABRICATOR
DAY
500.00
18
DAY
450.00
19
DAY
500.00
20
FOREMAN,SKILLED.
DAY
358.00
21
DAY
500.00
22
DAY
358.00
23
DAY
500.00
388
LBR
CODE
LABOUR DESCRIPTION
UNIT
RATE
24
HELPER,UNSKILLED.
DAY
312.00
25
DAY
750.00
26
HOLE DRILLER,SEMI-SKILLED.
DAY
331.00
27
DAY
358.00
28
LAB.ASSISTANT.
DAY
400.00
29
DAY
358.00
30
DAY
312.00
31
DAY
312.00
32
DAY
500.00
33
MAISTRY SKILLED/SUPERVISOR
DAY
500.00
34
DAY
400.00
35
DAY
450.00
36
DAY
312.00
37
DAY
252.00
38
MAZDOOR,UNSKILLED HEAVY/MALE.
DAY
312.00
39
MECHANIC.
DAY
500.00
40
MINER OR BLASTER,SEMI-SKILLED.
DAY
331.00
41
MUKADAM,SEMI-SKILLED.
DAY
331.00
42
PAINTER I CLASS,SKILLED.
DAY
358.00
43
DAY
358.00
44
PAINTER(WHITE WASHER)SEMI-SKL.
DAY
331.00
45
DAY
358.00
46
POLISHMAN,SEMISKILLED .
DAY
358.00
47
QUARRY MAN,SEMI-SKILLED.
DAY
397.00
389
LBR
CODE
LABOUR DESCRIPTION
UNIT
RATE
48
SKILLED LABOUR.
DAY
312.00
49
DAY
400.00
50
SUPERVISOR.
DAY
400.00
51
SWEEPER
DAY
312.00
52
TAR HANDLER,SEMI-SKILLED.
DAY
312.00
53
DAY
312.00
54
DAY
358.00
55
TRAFFIC COUNTOR
DAY
358.00
56
TRAFFIC LEGULATOR.
DAY
331.00
57
TREE CUTTER,SEMI-SKILLED.
DAY
312.00
58
DAY
400.00
59
WATCHMAN.
DAY
297.00
60
WELDER,SKILLED.
DAY
400.00
61
WELDER/DRILLER,SKILLED
DAY
450.00
390
MATERIAL DESCRIPTION
UNIT
Rate
A.C. COLLAR.
No.
32.00
No.
32.00
R.M.
323.00
A.C.BEND 100MM.
No.
41.00
A.C.BEND 75MM.
No.
38.00
A.C.CORR.SHEET 6MM.TH.
Sq.M.
269.00
No.
43.00
No.
54.00
No.
162.00
10
No.
77.00
11
No.
172.00
12
No.
32.00
13
A.C.PIPE 100MM.DIA.
R.M.
102.00
14
R.M.
130.00
15
Sq.M.
299.00
16
No.
151.00
17
R.M.
106.00
18
R.M.
118.00
19
R.M.
75.00
20
Sq.M.
234.00
21
A.C.SHEET RIDGE .
PAIR.
284.00
22
No.
54.00
23
A.C.SHOE 150MM.DIA.
No.
67.00
24
No.
215.00
25
No.
431.00
26
No.
194.00
27
ALLUMINIUM PAINT.
LITR
224.00
28
ALLUMINIUM POWDER
GRAM
5.00
391
MATERIAL DESCRIPTION
UNIT
Rate
29
R.M.
51.00
30
ALLUMINIUM SECTION
Kg.
244.00
31
Sq.M.
421.00
32
No.
154.00
33
ALLUMINIUM STRIPS
R.M.
226.00
34
No.
226.00
35
Sq.M.
1077.00
36
Sq.M.
2843.00
37
No.
27.00
38
Cu.M.
59625.00
39
BALLCOCK 15MM.DIA.P.V.C.FLOAT
No.
247.00
40
No.
358.00
41
R.M.
13.00
42
BAMBOO 50 MM.DIA.
R.M.
27.00
43
BARBED WIRE.
Kg.
59.00
44
No.
382.00
45
BED WASHER
Kg.
120.00
46
No.
84.00
47
No.
233.00
48
No.
232.00
49
No.
331.00
50
No.
363.00
51
No.
79.00
52
No.
148.00
53
BIG GRASS.
BUNDLE
49.00
54
BINDING WIRE .
Kg.
64.00
55
BITUMEN (COMPOUND).
Kg.
57.00
56
Kg.
47.00
57
BITUMEN PRIMER
LITR
118.00
58
BITUMINOUS FILLERS.
kg.
22.00
MAT
CODE
392
MATERIAL DESCRIPTION
UNIT
Rate
59
Sq.M.
1252.00
60
BITUMINOUS WASHERS .
Kg.
74.00
61
No.
391.00
62
BLACK HINGES.
No.
79.00
63
Sq.M.
386.00
64
Sq.M.
425.00
65
BLASTING POWDER.
Kg.
172.00
66
Sq.M.
1040.00
67
LITR
95.00
68
No.
637.00
69
No.
842.00
70
No.
474.00
71
Sq.M.
599.00
72
BOUNDARY STONE.
No.
551.00
73
No.
511.00
74
No.
842.00
75
No.
708.00
76
No.
809.00
77
No.
251.00
78
BRASS OXI.BUTT.HINGES.125MM.
No.
330.00
79
No.
405.00
80
No.
1673.00
81
BRASS SCREWS
GROSS
540.00
82
PAIR
139.00
83
No.
631.00
84
No.
789.00
85
No.
863.00
86
No.
1052.00
87
No.
1578.00
88
BRASS.ORNAMENTLE HANDLE
No.
331.00
MAT
CODE
393
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
89
BRASS.OXI.HANDLES 125MM.
No.
163.00
90
BRASS.OXI.HINGES 100MM.
No.
206.00
91
No.
137.00
92
No.
428.00
93
No.
547.00
94
No.
292.00
95
No.
421.00
96
No.
389.00
97
BRICK 9"X6"X4"SIZE
No.
11.00
98
BRICK-BATS
Cu.M.
681.00
99
BRICKS ( II CLASS ).
No.
7.00
Cu.M.
471.00
100
101
No.
6.00
102
Kg.
15.00
103
Kg.
15.00
104
No.
73.00
105
No.
183.00
106
No.
102.00
107
NO
157.00
108
No.
58.00
109
No.
35.00
110
No.
158.00
111
No.
190.00
112
No.
179.00
113
No.
47.00
114
No.
30.00
115
No.
9316.00
116
C.C.T.W.
Cu.M.
93866.00
117
Cu.M.
97625.00
118
No.
251.00
394
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
119
No.
192.00
120
No.
840.00
121
No.
969.00
122
No.
754.00
123
C.I.BEND 100MM.
No.
431.00
124
C.I.BRACKETS
PAIR
124.00
125
C.I.COLLER 100mm.DIA.
No.
409.00
126
C.I.COLLER 150mm.DIA.
No.
518.00
127
C.I.COLLER 75 MM.DIA.
No.
280.00
128
No.
1052.00
129
No.
409.00
130
No.
409.00
131
C.I.COWL/VENT 75 MM.DIA.
No
269.00
132
No.
120.00
133
No.
216.00
134
No.
6754.00
135
No.
422.00
136
No.
372.00
137
C.I.PIPE 100MM.DIA.
R.M.
1052.00
138
R.M.
1834.00
139
R.M.
842.00
140
No.
677.00
141
SET
63110.00
142
No.
1260.00
143
No.
388.00
144
No.
958.00
145
No.
737.00
146
No.
1725.00
147
No.
484.00
148
No.
110.00
395
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
kg.
66.00
149
150
Sq.M.
3669.00
151
CCTW.PURLINS/PLANKS IN GENERAL
Cu.M.
92983.00
152
Sq.M.
1844.00
153
Sq.M.
172.00
154
CEMENT PAINT.
Kg.
58.00
155
R.M.
1061.00
156
R.M.
1734.00
157
R.M.
930.00
158
CENTRING OIL
LITR
39.00
159
Sq.M.
525.00
160
No.
40.00
161
No.
310.00
162
CHARCOAL
Kg.
32.00
163
Sq.M.
389.00
164
Sq.m.
33.00
165
No.
4808.00
166
No.
737.00
167
No.
8720.00
168
No.
1207.00
169
No.
10.00
170
COAL TAR.
Kg.
45.00
171
No.
55.00
172
COIR STRING .
Kg.
55.00
173
Box.
236.00
174
No.
1707.00
175
Sq.M.
217.00
176
FRAME
1042.00
177
FRAME
1084.00
178
FRAME
1120.00
396
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
179
FRAME
1209.00
180
FRAME
1181.00
181
FRAME
1357.00
182
FRAME
1262.00
183
Sq.M.
2345.00
184
No.
120.00
185
No.
2717.00
186
No.
13.00
187
No.
21.00
188
KG
9.00
189
No.
1622.00
190
COLOURED CEMENT
Kg.
85.00
191
Sq.M.
182.00
192
No.
200.00
193
Kg.
461.00
194
R.M.
245.00
195
COPPER PLATE.
Kg.
599.00
196
Kg.
511.00
197
No.
72.00
198
CORNER/QUIONS 30X20X30CM.
No.
71.00
199
No.
213.00
200
No.
205.00
201
COUSTIC SODA.
Kg.
69.00
202
COW DUNG.
Kg.
7.00
203
CRIPPED WIRE
Sq.M.
52.00
204
No.
368.00
205
No.
174.00
206
Cu.M.
974.00
207
Cu.M.
792.00
208
Cu.M.
600.00
397
MATERIAL DESCRIPTION
UNIT
Rate
209
Sq.M.
470.00
210
Kg.
853.00
211
Rm.
21004.00
212
D.D.V.P.100%EMULSION CONCENTRT
LITR.
147.00
213
Sq.M.
924.00
214
DETONATER.
No.
19.00
215
No.
2148.00
216
DRY DISTEMPER
Kg.
39.00
217
R.M.
52.00
218
R.M.
220.00
219
No.
268.00
220
No.
1463.00
221
LITR
315.00
222
No.
56.00
223
ENGINE OIL.
LITR
265.00
224
No.
621.00
225
No.
1052.00
226
No.
1260.00
227
No.
937.00
228
Sq.M.
274.00
229
Cu.M.
1523.00
230
Cu.M.
207.00
231
F.W.FOR R.C.BEAMS.
Cu.M.
1443.00
232
F.W.FOR R.C.COLUMNS.
Cu.M.
1549.00
233
F.W.FOR R.C.FOOTING.
Cu.M.
121.00
234
F.W.FOR R.C.PARDI.
Cu.M.
2514.00
235
Cu.M.
857.00
236
Cu.M.
1125.00
237
Cu.M.
482.00
238
Cu.M.
490.00
MAT
CODE
398
MATERIAL DESCRIPTION
UNIT
Rate
239
FACTORY T.W.FRAME.
R.M.
858.00
240
No.
183.00
241
No.
1261.00
R.M.
553.00
Sq.M.
2477.00
No.
10.00
Cu.M.
178.00
MAT
CODE
242
243
244
FIRE BRICKS
245
246
FIRE WOOD
247
No.
453.00
248
No.
908.00
249
No.
74.00
250
No.
2426.00
251
No.
215.00
252
PAIR
913.00
253
No.
1207.00
254
No.
945.00
255
Sq.M.
247.00
256
PAIR
113.00
257
FORMICA.
Sq.M.
640.00
258
FRENCH POLISH.
LITR
163.00
259
No.
808.00
260
FUSE
No.
16.00
261
G.C.I.SHEETS(CORRUGATED)22BWG.
M.T.
71435.00
262
No.
18.00
263
No.
18.00
264
GROSS
234.00
265
No.
6.00
266
No.
76.00
267
No.
89.00
QUINTAL 1574.00
399
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
268
No.
137.00
269
G.I.BEND/PLUG(18G)75-100 MM.DIA
No.
179.00
270
G.I.CHAIN 12 MM.DIA.
R.M.
421.00
271
G.I.CHAIN 28 MM.DIA.
R.M.
1168.00
272
No.
22.00
273
No.
27.00
274
No.
56.00
275
No.
58.00
276
No.
75.00
277
No.
22.00
278
No.
32.00
279
No.
53.00
280
No.
114.00
281
G.I.FIXTURE
Kg.
102.00
282
No.
500.00
283
No.
868.00
284
No.
1334.00
285
No.
1963.00
286
No.
2577.00
287
No.
307.00
288
Kg.
95.00
289
R.M.
1090.00
290
G.I.PIPE 100mm,DIA.MEDIUM
R.M.
944.00
291
R.M.
154.00
292
R.M.
135.00
293
R.M.
199.00
294
R.M.
168.00
295
R.M.
289.00
296
R.M.
267.00
297
R.M.
297.00
298
R.M.
263.00
400
MATERIAL DESCRIPTION
UNIT
Rate
299
R.M.
353.00
300
R.M.
294.00
301
R.M.
455.00
302
R.M.
378.00
303
R.M.
522.00
304
R.M.
541.00
305
R.M.
688.00
306
R.M.
629.00
307
No.
35.00
308
No.
55.00
309
No.
79.00
310
No.
56.00
311
No.
123.00
312
DOZ.
4.00
313
G.I.SCREW 30MM
No.
5.00
314
G.I.SCREW 40MM
No.
5.00
315
G.I.SCREW BOLTS
No.
3.00
316
GROSS
168.00
317
G.I.SCREWS 100MM
GROSS
337.00
318
G.I.SCREWS 125MM
GROSS
446.00
319
No.
1185.00
320
No.
34.00
321
No.
42.00
322
R.M.
95.00
323
No.
31.00
324
No.
97.00
325
No.
105.00
326
No.
147.00
327
No.
57.00
328
No.
81.00
MAT
CODE
401
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
329
No.
117.00
330
No.
214.00
331
G.I.WASHERS
No.
3.00
332
G.I.WASHERS.
Kg.
76.00
333
G.Y.P.BOARD
Sq.M.
296.00
334
Sq.M.
1782.00
335
Sq.M.
1405.00
336
No.
183.00
337
R.M.
237.00
338
R.M.
323.00
339
GI.PL.RAINPIPE (18G)150MM.DIA.
R.M.
319.00
340
No.
188.00
341
Sq.M.
350.00
342
Sq.M.
291.00
343
GLASS 4 MM.THICK
Sq.M.
485.00
344
Sq.M.
646.00
345
GRASS
BUNDLE
54.00
346
Cu.M.
1077.00
347
GREASE
Kg.
300.00
348
Sq.M.
905.00
349
No.
485.00
350
No.
269.00
351
GUM
Kg.
323.00
352
No.
248.00
353
GUSSET PLATES
Kg.
70.00
354
LITR
65.13
355
R.M.
254.00
356
R.M.
81.00
357
Sq.M.
969.00
358
No.
70.00
402
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
359
No.
81.00
360
No.
38.00
361
No.
54.00
362
No.
32.00
363
No.
43.00
364
M.T.
1077.00
365
Sq.M.
188.00
366
M.T.
1077.00
367
HEMP (wakh )
Kg.
49.00
368
HEMP ROPE.
Kg.
49.00
369
M.T.
50073.00
370
No.
54.00
371
No.
49.00
372
No.
57.00
373
No.
22.00
374
No.
17.00
375
No.
24.00
376
No.
19.00
377
No.
58.00
378
No.
46.00
379
No.
38.00
380
Sq.M.
1748.00
381
No.
6491.00
382
Cu.M.
98239.00
383
No.
18.00
384
No.
38.00
385
No.
47.00
386
No.
41.00
387
No.
2.00
403
MATERIAL DESCRIPTION
UNIT
Rate
388
J.W.BALLIES .
R.M.
75.00
389
Cu.M.
26019.00
390
KADAPA ST.1.5X0.45M.TH.POLISHD
No.
353.00
391
Sq.M.
370.00
392
Sq.M.
403.00
393
KHANDIKIES
R.M.
162.00
394
KHANDKIES
No.
67.00
395
No.
2444.00
396
No.
1571.00
397
Sq.M.
456.00
398
Sq.M.
509.00
399
Sq.M.
863.00
400
Sq.M.
830.00
401
No.
188.00
402
No.
781.00
403
No.
1344.00
404
No.
975.00
405
Kg.
112.00
406
LIME (UN-SLAKED).
Kg.
8.00
407
Cu.M.
858.00
408
Kg.
9.00
409
LITR
135.00
410
No.
718.00
411
Kg.
50.00
412
SET
73279.00
413
Sq.M.
927.00
414
M.S.FLAT
Kg.
48.00
415
M.S.GRILL RAILING .
Kg.
69.00
416
Kg.
64.00
417
No.
317.00
MAT
CODE
404
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
Kg.
48.00
418
M.S.PLATE.
419
Sq.M.
186.00
420
MALTHION.
LITR.
120.00
421
No.
45.00
422
No.
337.00
423
No.
80.00
424
No.
19.00
425
No.
15015.00
426
MARBLE CHIPS.
Kg.
26.00
427
Kg.
31.00
428
No.
1045.00
429
Sq.M.
192.00
430
Sq.M.
214.00
431
MDF 18MM TK
Sq.M.
619.00
432
No.
1020.00
433
No.
20.00
434
No.
836.00
435
No.
527.00
436
No.
1502.00
437
No.
42.00
438
Sq.M.
65.00
439
Sq.M.
80.00
440
MUD MORTER
Cu.M.
268.00
441
NAILS
Kg.
73.00
442
NEERU.
Kg.
8.00
443
No.
63.00
444
NOBLE DYNAMITE.
Kg.
147.00
445
No.
219.00
446
No.
454.00
405
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
No.
389.00
447
448
Cu.M.
26234.00
449
Cu.M.
29567.00
450
No.
16.00
451
No.
13.00
452
NUTBOLTS,WASHERS(12MM.D&75MM.L
No.
40.00
453
Kg.
91.00
454
Sq.M.
302.00
455
Kg.
71.00
456
OIL PAINT
Sq.M.
222.00
457
No.
707.00
458
OXI.(ACCETELENE) GAS.
CYLINDER.
632.00
459
No.
239.00
460
No.
22.00
461
P.C.C.SOLID BLOCK(1:5:6)
No.
16.00
462
R.M.
177.00
463
R.M.
113.00
464
R.M.
33.00
465
R.M.
46.00
466
R.M.
62.00
467
R.M.
86.00
468
R.M.
100.00
469
R.M.
141.00
470
No.
27.00
471
P.V.C.FLUSHING TANK
No.
1361.00
472
P.V.C.PIPE 50MM.DIA.
R.M.
105.00
473
Sq.M.
606.00
474
No.
1865.00
475
No.
1188.00
476
Kg.
235.00
406
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
No.
107.00
477
478
Sq.M.
1097.00
479
Sq.M.
332.00
480
Sq.M.
172.00
481
Sq.M.
180.00
482
No.
69.00
483
Kg.
392.00
484
Sq.M.
602.00
485
Sq.M.
382.00
486
Sq.M.
464.00
487
Sq.M.
317.00
488
Sq.M.
247.00
489
Sq.M.
232.00
490
Sq.M.
243.00
491
Sq.M.
278.00
492
LITR
211.00
493
Sq.M.
862.00
494
LITR
128.00
495
Sq.M.
1529.00
496
PUTTY
Kg.
77.00
497
LITR
8.00
498
LITR
8.00
499
PVC.MUL.CHEMB.HOLOW SEC.2MM TK
Sq.M.
196.00
500
Cu.M.
575.00
501
Cu.M.
522.00
502
503
Sq.M.
376.00
504
R.M.
183.00
505
R.M.
215.00
506
R.M.
322.00
268.00
407
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
507
R.M.
451.00
508
No.
8374.00
509
Kg.
355.00
510
Kg.
118.00
511
Kg.
27.00
512
RED SOIL
Cu.M.
430.00
513
R.M.
11.00
514
Sq.M.
8.00
515
Cu.Cm.
3.00
516
M.T.
44014.00
517
SET
45087.00
518
ROLLING SHUTTER .
Sq.M.
601.00
519
Sq.M.
129.00
520
Sq.M.
166.00
521
Sq.M.
177.00
522
Sq.M.
188.00
523
Cu.M.
76.00
524
RUBBER GASKET
R.M.
56.00
525
RUBBER INSERTION.
Kg.
48.00
526
RUBBERISED ADHESIVE
LITR
333.00
527
R.M.
482.00
528
R.M.
767.00
529
R.M.
2325.00
530
No.
134.00
531
SAND (SCREENED).
Cu.M.
1125.00
532
SAND CRUSHED
Cu.M.
616.00
533
SAND ORDINARY
Cu.M.
846.00
534
SARAS
Kg.
68.00
535
Kg.
10.00
536
No.
151.00
408
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
537
SEWER TRAP.
No.
333.00
538
SHACKLE 12 MM.DIA.
No.
245.00
539
SHACKLE 36 MM.DIA.
No.
854.00
540
Sq.M.
752.00
541
Sq.M.
553.00
542
No.
268.00
543
No.
354.00
544
No.
59.00
545
No.
247.00
546
No.
215.00
547
No.
37.00
548
No.
59.00
549
No.
75.00
550
No.
102.00
551
No.
193.00
552
No.
37.00
553
No.
48.00
554
No.
59.00
555
No.
80.00
556
No.
91.00
557
No.
113.00
558
No.
118.00
559
No.
161.00
560
No.
327.00
561
SOLDER JOINT
No.
5.00
562
Sq.M.
679.00
563
Sq.m.
2952.00
564
SPIRIT COMMON
LITR
61.00
565
SPUN YARN .
Kg.
86.00
566
No.
1288.00
409
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
567
MT
42.00
568
No.
8.00
569
No.
10.00
570
R.M.
108.00
571
R.M.
172.00
572
R.M.
193.00
573
R.M..
263.00
574
R.M.
336.00
575
STEEL PRIMER.
LITR
123.00
576
Sq.M.
1031.00
577
Sq.M.
2738.00
578
STONE DUST
Cu.M.
322.00
579
R.M.
134.00
580
R.M.
147.00
581
R.M.
383.00
582
No.
204.00
583
No.
28.00
584
No.
99.00
585
No.
39.00
586
Kg.
54.00
587
STRUCTURAL STEEL.
MT
49533.00
588
SUNMICA SHEET
Sq.M.
326.00
589
SYNTHETIC PAINT
LITR
232.00
590
T.W.(SUPERIOR) PLANK.
Cu.M.
72998.00
591
No.
34.00
592
R.M.
72.00
593
T.W.BIDDING.
R.M.
17.00
594
R.M.
268.00
595
R.M.
376.00
596
R.M.
451.00
410
MATERIAL DESCRIPTION
UNIT
Rate
597
T.W.GIRDER(JOIST)
Cu.M.
70100.00
598
T.W.GLASS BEDDING
Cu.M.
58399.00
599
Cu.M.
74716.00
600
Cu.M.
61941.00
601
T.W.PLANKS 20MM.TH(10-15 CM W)
Cu.M.
93976.00
602
T.W.PLANKS-50X12 mm.
R.M.
75450.00
603
Sq.M.
1164.00
604
T.W.SASH BAR
Cu.M.
78305.00
605
T.W.VENTILATOR SHUTTER
Sq.M.
1835.00
606
Sq.M.
283.00
607
Sq.M.
366.00
608
TAR FELT .
Sq.M.
598.00
609
Sq.M.
67.00
610
Sq.M.
32.00
611
Sq.M.
2255.00
612
THERMOPLASTIC PAINT
LITR
235.00
613
No.
67.00
614
No.
51.00
615
Sq.M.
506.00
616
No.
347.00
617
No.
60.00
618
No.
45.00
619
N0.
87.00
620
No.
40.00
621
No.
50.00
622
No.
75.00
623
No.
59.00
624
No.
50.00
625
No.
51.00
626
No.
50.00
MAT
CODE
411
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
627
No.
116.00
628
Sq.M.
1646.00
629
Sq.M.
516.00
630
Sq.M.
656.00
631
Sq.M.
1075.00
632
TRAP HEADER
No.
46.00
633
No.
62.00
634
TRAPE HEADER
No.
129.00
635
No.
161.00
636
TREAD CHAQUERED
DOZ.
224.00
637
TUPERNINE
LITR
85.00
638
URINAL SEMI-STALL.
No.
2707.00
639
VARNISH.
LITR
173.00
640
VENEER 4MM.THICK.
5Q.M.
434.00
641
Sq.M.
975.00
642
Sq.M.
970.00
643
No.
1715.00
644
No.
1942.00
645
No.
1595.00
646
No.
1887.00
647
No.
1979.00
648
No.
1824.00
649
No.
2045.00
650
No.
1101.00
651
No.
1206.00
652
No.
1199.00
653
No.
1300.00
412
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
654
No.
325.00
655
No.
582.00
656
No.
682.00
657
No.
745.00
658
No.
6658.00
659
No.
1636.00
660
No.
3513.00
661
No.
4885.00
662
No.
6146.00
663
No.
456.00
664
Kg.
43.00
665
WAX.
Kg.
81.00
666
Sq.M.
268.00
667
Sq.M.
220.00
668
WELDING
Cm.
4.00
669
WELDING ELECTRODES.
No.
24.00
670
No.
4252.00
671
No.
240.00
672
No.
290.00
673
No.
487.00
674
WHITE CEMENT
Kg.
63.00
675
Sq.m.
405.00
676
Kg.
178.00
677
Kg.
118.00
678
Sq.M.
922.00
413
MATERIAL DESCRIPTION
UNIT
Rate
679
WOOD PRIMER.
LITR
129.00
680
Sq.M.
559.00
681
LITR
215.00
682
Cu.M.
832.00
683
HARD MURUM
Cu.M.
114.00
684
SOFT MURUM
Cu.M.
511.00
685
CEMENT
MT
6650.00
686
CEMENT
BAG
333.00
687
MT
43601.00
688
M.S.BARS/TMT BARS
Kg.
48.00
689
M.S.BARS/TMT BARS
MT
48496.00
690
N0.
65.00
691
N0.
71.00
692
N0.
90.00
693
N0.
107.00
694
N0.
143.00
695
MT
4831.00
696
GREECOBOND
Kg.
54.00
697
Sq.M.
333.00
698
Sq.M.
475.00
699
Sq.M.
444.00
700
Sq.M.
599.00
701
Cu.M.
426.00
702
Cu.M.
525.00
M-001
Cu.M.
353.00
M-002
Cu.M.
450.00
MAT
CODE
414
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
M-003
Cu.M.
500.00
M-004
Cu.M.
989.00
M-005
Cu.M.
1060.00
M-006
Cu.M.
1766.00
M-007
Moorum at site
Cu.M.
212.00
M-008
Cu.M.
636.00
M-009
Cu.M.
250.00
M-010
Cu.M.
300.00
Cu.M.
350.00
Cu.M.
600.00
M-012
M-013
Cu.M.
600.00
M-014
Cu.M.
660.00
M-015
Cu.M.
700.00
M-016
Cu.M.
671.00
M-017
Cu.M.
600.00
M-018
Cu.M.
565.00
M-019
Cu.M.
530.00
M-020
Cu.M.
460.00
Cu.M.
460.00
Cu.M.
460.00
Cu.M.
460.00
Cu.M.
460.00
M-011
M-021
M-022
Stone Crusher dust finer than 3mm with not more than 10%
passing 0.075 sieve
Coarse graded Granular sub-base Material 2.36mm & below
M-024
M-025
Cu.M.
460.00
M-026
Cu.M.
636.00
M-027
Cu.M.
636.00
M-028
Cu.M.
636.00
M-023
415
MAT
CODE
MATERIAL DESCRIPTION
UNIT
Rate
M-029
Cu.M.
566.00
M-030
Cu.M.
460.00
M-031
Cu.M.
637.00
M-032
Cu.M.
637.00
M-033
Cu.M.
637.00
M-034
Cu.M.
566.00
M-035
Cu.M.
566.00
M-036
Cu.M.
566.00
M-037
Cu.M.
425.00
M-038
Cu.M.
425.00
M-039
Cu.M.
309.00
M-040
Cu.M.
490.00
M-041
Cu.M.
525.00
M-042
Cu.M.
525.00
M-043
Cu.M.
525.00
M-044
Cu.M.
525.00
M-045
Cu.M.
525.00
M-046
Cu.M.
640.00
M-047
Cu.M.
640.00
M-048
Cu.M.
650.00
M-049
Cu.M.
550.00
M-050
Cu.M.
460.00
M-051
Cu.M.
550.00
M-052
Cu.M.
460.00
M-053
Cu.M.
815.00
M-054
Cu.M.
650.00
M-055
Cu.M.
636.00
M-056
Cu.M.
566.00
416
Cat. No.
Description
CP
KUB-35001
KUB-35021
KUB-35037
KUB-35041
KUB-35053
KUB-35083
KUB-35089
KUB-35167
KUB-35167B
KUB-35169
KUB-35169B
KUB-35421
Pillar Cock
Pillar Cock
Bib Cock with Wall Flange
2 way Bib Cock with Wall Flange
Angular Stop Cock with Wall Flange
Concealed Stop Cock with Adjustable Wall Flange
Concealed Stop Cock Regular Body with Adjustable Wall Flange
Central Hole Basin Mixer without Popup with 450mm Copper Pipes
Central Hole Basin Mixer without Popup with 450mm Braided Hoses
Central Hole Basin Mixer with Popup with 450mm Copper Pipes
Central Hole Basin Mixer with Popup with 450mm Braided Hoses
4-Way Divertor for Concealed Fitting with Built-in Non-return Valves
1325
2450
1300
1700
1225
1400
1450
--4900
--5300
2750
Cat. No.
Description
CP
KUB-35009
KUB-35009B
KUB-35011
KUB-35011B
KUB-35025B
KUB-35051
KUB-35051B
KUB-35065
KUB-35065K
Tall Boy Single Lever Basin Mixer without Popup with 450mm Copper Pipe
Tall Boy Single Lever Basin Mixer without Popup with 450mm Braided Hoses
Single Lever Basin Mixer without Popup with Copper Pipe
Single Lever Basin Mixer without Popup with 450mm Long Braided Hoses
Mini Single Lever Basin Mixer without Popup Waste System with 300mm Long Braided Hoses
Single Lever Basin Mixer with Popup with Copper Pipes
Single Lever Basin Mixer with Popup with Braided Hoses
Single Lever Concealed Divertor for Bath & Shower with Button at Top
Single Lever Exposed Parts Kit consisting of Operating Lever, Wall Flange
(with seals) & Button only (suitable for item ALD-065)
Single Lever Concealed Divertor for Bath & Shower with Button at Bottom
Single Lever Exposed Parts Kit consisting of Operating Lever, Wall Flange
(with seals) & Button only (suitable for item ALD-075)
Single Lever High Flow Concealed Divertor for Bath and Shower
Single Lever Exposed Parts Kit consisting of Operating Lever, Wall Flange
(with seals) & Button only (suitable for item ALD-079)
Single Lever Wall Mixer with Telephone Shower arrangement only
Single Lever High Flow Bath filler (Concealed Body) Wall mounted model
with bath Spout (Composite One Piece Body)
High Flow Single Lever Bath & Shower Mixer (Concealed Body)
Wall Mounted Model with Button Spout Composite One Piece Body
Side Lever Sink Mixer (Table Mounted) with 450mm Copper Pipes & Brass Nuts
Single Lever 3 Inlet Divertor Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-079)
Single Lever 3-Inlet Exposed Parts Kit consisting of Operating Lever,
Wall Flange & Button only (suitable for item ALD-193)
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm
Long Copper Connection Pipes & Brass Nuts
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm
Long Copper Connection Pipes & Brass Nuts
Single Lever Basin Mixer (Concealed Body) Wall mounted model with Spout (Composite One Piece Body)
---6050
---4875
3300
---5275
----
KUB-35075
KUB-35075K
KUB-35079
KUB-35079K
KUB-35119
KUB-35135
KUB-35137
KUB-35179B
KUB-35193
KUB-35193K
KUB-35213
KUB- 35213B
KUB-35233N
CP
Chrome Plated
417
2975
---2975
---3225
6975
7400
7700
5600
---3225
---5425
6500
Cat. No.
Description
CP
FUS-29001
Pillar Cock
965
FUS-29037
Bib Cock
965
FUS-29041
FUS-29053
FUS-29083
1025
FUS-29089
1075
FUS-29421
2175
Cat. No.
Description
CP
FUS-29011B
FUS-29009B
FUS-29051B
FUS-29065K
Single Lever Basin Mixer without Popup Waste System with 450mm Long Braided Hoses
Tall Boy Single Lever Basin Mixer without Popup Waste System with 450mm Long Braided Hoses
Single Lever Basin Mixer with Popup Waste System with 450mm Long Braided Hoses
Single Lever Exposed Parts Kit Consisting of Operating Lever, Wall Flange
(with Seals) & Button only (Suitable for Item ALD-065)
Single Lever Concealed Divertor for Bath & Shower with Button at Top
Single Lever Exposed Parts Kit Consisting of Operating Lever, Wall Flange
(with Seals) & Button only (Suitable for Item ALD-075)
Single Lever Concealed Divertor for Bath & Shower with Button at Bottom
Single Lever High Flow Divertor Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-079)
Single Lever High Flow Concealed Divertor for Bath and Shower
Single Lever Wall Mixer with Telephone Shower Arrangement only
Single Lever Concealed Mixer for Connection to Over Head Shower only
Single Lever Shower Mixer for Connection to Telephone Shower
with Connecting Legs and Flanges
Single Lever High Flow Bath Filler (Concealed Body) Wall Mounted Model
with Bath Spout (Composite One Piece Body)
High Flow Single Lever Bath & Shower Mix (Concealed Body) with Button Spout Composite One Piece Body
Single Lever Sink Mixer with Swinging Spout (Wall Mounted Model)
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model) with 450mm Long Braided Hoses
Single Lever 3-Inlet Exposed Parts Kit Consisting of Operating Lever,
Wall Flange & Button only (Suitable for Item ALD-193)
Single Lever 3 Inlet Divertor Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-079)
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm Long Braided Hoses
Single Lever Basin Mixer Wall Mounted (Composite One Piece Concealed Body) with Spout
Single Lever Concealed Deusch Mixer with provision for Connection to Overhead Shower only
Single Lever Concealed Deusch Mixer with provision for Connection to Spout only
3525
---3925
FUS-29065
FUS-29075K
FUS-29075
FUS-29079K
FUS-29079
FUS-29119
FUS-29139
FUS-29149
FUS-19135
FUS-29137
FUS-29163
FUS-29173B
FUS-29193K
FUS-29193
FUS-29213B
FUS-29233N
FUS-29227
FUS-29229
CP
1425
915
: Chrome Plated
418
1775
---1775
---2025
---4575
3675
3875
5000
5400
4175
3925
2025
---4075
4450
3225
3225
Cat. No.
Description
CP
FUS-29001
Pillar Cock
965
FUS-29037
Bib Cock
FUS-29041
FUS-29053
FUS-29083
1025
FUS-29089
1075
FUS-29421
2175
Cat. No.
Description
CP
FUS-29011B
FUS-29009B
FUS-29051B
FUS-29065K
Single Lever Basin Mixer without Popup Waste System with 450mm Long Braided Hoses
Tall Boy Single Lever Basin Mixer without Popup Waste System with 450mm Long Braided Hoses
Single Lever Basin Mixer with Popup Waste System with 450mm Long Braided Hoses
Single Lever Exposed Parts Kit Consisting of Operating Lever, Wall Flange
(with Seals) & Button only (Suitable for Item ALD-065)
Single Lever Concealed Divertor for Bath & Shower with Button at Top
Single Lever Exposed Parts Kit Consisting of Operating Lever, Wall Flange
(with Seals) & Button only (Suitable for Item ALD-075)
Single Lever Concealed Divertor for Bath & Shower with Button at Bottom
Single Lever High Flow Divertor Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-079)
Single Lever High Flow Concealed Divertor for Bath and Shower
Single Lever Wall Mixer with Telephone Shower Arrangement only
Single Lever Concealed Mixer for Connection to Over Head Shower only
Single Lever Shower Mixer for Connection to Telephone Shower
with Connecting Legs and Flanges
Single Lever High Flow Bath Filler (Concealed Body) Wall Mounted Model
with Bath Spout (Composite One Piece Body)
High Flow Single Lever Bath & Shower Mix (Concealed Body) with Button Spout Composite One Piece Body
Single Lever Sink Mixer with Swinging Spout (Wall Mounted Model)
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model) with 450mm Long Braided Hoses
Single Lever 3-Inlet Exposed Parts Kit Consisting of Operating Lever,
Wall Flange & Button only (Suitable for Item ALD-193)
Single Lever 3 Inlet Divertor Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-079)
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm Long Braided Hoses
Single Lever Basin Mixer Wall Mounted (Composite One Piece Concealed Body) with Spout
Single Lever Concealed Deusch Mixer with provision for Connection to Overhead Shower only
Single Lever Concealed Deusch Mixer with provision for Connection to Spout only
3525
---3925
FUS-29065
FUS-29075K
FUS-29075
FUS-29079K
FUS-29079
FUS-29119
FUS-29139
FUS-29149
FUS-19135
FUS-29137
FUS-29163
FUS-29173B
FUS-29193K
FUS-29193
FUS-29213B
FUS-29233N
FUS-29227
FUS-29229
CP
965
1425
915
: Chrome Plated
419
1775
---1775
---2025
---4575
3675
3875
5000
5400
4175
3925
2025
---4075
4450
3225
3225
Cat. No.
Description
ORM-10001
ORM-10037
ORM-10041
ORM-10053
ORM-10083
ORM-10089
ORM-10421
Pillar Cock
Bib Cock
2 Way Bib Cock with Flange
Angular Stop Cock with Flange
Concealed Stop Cock Regular Body 15mm with Flange
Concealed Stop Cock Regular Body 20mm with Flange
4-Way Divertor for Concealed Fitting with Built-in Non-return Valve
Cat. No.
ORM-10011
ORM-10011B
ORM-10051
ORM-10051B
ORM-10065K
ORM-10065
ORM-10075K
ORM-10075
ORM-10079K
ORM-10079
ORM-10119
ORM-10135
ORM-10137
ORM-10139
ORM-10149
ORM-10163
ORM-10173
ORM-10173B
ORM-10193K
ORM-10193
ORM-10213
ORM-10213B
ORM-10233N
CP
Description
965
965
1425
915
1025
1075
2175
CP
420
--3125
--3525
1375
1375
1625
4175
4600
4900
3275
3475
3775
--3525
1625
----3675
4050
Cat.No.
Description
VGN-27001
VGN-27037
VGN-27041
VGN-27053
VGN-27083
VGN-27089
VGN-27421
Pillar Cock
Bib Cock
2 Way Bib Cock with Flange
Angular Stop Cock with Flange
Concealed Stop Cock Regular Body 15mm with Flange
Concealed Stop Cock Regular Body 20mm with Flange
4-Way Divertor for Concealed Fitting with Built-in Non-return Valve
Cat.No.
Description
VGN-27011
Single Lever Basin Mixer without Popup Waste System with 450mm
Long Copper Pipes & Brass Nuts
Single Lever Basin Mixer without Popup Waste System with 450mm
Long Braided Hoses
Single Lever Basin Mixer with Popup Waste System with 450mm
Long Copper Pipes & Brass Nuts
Single Lever Basin Mixer with Popup Waste System with 450mm
Long Braided Hoses
Single Lever Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-065)
Single Lever Concealed Divertor for Bath & Shower with Button at Top
Single Lever Exposed Parts Kit Consisting of Operating Lever,
Wall Flange (with Seals) & Button only (Suitable for Item ALD-075)
Single Lever Concealed Divertor for Bath & Shower with Button at Bottom
Single Lever High Flow Divertor Exposed Parts Kit Consisting of
Operating Lever, Wall Flange (with Seals) & Button only
(Suitable for Item ALD-079)
Single Lever High Flow Concealed Divertor for Bath and Shower
Single Lever Wall Mixer with Telephone Shower Arrangement only
High Flow Single Lever Bath Filler (Concealed Body)
Wall Mounted Model with Spout Composite One Piece Body
High Flow Single Lever Bath & Shower Mix (Concealed Body) with Button
Spout Composite One Piece Body
Single Lever Concealed Mixer for Connection
To Over Head Shower only
Single Lever Shower Mixer for Connection to Telephone
Shower with Connecting Legs and Flanges
Single Lever Sink Mixer with Swinging Spout (Wall Mounted Model)
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Copper Pipes
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Braided Hoses
Single Lever 3-Inlet Exposed Parts Kit Consisting of Operating Lever,
Wall Flange & Button only (Suitable for Item ALD-193)
Single Lever 3 Inlet Divertor Exposed Parts Kit Consisting of
Operating Lever, Wall Flange (with Seals) & Button only
(Suitable for Item ALD-079)
Single Lever 1-Hole Bidet Mixer with Popup Waste System
with 300mm Long Copper Pipes & Brass Nuts
Single Lever 1-Hole Bidet Mixer with Popup Waste System
with 300mm Long Braided Hoses
Single Lever Concealed Basin Mixer Wall Mounted Model
with Spout (Composite One Piece Body)
VGN-27011B
VGN-27051
VGN-27051B
VGN-27065K
VGN-27065
VGN-27075K
VGN-27075
VGN-27079K
VGN-27079
VGN-27119
VGN-27135
VGN-27137
VGN-27139
VGN-27149
VGN-27163
VGN-27173
VGN-27173B
VGN-27193K
VGN-27193
VGN-27213
VGN-27213B
VGN-27233N
CP
965
965
1425
915
1025
1075
2175
CP
421
--3125
--3525
1375
--1375
--1625
--4175
4600
4900
3275
3475
3775
--3525
1625
----3675
4050
Cat. No.
Description
CP
OPL-15001
OPL-15037
OPL-15041
OPL-15053
OPL-15083
OPL-15089
OPL-15421
Pillar Cock
Bib Cock
2 Way Bib Cock with Flange
Angular Stop Cock with Flange
Concealed Stop Cock Regular Body 15mm with Flange
Concealed Stop Cock Regular Body 20mm with Flange
4-Way Divertor for Concealed Fitting with Built-in Non-return Valve
915
915
1375
865
1025
1075
2125
Cat. No.
Description
CP
OPL-15011
Single Lever Basin Mixer without Popup Waste System with 450mm
Long Copper Pipes & Brass Nuts
OPL-15011B
Single Lever Basin Mixer without Popup Waste System with 450mm
OPL-15051
Single Lever Basin Mixer with Popup Waste System with 450mm
2975
---
Single Lever Basin Mixer with Popup Waste System with 450mm
---
3375
Wall Flange (with Seals) & Button only (Suitable for Item ALD-065)
Single Lever Concealed Divertor for Bath & Shower with Button at Top
1225
OPL-15065
1225
OPL-15075
OPL-15079
OPL-15119
1475
--4025
4450
OPL-15075K
OPL-15079K
OPL-15135
Single Lever Exposed Parts Kit Consisting of Operating Lever, Wall Flange
High Flow Single Lever Bath Filler (Concealed Body) Wall Mounted
OPL-15137
High Flow Single Lever Bath & Shower Mix (Concealed Body) with Button
OPL-15139
OPL-15149
OPL-15163
OPL-15173
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
---
OPL-15173B
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
OPL-15193K
1475
---
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm
---
Single Lever 1-Hole Bidet Mixer with Popup Waste System with 300mm
3325
4775
3125
3325
3625
3525
Single Lever Concealed Basin Mixer Wall Mounted Model with Spout
3900
422
Cat. No.
Description
SOL-6011
SOL-6037
SOL-6041
SOL-6053
SOL-6083
SOL-6089
SOL-6095
SOL-6167B
SOL-6169B
SOL-6189
SOL-6191
SOL-6217
SOL-6267
SOL-6273UPR
SOL-6219
SOL-6271
SOL-6281
SOL-6309
SOL-6319B
SOL-6347
SOL-6357
SOL-6359
SOL-6421
SOL-6431
SOL-6433
SOL-6435
SOL-6437
SOL-6441
SOL-6613B
SOL-6627
Pillar Cock
Bib Cock
2 Way Bib Cock with Wall Flange
Angular Stop Cock Adjustable Wall Flange
Concealed Stop Cock Adjustable Wall Flange
Concealed Stop Cock Regular Body Adjustable Wall Flange 20mm
Bath Tube Filler consisting of 2 Control Cocks and one Spout (Available in both 1/2" and 3/4" sizes)
Central Hole Basin Mixer without Popup with 450mm Braided Hoses
Central Hole Basin Mixer Regular Spout with Popup 450mm Pipe
3-Hole Basin Mixer without Popup Waste
3-Hole Basin Mixer with Popup Waste
Wall Mixer with Telephone Shower Arrangement only but without Crutch
Wall Mixer (Wall Mounted Model) with Telephone Shower Arrangement only & with Telephone Shower Crutch
Wall Mixer with provision for Overhead Shower with 115mm Long Upper Bend Pipe and Wall Flange
Wall Mixer (Wall Mounted Model) Non-Telephonic Shower System
Bath Tub Mixer Exposed Adjustable Telephone Shower only with Stand
Wall Mixer (Wall Mounted Model) 3-In-1 with 115mm Bend Pipe
Sink Mixer with Swinging Spout Wall Mounted
Sink Mixer 1-Hole Regular Spout Table Mounted 450mm Braided Hoses
Sink Cock Regular Swinging Spout Wall Flange
Sink Cock with swinging Spout (Table Mounted)
Sink Cock with Swinging Spout (Table Mounted) with right hand Operating knob
4-Way Divertor with Built-in Non Return Valve
Two Concealed Stop cocks Composite Single Plate System
Two Concealed Stop Cocks with Basin Spout (Composite One Piece Body)
Two Concealed Stop Cocks with Bath Spout (Composite One Piece Body)
Two Concealed Stop Cocks with Bath Spout Button Attachment (Composite One Piece Body)
Single Concealed Stop Cock with Basin Spout (Composite One piece body)
1-Hole Bidet with Popup Waste System with 300mm Long Braided Hoses
3-Hole Bidet with Popup Waste System (Bottom Spray)
CP
Cat. No.
Description
SOL-6001B
SOL-6051B
SOL-6065
SOL-6075
SOL-6079
SOL-6227
SOL-6229
SOL-6233N
Single Lever Basin Mixer (Angular Flow) without Popup with 450mm Braided Hoses
Single Lever Basin Mixer (Angular Flow) without Popup with 450mm Braided Hoses
Single Lever Concealed Divertor for Bath & Shower System
Single Lever Concealed Divertor for Bath & Shower System
High Flow Single Lever Concealed Divertor for Bath & Shower System
Single Lever Concealed Deusch Mixer with provision for Connection to Overhead Shower
Single Lever Concealed Deusch Mixer with provision for Connection to Spout only
Single Lever Basin Mixer (Concealed Body) Wall Mounted Model with Spout
(Composite One Piece Body)
915
915
1375
865
1025
1075
3750
2650
3050
3000
3400
2900
3200
3300
2550
3400
3600
2500
2700
1375
1450
1600
2125
2300
3000
3000
3450
1925
2950
3400
CP
423
2875
3275
1125
1125
1375
2675
2675
3750
Cat. No.
Description
CP
QQT-7011
QQT-7037
QQT-7041
QQT-7053
QQT-7083
QQT-7089
Pillar Cock
Bib Cock with Wall Flange
2-Way Bib Cock with Wall Flange
Angular Stop Cock (Regulating Valve) with Wall Flange
Concealed Stop Cock, Extra Heavy Body with Adjustable Wall Flange
Concealed Stop Cock Regular Body with Adjustable Wall Flange
Size 20mm
QQT-7095
Bath Tub Filler consisting of 2 Control Cocks and one Spout
(Available in both 1/2" and 3/4" sizes)
QQT-7167
Central Hole Basin Mixer Regular Spout without Popup Waste System
with 10mm dia 450mm Long Copper Pipes.
QQT-7167B
Central Hole Basin Mixer Regular Spout without Popup Waste System
with 10mm dia 450mm Long Braided Hoses
QQT-7169
Central Hole Basin Mixer Regular Spout with Popup Waste Assembly
with 10mm dia 450mm Long Copper Pipes
QQT-7169B
Central Hole Basin Mixer Regular Spout with Popup Waste
Assembly with 10mm dia 450mm Long Braided Hoses
QQT-7171
Central Hole Basin Mixer with small Spout without Popup waste
System with 450mm Long Copper Pipes & Brass nuts
QQT-7171B
Central Hole Basin Mixer with small Spout without Popup
Waste System with 450 mm Long Braided Hoses
QQT-7173
Central Hole Basin Mixer with small Spout with Popup
Waste System with 450mm Long Copper Pipes & Brass nuts
QQT-7173B
Central Hole Basin Mixer with small Spout with Popup
Waste System with 450mm Long Braided Hoses
QQT-7189
3-Hole Basin Mixer without Popup Waste System
QQT-7191
3-Hole Basin Mixer with Popup Waste Assembly
QQT-7209
Shower Mixer for Shower Cubicles (Wall Mounted)
with Connecting legs & Flange
QQT-7217
Wall Mixer with Telephonic without Crutch
QQT-7219
Wall Mixer (Wall Mounted Model) Non-Telephonic
Shower Arrangement with Connecting Legs & Flanges
QQT-7267
Wall Mixer 3-in-1 System with provision for both Telephone
Shower and Overhead Shower complete with Wall Flange
with 115mm Long Bend Pipe
QQT-7271
Bath Tub Mixer with Exposed Straight Legs with Telephone
Shower Arrangement with Crutch only (without Hand Shower)
QQT-7273UPR Wall Mixer with provision for Overhead Shower with 115mm
Long Upper Bend Pipe and Wall Flange
QQT-7277
4-Hole Bath Tub Mixer Consisting of 2 Nos of Control Cocks,
1-Button Spout & 1 Telephone Shower with 8mm dia 1.5 Meter
Long Flexible Tube & Bracket
QQT-7281
Wall Mixer (Wall Mounted Model) 3-in-1 System with provision
for both Telephone Shower and Overhead Shower Complete
with 115mm Long Bend Pipe
QQT-7309
Sink Mixer with Swinging Spout (Wall Mounted Model)
with Connecting Legs & Flanges
QQT-7319
Sink Mixer One Hole with Swinging High Neck Spout
(Table Mounted Model) with 450mm Long Copper Pipes
QQT-7319B
Sink Mixer One Hole with Swinging High Neck Spout
(Table Mounted Model) with 450mm Long Braided Hoses
QQT-7347
Sink Cock with Swinging Casted Spout (Wall Mounted) with Flange
QQT-7421
4-Way Divertor for Concealed Fitting with Built-in Non-Return-Valve
424
1050
1050
1500
975
1050
1100
3800
--2750
--3150
--2550
--2950
2950
3350
2300
2975
2675
3275
3475
3275
4600
3575
2675
--2950
1550
2400
Cat. No.
Description
QQT-7613
QQT-8081
1-Hole Bidet Mixer with Popup Waste Assembly with 10mm dia,
300mm Long Pipes
1-Hole Bidet Mixer with Popup Waste Assembly with 10mm dia,
300mm Long Pipes
3-Hole Bidet Mixer Complete with Popup Waste Assembly
(Bottom Spray)
Flush Cock with Lever Handle
Cat. No.
Description
QQT-7613B
QQT-7627
CP
---3150
3450
1850
CP
FLR-5011
FLR-5021
FLR-5037
FLR-5041
FLR-5047
FLR-5053
FLR-5083
FLR-5089
Pillar Cock
Pillar Cock with 200mm extended body
Bib Cock with Wall Flange
2 Way Bib Cock with Wall Flange
Bib Cock with Wall Flange
Angular Stop Cock (Regulating Valve) with Wall Flange
Concealed Stop Cock, Extra Heavy Body with Adjustable Wall Flange
Concealed Stop Cock Regular Body with Adjustable Wall Flange
size 20mm
FLR-5095
Bath Tub Filler consisting of 2 Control Cocks and one Spout
(Available in both 1/2"" and 3/4"" sizes)
FLR-5167
Central Hole Basin Mixer Round Spout without Popup Waste System
with 10mm Dia, 450mm Long Copper Pipes
FLR-5167B
Central Hole Basin Mixer Round Spout without Popup Waste System
with 10mm Dia, 450mm Long Braided Hoses
FLR-5169
Central Hole Basin Mixer Round Spout with Popup Waste Assembly
with 10mm Dia, 450mm Long Copper Pipes
FLR-5169B
Central Hole Basin Mixer Round Spout with Popup Waste Assembly
with 10mm Dia, 450mm Long Braided Hose
FLR-5189
3-Hole Basin Mixer without Popup Waste System
FLR-5191
3-Hole Basin Mixer with Popup Waste System
FLR-5217
Wall Mixer (Wall Mounted Model) with Telephone Shower Arrangement
only but without Crutch
FLR-5219
Wall Mixer (Wall Mounted Model) Non-Telephonic Shower Arrangement
with Connecting Legs & Flanges
FLR-5267
Wall Mixer (Wall Mounted Model) with Telephone Shower Arrangement
only & with Telephone Shower Crutch
FLR-5273UPR Wall Mixer with provision for Overhead Shower with 115mm long
Upper Bend Pipe and Wall Flange
FLR-5271
Bath Tub Mixer (Exposed adjustable legs) with
Telephone Shower arrangement only
FLR-5281
Wall Mixer (Wall Mounted Model) 3-in-1 System with provision for
Both Telephone Shower and Overhead Shower Complete
with 115mm Long Bend Pipe.
FLR-5309
Sink Mixer with Swinging Spout (Wall Mounted Model)
with Connecting Legs & Flanges
FLR-5319
Sink Mixer with "U" Shaped Swinging Spout (Table Mounted)
with 10mm dia 450mm Long Copper Pipes
FLR-5319B
Sink Mixer with "U" Shaped Swinging Spout (Table Mounted)
with 10mm dia 450mm Long Braided Hoses
FLR-5347
Sink Cock with Swinging Casted Spout (Wall Mounted) with Flange
FLR-5357
Sink Cock with Round Swinging Spout (Table Mounted) with Flanges
FLR-5421
4-Way Divertor for Concealed Fitting with Built-in Non-Return Valves
FLR-5427
Concealed 4-Way Divertor Set with Hot & Cold Concealed Stop Cock
(Single Piece Casted Body) with Built-in Non-Return Valves
FLR-5431
Two Concealed Stop cocks Composite Single Plate System
425
790
1350
790
1250
810
740
900
950
3500
--2450
--2850
2850
3250
2650
2300
2950
3050
3150
3350
2300
--2500
1250
1325
2000
4100
2050
FLR-5433
FLR-5435
FLR-5437
FLR-5441
2750
2750
3200
1800
Cat. No.
Description
FLR-5613
FLR-5627
FLR-6081
S.No. Cat.
Description
FLR-5001
FLR-5613B
FLR-5001B
FLR-5003
FLR-5003B
FLR-5005
FLR-5005B
FLR-5007
FLR-5007B
FLR-5009
FLR-5009B
FLR-5025B
FLR-5051
FLR-5051B
FLR-5063
FLR-5063B
FLR-5065K
FLR-5065
FLR-5075K
FLR-5075
FLR-5079K
FLR-5079
CP
CP
426
---2675
---2475
---3475
---3675
---3875
2275
---3075
---2875
925
---925
---1175
----
FLR-5105
FLR-5119
Single Lever One Hole Bath & Shower Mixer (High Flow) Tub Mounted
with Telephone Shower Arrangement with 220mm Long Connecting Pipes
Single Lever Wall Mixer with Telephone Shower Arrangement only
S.No. Cat.
Description
FLR-5123
Single Lever Bath & Shower Mixers (High Flow) Wall Mounted Model
with Exposed Straight Legs with Telephone Shower Arrangement only
Single Lever Concealed Mixer for Connection to Over Head Shower only
Single Lever Shower Mixer Exposed for Connection to
Telephone Shower only
High Flow Single Lever Bath Filler (Concealed Body) with Bath Spout
Composite One Piece Body
High Flow Single Lever Bath & Shower Mix (Concealed Body)
with Button Spout Composite One Piece Body
Single Lever Sink Mixer with Swinging Spout (Wall Mounted Model)
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Copper Pipes
Single Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Braided Hoses
Side Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Copper Pipes & Brass Nuts
Side Lever Sink Mixer with Swinging Spout (Table Mounted Model)
with 450mm Long Copper Pipes & Brass Nuts
Single Lever 3-Inlet Exposed Parts Kit Consisting of Operating Lever,
Wall Flange & Button only (Suitable for Item ALD-193)
Single Lever 3-Inlet Concealed Divertor for Bath and Shower
(with provision for 2 Cold Inlets and One Hot Inlet)
Single Lever 1-Hole Bidet Mixer with Popup Waste System
with 300mm Long Copper Pipes & Brass Nuts
Single Lever 1-Hole Bidet Mixer with Popup Waste System
with 300mm Long Braided Hoses
Single Lever Concealed Deusch Mixer with provision
for Connection to Overhead Shower
Single Lever Concealed Deusch Mixer with provision
for Connection to Spout only
Single Lever Concealed Basin Mixer (Wall Mounted)
with Spout Composite One Piece Body
FLR-5139
FLR-5149
FLR-5135
FLR-5137
FLR-5163
FLR-5173
FLR-5173B
FLR-5179
FLR-5179B
FLR-5193K
FLR-5193
FLR-5213
FLR-5213B
FLR-5227
FLR-5229
FLR-5233N
CP
CP
Cat. No.
Description
SNR-51011
SNR-51051
SNR-51071
SNR-51077
SNR-51079
SNR-51081
3025
4150
4500
3325
---3075
---3325
1175
------3225
2475
2475
3600
CP
Description
SNR-51021A
SNR-51021
SNR-51027
SNR-51083
SNR-51093N
4525
2825
Chrome Plated
Cat. No.
SNR-51087
4375
3725
12500
13000
12500
12000
2500
9500
CP
427
9000
7500
8000
6500
7000
9900
Cat. No.
SFT-011
SFT-085
Description
CP
Pillar Cock Soft Touch Operation Auto Shut-off Complete with Battery Box
Soft Touch Dual Flow Concealed Type Flushing Valve Set for
Western Commode with Auto Shut-off complete with Battery Box
Cat. No.
Description
PRS-031
PRS-043
PRS-061
PRS-077
4900
8900
CP
1500
1550
2600
1600
Cat. No.
Description
FLR-5031
FLR-5043
OPA-15031
OPA-15031B
OPA-15267
CP
975
1025
---3595
4565
Cat. No.
Description
CP
Cat. No.
CQT-23011
CQT-23021
575
750
CQT-23037
CQT-23041
CQT-23047
CQT-23053
Bib Cock
2 Way Bib Cock
Bib Cock with Wall Flange
Angular Stop Cock (Regulating Valve)
565
800
600
550
CQT-23069
CQT-23083
675
CQT-23059
CQT-23089
CQT-23123
CQT-23127
CQT-23167B
CQT-23169B
CQT-23219
CQT-23267
585
CQT-23281
825
875
1100
1100
2000
2400
1950
2550
428
CQT-23309
CQT-23309B
CQT-23321B
CQT-23347
Description
CP
2650
2650
2750
2750
1950
1950
2250
950
CQT-23349
CQT-23421
CQT-24081A
CQT-24081
1675
1625
Cat. No.
Description
VTG-9011
VTG-9037
VTG-9041
VTG-9053
VTG-9083
VTG-9089
VTG-9095
VTG-9167
VTG-9167B
VTG-9169
VTG-9169B
VTG-9189
VTG-9191
VTG-9209
VTG-9217
VTG-9219
VTG-9267
VTG-9273UPR
VTG-9271
VTG-9309
VTG-9319
VTG-9319B
VTG-9347
VTG-9421
VTG-9613
VTG-9613B
VTG-9627
Pillar Cock
Bib Cock with Wall Flange
Two Way Bib Cock with Wall Flange
Angular Stop Cock (Regulating Valve) with Wall Flange
Concealed Stop Cock, Extra Heavy Body with Adjustable Wall Flange Size 15mm
Concealed Stop Cock Regular Body with Adjustable Wall Flange Size 20mm
Bath Tub Filler consisting of 2 Control Cocks and one Spout (Available in both 1/2" and 3/4" sizes)
Central Hole Basin Mixer Regular Spout without Popup Waste System with 10mm dia 450mm Long Copper Pipes (with Aerator)
Central Hole Basin Mixer Regular Spout without Popup Waste System with 10mm dia 450mm Long Braided Hoses Pipes (with Aerator)
Central Hole Basin Mixer Regular Spout without Popup Waste System with 10mm dia 450mm Long Copper Pipes (with Aerator)
Central Hole Basin Mixer Regular Spout with Popup Waste Assembly with 10mm dia 450mm Long Braided Hoses
3-Hole Basin Mixer without Popup Waste System
3-Hole Basin Mixer with Popup Waste Assembly
Shower Mixer for Shower Cubicles (Wall Mounted Model) with Connecting Legs & Flanges for Connection to Telephone Shower
Wall Mixer with Telephone Shower Arrangement only but without Crutch
Wall Mixer (Wall mounted Model) non-Telephonic Shower System
Wall Mixer (Wall Mounted Model) with Telephone Shower Arrangement only & with Telephone Shower Crutch
Wall Mixer with provision for Overhead Shower with 115mm Long Upper Bend Pipe and Wall Flange
Bath Tub Mixer with Telephone Shower Arrangement only with Exposed adjustable Legs & Crutch
(in 20mm Size Internal Cartridge) without Hand Shower
Wall Mixer (Wall Mounted Model) 3-in-1 System with provision for both Telephone Shower and Overhead Shower Complete
with 115mm Long Bend Pipe Connecting Legs & Flanges (without Hand & Overhead Shower)
Sink Mixer with Swinging Spout (Wall Mounted Model) with Connecting Legs & Flanges (Wall Mounted Model)
One Hole Sink Mixer with Swinging High Neck Spout (Table Mounted) with 10mm Dia, 450mm Long Copper Pipes
One Hole Sink Mixer with Swinging High Neck Spout (Table Mounted) with 10mm Dia, 450mm Long Braided Hoses
Sink Cock Regular Swinging Spout (Wall Mounted Model) with Wall Flange
4-Way Divertor for Concealed fitting with Built-in Non-return Valves with Divertor Handle
1-Hole Bidet Mixer with Popup Waste Assembly with 10mm Dia, 300mm Long Pipes
1-Hole Bidet Mixer with Popup Waste Assembly with 10mm Dia, 300mm Long Braided Hoses
3-Hole Bidet Mixer Complete with Popup Waste Assembly (Bottom Spray)
Cat. No.
Description
CP
Cat. No.
CON-011
Pillar Cock
575
CON-267
CON-021
CON-037
CON-039
750
565
600
CON-041
CON-047
800
600
CON-049
CON-053
CON-055
625
550
585
CON-059
CON-069
CON-083
585
675
VTG-9281
CON-087
CON-089
CON-095
CON-107
CON-123
CON-127
CON-167B
CP
825
1150
875
3525
750
1100
1100
2000
429
Description
CON-321B
CON-347
730
720
1000
695
975
1030
3715
2370
2250
2695
2575
2575
2900
1825
2275
2175
2625
2575
3725
2925
2175
2620
2500
1175
2250
2820
2700
3025
CP
2550
2650
2750
2750
2950
1950
1950
2050
2050
2250
CON-169B
CON-189
CON-191
CON-217
CON-219
Cat. No.
2400
2400
2800
CON-357
CON-359
CON-421
CON-613B
2250
CON-627
1950
Description
CP
EKO
EKO-33673LWR Exposed Shower Mixer (Wall Mounted) with Thermostatic Control, 115mm Long Bend Pipe on Lower Side,
Connecting Legs and Wall Flanges
4500
FLORENTINE
FLR-5651
7100
FLR-5671
8100
FLR-5655
Shower Mixer (Wall Mounted) with Thermostatic Control with Legs and Wall Flanges
5100
FLR-5657
Exposed Bath Shower Mixer (Wall Mounted) with Attachment on Spout with Connecting Legs and Flanges
6500
FLR-5659
Exposed Bath Shower Mixer (Tub Mounted) with Thermostatic Control Cartridge
with Button Attachment on Spout with Straight Legs
6800
FLR-5671
8100
SOLO
SOL-6651
7250
SOL-6671
8250
VINTAGE
VTG-9651
7250
VTG-9671
8250
FUSION
FUS-29651
7500
FUS-29671
8500
KUBIX
KUB-35651
8500
KUB-29671
9500
Cat. No.
Description
SPJ-429
SPJ-433
SPJ-439
SPJ-463
SPJ-461
SPJ-467
SPJ-29429
SPJ-29463
SPJ-5429
SPJ-5443
SPJ-5447
SPJ-5463
SPJ-7429
CP
430
750
1450
900
1200
2250
2600
910
1335
750
750
900
1200
950
950
1050
1100
2100
2400
2850
SPJ-7463
SPJ-35429
SPJ-35463
CAT NO
DESCRIPTION
CP
BSH-1761
BSH-1771
Body Shower 120mm Dia. Round Shape (ABS Chrome Plated Face Plate) with Installation Box & Rubit Cleaning System
Body Shower 130x120mm Rectangular Shape (ABS Chrome Plated Face Plate) with Installation Box & Rubit Cleaning System
3000
3500
CAT NO
DESCRIPTION
HSH-5537N
SPJ-15429
SPJ-15463
HSH-5537
HSH-7537
HSH-9537
HSH-35537
HSH-49537
HSH-1717
HSH-1721
HSH-1727
HSH-1729
HSH-1731
HSH-1737
HSH-1739
HSH-1781
HSH-1937
HSH-1939
1350
825
1225
1250
1650
CP
431
700
------1925
1175
2600
2000
2750
2450
3600
2600
1250
1850
2250
900
1300
CAT NO
DESCRIPTION
OHS-489
OHS-499
OHS-5489
OHS-7489
OHS-495
OHS-497N
OHS-497
OHS-49497
OHS-35495
OHS-35497
OHS-1709
OHS-1719
OHS-1757
OHS-1759
OHS-1769
OHS-1779
OHS-1789
OHS-1799
OHS-1803
OHS-1805
OHS-1813
OHS-1819
OHS-1823
OHS-1829
OHS-1833
OHS-1835
OHS-1839
OHS-1843
OHS-1989
OHS-1999
CP
432
1075
---1300
---1200
3300
---5100
3000
4000
2200
3200
2575
2500
3750
2650
1600
2200
3200
3500
4100
4600
5600
6100
8250
6500
8900
3450
1200
1800
Cat.
Description
CP
SHA-479L450
Shower Arm 20mm & 450mm Long Round Shape with 90 Bend
for Wall Mounted Showers with Flange
925
SHA-479L300
Shower Arm 20mm & 300mm Long Round Shape with 90 Bend
SHA-479L600
Shower Arm 20mm & 600mm Long Round Shape with 90 Bend
840
1100
SHA-483
SHA-49483
SHA-455L400
800
400
650
1250
SHA-495
1650
900
1200
Cat.
Description
CP
SHA-475L75
250
SHA-475L100
SHA-475L280
325
575
365
Cat.
Description
CP
SHA-1187
950
SHA-1189
SHA-1197
SHA-1185
1250
750
1600
1150
SHA-1199L915
SHA-1183
Cat.
Description
SHA-1211
Exposed Shower Pipe for Wall Mixer Round Shape 16mm, Size 1375x375mm with Wall Bracket,
for Connecting Overhead Shower
Exposed Shower Pipe for Wall Mixer Round Shape 25mm, Size 1050x350mm with provision
to Adjust Height Upto 250mm with Wall Bracket, for Connection to Overhead Shower &
Sliding Holder for Hand Shower
Exposed Shower Pipe with provision for Simultaneous Working of Showers with Operating
Divertor Knob, Round Shape 24mm, Size 975x 370mm with Sliding Holder for Hand Shower,
Wall Bracket & 15mm Concealed Water Inlet Connection for Connection to
Concealed Shower Mixer
Exposed Shower Pipe with provision for Simultaneous Working of Showers with Operating
Divertor Knob, Round Shape 24mm, Size 975x370mm with Sliding Holder for Hand Shower,
Wall Bracket & 8mm dia, 1M Long Flexible Tube for Connection to Exposed Shower Mixer
Exposed Shower Pipe with provision for Simultaneous Working of Showers with Operating
Divertor Knob, Flat Shape 1071x50x15mm & 350mm Wide with Sliding Holder for Hand Shower,
SHA-1213
SHA-1215R
SHA-1217R
SHA-1215F
1325
3750
CP
433
2250
5975
9700
9950
SHA-1217F
Wall Bracket & 15mm Concealed Water Inlet Connection for Connection
to Concealed Shower Mixer
Exposed Shower Pipe with provision for Simultaneous Working of Showers with
Operating Divertor Knob, Flat Shape 1071x50x15mm & 350mm Wide with Sliding Holder
for Hand Shower, Wall Bracket & 8mm dia, 1M Long Flexible Tube for Connection
to Exposed Shower Mixer
15250
15500
Cat.
Description
CP
SHA-545
Standard Wall Bracket for Hand Shower 65mm Long Round Conical Shape
275
SHA-555
Premium Wall Bracket for Hand Shower, 35mm & 100mm Long Round Shape
400
Cat.
Description
CP
SHA-549D8
SHA-549D12
SHA-567
SHA-571
725
900
195
625
Cat.
Description
CP
SHA-1195S
Wall Outlet 35x25x25mm Square Shape with 15mm Thread to connect Hand Shower Pipe & Flange
240
SHA-1195R
Wall Outlet 30mm, 40mm Long Round Shape with 15mm Thread to connect Hand Shower Pipe & Flange
240
Cat.
Description
CP
SHA-1301
SHA-1303
SHA-1305
SHA-1307
Flow Restrictor 2.5 LPM (G) at 3bar Pressure with Shower Housing
Flow Restrictor 6.0 LPM (GA) at 3bar Pressure with Shower Housing
Flow Restrictor 8.0 LPM (GB) at 3bar Pressure with Shower Housing
Flow Restrictor 12.0 LPM (GC)At 3bar Pressure with Shower Housing
250
250
250
250
CAT. NO.
DESCRIPTIONS
FLV-1001
Remote Operated Flush Valve with 32mm Size Control Cock &
Operating Lever Assembly
Flush Valve with 25mm size Control Cock
Flush Valve with 32mm Size Control Cock & Elbow Set Complete
with Adjustable Sleeve and Wall Flange
Flush Valve with 32mm Size Control Cock & Elbow Set Complete
with Adjustable Sleeve and Wall Flange(NEL)
Flush Valve DUAL FLOW with 32mm Size Control Cock & Elbow Set
Complete with Adjustable Sleeve and Wall Flange
Concealed Flush Valve Complete with 32mm Size Control Cock &
200mm Long Operating Lever
Concealed Flush Valve Complete with 32mm Size Control Cock &
75mm Long Operating lever
Elbow Set Complete 32mm with Wall Flange
Metropole Flush Valve Dual Flow Concealed Type
with Cover Plate 32mm Size
Metropole Flush Valve Dual Flow 32mm size (Concealed Body)
with Concealed Shut-off provision and Rectangular Dual Flush Plate
(ABS Chrome Plated)
Metropole Flush Valve Dual Flow Concealed Type
with Cover Plate 40mm Size
Metropole Flush Valve Dual Flow 40mm size (Concealed Body)
FLV-1011
FLV-1015
FLV-1015NEL
FLV-1029
FLV-1051
FLV-1071
FLV-1083
FLV-1085
FLV-1085DFP
FLV-1089
FLV-1089DFP
CP
2750
2450
2900
2900
3000
2750
2600
450
2300
2750
2425
434
FLV-1093
FLV-1095
Cat. No.
Description
ALD-055
1900
ALD-065
2300
ALD-075
2300
ALD-079
2800
ALD-193
2900
ALD-563
1050
ALD-573
1325
ALD-577
1450
ALD-583
725
ALD-593
1175
2900
2250
2125
CP
ALD-705
265
ALD-709
265
ALD-769
1050
ALD-769B
1100
ALD-803
235
ALD-803B
175
ALD-805
235
ALD-805B
175
ALD-809
205
ALD-809B
145
Cat.
Description
ACN-1101N
ACN-1111N
ACN-1115N
ACN-1121N
ACN-1121NR
ACN-1131N
ACN-1135N
ACN-1137N
ACN-1141N
CP
1200
975
1150
820
825
500
825
1250
500
435
ACN-1143N
ACN-1151N
ACN-1153N
ACN-1155N
ACN-1161N
ACN-1171N
ACN-1173
ACN-1181N
ACN-1181FN
ACN-1191N
ACN-1193N
ACN-1195N
Cat. No.
Description
AQN-7711
AQN-7711A
AQN-7711B
AQN-7721
AQN-7731
AQN-7733
AQN-7741
AQN-7751
AQN-7753
AQN-7755
AQN-7761
AQN-7771
AQN-7781
AQN-7781B
AQN-7791
Cat. No.
Description
AKB-35701
AKB-35711
AKB-35715
AKB-35721
AKB-35731
AKB-35735
AKB-35741
AKB-35743
AKB-35751
AKB-35753
AKB-35755
AKB-35761
AKB-35771
AKB-35781
AKB-35781F
AKB-35791
975
575
975
425
450
1050
1100
2450
2150
300
2850
1925
CP
990
930
870
695
880
795
775
745
985
975
510
1550
2300
2090
400
CP
1825
1150
1300
975
875
1150
875
1375
725
1100
500
525
1450
2775
2400
400
436
Cat. No.
Description
AHS-1501
AHS-1503
AHS-1507
AHS-1531
AHS-1551
AHS-1553
AHS-1565
AHS-1569
AHS-1581
CP
720
835
950
950
1175
1350
925
315
2550
437
14.1 STATEMENT A3
MACHINARY RATES
MACHINARY DESCRIPTION
MCH
CODE
1
AIR COMPRESSOR.
YEAR 2015-16
UNIT
RATE
HOUR.
600.00
ASPHALT MIXER.
DAY
3500.00
M.T.
2000.00
BLOW LAMP
DAY
1000.00
BOILER.[ASPHALT].
DAY
1500.00
R.M.
150.00
R.M.
180.00
10
R.M.
200.00
11
BOUSER.
HOUR.
600.00
12
M.T.
3000.00
13
DAY
2000.00
14
DAY
3500.00
16
DAY
1500.00
17
DAY
3000.00
18
CONCRETE MIXER.
DAY
1500.00
20
CRUSHER.
DAY
4800.00
21
HOUR
240.00
22
HOUR.
2500.00
23
DUMPER/TIPPER.
DAY
4800.00
24
DAY
2000.00
25
DAY
2000.00
26
DAY
500.00
27
EXCAVATOR / LOADER.
DAY
7500.00
29
M.T.
1000.00
34
DAY
1200.00
35
DAY
5000.00
36
HOUR.
7000.00
37
JACK HAMMER.
DAY
210.00
38
DAY
1500.00
39
DAY
6000.00
438
MCH
CODE
MACHINARY DESCRIPTION
UNIT
RATE
42
MORTER GRADER
HOUR
2400.00
43
PAVEMENT BREAKER.
HOUR.
1000.00
44
HOUR.
750.00
46
PNUEMATIC CHISEL.
DAY
2000.00
47
DAY
4000.00
49
RAMMER
HOUR
1000.00
50
DAY
300.00
51
DAY
7500.00
53
DAY
4000.00
54
HOUR.
300.00
56
HOUR
800.00
57
HOUR.
1600.00
58
DAY
2000.00
59
TRACTOR.
DAY
2000.00
60
DAY
4500.00
61
DAY
6000.00
62
VIBRATOR CONCRETE
DAY
1000.00
63
VIBRATORY ROLLER.
DAY
750.00
64
WAGON DRILL
HOUR.
750.00
65
DAY
1500.00
66
DAY
2500.00
67
NO.
150.00
68
WELDING MACHINE.
DAY
2000.00
69
WINCH OR HOIST
DAY
1500.00
55
DAY
1725.00
56
DAY
100.00
57
DAY
175.00
58
DAY
1600.00
59
R.M.
345.00
60
R.M.
460.00
61
R.M.
575.00
62
R.M.
690.00
439
MCH
CODE
MACHINARY DESCRIPTION
UNIT
RATE
63
DAY
2300.00
64
PAVEMENT BREAKER.
HOUR.
175.00
65
TRACTOR.
DAY
575.00
66
R.M.
650.00
67
R.M.
1670.00
68
R.M.
115.00
69
R.S.J.LOADING PLATFORM.
No.
2875.00
70
HOUR
2576.00
71
HOUR
675.00
72
HOUR
840.00
73
HOUR
1200.00
74
HOUR
630.00
75
CONCRETE PUMP
HOUR
700.00
440
Highway dumper
4
5
Scraper motorized
Scraper push loaded
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Graders
Loaders Crawlers
Loaders wheeled
Compactors:
Self propelled
Sheep foot roller
Drawn sheep foot roller
Vibrator roller
Smooth drum roller
Smooth drum vibratory
roller.
Pneumatic tyred roller
High speed compactor
Water sprinkler
Diesel compressor
Diesel compressor
Batching and mixing plant
Portable concrete mixer
Diesel engine
Diesel electrical
Trucks & highway dumper
Hot Mix plant major/ minor
Paver finishers.
Capacity
Up to 1.125 cum.
1.125 to 2.25
cum.
Above 7.6 cum.
Upto 7.3 cum
441
Lift of Equipment
Years
Hours
10
12000
12
15000
8
10000
10
8
10000
90000
10
10000
8
10
12
8
10
10
10
10
9000
12000
16000
12000
15000
12000
12000
15000
10
12000
8
8
8
8
10000
8000
10000
8000
8
10
10
8
10
18
5
8
12
10
15
15
10000
16000
16000
10000
12000
30000
6500
10000
20000
180000km
15000
5000
Name of
Machinery
Average
output
per Hr.
Average
output
per day
138 cum
120 cum
b. Murum gravel
320 cum
c. Soling
d. Metalling
e. Surface dressing 1st
coat
2nd coat
f. Rolling of 20 mm
thick carpet
g. Seal coat over 20
mm thick carpet
h.
Rolling
of
BM/BUSG/AC
42 cum
30 cum
650 sqm
9430 sqm.
465 sqm
930 sqm.
279
sqm.
(consider
up to with
1H.M. plant
35 cum)
Sheep
foot
roller 595 cum
(Double drum) Earth
compaction.
Single
pass
stabilizers
(stabilization)
Remarks
442
2 Roller
Sr.
No.
Name of
Machinery
Average
output
per Hr.
Average
output
per day
Remarks
63000 Ltrs.
120 T.
450 T
9
10
Bitumen Boiler
Stone crushers (400 12 T
mm
x
225
mm cum)
opening)
11
120 cum
12
Granulator
4 cum
24 cum
13
Trucks/
Tipper
for
carriage of materials
on good roads
8 km
16 km
32 km
6 trips
5 trips
4 trips
Vibratory
scimipactor
Earthwork
15
Asphalt mixer
At a distance of 4 km
from H.M. plant and
using 5 trucks of 5 ton.
Capacity
(for
long
distance the No. of
trucks will have to be
increased.)
2270 T
(7 72 T
(50 cum)
roller -
2250 cum
30 cum.
443
Machine
Engine
Horse
Power
Fuel consum
ption per
Fuel
consumption per
day
34 HP
4 Ltrs.
14 Ltrs.
b. For dryer
180 Ltrs.
35 Ltrs.
48 HP
6 Ltrs.
Dozers
a) Michigan
b) Russian
165 HP
100 HP
16 Ltrs.
11 Ltrs.
Scraper
165 HP
15 Ltrs.
Tipper 5 Ton
60 HP
1 Ltr/3km
Pay loader
a) Escorts
b) BELL
40 HP
165 HP
5 Ltrs
15 Ltrs
Tandom roller 8- 10
34 HP
4 Ltrs.
444
Sr.
No.
Machine
Engine
Horse
Power
Fuel consum
ption per
9
10
Trucks 5 Ton
Stone crusher 10-12
ton.
Water tanker
60 HP
40 HP
1 Ltrs/4 km
4 Ltrs.
11
6.50 Ltrs.
Fuel
consumption per
day
HSD 28.00 Ltrs.
HSD 40.00 Ltrs.
M. Oil 1.00 Ltrs.
Grease 0.50 kg.
12
13
Pusher
14
Vibratory roller
seismopactor
15
Asphalt Mixer
4 Ltrs.
445
Excavation in soil
murum and
boulder.
Earthwork
including
compaction.
Machinery
used
Compaction of
WBM/ GSB
Compaction of
soling
Crushed metal
POL
H.S.D.
Ltrs.
65.00
M.Oil
Ltrs.
Grease
kg.
1.20
0.60
Excavator
100
cum.
Scrapper
100
cum.
76.00
1.45
0.75
Pusher
100
cum.
100
cum.
100
cum.
100
cum.
19.00
0.35
0.18
19.00
0.35
0.18
7.00
0.18
0.09
6.25
0.20
0.20
127.25
7.00
2.53
0.18
1.40
0.09
6.25
0.20
0.20
13.25
83.00
0.38
2.65
0.29
2.65
66.50
1.65
0.85
149.50
60.00
4.30
1.90
3.50
1.90
48.00
1.15
0.60
108.00
56.00
3.05
2.50
Tractor
dozer
Water
tanker
Roller
Unit
Water
tanker
100
cum.
Roller
100
cum.
Roller
100
cum.
100
cum.
Water
Tanker
Roller
100
cum.
100
cum.
Water
tanker
Stone
100
446
LBM @ 2.00
M.T./cum
BM @ 2.00 M.T./
cum.
DBM @ 2.42 M.T./
cum.
BC @ 2.60 M.T./
cum.
crusher
Hot mix
plant
cum.
120 M.T. 86.00+
LDO
10
11
20 mm PMC
Ordinary concrete
High grade
concrete
4.00
Pay load
36.00
1.00
1.00
Paver
finisher
Road roller
Tandom
roller
Tipping
trucks
42.00
2.00
1.00
50.00
24.00
1.60
0.80
1.60
4.00
8.00
4.00
0.20
21.00
12.40
54.00
70.00
35.00
1.70
1.70
-
1.70
1.70
-
15.00
50.00
43.00
18.00
61.00
Bitumen
storage
tanks
8.00
Asphalt
mixer
Roller
1000
cum.
Concrete
mixer
Vibrator
100
cum.
100
cum.
Concrete
mixer
Vibrator
100 cum
Transportation
Truck/
The material to be transported by Highway
a truck of 9.00 M.T./ capacity is Dumper
sand/ stone 5.75 cum earth/
murum 6 cum.
447
+ G. Oil
4 Ltrs
3.00 +
LDO
200.00
441.00
+ LDO
+ G. Oil
4 Ltrs.
16.00
Miscellaneous Data
Type of
mixer
Tilting
Non tilting
Open pan
Non tilting
Open pan
Mixing
Discharging
50-55
20
5.65
40
15-35
20
50-75
40
30-45
20
Total
110-115
100-140
65-85
115-150
50-95
Concrete mixer
2,3 and 5 T are hands loaded.
7 and 10 T are skip loaded.
Ordinary concrete for 7 Mixer per hour is 5 cum or 35 cum/day. High
concrete for 7 T mixer per hour is 4 cum or 28 cum/ day. The fuel
consumption is
H.S.D.
12.00 Ltrs.
E. Oil
0.60 Ltrs.
Grease
0.60 Kg.
448
Item
Unit
1.
Cum.
6.27
2.
Cum.
6.72
3.
Cum.
4.42
4.
Cum.
3.40
5.
Cum.
2.65
No.
Requirement
in bag.
Cum.
6.27
7.
Cum.
7.60
8.
Cum.
8.50
9.
Cum.
9.50
10.
Cum.
10.00
11.
Cum.
10.50
BRICK WORK
12.
Cum.
1.65
13.
Cum.
1.52
14.
Cum.
1.44
15.
Cum.
1.13
16.
Cum.
0.22
MASONRY
17.
Cum.
1.77
18.
Cum.
1.94
19.
Cum.
1.80
20.
Cum.
1.50
Sqm.
0.35
449
SR.
Item
Unit
No.
22.
Requirement
in bag.
Sqm.
0.20
23.
Sqm.
0.276
24.
4.00
Sqm.
0.045
Sqm.
0.07
Sqm.
0.09
Sqm.
0.11
Sqm.
0.14
Sqm.
0.17
Sqm.
0.14
Sqm.
0.14
Sqm.
0.17
Sqm.
0.22
Sqm.
0.22
Sqm.
0.22
Sqm.
0.22
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
450
SR.
Item
Unit
No.
38.
Requirement
in bag.
Sqm.
0.03
Sqm.
0.025
40.
Sqm.
0.05
41.
0.04
Sqm.
0.03
Sqm.
0.044
Sqm.
0.135
Sqm.
0.14
Sqm.
0.15
Sqm.
0.13
Sqm.
0.13
Sqm.
0.13
Sqm.
0.18
Sqm.
0.18
39.
stone masonry.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
451
SR.
Item
Unit
No.
52.
53.
Sqm.
0.36
Sqm.
0.44
Sqm.
0.15
Sqm.
0.18
Sqm.
0.18
Sqm.
0.18
Sqm.
0.22
Sqm.
0.21
Sqm.
0.15
Sqm.
0.18
a) Gray Cement
Sqm.
0.20
b) White Cement
Sqm.
0.13
a) Gray Cement
Sqm.
0.20
b) White Cement
Sqm.
0.80
Sqm.
0.30
Sqm.
0.18
54.
55.
Requirement
in bag.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
452
SR.
Item
Unit
No.
66.
Requirement
in bag.
Sqm.
0.10
67.
Sqm.
0.20
68.
Sqm.
0.20
10 & 6 mm
Qty. of Chips
required per
Sq. M.
0.009 cum.
6 mm
0.006 cum
12 mm
0.018 cum.
(cold)
10 mm
0.009 cum.
20 mm
0.015 cum.
20 mm
0.015 cum
12 mm
0.010 cum.
20 mm
0.0185 cum.
12 mm
0.012 cum.
6 mm
0.006 cum.
Item
5
Two coat surface dressing
6
Chip Size
Qty. of Asphalt
Required per Sq.
M.
0.98 kg.
0.68 kg
1.51 kg
1.80 kg
2.90 kg
2.05 kg
0.036 cum.
3 kg/10
sqm.
0.30 kg
2.35 kg/sqm.
13.2 mm
0.018 cum.
0.94 kg.
11.2 mm
0.090 cum
0.50 kg
0.027 cum
1.44 kg
0.30 kg/
sqm. On
WBM 1.00
8
20 mm
0.0185 cum
11.2 mm
0.012 cum
6 mm
0.06 cum
0.0365 cum
0.30 kg/sqm
Tack coat
on B.T.
0.30 kg.
1.74 kg.
1.97 kg
0.30 kg
On WBM 1.00
454
Sr.
No.
Item
Chip Size
Qty. of Chips
required per
Sq. M.
2.27 kg/
2.37
sqm.
9
Qty. of Asphalt
Required per Sq.
M.
40 mm
0.06 cum.
Penetration1.75 kg/
12 mm
0.018 cum
sqm
0.078 cum
10
75 mm B.B.M.
40 mm
0.090 cum.
Penetration 2.00 kg.
1.08 cum/sqm.
11
12
13.2 mm
0.018 cum
40 mm
0.090 cum
W.B.M.)
13.2 mm
0.018 cum
40 mm
0.060 cum
W.B.M)
13
Penetration 2.00 kg
Penetration 2.00 kg
13.2 mm
0.012 cum
40 mm
0.090 cum
13.2 mm
0.018 cum
penetration 2.00 kg
40 mm
0.060 cum
13.2 mm
0.012 mm
penetration 2.00 kg
40 mm
0.06 cum.
12 mm
0.015 cum
10 mm
0.012 cum
16
2.00 kg,/sqm
0.087 cum.
40 mm
0.06 cum.
2.75 kg I No.
12 mm
0.015 cum
1.25 kg II No.
10 mm
0.012 cum
0.087 cum.
455
4.00 kg/sqm.
Sr.
No.
Item
Chip Size
Qty. of Chips
required per
Sq. M.
17
20 mm Mix seal surfacing
18
0.027 cum.
0.0376 cum
(Excluding Tack
coat)
(gradation)
19
Qty. of Asphalt
Required per Sq.
M.
2.2 kg /sqm. Type A
(Excluding Tack
coat)
(gradation)
20
50 mm Bituminous Macadam
(Density 2.00 Mt/ cum) 3.3%
Bitumen
66 kg/ cum
(Excluding Tack
coat)
(Excluding Tack
coat)
21
Coarse
aggregate
Fine
Aggregate
Cement
Bitumen
22
75 mm BUSG
40 mm
0.09 cum/sqm
20 mm
12 mm
0.018 cum/sqm
456
3 kg/ sqm
|E xi` +nV{jEi
Vin <i
] x
VxE vE M,
x {{jE G 01/11/|G 20/<i 2
j, < 400 032
nxE : 15 2011
{{jE :
x, VxE vE M, j +iMi v |ES xS <i
vES |Ex i E Vii. |E xi` +nV{jE i Ei +ix
Vi n <i +xME f {i vhi ii. xS + xnx + +
E, BES iE/VS `Eh nx v <iv Vi Ij ni S ii
+fx i. iS f {i vhi + iin -S ` |hi +ii
ES +fx i. {x i, ={Ci JiEbx Ei xh E Vi.
i |E xi` +nV{jE i Eh` J |h Sx xMi
Ehi i +i.
1)
2)
3)
4)
5)
457
6)
xi tiEhiCi |nE ti Mx ] ], ti
]x, ], { tiEh, ]]<], =nx <inEi n
xSi Ex i {{jE Ef |iI +Eix i +nV{jEi ]
Ehi , il{ i{E V Ei l{i vE +E +,
iEi l{i Mx iin E.
7)
8)
+nV{jEi xn E Vx x] v |h +E iinS Eh
iS h {]{h xn Ei. iS |iE +nV{jEi Sxi
+xGE 1 i 3 x h |i/S. . n 4 i 7 x h |i / S. .
n `E{h xn Ehi .
Sxx |E xiEi ={Ci Ji {`S f
Ii
(x..iEb)
+vIE +i il {nvn ={ S
|i,
J +i, VxE vE |nE M, < / {h / +Mn/
xE /+i/ xM{/(ti) <.
+vIE +i,
EE +i,
. S (vE) S E.
. ={S (<i) S E
458
RI I c
T d.
Te d
d RT S
d T dI-2014/..06/-1,
T, TR
: T,
4) d . dI-2007/..257/-1 . 21 2008
5) d . dI-2009/..116/-1 . 4/12/2009
RI d T d d
T e. c c S TedS
(
ia
ii ai
) T ST TI ( a
) T C dI MO
13 d
T T TI d RI I
C e. d RT dTT T TI dI e
dT d , RoTd o, so d o d
C (
RR (
A A) I T RI
i y) T eI H TT dI
I d RR d
e. c d TI d e
d
d
dS
.17/01/1979,
RI Td d RR
-2014/..06/-1,
T (d RT /
I / TRI I),
S , R d.
RR RI T ddI
e.
IT RI TdR TI T d
T es Td o I d:
d e c d d ,
IT T T T I T TH
e I o d.
H BM/DBM/AC/BC
RI d Td Ide dd RoTd
I e. , S
e d 6 Te (d T
Cd) d T Td dds I dR
d RI T TS I-
d e. d dR S T S
I e. e de Te I
Ro Td / SI e . de Te
TI eI RI T Ide dd RoTd
R .
) TT RI dde T T
. 75
d, T T (SCADA) Ide
dd RoTd , so C / so ( as per para ...
of IRC:SP: - ) I e.
4 r 2
460
-2014/..06/-1,
) TT RI dde T T
.75.00 T e
RI T TT Id
dd dT, d Ro Td / T Td o, dd e , To
, e , ( d e TeT T e
d) d T d d
so, d , o d d (SCADA) I
. dRR . 1 T
I e.
T 3 T d T es Td o
I d: d e c
d d IT T T T I
e T TH e I o d. d d
T Id d o
C
.
3.2
T RI T d
SI S
drainage) T d o d S T S
T dR dT . TI
T dI T I- -
dT T . d RI T dI
d T T o TI I .
3.3
R I T T dI, R
(Camber
Correction)
TI .
3.4
RI
RT dI
S TedS d
T TI d . d T T ,
T T e T d d-d-73
e T TI
Td d-d-20 T d e .
d d Te d www.maharashtra.gov.in d
d d 201405271139285618 d e . e
d H e .
461
4 r 3
-2014/..06/-1,
Te d .
Himanshu
A Shrimal
Himanshu A Shrimal
cn=Himanshu A Shrimal c=IN
o=Government of Maharashtra
ou=Public Works Department
2014-05-27 17:14+05:30
(eT T)
S d d
1. d T S, d RT S,
2. d S, d RT T,
3. d S, d RT S / e c S
4. d , d RT S, T, TR - 400032
4 r 4
462
ANNEXURE
The Hilly and inaccessible/tribal area as defined in G.R. of Planning Department No.
10897 CR-66/ Plan-19 dated 23/11/1990
Hilly and Inaccessible / Tribal area
District : Aurangabad
A)Soygaon Taluka : Total Taluka
B)Sillod Taluka
1) Dhansing wadi,2) Charmer 3) Dhawada 4) Aadharwadi 5)Kelagaon 6) Sirsala
7)Ghatnandra 8) Nanegaon 9) Ghatambri 10)Pimpaden 11) Mukhpat 12) Waghara
13) Ranjani 14) Ajantha 15) Anad 16) Amasari 17) Natwi 18) Wadali 19) Halda
C) Kannad Taluka
1) Tandulwadi 2) Chiwli 3) Mungsapur 4) Pedakwadi
5) Kondwadi 6) Kalanki
7) Wadner 8) Ambala 9) Amba 10) Jamdi 11) Rel wadi 12)
Kunjkhed
13)Nandginvadi14)Hiverkhada 15) Wadali 16) Jait Kheda 17) Malegaon(Thokal)
18) Bharamba19) Malegaon(Lokhand) 20)Mohadi 21) Hasta 22) Mahegaon 23) Devpul
24) Palsi (Kh) 25) Kolambi Manjra 26) Bhildari (Pishore) 27) Gaur
Pimpir 28)
Jawkheda(Bk) 29) Pimperkheda 30)Shafiyabad 31) Khadki 32) Pishore 33) Khatkeda
34)Wasdi 35) Nimbhori 36)Umerkheda 37) Sawargaon
38)
Dhamni
(Kh)
39) Ambegaon (Bk) 40) Mehun 41) Haraswadi 42) Wadgaon 43) Lonza 44) Pangra
45) Belkhada 46) Sonwadi 47) Shipghat 48) Chimnapur 49) Nagapur 50) Karanj-Khed
51) Rewalgaon 52)Nevpur(Jahangir) 53) Ghatshendra 54) Takali Antur 55) Lohgaon
D) Khultabad Taluka
1) Wadgaon 2)Padali 3) Viramgaon 4) Sawkheda 5) Loni 6) Bodkha 7) Khultabad
8) Dhamangaon 9)Abdulpur 10) Nirgudi(Bk)11) Pimpri 12) Jafarwadi 13) Mhaismal
14) Shirasmnal 15) Takli 16) Akhatwada 17) Verul 18) Mambapur 19) Khultabad
20) Sarai 21)Badalabai 22)Nandrabad 23) Mausala 24) Rasulpur 25) Shankarpurwadi
26) Salukheda 27) Khirdi 28) Sankheda 29) Bhatji 30) Lamangaon 31) Khatnapur
E) Phulambri Taluka
1) Babulgaon 2) Shirodi (Bk) 3)Pokhari 4)Babra 5) Mominabad 6)Leha
7) Bodhegaon(Bk) 8)Andhari 9) Jatwa 10) Umravati 11) Pardeshiwadi 12) Naigaon
13) Tapovan 14) Hivra.
463
464
39)Chuncha
Aurangabd District
A) Kannad Taluka
1) Kanadgaon) 2) Dudhmal 3) Talner 4) Wadod 5) Moharda 6) Vazirwadi (Wadi under
Moharda village)
5)
Beed District
A) Kaij Taluka
1) Talneri 2) Nagzari 3) Jiwachiwadi 4) Gheatewadi 5) Sakuchiwadi 6) Kordyachiwadi
7) Guarwadi 8) Pirachiwadi.
B) Ashti Taluka
1) Deulgaon Ghat 2) Chinchwadi 3) Aranvihira 4) Karkhel Khurd 5) Velturi 6)Shendale
7) Masubachiwadi 8) Mahinda 9) Pangra 10) Pimpri (Naik Ghat).
C) Patoda Taluka
1) Nirgudi 2) Wadzari 3) Rohawadi 4) Domri.
D) Ambejogai Taluka
1) Chinchkandi 2) Rakshaswadi 3) mamdapur (Parli) 4) Elda 5) Mandwa (Pathan)
6)Kalpati (Laman tanda) 7) Sakud 8) Ambalwadi.
E) Beed Taluka
1) Hivra Pahadi 2) Borphadi 3) Vangi 4) Kotharwadi 5) Aherwadi 6) Karzani
7)Dhangarwadi 8) Charata 9) Menglewadi 10) Jadhavwadi 11) Nagzari 12) Patoda
(Belwadi) 13) Kacharwadi 14) Khandala.
F) Parli Vaijanth (Vaiknath) Taluka
1) Sarfrajpur 2) Gardewadi 3) Karhewadi 4) Moha 5) Bodhegaon 6) Sonhivra
7)Aswalamba 8) Wantakli 9) Danunapur 10) Dabhe 11) Indabwadi 12) Kanherwadi
13) Bhopla 14) Dewada.
G) Dharur Taluka
1) Chikalbeed 2) Khadki 3) Tokwadi 4) Pimple 5) Mainwadi 6) Choramba 7) Moha
(Jahagir) 8) Matewadi 9) BhogalwadilO) Mohkhed 11) Amla 12) Koyal.
465