Professional Documents
Culture Documents
Raigad DSR 2015-16 PWD PDF
Raigad DSR 2015-16 PWD PDF
2()15 - 2()1(j
l~C)R
ll1\lf;1\I) l)IS'l'lll(~1'
SlJPEllIN1'ENl)ING l~NGINEEll
R1llGAI) 1>un1,1c lfOllf{S (~lll(~f,I~,
li:ONli:AN HUA.VAN, NAVI MU)lll1\.I.
P1iee Rs.1000/
S~BEDULE
OF RATES
INDEX
Sit. NO.
CLASSIFICATION OF ITE!US
GENERAL NOTES
BIJIJ,DING lfOllHS
PAGE NO.
FllOM
TO
2.1
Bd - A Excavation
2.2
Bd - B Pile Foundation
10
2.3
11
12
2.4
13
14
2.5
15
19
2.6
Bd - G Brick Masonry
20
21
2.7
Bd - H Stone Masonry
22
23
2.8
Bd - I Block Masonry
24
24
2.9
Bd - J Water Proofing
25
30
2.10
Bd - K Expansion Joints
31
32
2.11
33
38
2.12
39
47
2.13
Bd - N Wood Finishes
48
48
2.14
Bd - O Oil Painting
49
51
2.15
52
52
2.16
Bd - Q Wood Work
53
56
2.17
57
67
2.18
68
100
2.19
Bd - U Iron Works
101
101
2.20
102
128
2.21
Bd - W Miscellaneous
129
142
Road Work
143
165
Bridge Work
166
189
CD WORK
190
192
BORING
193
195
SURVEY WORK
196
206
VIDEOGRAPHY
207
208
Labour Rates
209
211
10
Machinery Rates
212
216
11
Material Rates
217
244
12
Annexure A (Pipe)
245
245
13
246
250
14
Material consumption
251
252
15
253
257
16
258
262
Schedule of Rates prepared for the year 2015-2016 orerative from 1/11/2015 and
applicable for Raigad District.
0.02
For the rates in Jail premises and Corporation areas an increase of percentage over the
normal schedule of rate prescribed forthe year 2015-2016 is allowed as follows:extra shall be added to item rates
onlv.
extra shall be added to item rates
2) Corporation Areas
5%
0
only.
extra shall be added to item rates
10%
3) Tribal Area in Raigad Dist.
onlv.
Note- The increase in rates as above should be applicable only one at a time e.g. If Jail
1
and Mental Hospital premises falls in Corporation area, an increase of only 15%
is to be considered and not 20% (i.e. 5% + 15%).
1) Jail Premises
15%
Note- The above percentage should be applied on the cost of items after deducting the
2
cost of materials as stated below.
0.03
Rs.
Rs.
Rs.
v) Structural Steel
Rs.
Rs.
Rs.
Rs.
Rs.
Rs.41,540/-Per M.T.
Rs.
Rs.
Rs.
a) The rates of Bulk bitumen, CRMB & PMB for the items of bitumenious works are
based on the rates prevailing from H .P .C.L. These rates are inclusive of all taxes.
Subsequent increase/decrease, if any, in these rates shall be accounted for in the Rate
analysis of items, while framing estimates.
b) While preparing the. estimates, the above rates may be treated as basic rates and if
any change is noted, all calculations should be done accordingly.
c) VAT is included in all basic rates of material rates as per finance dept. Mantralaya
Mumbai 400 032 circular dated 30/09/2006
d) Since the basic rates of materials adopted while preparing the Rate Abstract of items
are as per market rates.which include VAT, Royalty Charges and other taxes, no
separate provision is required to be made in the DSR items i.e.rates GOnsidered in the
DSR are inclusive of VAT & Royalty charges.
e) Rates for completed items are based on a minimum initial lead of 5 Km. Actual lead
charges for lead beyond 5 Km. shall be added while framing the estimate.
0.04
Basic Rates of Rubble, Khandkies, Metal, Murum, Sand, Aggregates, Bricks, Earth for
embankment filling, considered in this schedule are inclusive of Royalty charges, Also
the completed item rates are also inclusive of Royalty charges. Vide ~ f.:luP:r SI'.
~ Cf CR ~ S!'.'11@R
Zo/zo-Z~/>f.Sf;.C,o~/"@
0.05
0.06
For cost towards procurement and temporary storage of water for construction purpose,
provision of 1% in the rate analysis is made. In difficult situation where water is not
available in reasonable lead or where water charges are essentially required to be paid
to local authorities etc., the assessment of cost of procurement of water for construction
may be made on factual data. If this cost of procurement of water required for
construction is more than 1%, then for additional cost (i.e. more than 1%) seperate
provision should be made in the estimate.
As per Govt. in industries and power G.R.No.BCA-2009/CR-108/Labour 7-A dated
17/06/2010,1% cess on labour welfare is considered inthe DSR while arriving the
rate.The amount shall be deducted from contractors bills as prescribed in the said G.R.
0.07
0.08
Quality control testing charges shall be calculated as per prescribed frequency and same
should be considered as an individual item while framing estimate. Frequency chart and
rates of quality control test of different material I item is attached in this D.S.R.
0.09
The completed item rates are inclusive of 1% Labour amenity charges as per Govt. I
P.W. Department's Circular No DSR-1090/CR-6453/Plan-3, dated 14/07/1993
0.10
Items required for testing of soils, road and building materials, mix designs, Job-mix etc.
shall be take from the schedule of testing charges of Superintending Engineer, Vigilance
and Quality Control Circle, Navi Mumbai.
The rates for labour and materials are included in the D.S.R. for the purpose of preparing
rate analysis. The labour rates shown against the completed items are based on
minimum labour wages of Labour Commissioner . Whenever the item splitup in to
component i.e. labour, material, and machinery to be executed each separately it
should be ensured that the rate of individuatcompnent at item does not exceed the
concerned complete item rate sanctioned in D.S.R.
0.11
0.12
The rates for items required for water supply and sanitary works, which are not included
in this D.S.R. The C.S.R. of Maharashtra Jeevan Pradhikaran in the district is to be "
adopted.
2
0.13
The rates of machinery hire charges shall be as per the machinery use rates of W.R.
Department issued by the Chief Engineer (Mech}, Nasik.
0.14
The rates for items pertaining to Parks and Gardens, shal' be taken from t!ie C.S.R. of
Superintendent, Parks and Gardens, Mumbai.
0.15
While calculating part rate or reduced rate etc., necessary overhead charges, sundries
etc. should be proportionately considered as per rate abstract.
0.16
0.17
0
0.18
The Head load is to be considered while preparing detailed rate analysis for inaccessible
area where shifting of materials by head load is necessary.
0.19
The rates of excavation items for building & C.D. works are inclusive of normal manual
dewatering. If pumping is required additional item for dewatering shall be introduced
while framing the estimate, on BHP basis with prior permission of S.E.
The detailed rate analyasis shall be prepared for works of Matheran Hill Station,
Raigad Fort and Gharapuri Island, the same shall be got approved from the
Superintending Engineer
0.20
0.21
0.22
0.23
The incresed in rate for tribal area is to be used only for the village identified by tribal
development deptt.
Bituminous work for Road and concrete work for Building & Bridge with modern
machinary with SCADA the rate shall be incrrsed by 0.5 % on DSR item rate only.
f)
0.24
a)
b)
c)
d)
e)
For framing the various rates in D.S.R. following leads are considered unless
otherwise specifically mentioned in the items For items of supplying stone metal, Rubble :- Initial lead 50 meters.
(15cm. to 23cm.)
Supplying soft/Hard murum & earth for :- Initial lead 50 meters.
embankment
For Bituminious construction works no lead for asphalt and 5.00 km. initial lead
for metal/aggregates is considered.
For all items of cement concrete, plain or reinforced cement concrete, stone
masonary the initial lead for metal, sand, stone, cement & steel is considered as
5.00 km.
For working out items of additional leads more than 5.00 km., the estimate shluld
be prepared for actual leads by deducting initial lead charges of 5.00 km. for all
completed items.
0.25
For E.G.S. works like earthwork in embankment, Items following the specifications
mentioned in Rd-13 Page No.194 shall invariably be used while framing the estimate.
0.26
a)
b)
c)
0.27
The D.S.R. rates for bridge items are for works in normal conditions of site.
Wherever bridges are to be constructed in special site conditions such as bridge
on creek having tidal effects/in standing water of perennial river, the detailed rate
analysis shall be prepared and the same shall be got approved from the
concerned Superintending Engineer.
Rates for excavation for Bridges I C.D. Works/Sakav are considered for initial lift
of 1.50 mtr., and charges for additional lift above 1.50 mtr. shall be added as
below.
i) Lift above 1.50 mtr. upto 3.00 mtr.
The rates of supplying R.C.C. pipes at site of work shall be adopted as per
MSSIDC rate contract, plus 10% overhead charges while Framing the of
estimates.
CONCRl!1'll 11'1!MS
The grade of reinforced cement concrete sl'\ould be as per Govt Circular No. RMR1094/184/R-1 Dated 12-6-1996 and recent govt. guidelines and IRC codal provisions for
Bridges. In case of buildings IS-456-2000 should be followed.Appropriate grade of
concrete is specified for different exposure. Condition Mix design shall be done as per
requirement of IS 456-2000 for Building,& IRC-21-2000,for Bridges.
0.28
TRANSPORTATION CllARGES :
a)
b)
c)
sci/Executive Engineer
Alibag P.W. Division, Alibag
Dist- Raigad
sci/Executive Engineer
Mahad P.W. Division,Mahad
Dist- Raigad
sci/Executive Engineer
Road Development Division No,3, Panvel
Dist- Raigad
sci/Executive Engineer
Mahad R.P. Division,Mahad
Dist- Raigad
sd/-
Superintending Engineer
Raigad P.W.Circle, Konkan Bhavan,
Navi Mumbai
BD-A.: EXCA.VA.'llON
Item
No
1
Item Description
Unit
labour
165.00
154.00
190.00
217.00
385.00
180.00
202.00
349.80
628.00
917.00
545.00
572.00
832.70
429.00
Excavation for
foundation in -----------------including removing the excavated material up to a
distance of SO m. beyond the building area &
stacking and spreading as directed, dewatering,
preparing the bed for the foundation and necessary
back filling, ramming, watering including shoring
and strutting etc. complete. (lift upto 1.5 m.)
Spec. No.: Bd.A.1 Page No. 259
1) By Manual Means
a) earth, soil of all types, sand, gravel and soft Cu.Mt.
mu rum,
Cu.Mt.
b) hard murum
c) Hard murum and boulders
Cu.Mt.
d) Soft rock and old cement and lime masonry Cu.Mt.
foundations
e) Hard rock by blasting
Cu.Mt.
f) Hard rock by chiselling, wedging, line drilling, etc.
Cu.Mt.
g) laterite rock (soft or hard,)
2) By Mechanical Means.
Cu.Mt.
Cu.Mt.
b) hard murum
c) Hard murum and boulders
Cu.Mt.
Cu.Mt.
Cu.Mt.
104.00
118.00
131.00
323.00
46.00
50.00
62.00
261.00
Cu.Mt.
70.40
64.90
Cu.Mt.
316.80
64.90
778.80
183.70
1254.00
53.00
.,
Item
Unit
Item Description
No
Labour
954.00
178.00
HR.
83.00
59.00
HR.
101.00
59.00
HR.
121.00
59.00
Item
Item Description
Unit
No
DD - B : PILE FOUNDA'l'ION
1
1) M-20
a) 225 mm dia.
b) 300 mm dia.
c) 380 mm dia.
d) 450 mm dia.
e) 535 mm dia.
f) 600 mm dia.
2) M-25
a) 225 mm dia.
b) 300 mm dia.
c) 380 mm dia.
d) 450 mm dia.
e) 535 mm dia.
f) 600 mm dia.
Providing ----------- RCC cast in-situ double rim
bored pile of ----------------- each of load capacity as
per design and of specified diameter of pile and
bulb as directed, sunk to the required depth
through all strata except rock,excluding provision of
reinforcement including placing reversible drum
type concrete
mixer concrete
by tremie
of concrete
etc.
arrangement compaction
complete.Spec. No.: Bd-F
1) M-20
a) 225 mm dia.
b) 300 mm dia.
c) 380 mm dia.
d) 450 mm dia.
ej 535 mm dia.
f) 600 mm dia.
1) M-25
a) 225 mm dia.
b) 300 mm dia.
c) 380 mm dia.
d) 450 mm dia.
e) 53!i mm dia.
fl 600 mm dia.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
557.00
716.00
1017.00
1432.00
1912.00
2433.00
98.00
98.00
99.00
99.00
98.00
98.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
587.00
777.00
1118.00
1432.20
1985.00
2208.00
98.00
99.00
99.00
99.00
99.00
99.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
583.00
853.00
1282.00
1802.00
2165.00
2754.00
99.00
9,9.00
99.00
99.00
113.00
99.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
619.00
929.00
1421.00
2015.00
2353.00
3016.00
99.00
99.00
99.00
99.00
99.00
113.00
Item
No
3
Item Description
Unit
Providing M-25 RCC cast in-situ bored pile of --mm dia.using minimum cement quantity @ 375
kg/cum ., each of load capacityas per design and of
specified diameter ,or as directed, placed through
all starta except rock excluding provision of
reinforcement, including placing concrete by temie
arrengment compaction of concrete and with
drawal of steel shell etc. complete Spec. No.: Bd-F
a) 625
2424.00
492.00
b)650
2464.00
512.00
c) 750
3006.00
596.00
d) 800
3700.00
645.00
e)825
3868.00
669.00
f) 900
4925.00
834.00
g) 975
5926.00
864.00
h) 1000
i) 1050
5926.00
6446.00
864.00
925.00
No.
240.00
233.00
R.Mt.
135.00
19.00
No.
41251.00
8250.00
No.
49829.00
9966.00
No.
60344.00
12065.00
Item
Item Description
Unit
No
I
10
R.Mt.
Labour
440.00
0.00
Item
Unit
Item Description
No
Labour
M.T.
71886.00
10009.00
M.T.
68839.00
9212.00
M.T.
69150.29
8968.07
M.T.
83261.56
21462.98
11
Item
Item Description
Unit
No
Labour
3702.00
1689.00
M.T.
69596.00
2168.00
Cm.
6.00
1.00
12
Ul'it
Item Description
Item
No
BD
1
J~ :
Labour
Cumt
a) M-10
Cu mt
4550.00
583.00
b) M-15
Cu.Mt.
5126.00
583.00
a) M-15
Cu.Mt.
5169.00
583.00
b) M-20
Cu.Mt.
5529.00
583.00
a) M-15
Cu.Mt.
5385.00
613.00
b) M-20
Cu.Mt.
5745.00
706.00
8455.00
899.00
Providing and casting in situ cement concrete-------of trap I granite / quartzite /gneiss metal for steps
including
centering,
formwork,
compacting,
roughening them if special finish is to be provided
and
curing
and
finishing
if
required
complete,reversible Drum Type mixer / Concrete
mxer with hopper.
Spec. No.: Bd. E. 1 Page No.287
Providing and casting in situ cement concrete --------- of trap / granite /quartzite/ gneiss metal for bed
blocks, foundation blocks and such other items
including bailing out water formwork, compacting,
roughening, them if special finish is to be provided
and curing and finishing if required complete,
concrete mixer with hopper
Spec. No.: Bd.E.4 Page No. 289 and B-7, Page No.38
'
13
Item
Item Description
Unit
No
Labour
5563.00
5923.00
673.00
673.00
Providing and casting in situ cement concrete-------of trap metal for coping to plinth or parapet,
moulded or chamfered as per drawings or As
directed by Engineer-In-Charge., roughening the
exposed faces if special finish is to be provided and
curing etc. complete.
Spec. No.: BdE-3 Page No. 288
a) M-15
b) M-20
Cu.Mt.
cu.Mt.
14
Unit
Item Description
Item
No
Labour
Providing and laying in situ cement concrete -------of trap/ granite /quartzite/ gneiss metal for R.C.C.
work in foundations like raft, strip foundations,
grillage and footings of R.C.C. columns and steel
stanchions etc. including bailing out water,
formwork, cover blocks compaction and curing
roughening the surface if special finish is to be
provided (Excluding reinforcement and structural
steel) complete
Spec. No.: Bd.F.3 Page No. 298 and B.7, Page No.38
a) M-20
Cu.Mt.
5312.00
792.00
b) M-25
Cu.Mt.
5492.00
834.00
c) M-30
Cu.Mt.
5672.00
834.00
a) M-20
Cu.Mt.
7026.00
1247.00
b) M-25
Cu.Mt.
7206.00
1474.80
c) M-30
Cu.Mt.
7386.00
1474.80
d) M-35
7566.00
1475.00
e) M-40
8000.00
1475.00
Providing and casting in situ cement concrete-------- of trap I granite /quartzite/ gneiss metal for
R.C.C. columns as per detailed designs and drawing
or as directed including centering, formwork, cover
blocks compacting and roughening the surface if
special finish is to be provided and curing complete.
(Excluding reinforcement)reversible drum type
concrete mixer/concrete mixer with hopper
Spec. No.: Bd.F.5 Page No. 300 and B.7, Page.No. 38
Providing & casting in situ cement concrete----------of trap I granite /quartzite/ gneiss metal for R.C.C.
beams and lintels as per detailed designs &
drawings or as directed including centering,
formwork, cover blocks compaction & roughening
the surface if special finish is to be provided &
curing complete. (Excluding reinforcement) drum
type concrete mixer /Concrete mixer with hopper
Spec. No.: Bd.F.6 Page No. 300 and B.7.
a) M-20
Cu.Mt.
7374.00
1477.00
b) M-25
Cu.Mt.
7554.00
1483.00
Cu.Mt.
7734.00
1483.00
c) M-30
15
Item
Unit
Item Description
Completed
No
Providing and casting in situ cement concrete----------of trap/ granite / quartzite/ gneiss metal for
R.C.C. slabs and landings canopy, waist slab with
steps as per detailed designs and drawings
including centering, formwork,
cover blocks
compacting and roughening the surface if special
finish is to be provided and curing complete.
(Excluding reinforcement) reversible drum type
concrete mixer/ concrete mixer with hopper.
'
Spec. No.: Bd.F.8 Page No. 302 and 8.7, Page No.38
a) M-20
Cu.Mt.
Cu.Mt.
Cu.Mt.
8331.00
8501.00
8691.00
1640.00
1640.00
1640.00
a) M-20
Cu.Mt.
8452.00
1640.00
b) M-25
Cu.Mt.
8632.00
1640.00
9624.00
1903.00
b) M-25
c) M-30
5
Providing & casting in situ cement concrete -----------of trap/ granite/ quartzite/ gneiss metal for R.C.C.
chajja as per detailed design & drawings including
centering, formwork, cover blocks compacting &
roughening the surface if special finish is to be
provided
&
curing
complete.
(Excluding
reinforcement) reversible drum type concrete mixer
I Concrete mixre with hopper.
Spec. No.: Bd.F.9 Page No. 303 and B.7, Page No.38
16
Unit
Item Description
Item
Completed
Labour
9624.00
1903.00
Cu.Mt.
Cu.Mt.
Cu.Mt.
9339.00
9519.00
9699.00
1903.00
1903.00
1903.00
Cu.Mt.
Cu.Mt.
Cu.Mt.
5893.00
6080.00
6272.00
1028.00
1067.00
1070.00
No
Providing and casting in situ cement concrete in ----------- of trap/ granite/ quartzite/ gneiss metal for
R.C.C. pardi 75mm thick I fins including centering,
formwork,
cover
blocks
compacting
and
roughening them if special finish is to be provided
and
curing
complete.
(Excluding
reinforcement).with reversible Drum Type mixer I
concrete mixer with hopper
Spec. No.: Bd.F.11 Page No. 304 and B.7, Page No.
38
a) M-20
b} M-25
c} M-30
17
Item
No
10
Item Description
Unit
Labour
8284.00
8476.00
8663.00
1918.00
1925.00
1976.00
713.00
64.00
M.T.
62444.00
6802.00
M.T.
54784.00
5400.00
Providing and casting in situ cement concrete ------------of trap metal for R.C.C. pile caps as per' detailed
designs and drawings, including bailing out water
formwork,
compacting,
manually,
centering,
finishing and curing etc. complete. {Excluding steel
reinforcement)
Spec. No.: BdF-1 Page No. 297
Cu.Mt.
a) M-20
5872.00
1088.00
b) M-25
Cu.Mt.
6064.00
1090.00
c) M-30
Cu.Mt.
6254.00
1090.00
Providing and casting in situ cement concrete in--------- of trap/ granite/ quartzite/ gneiss metal for
R.C.C. Waist Slabs steps and parapet as per
detailed designs & dra~ing including centering,
formwork,
cover blocks compacting and
roughening the surface if special finish is to be
provided
and
curing ' complete.
{Excluding
reinforcement). reversible drum type concrete
mixer/ concrete mixer with hopper
Soec. No.: Bd.F.13
Cu.Mt.
a) M-20
Cu.Mt.
b) M-25
Cu.Mt.
c) M-30
11
12
13
0
No
14
Unit
Item Description
Item
Labour
No.
169.00
19.00
Cu.Mt.
Cu.Mt.
Cu.Mt.
4939.00
5119.00
5319.00
585.00
588.00
593.00
Providing and laying in position ready mixed ---------- grade concrete for reinforced cement concrete
work , in foundations like raft, strip foundations,
grillage and footings of R.C.C. columns and steel
stanchions etc. work,using fly ash and cement
content as per approved design mix, and
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all
leads,
having
continuous
agitated
mixer,
manufactured as per mix design of specified grade
for reinforced cement concrete work, including
pumping of R.M.C. from transit mixer to site of
laying, including the cost of centering, shuttering,
finishing and reinforcement, including cost of
admixtures in recommended proportions as per IS :
9103 to accelerate I retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer - in charge.
Spec. No.: Bd.F.3
a) M-20
b) M-25
c) M-30
19
Item
No
Item Description
Unit
BD - G : BRICK MASONRY
1
4782.00
870.00
4921.00
1082.00
4782.00
870.00
5048.00
1057.00
595.00
103.00
4850.00
1175.00
Item Description
Item
Unit
No
Providing
first
class
Brick
masonry
with Cu.Mt.
Labour
5443.00
1175.00
4850.00
1175.00
5655.00
1527.00
10
4677.00
785.00
11
5044.00
928.00
12
675.00
108.00
21
Item
Unit
Item Description
No
BB - D : STONE MASONRY
Cu.Mt.
3231.00
959.00
3486.00
1089.00
3012.00
1089.00
3225.00
1228.00
3297.00
1388.00
3433.00
1490.00
watering complete.
Spec. No.: Bd.H.7 Page No. 332
6
-'
Item
No
7
Item Description
Unit
Labour
1410.00
6288.00
1451.00
6381.00
1633.00
complete.
Spec. No.: Bd.H.13 Page No. 333
10
6852.00
1685.00
11
5452.00
1708.00
23
Item
Item Description
Unit
No
Labour
Sq.Mt.
517.00
161.00
Sq.Mt.
1027.00
347.00
1235.00
217.00
675.00
62.00
24
Item
Item Description
Unit
No
Labour
311.00
61.00
127.00
27.00
25.00
8.00
467.00
373.00
25
Ltr.
Item
Unit
Item Description
No
Labour
367.00
171.00
16.00
16.00
607.00
264.00
750.00
42.00
26
Item
No
9
10
Unit
Item Description
Labour
664.00
54.00
797.00
151.00
27
Item
Unit
Item Description
Labour
728.00
149.00
12
835.00
334.00
13
294.00
55.00
14
483.00
63.00
No
11.
28
RMt.
Item
No
15
Unit
Item Description
complete.
Spec. No.: As directed by Engineer-in-charge
16
334.00
157.00
3555.00
1121.00
599.00
0.00
17
18
of cement. Cure the surface with water. Clean the surface with
wire brush to remove all loose dust, dirt etc.Saturate the
surface ;\Jith water to reach SSD condition. Apply two coats of
Dr Fixit Safeguard(or equivalent BASF/ FOSROC / STP) ((pot life
at30C, hrs is 60-75, Surface drying
29
Item
Unit
Item Description
Completed
No
'
30
Labour
Item
No
Item Description
Up it
BD - K: EXPANSION JOINT~
1
a) interior Columns
Sq.Mt.
2638.00
221.00
b) exterior Columns
Sq.Mt.
3323.00
292.00
a) at floor level
b) at terrace level
Sq.Mt.
Sq.Mt.
3685.00
4964.00
292.00
437.00
Sq.Mt.
Sq.Mt.
Sq.Mt.
Sq.Mt.
4518.00
5015.00
4491.00
4575.00
639.00
675.00
578.00
482.00
R.Mt.
1239.00
134.00
Providing
expansion
joints
in
R.C.C.
framed
31
Item
Unit
Item Description
No
32
R.Mt.
Labour
1577.00
147.00
Item Description
Item
Unit
No
Sq.Mt.
110.00
64.00
b) 1:4
Sq.Mt.
117.00
64.00
a) 1:5
Sq.Mt.
150.00
81.00
b) 1:4
Sq.Mt.
154.00
81.00
c) 1:3
Sq.Mt.
169.00
81.00
a) 1:5
Sq.Mt.
245.00
103.00
b) 1:4
Sq.Mt.
266.00
138.00
c) 1:3
Sq.Mt.
254.00
138.00
352.00
175.00
33
Item
No
5
Item Description
Providing sand faced plaster externally in cement Sq.Mt.
mortar using approved screened sand, in all
positions including base coat of 15 mm thick in
cement mortar 1:4 using waterproofing compound
at 1 kg per cement bag curing the same for not
less than 2 days and keeping the surface of the base
coat rough to receive the ~and faced treatment 6 to
8 mm thick in cement mortar 1:4 finishing the
surface by taking out grains and curing for fourteen
days scaffolding etc.complete.
Spec. No.: Bd.L.7 Page No. 369
398.00
200.00
464.00
200.00
39.00
24.00
95.00
21.00
34
Item
No
10
Unit
Item Description
Labour
295.00
12
Sq.Mt.
118.00
91.00
Sq.Mt.
100.00
87.00
a) tuck pointing
Sq.Mt.
169.00
149.00
b) weathered pointing
Sq.Mt.
163.00
122.00
c) vee pointing
Sq.Mt.
118.00
91.00
13
48.00
35.00
14
R.Mt.
20.00
19.00
15
R.Mt.
18.00
12.00
b) 100 mm
R.Mt.
26.00
18.00
c) 150 mm
R.Mt.
38.00
18.00
complete.
Spec. No.: As directed by Engineer in charge.
a) 75 mm
35
Item
No
16
17
Unit
Item Description
Labour
29.20
103.00
49.00
160.00
37.00
18
36
Item
No
19
'
Item Description
Unit
and
labour etc.
complete.
{Prior
approval
of
20
330.00
133.00
373.00
197.00
21
37
Item
Item Description
Unit
No
22
Labour
502.00
222.00
'
38
Item
Unit
Item Description
No
Labour
Sq.Mt.
471.00
121.00
Sq.Mt.
504.00
122.00
Sq.Mt.
591.00
136.00
Sq.Mt.
Sq.Mt.
559.00
806.00
176.00
153.00
a) Polished Shahabad
b) Polished Tandur
3
1315.00
153.00
1456.00
431.00
39
Unit
Completed
Labour
R.Mt.
1315.00
185.00
Sq.Mt.
827.00
131.00
Sq.Mt.
1297.00
239.00
a) white glazed
Sq.Mt.
895.00
140.00
b) coloured glazed
Sq.Mt.
1175.00
206.00
a) white glazed
Sq.Mt.
863.00
280.00
b) coloured glazed
Sq.Mt.
1425.00
305.00
No
Item Description
Item
complete.
Spec. No.: BdM - 5 Page No. 381
6
40
Item
No
9
Item Description
Unit
11
1030.00
483.00
Sq.Mt.
Sq.Mt.
Sq.Mt.
Sq.Mt.
1060.00
1292.00
1312.00
1191.00
362.00
254.00
274.00
374.00
Sq.Mt.
Sq.Mt.
Sq.Mt.
Sq.Mt.
1224.00
1296.00
1260.00
1220.00
305.00
378.00
220.00
426.00
12
41
Item
No
13
Item Description
Unit
Providing
and
laying Sq.Mt.
SOMANl/PAVIT/ULTRA/VIYARA/ or eqivalent make
chequered tiles of approved quality of size 30 cm x
30 cm for flooring in required position laid on a bed
of 1:4 cement mortar including cement float, filling
joint with cement slurry cleaning curing complete.
Spec. No.: Bd. M-12
787.00
385.00
15
1730.00
134.00
16
Sq.Mt.
1410.00
258.00
Sq.Mt.
1470.00
100.00
Sq.Mt.
1730.00
101.00
42
Item
No
17
Item Description
Unit
18
a) 100 mm.
R.Mt.
173.00
33.00
b) 150mm.
R.Mt.
260.00
50.00
Sq.Mt.
1320.00
26.00
Sq.Mt.
Providing and laying in position flooring of / Amba Sq.Mt.
White I Cat bary brown I RBI red I Ocean Brown
granite stone slab of premium quanity of approved
shade and size 18 mm to 20 mm thick on bed 1:4
cement mortar including coloured cement slurry to
match the colour of the slab polishing curing and
1380.00
3158.00
78.00
270.00
315.00
28.00
Providing
and
laying
Vitrified----------------decorative type of size 590 mm to 605 mm x 590
mm to 605 mm of 8 to 10 mm thickness (on a
existing flooring) with bonding chemical and
confirming to IS 15622-2006 (Group Bia) of
approved make shade and pattern for flooring in
required position laid on a bed of bonding chemical
filling joints curing and cleaning etc complete.
Spec. No.: Bd. M-12 page No. 385
a) mirror/glossy finish
b) matt finish
19
R.Mt.
43
Item
No
21
Item Description
Unit
22
2660.00
219.00
23
1128.00
302.00
24
814.00
183.00
25
2587.00
253.00
26
3516.00
733.00
44
.1/l
Item
No
27
Item Description
Unit
Labour
198.00
840.00
270.00
29
1012.00
401.00
30
3343.00
578.00
31
982.00
296.00
32
3241.00
383.00
Item
Unit
Item Description
No
33
34
labour
760.00
271.00
248.00
35
316.00
134.00
36
Providing
treatment
of
TREMIX
VACCUM Sq.Mt.
dewatering over cement concrete M-25 surface 100
mm including fixing of M.S. channel framework as
per required size and placing of dowel rods,
vibrating the concrete by needle vibrator and
leveling by tremix double beam surface vibrator,
dewatering through sunction matt of tremix
739.00
70.00
Item
No
37
Unit
Item Description
treatment
of TREMIX
VACCUM Sq.Mt.
Providing
dewatering over cement concrete M-25 surface 150
mm including fixing of M.S. channel framework as
per required size and placing of dowel rods,
vibrating the concrete by needle vibrator and
leveling by tremix double beam surface vibrator,
dewatering through sunction matt of tremix
system, power floating by skin floater and power
trowelling to obtain required level, surface cleaning
including procuring three phase tempoarary electric
supply I generator set if required at site for
operating above machinery etc. complete.
Spec. No.: BdF-12 Page No. 385
Labour
104.00
38
477.00
8.00
39
918.00
64.00
40
1052.00
64.00
47
Item
No
Item Description
Unit
BU - N : WOOD FINISHES
1
13.00
7.00
21.00
9.00
Providing and applying Wax polishing to ----------including knotting, preparing the surface,
scaffolding etc. complete as directed.
Spec. No.: Bd.N.1.2 Page No. 399
Sq.Mt.
Sq.Mt.
33.00
22.00
30.00
15.00
49.00
77.00
39.00
56.00
Providing and applying varnish in------------inciuding knotting, preparing the surface, scrapping,
scaffolding, etc. complete.
Spec. No.: Bd.N.1.4 Page No. 400
a) one coat on previously varnished wood work
Sq.Mt.
21.00
9.00
Sq.Mt.
27.00
9.00
677.00
336.00
48
Unit
Item Description
Item
Labour
Sq.Mt.
6!:l.OO
18.00
Sqmt
101.00
18.00
two coats
Sq.Mt.
Providing & applying -------- of lead/zinc base oil
paint/ bituminious paint of approved colour to new
structural steel work and iron work in buildings
including scaffolding if necessary, cleaning and
preparing the surface. (excluding primer coat).
Spec. No.: Bd.0.3 Page No. 404
62.00
18.00
a)two coats
Sq.Mt.
67.00
18.00
b) Three coats
Sq mt
101.00
29.00
49.00
89.00
16.00
22.00
70.00
88.00
18.00
24.00
No
DD - 0: on, 111'.IN'flNG
1
b) Three coats
Providing and applying----------- of lead/zinc base oil
paint/bituminious paint of approved colour and
shade to old wood work and fiber boards previously
painted including if necessary scaffolding, preparing
the surface excluding priming coat complete.
Spec. No.: Bd.0.2 Page No. 404
Sa.Mt.
Sq mt
Item Description
Item
No
6
Unit
Labour
Sq.Mt.
64.00
18.00
b) Three coats
Sq.Mt.
91.00
24.00
70.00
18.00
49.00
55.00
18.00
24.00
26.00
8.00
10
22.00
8.00
a) Two coat
b) Three coats
50
Unit
Item Description
Item
No
11
foreign
matter
and
sand
papering
Labour
23.00
9.00
as
required.
Spec. No.: As directed by Engineer in charge.
12
15.00
11.00
13
212.00
98.00
14
143.00
36.00
15
157.00
40.00
16
130.00
33.00
Item Description
Item
No
Unit
5.00
3.00
Sq.Mt.
8.00
6.00
a) one coat
Sq.Mt.
24.00
5.00
b) two coats
Sq.Mt.
44.00
12.00
c) Three coats
Sq.Mt.
67.00
20.00
Sq.Mt.
62.00
15.00
Sq mt
114.00
20.00
21.00
9.00
b) two coats
2
52
Unit
Item Description
Item
No
Labour
HD - Q : WOOD "'Ollli
1
a) 25 mm
Sq.Mt.
2143.00
61.00
b) 50mm
Sq.Mt.
4102.00
61.00
Cu.Mt.
90030.00
818.00
Cu.Mt.
4S193.00
3308.00
1976.00
84.00
Cu.Mt.
92767.00
12832.00
Cu.Mt.
43463.00
12832.00
Cu.Mt.
87101.00
S496.00
Cu.Mt.
49215.00
4744.00
53
Item Description
Item
No
6
Unit
R.Mt.
labour
188.10
938.00
116.00
Engineer)
Spec. No.: Bd.Q.8, Page No. 425
R.Mt.
462.00
99.00
R.Mt.
162.80
69.00
R.Mt.
253.00
60.00
R.Mt.
528.00
87.00
R.Mt.
222.00
70.00
species
10
species
54
Item
No
11
Item Description
Unit
R.Mt.
300.00
45.00
13
2854.50
825.00
14
Rmt
118.00
22.00
15
a} CCTwood
Sq mt
1165.00
59.00
b) HARD wood
Sq mt
506.00
59.00
55
Item
Item Description
Unit
Completed
No
16
56
Sq mt
2103.20
Labour
1036.00 .
Item
Unit
Item Description
No
Labour
725.55
60.50
798.00
62.70
R.Mt.
212.00
70.00
732.00
73.00
674.00
67.00
kg/sq.m.)
Spec. No.: Bd.R.5, Page No. 453
57
Item
No
Item Description
Unit
scaffolding complete.
Spec. No.: Bd. R.7, Page No. 453
7
Sqmt
455.40
44.00
R.Mt.
397.00
88.00
R.Mt.
2629.00
199.00
10
R.Mt.
1997.00
173.00
11
R.Mt.
2111.00
197.00
No.
535.00
17.00
complete.
Spec. No.: Bd. R. 10, Page No. 455
12
Item
Item Description
Unit
No.
No
13
Labour
101.00
22.00
necessary.
Spec. No.: Bd. R. 13, Page No. 459
14
809.00
625.00
15
625.00
365.00
59
No
16
Unit
Item Description
Item
Labour
196.00
681.00
237.00
17
18
19
Sq.Mt.
1449.00
438.00
b) 15mm
Sq.Mt.
1541.00
385.00
1113.00
116.00
60
!'Jo
20
Unit
Item Description
Item
Labour
146.00
21
89.00
40.00
22
32.00
26.00
23
Sqmt
235.00
130.00
complete.
24
No
124.30
61.00
25
No
158.00
50.00
26
R.Mt.
79.00
9.00
b) 25mmx12
R.Mt.
33.00
9.00
61
Item
No
27
28
Item Description
Unit
No.
88.00
62.00
S71.00
94.00
844.00
SO.DO
29
62
Item
No
31
Unit
Item Description
Labour
R.Mt.
787.00
57.00
R.Mt.
1709.00
167.00
32
'
63
Item
Item Description
Unit
Completed
No
,33
64
1943.00
labour
158.00
Item
No
34
Item Description
Unit
65
R.Mt.
i.abour
2200.00
167.00
Item
No
35
Item Description
Unit
R.Mt.
36
37
66
Labour
1015.00
67.00
557.00
19.00
148.00
Item
No
38
Item Description
Unit
67
No.
labour
903.00
123.00
Item
Item Description
Unit
No
Labour
120031.00
25106.00
54672.00
16003.00
1917.00
371.00
No.
849.00
224.00
R.Mt.
68
684.20
221.00
Item
No
6
Unit
Item Description
Rmt
Labour
552.00
55.00
3797.00
747.00
5061.00
926.00
69
Item
Unit
Item Description
No
9
4760.00
labour
979.00
10
3260.00
574.00
11
3706.00
728.00
70
'1!
Item Description
Item
No
12
Unit
Labour
13
14
a) Ventilator
Sq mt
3076.00
910.00
b) Fanlight
Sq mt
2461.00
910.00
Sq mt
3350.60
309.00
Sq mt
2223.10
309.00
4200.00
966.00
71
Item
Item Description
Unit
No
15
4490.00
1266.00
17
3624.00
738.00
18
3481.00
559.00
72
Item
No
19
Unit
Item Description
Labour
2436.00
241.00
2735.00
415.00
21
4380.00
919.00
22
3867.00
892.00
23
3073.00
647.00
(Without irame)
Spec. No.: BdT- 27 Page No. 494
73
Item
No
24
Unit
Item Description
25
2775.00
409.00
26
2570.00
471.00
27
2250.00
310.00
74
Item
No
28
Item Description
Unit
4664.00
Labour
440.00
5488.00
650.00
4205.00
617.00
29
30
Item
No
31
Item Description
Unit
Labour
2682.00
571.00
15460.00
4087.00
32
76
Item
No
33
Unit
Item Description
77
Completed
11269.00
labour
2060.00
Item
Item Description
Unit
Completed
No
34
'
78
3957.00'
labour
436.00
'
Item
No
35
Item Description
Unit
79
Labour
4561.00
616.00
Item
No
36
37
Item
Des~ription
Unit
Labour
5062.00
674.00
a) 30 mm
Sq.Mt.
4732.00
111.00
b) 35 mm
Sq.Mt.
5732.00
545.00
80
Item
No
38
Unit
Item Description
2676.30
Labour
250.00
2679.60
1544.00
Completed
39
".
81
Item Description
Item
Unit
No
Labour
40
2637.80
1108.00
41
1173.00
509.00
42
43
b) single leaf
Sq mt
4101.90
1010.00
a) double leaf
Sq mt
4648.60
1000.00
Sq mt
4405.00
992.00
82
Item Description
Item
Unit
Completed
Labour
Sq mt
3315.00
700.00
(Without frame)
a) single leaf
Sqmt
3200.00
701.00
b) double leaf
Sqmt
4007.30
700.00
No
a) double leaf
44
45
Rmt
398.00
44.00
46
Rmt
473.00
44.00
47
Rmt
575.00
44.00
83
Item
Unit
Item Description
No
48
Sqmt
Completed
3253.80
49
Sqmt
2852.30
84
Labour
360.00
360.00
Item
No
50
Item Description
Unit
Completed
660.00
51
2212.00
975.00
2216.00
447.00
53
3050.00
841.00
54
2640.00
308.00
85
Item
Item Description
Unit
No
SS
Completed
626.00
Labour
Kg.
S6
Sqmt
S223.90
9S7.00
S7
192S.OO
934.00
S8
2992.00
680.00
3896.00
737.00
288.00
"'
etc.complete.
Spec. No.: As directed by Engineer Jncharge
S9
86
Item
No
60
Unit
Item Description
Labour
2779.00
999.00
2771.00
617.00
62
3441.00
457.00
63
3945.00
502.00
64
2715.00
331.00
87
Sqmt
Item
No
65
66
67
Item Description
Unit
Labour
Sq.Mt.
3182.30
910.00
Sq.Mt.
3263.00
608.00
2831.00
886.00
68
69
Sq.Mt.
4759.00
682.00
Sq.Mt.
4227.00
418.00
3590.00
363.00
Sq.Mt.
3213.00
332.00
88
\~
Item Description
Item
No
70
Unit
Labour
Sq.Mt.
4177.00
455.00
Sq.Mt.
3979.00
429.00
71
2470.00
675.00
72
4211.00
774.00
Sq.Mt.
Item
Item Description
Unit
Sq.Mt.
Completed
3S23.00
Sq.Mt.
4360.00
847.00
Sq.Mt.
3915.00
935.00
6899.00
928.00
No
836.00
73
90
Item
No
74
Item Description
Unit
75
3548.00
222.00
1134.00
228.00
40 x 6 mm by drilling holes.
etc. complete.
Spec. No.: As directed by Engineer-in-charge
,91
'
Item
Item Description
Unit
No
77
Labour
Sq.Mt.
1387.00
397.00
Sq.Mt.
1569.00
397.00
78
900.00
317.00
79
1521.00
515.00
80
3824.00
460.00
81
2511.00
428.00
92
Item Description
Item
No
82
Unit
Labour
3038.00
522.00
3496.00
782.00
1344.00
1488.00
248.00
148.00
1584.00
351.00
83
84
veneer
93
Item
Unit
Item Description
Labour
1280.00
1684.00
109.00
124.00
1830.00
135.00
86
2230.00
381.00
87
3764.00
682.00
88
76564.00
8316.00
No
85
94
Item
No
89
Item Description
Unit
Labour
92.00
2285.00
207.00
91
326.00
105.00
92
R.Mt.
111.00
23.00
93
512.00
51.00
94
497.00
523.00
complete
Spec. No.: As directed by Engineer in charge.
95
95
>
61.00
63.00
Item
No
96
Unit
Item Description
Providing and fixing sheet glass of 24 oz. for all size Sq.Mt.
including putty etc. complete.
Spec. No.: Bd.S. Page No. 465 to 467
Labour
70.00
97
449.00
76.00
98
633.00
129.00
99
781.00
68.00
100
1403.00
120.00
101
1591.00
240.00
102
1013.00
50.00
complete.
Spec. No.: As directed by Engineer-in-charge
96
R.Mt.
Item
Unit
Item Description
No
Labour
103
R.Mt.
103.00
50.00
104
Sqmt
2302.00
306.00
105
Sqmt
3422.00
999.00
106
Sqmt
3314.00
881.00
107
Sqmt
3119.00
375.00
07
Item
No
108
Item Description
Unit
109
Sq mt
2694.00
375.00
Sq mt
3118.00
375.00
Sq mt
3618.00
375.00
Sq mt
4118.00
393.00
Sq mt
3788.00
657.00
Engineer in charge.
98
Item
No
110
111
Item Description
Unit
Labour
Sq mt
3359.00
603.00
Sq mt
3860,00
832.00
Sqmt
3225.00
421.00
Sqmt
1557.00
326.00
112
99
Item
Item Description
Unit
Labour
Sq mt
2122.00
325.00
Sq mt
Sq mt
Sq mt
Sq mt
228.00
237.00
331.00
201.00
37.00
25.00
37.00
25.00
a) 25mm XPM
b) 20mm XPM
Sqmt
Sqmt
161.00
186.00
37.00
37.00
Sqmt
2600.00
500.00
No
113
114
a) 75
b)50
c) 25
d)50
115
116
x 25 mm
x25 mm
x 25 mm
x50mm
100
,-''i'.I
Item Description
Item
Unit
No
Labour
HD - U : IRON WORK
1
for
per
and
and
a) 15 kg/sq.m
Sq.Mt.
1163.00
196.00
b) 20 kg.fsq.m.
Sq.Mt.
1498.00
196.00
Kg
55.00
7.00
a) 15 kg/sq.m
Sq.Mt.
2037.00
180.00
b) 20 kg/sq.m
Sq.Mt.
2337.00
180.00
Sq mt
Sq.Mt.
Sq.Mt.
2236.00
2461.00
2726.00
279.00
278.00
278.00
101
Item
Item Description
Unit
No
Labour
Providing and laying cast iron pipes of B class of---------------- with sockets and spigot ends/ flanges and
cast centrifugally/ vertically including specials,
laying pipes and back filling the trench complete
including excavation.
Spec. No.: Bd.V.1 Page No. 547
a) 80mm diameter
b) lOOmm diameter
c) 150mm diameter
Providing and making ISi Mark ferrule connection of
---------------To water main including ferrule
coupling cast iron bell mouth cover, built in non
return valve and fixing including excavation and
reinstatement complete.
Spec. No.: Bd.V. 4 page 551
a) 15 mmdia.
b) 20 mm dia.
c) 25mm dia.
d)40mm dia.
e) SO mm dia.
Providing and laying in trenches ------------Galvanised iron pipes having embossed 1.S.L mark
on it, of jindal/Tata/Zenith or equivalant make
necessary fitting remaking good the demolished
portion with filling trenches and with primer of anti
corrosive oil paint, 2 coats complete.
Spec. No.: Bd.V.5 Page No. 551
A ) medium grade
a) 15 mm dia. of 1.25 kg/meter
b) 20 mm dia. of 1.63 kg/meter
c) 25 mm dia. of 2.49 kg/meter
d) 32 mm dia. of 3.20 kg/meter
e) 40 mm dia. of 3.68 kg/meter
f) 50 mm dia. of 5.17 kg/meter
g) 80 mm dia. of 8.57 kg/meter
h) 100 mm dia. of 12.43 kg/meter
B) Heavy grade
a) 15 mm dia of 1.50 kg/metre
b) 20 mm dia of 1.95 kg/metre
c) 25 mm dia of 3.50 kg/metre
d) 32 mm dia of 3.93 kg/metre
e) 40 mm dia of 4.54 kg/metre
f) 50 mrn dia of 6.33 kg/metre
g) 80 mm dia. of 10.31 kg/metre
hl 100 mm dia. of 15.15 kg/metre
102
R.Mt.
R.Mt.
852.00
1118.00
37.00
49.00
R.Mt.
1528.00
46.00
No.
No.
No.
No.
No.
745.00
892.00
1492.00
3186.00
4483.00
290.00
290.00
290.00
290.00
290.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
236.00
302.00
361.00
433.00
500.00
554.00
793.00
1160.00
70.00
70.00
85.00
85.00
100.00
100.00
110.00
110.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
277.00
310.00
375.00
440.00
519.00
735.00
920.00
1279.00
80.00
80.00
90.00
90.00
110.00
110.00
120.00
120.00
No
4
Unit
Item Description
Item
Completed
Labour
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
Rmt
R.Mt.
270.00
319.00
367.00
399.00
424.00
520.00
665.00
783.00
85.00
113.00
76.00
76.00
76.00
77.00
70.00
101.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
279.00
338.00
381.00
461.00
534.00
594.00
1008.00
1205.00
83.00
113.00
86.00
86.00
87.00
88.00
91.00
93.00
R.Mt.
210.00
148.00
b) 20 mm dia.
R.Mt.
231.00
148.00
c} 25 mm dia.
R.Mt.
286.00
148.00
d) 32 mm dia.
R.Mt.
354.00
148.00
e} 40 mm dia.
R.Mt.
456.00
148.00
f) 50 mm dia.
R.Mt.
508.00
148.00
Providing & fixing on walls/ ceiling/ floors,-----------Galvanised iron pipes having embossed l.S.I. mark
on it, of jindal/Tata/Zenith or equivalant make of
required diameter and weight with screwed socket
joints necessary galvanised iron fitting such socked
back nuts albows bends tees reducer enlagers plugs
clamps etc. including removing good to the
demolished portion primer of anticorrossive paint
in two coats complete. A) 15 mm Dia. G.I. pipe.
Spec. No.: Bd.V.5 Page No. 551
A) medium grade
a) 15 mm dia. of 1.25 kg/meter
b) 20 mm dia. of 1.63 kg/meter
c) 25 mm dia. of 2.49 kg/meter
d) 32 mm dia. of 3.20 kg/meter
e) 40 mm dia. of 3.68 kg/meter
f) 50 mm dia. of 5.17 kg/meter
g) 65 mm dia. of 6.95 kg/meter
h) 80 mm dia. of 8.57 kg/meter
i} 100 mm dia. of 12.43 kg/meter
B} Heavy grade
a) 15 mm dia of 1.50 kg/metre
b) 20 mm dia of 1.95 kg/metre
c) 25 mm dia of 3.50 kg/metre
d) 32 mm dia of 3.93 kg/metre
e) 40 mm dia of 4.54 kg/metre
f} 50 mm dia of 6.33 kg/metre
g) 80 mm dia. of 10.31 kg/metre
h) 100 mm dia. of 15.15 kg/metre
103
Item
No
6
Unit
Providing and fixing on walls/ ceiling/ floor------------ CPVC pipe with necessary fittings, remaking good
the demolished portion etc. complete.
Spec. No.: BD.V 5 page 551 and as directed by
Engineer in charge
a) 15 mm dia.
b) 20 mm dia.
c) 25 mm dia.
d) 32 mm dia.
e) 40 mm dia.
f) 50 mm dia.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
177.00
202.00
255.00
323.00
426.00
481.00
113.00
118.00
118.00
118.00
118.00
118.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
222.00
252.00
342.00
471.00
646.00
128.00
128.00
128.00
128.00
128.00
No.
No.
No.
No.
No.
No.
No.
2056.00
2799.00
4261.00
5243.00
10825.00
12855.00
16542.00
253.00
253.00
253.00
345.00
665.00
1005.00
1012.00
Item Description
104
Item
No
9
Item Description
Unit
253.00
318.00
426.00
42.00
42.00
42.00
No.
No.
No.
No.
No.
No.
No.
No.
254.00
321.00
398.00
619.00
694.00
749.00
840.00
895.00
39.00
43.00
43.00
54.00
49.00
50.00
75.00
65.00
No.
No.
230.00
256.00
65.00
52.00
Ltr.
11.00
1.00
10.00
1.00
a) 15 mm diameter
b) 20mm diameter
c) 2Smm diameter
10
11
12
13
105
Ltr.
Item
No
14
Item Description
Unit
R.Mt.
15
No.
2814.00
1518.00
16
No.
6510.00
848.00
17
No.
7333.00
1347.00
18
No.
4909.00
1378.00
106
Item
No
19
Unit
Item Description
Labour
No.
7460.00
1378.00
20
No.
4576.00
1200.00
24b I
20
No.
4768.00
1145.00
107
Item
Item Description
Unit
No.
22
No.
4045.00
1182.00
23
No.
5811.00
1407.00
24
No.
1307.00
202.00
No
21
I
108
Item Description
Unit
Completed
Labour
25
No.
6211.00
848.00
26
No.
6753.00
848.00
27
No.
3087.00
503.00
28
No.
3623.00
739.00
Item
No
(J
109
Item
No
2.9
Item Description
Unit
No.
before use.}
Spec. No.: As directed by Engineer-in-charge
30
No.
3661.00
1067.00
31
R.Mt.
1303.00
168.00
32
No.
2848.00
680.00
33
No.
2122.00
680.000
Item
No
34
Unit
Item Description
Labour
No.
2950.00
680.00
No.
2950.00
675.00
35
No.
2441.00
675.00
36
No.
3133.00
675.00
37
No.
1230.00
101.00
38
No.
1440.00
75.00
Item
No
39
Item Description
Unit
No.
Completed
2933.00
40
No.
2584.00
676.00
41
No.
7242.00
1761.00
42
No.
572.00
149.00
43
No.
747.00
227.00
44
No.
355.00
112.00
112
Item
No
45
Item Description
Unit
No.
Completed
315.00
Labour
202.00
No.
484.00
101.00
47
R.Mt.
229.00
101.00
48
R.Mt.
555.00
101.00
49
R.Mt.
1204.00
101.00
Item
Item Description
Unit
Providing , laying & fixing, jointing Supreme Ecodrain 110 mm SN 8 Nu- Drain Upvc pipes or of
equivalent make, manufacture as per EN 13476 or
R.Mt.
No
50
Providing , laying & fixing ,jointing Supreme Ecodrain 160 mm SN 4 Nu- Drain Upvc pipes or of
equivalent make, manufacture as per EN 13476 or
equivalent as per l.S.15328 with fittings such a
bends, tees , coupler, etc, jointing with rubber
lubricant including necessary excavation, trench
refilling with selective excavated materialetc.
complete.
R.Mt.
505.00
30.00
52
Providing , laying & fixing ,jointing Supreme Ecodrain 200 mm SN 4 Nu- Drain Upvc pipes or of
equivalent make, manufa&,ture as per EN 13476 or
equivalent as per l.S.15~28 with fittings such a
bends, tees tees , coupler etc, jointing with rubber
lubricant including necessary excavation, trench
refilling with selective excavated materialetc.
complete.
Spec. No.: As Directected By Engineer lncharge
R.Mt.
519.00
14.00
53
No.
1126.00
153.00
54
R.Mt.
190.00
36.00
114
Item
Item Description
Unit
R.Mt.
No
56
complete.
Spec. No.: Bd.V.37, Page No. 571
57
R.Mt.
230.00
58.00
R.Mt.
330.00
58.00
59
R.Mt.
525.00
99.00
60
R.Mt.
R.Mt.
R.Mt.
R.Mt.
346.00
414.00
459.00
567.00
164.00
179.00
179.00
185.00
No.
5764.00
1029.00
trench complete.
Spec. No.: Bd.V.41, Page No. 573
a) 100mm diameter
b) 150mm diameter
c) 225mm diameter
d) 300mm diameter
61
Item
Item Description
Unit
No
labour
61
No.
4505.00
?Ql.00
62
No.
5312.00
707.00
63
No.
5162.00
816.00
64
Providing
and
constructing
Brick
Masonry
inspection Trap 90cm x 45cm including 1:4:8 C.C
foundation, 1:2:4 CC.channels/half round glazed
stoneware pipe channel, salt glazed stone-ware
intercepting trap with rodding pipe set in 1:4:8
cement concrete block, brick masonry plastering
inside and Outside, with C.I. lead cover with frame
fixed in cement concrete.
Spec. No.: Bd.V.44, Page No. 575
No.
6880.00
710.00
116
Unit
Item Description
Item
Completed
labour
No.
6203.00
900.00
No
65
Providing
and
constructing
Brick
Masonry
66
No.
3191.00
395.00
67
No.
8254.00
413.00
117
Item
No
68
Item Description
Unit
No.
Completed
19646.00
Labour
455.00
No.
1110.00
325.00
No.
2513.00
194.00
No.
1722.00
309.00
. No.
2318.00
299.00
.No.
1332.00
286.00
69
70
71
72
No.
11306.00
1002.00
72
No.
1465.00
1275.00
"n
..
Item
No
73
Item Description
Unit
No.
complete.
Spec. No.: As directed by Engineer in charge.
74
No.
879.00
124.00
complete.
Spec. No.: As directed by Engineer in charge
75
No.
1070.00
113.00
76
No.
3696.00
257.00
77
No.
1122.00
95.00
78
No.
866.00
133.00
79
No.
1598.00
129.00
No.
88.00
25.00
119
Item Description
Unit
No.
Item
No
81
No.
450.00
55.00
83
No.
363.00
55.00
84
No.
845.00
75.00
85
No.
165.00
13.00
86
No.
333.00
17.00
87
Rmt
58.30
15.00
b)20mm Dia
Rmt
70.40
15.00
Unit
Item Description
Item
Completed
Labour
Rmt
Rmt
Rmt
Rmt
Rmt
95.70
115.50
134.20
158.40
187.00
15.00
15.00
15.00
15.00
15.00
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
265.10
371.80
493.90
544.50
702.90
781.00
843.70
892.10
45.00
45.00
45.00
45.00
45.00
45.00
45.00
45.00
Rmt
463.10
543.40
595.10
5784.90
45.00
45.00
45.00
1390.00
No
c) 25mm Dia
d) 32mm Dia
e) 40mm Dia
f) SOmm Dia
g) 63mm Dia
88
a) lSmm Dia
89
b) 20mm Dia
c) 25mm Dia
d} 32mm Dia
e} 40mm Dia
f) SOmm Dia
g) 65mm Dia
h) 80mm Dia
Providing and fixing brass stop tap of approved
quality and make with crutch/ wheel including
90
a) 15mm Dia
b) 20mm Dia
c) 25mm Dia
Providing and fixing Indian type white glazed
earthenware 625 mm water closet pan including
"P" trap, white earthenware foot rests, Cast Iron
soil and vent pipes up to the outside face of the wall
including 100 mm. diameter cast iron plug bend,
cement concrete bedding, 10 litres fibre/UPVC high
level flushing cistern of approved quality and make
with fittings, inlet pipe with stop tap, brackets for
fixing the cistern, 32 mm. diameter UPVC flush pipe
with fittings and clamps, 20 mm diameter
galvanised iron overflow pipe with mosquito proof
coupling, galvanised iron chain and pull, painting to
the cistern and exposed pipes and cutting and
making good the walls and floors etc. complete.
(Exclusing waterproof brick bat coba)
121
Rmt
Rmt
No.
Item
No
91
Item Description
Unit
No.
1744.00
Labour
487.00
92
No.
5104.00
802.00
93
No.
7781.00
992.00
122
\J
Item
No
94
95
Unit
Item Description
No.
5091.00
Labour
1595.00
No.
6061.00
1223.00
No.
9239.00
914.00
Completed
96
123
Item
No
97
98
Item Description
Unit
Labour
No.
S138.00
1170.00
No.
No.
13269.30
9289.50
1387.00
1387.00
a) size 60 x 45 x 25
No.
5908.00
669.00
b) size 40 x 30 x 25
No.
5203.00
669.00
99
124
Item Description
Item
No
100
Unit
Rmt
Completed
469.00
Labour
68.00
Rmt
Rmt
162.80
228.80
195.00
195.00
a) 75 mm
Rmt
544.50
176.00
b) 100 mm
Rmt
614.90
176.00
complete.
101
102
Item
No
103
Item Description
Unit
Rmt
104
Rmt
630.00
130.00
105
Rmt
177.10
72.00
Rmt
196.90
93.00
Rmt
244.20
182.00
126
Item
No
106
Item Description
Unit
Rmt
Completed
530.00
Labour
106.00
a) 75 mm dia.
No.
61.60
32.00
b) 100 mm dia.
No.
112.20
32.00
No.
No.
58.30
81.40
25.00
25.00
No.
1087.90
119.00
litre
3.00
1.50
litre
Cu mt.
3.50
281.60
2.00
282.00
108
111
127
Item
No
112
113
Item Description
Unit
29.00
29.00
114
46.00
44.00
115
28.00
28.00
116
165.00
159.00
117
1285.00
1250.00
128
M.T.
Item
No
Item Description
Unit
DD W :MISCELIANEOUS
1
22.00
19.00
No.
267.00
227.00
No.
218.90
203.00
No.
189.20
171.00
25.30
22.00
10.00
10.00
109.00
104.00
109.00
104.00
356.00
349.00
129
Item
No
10
Unit
Item Description
11
136.40
125.40
12
No.
89.00
74.80
13
No.
84.00
79.00
14
41.00
34.00
15
21.00
20.00
16
11.00
10.00
17
No.
32.00
25.00
18
No.
43.00
37.00
130
Item
No
19
Item Description
Unit
20
24.00
20.00
21
23.00
20.00
28.00
25.00
23
16.00
14.00
24
R.Mt.
4.00
4.00
25
R.Mt.
26
R.Mt.
8.00
7.00
27
No.
7.00
5.00
28
R.Mt.
8.00
7.00
22
131
7.00
Item
No
29
Item Description
Unit
R.Mt.
30
3.00
3.00
31
R.Mt.
4.00
4.00
32
R.Mt.
8.00
7.00
33
42.00
10.00
34
No.
62.00
60.00
35
No.
110.00
103.00
36
No.
895.00
877.00
37
40.00
30.00
No
38
Unit
Item Description
Item
39
146.30
51.00
etc.
40
77.00
61.00
41
10.00
10.00
42
4.00
4.00
43
2.00
2.00
44
4.00
4.00
45
Labour
289.00
283.00
charges
for
applying
two
coats
of
133
No.
Item
No
46
Item Description
Unit
47
48
177.10
16.00
Sq.Mt.
Sq.Mt.
Sq.Mt.
Sq.Mt.
302.50
521.40
870.10
1221.00
51.00
107.00
122.00
177.10
Sq.Mt.
Sq.Mt.
Sq.Mt.
Sq.Mt.
365.00
389.00
477.00
588.00
112.00
110.00
111.00
112.00
377.00
422.00
SO
134
133.00
133.00
Item
No
51
Item Description
Unit
Sq.Mt.
Sq.Mt.
350.00
370.00
113.00
111.00
52
33.00
3.00
53
75.00
7.00
54
SO.DO
4.00
75.00
7.00
guaran-tee.
Spec. No.: As directed by Engineer in charge.
55
135
Item
Item Description
Unit
No
Labour
5.00
56
No.
23.00
57
No.
13.00
58
No.
7.00
59
R.Mt.
30.00
60
11.00
16.00
Item
Item Description
Unit
No
Completed
61
51.00
No.
Labour
63
181S.OO
57.00
R.Mt.
674.00
141.00
Providing and fixing mild steel grill gate with angle Sq.Mt.
iron frame 65 mm x 65 mm x 10 mm with iron bars
64
R.Mt.
437.00
98.00
6S
R.Mt.
74S.OO
83.00
with one coat of red lead primer and two coat of oil
paint etc. complete.
Spec. No.: As directed by Engineer in charge.
137
Item
No
66
Item Description
Unit
R.Mt.
67
56.00
11.00
68
74.00
12.00
69
66.00
9.00
70
112.00
71.00
138
Item
No
71
Item Description
Unit
No.
R.Mt.
112.00
41.00
charge
73
R.Mt.
568.00
124.00
74
501.00
233.00
structural steel)
Spec. No.: As directed by Engineer in charge.
139
Item
No
75
Unit
Item Description
No.
Completed
7302.00
Labour
6293.00
No.
8095.00
6468.00
77
173.80
158.40
78
1545.60
57.20
140
Item
No
79
Item Description
Unit
R.Mt.
1938.00
Labour
395.00
4473.00
756.00
22.00
16.00
No.
81
No.
82
Sqmt
141
Item
Unit
Item Description
No
83
9.00
8.00
25.00 - '
84
Sqmt
28.00
85
Sqmt
28.00
25.00
hand
86
Sqmt
844.00
168.00
87
Sqmt
52.00
28.00
142
Unit
Item Description
Item
No
10.00
13.00
5.00
9.00
11.00
5.00
No.
No.
No.
No.
No.
No.
580.00
710.00
825.00
900.00
1050.00
1150.00
525.00
700.00
780.00
923.33
1050.83
1178.33
135.00
125.00
b) hard murum
Cu.Mt.
160.00
140.00
Cu.Mt.
180.00
178.00
d) soft rock
Cu.Mt.
370.00
338.00
Cu.Mt.
Cu.Mt.
492.00
800.00
337.00
578.00
Cu.Mt.
60.00
0.00
b) hard murum
Cu.Mt.
66.00
0.00
Cu.Mt.
72.00
0.00
Cu.Mt.
140.00
0.00
a) on W.B.M. surface
b) on B.T.surface
c) on murum surface
2
Cutting Down trees With girths of--------------------including trunk and branches and stacking the
materials neatly within a lead of SOm. as directed
etc.complete.
Spec. No.: RD-1 Page No. 349
a) 30 to 60 cm.
b) 60 to 90 cm.
c) 90 to 180 cm.
d) 180 to 270 cm.
e) 270 to 450 cm.
f) above 450 cm.
Excavation for roadways in soft strata such as--------------------- including dressing section to the
required camber and side slopes and conveying the
excavated materials with all lifts upto a lead of 50 m
and spreading for embankment, disposing as
directed etc. complete. By manual means
Spec. No.: Rd. 2 Page No. 351/2012
d) soft rock
Item Description
Unit
Cu.Mt.
Item
Labour
48.00
26.00
Cu.Mt.
230.00
72.00
Cu.Mt.
255.00
120.00
272.00
130.00
No
144
Item
No
9
Item Description
Unit
10
Cu.Mt.
Watering and compacting of embankment formed
of materials obtained from the road cutting, within
a lead of SOm after laying them in layers of 20 to 30
cm with Power roller
Spec. No.: Rd.10 Page No. 3S9
33.00
20.00
11
Cu.Mt.
4S.OO
20.00
12
Cu.Mt.
70.00
30.00
13
SS2.00
70.00
14
Cu.Mt.
543.00
66.00
b) 60mm
Cu.Mt.
611.00
66.00
d)40mm
Cu.Mt.
682.00
68.00
145
Item
No
15
Item Description
Unit
Cu.Mt.
693.00
22.00
b) 25 mm
Cu.Mt.
720.00
19.00
c) 20 mm
Cu.Mt.
740.00
19.00
d) 12 mm
Cu.Mt.
750.00
20.00
e) 10 mm
Cu.Mt.
760.00
20.00
f) 6mm
Cu.Mt.
700.00
20.00
Cu.Mt.
274.00
8.00
a) soft murum
Cu.Mt.
82.00
8.00
b) hard murum/kankar
Cu.Mt.
102.00
8.00
c) gravel
Cu.Mt.
190.00
8.00
17
Cu.Mt.
115.00
100.00
18
62.00
45.00
19
Cu.Mt.
45.00
45.00
Cu.Mt.
35.00
30.00
16
etc.complete.
20
21
'
b) By Vibratory Roller.
146
Sq.Mt.
16.00
5.00
Sq.Mt.
22.00
5.00
Item
No
22
Item Description
Unit
Sq.Mt.
lS.00
S.00
b) By Vibratory Roller.
Compacting the hard mu rum I kankar 2.00m to
7.00 width (200mm loose) with---------------including artificial watering etc.complete.
Spec. No.: Rd. 30 Page No. 380
Sq.Mt.
18.00
5.00
a) static roller
b) By Vibratory Roller.
Sq.Mt.
Sq.Mt.
6.00
7.00
3.00
3.00
24
Sq.Mt.
7.00
3.00
2S
Cu.Mt.
3798.00
SlS.00
23
1~-s:
147
Unit
Item Description
Item
Grading 1
Cu.Mt.
Completed
959.00
Grading II
Cu.Mt.
1136.00
299.00
Grading Ill
Cu.Mt.
1134.00
299.00
Sq.Mt.
182.00
40.00
Sq.Mt.
203.00
37.00
Sq.Mt.
225.00
40.00
Sq.Mt.
246.00
53.00
Sq.Mt.
295.00
72.00
No
26
0
27
Sq mt
28
148
Item Description
Unit
Completed
Labour
29
Sq.Mt.
93.00
27.00
30
Sq.Mt.
155.00
37.00
31
Sq.Mt.
185.00
37.00
32
18.00
8.00
Sq.Mt.
30.00
9.00
Sq.Mt.
54.00
11.00
Item
No
149
Item
No
33
Unit
Item Description
34
Sq.Mt.
175.00
42.00
35
Sq.Mt.
60.00
11.00
150
Item
Unit
Item Description
No
36
Labour
Cu.Mt.
4490.00
82.00
Cu.Mt.
4690.00
82.00
151
Item
No
37
Unit
Item Description
Providing and laying 50-75 mm compacted thick
Cu.Mt.
38
132.00
1.00
133.00
1.00
152
Item
No
40
Item Description
Unit
Cu.Mt.
Providing and laying 25/40 mm compacted
thickness Bituminous Concrete as per design mix
(approved by Engineer) on prepared surface with
specified grade stone aggregate as per Table - 50018 with bitumen for wearing course including
loading of aggregate with F.E. loader and hot mixing
of stone aggregate and bitumen with filler
(including cost of anti-stripping compound
wherever required) in computerised hot mix plant,
transporting the mixed material by tippers to paver
and laying with paver finisher fitted (as per clause
504-3.5) to the required level and grade and
compacting by power rollers and vibratory rollers or
150 to 250 KN pneumatic tyred roller with TP = 0.7
Mpa, to achieve the desired density complete as
per clause 509 of MoRT&H specification including
all material, labour, machinery, lighting, guarding
and maintenance of diversion but excluding
primer/tack coat with Bitumen VG-30@ 5.40 to
5.60 percent by weight of total mix.
Spec. No.: As directed by Engineer-in-charge
153
Item
No
41
'
42
Item Description
Unit
Cu.Mt.
Completed
6034.00
Labour
1130.00
Cu.Mt.
5227.00
555.00
b) M-25
Cu.Mt.
5407.00
540.00
c) M-30
Cu.Mt.
5587.00
540.00
d) M-35
Cu.Mt.
5767.00
540.00
154
Item Description
Item
Unit
No
43
Labour
44
45
a) M-20
Cu.Mt.
5364.00
70.00
b) M-25
Cu.Mt.
5544.00
70.00
c) M-30
Cu.Mt.
5724.00
70.00
d) M-35
Cu.Mt.
5904.00
70.00
a) 5th kilometer
No.
3837.00
817.00
b) Ordinary kilometer
No.
2437.00
501.00
c) 200 meter
No.
633.00
176.00
d) Boundary
No.
490.00
173.00
No.
435.00
108.00
155
Item
No
46
Item Description
Unit
No.
Labour
121.00
156
'
No.
4988.00
121.00
Item Description
Unit
48
No.
3805.00
Labour
121.00
49
No.
4335.00
121.00
Item
Completed
No
157
Item
No
50
Item Description
Unit
158
Sq.Mt.
Labour
121.00
Item
No
51
Item Description
Unit
52
~JJ
No.
4376.00
121.00
No
53
Unit
Item Description
Item
Labour
Sq.Mt.
4356.00
556.00
No.
1350.00
0.00
No.
634.00
12.00
S4
Type XI of ASTM 04956 -09 with White Color and Red Color
combination and having minimum of retro reflective exposed
SS
160
Item
No
56
Item Description
Unit
No.
57
1100.00
1155.00
3.00
4.00
a) new work
R.Mt.
7.50
5.00
b) old work
R.Mt.
6.00
5.00
a) White
b) Yellow
58
161
Item
No
59
Unit
Item Description
60
Sq.Mt.
Sq.Mt.
75.00
56.00
46.00
35.00
No.
No.
No.
No.
221.00
217.00
124.00
61.00
141.00
141.00
53.00
20.00
No.
No.
No.
No.
6.00
8.00
10.00
12.00
2.00
2.00
2.00
2.00
61
62
Sq.Mt.
19.00
13.00
63
Sq.Mt.
18.00
6.00
64
Sq.Mt.
179.00
42.00
Cu mt
675.00
187.00
162
Item
No
66
Unit
Item Description
R.Mt.
67
No.
11.00
11.00
68
R.Mt.
350.00
112.00
69
Sq.Mt.
474.00
350.00
70
Sq.Mt.
S.00
4.00
71
Km.
410.00
41.00
Km.
15.00
2.00
complete.
Spec. No.: As directed by Engineer in charge.
163
Item
No
72
Item Description
Unit
Completed
Labour
Sq.Mt.
Sq.Mt.
Sq.Mt.
138.00
120.00
108.00
41.00
38.00
37.00
a) TFl-TECHGEO=PR-15 CE
Sq.Mt.
100.00
36.00
b) TFl-TECHGEO=PR-20 CE
Sq.Mt.
114.00
37.00
c) TFl-TECHGEO=PR-25 CE
Sq.Mt.
126.00
38.00
73
74
Providing and laying Techfab India-----------------marked needel punched and mechanically bonded
non woven geotexile indigenously manufactured
from high quality polypropylene staple fibres
(continuous filament will not be accepted)on the
prepared subgrade for separate cum filtration cum
drainage application with necessary overlaps as per
drawing(as per IRC:SP:59-2002)
Spec. No.: IRC:SP:59-2002
Providing and laying Techfab India-----------------Marked knitted and PVC coated Polyester Biaxial
Geogrid -Techgrid for basalt reinforcement
indigenously manufactured from selected high
tenacity polyester yarn with high molecular weight
(> 25000 g/mol), and low carboxyl end group (<30
mm mol /Kg) (extruded PP geogrid & Polyester
strip & Geostrip, steel strips not allowed & not
accepted )Requirement of geogrid strength in both
direction and granular fill (footing of geogrid/
reinforcing geosynthetic material with LDPE, Latex,
Bitumen and any other coating will not be allowed
and will not be accepted )for soil reinforced
Sq.Mt.
177.00
40.00
b) TFl-TechGrid- TGB-60 CE
Sq.Mt.
219.00
41.00
164
Item
Item Description
Unit
No
75
76
Labour
Providing and laying Techfab India------------------Marked knitted and PVC coated Polyester Uniaxial
Geogrid-Techgrid indigenously manufactured
from selected high tenacity polyester yarn with high
molecular weight (> 25000 g/mol), and low
carboxyl end group (<30 mm mol /Kg) (extruded PP
geogrid & Polyester strip & Geostrip, steel strips
not allowed & not accepted )with granular fill as per
design prepared by technical provider of reinfoced
earth wall and slope. The reinforced earth wall and
slope should have 100% coverage of Sm width
knitted and pVC coated Polyester geogrid.(Coating
of Geogrid/Reinforcing geosynthetic material with
LOPE, Latex, Bitumen and any other coating will not
be allowed and will not be accepted )for reinforced
soil wall and reinfoced slope application.
Spec. No.: IRC-SP-59-2002
Sq.Mt.
122.00
38.00
b) TGU TFl-TechGrid-TGU-60 CE
Sq.Mt.
138.00
38.00
Sq.Mt.
185.00
40.00
R.Mt.
61.00
34.00
165
Item Description
Item
No
Unit
BRIDGE WORKS.
1
Dismentling carefully the old structure--------------including cutting reinforcement steel bars, sorting
out serviceable materials and stacking, disposing off
unserviceable material, upto lead of Som etc.
Complete.
Spec. No.: BR- 2 Page No. 100
Cu.Mt.
454.00
347.00
Cu.Mt.
406.00
328.00
Cu.Mt.
369.00
360.00
RMT.
151.00
142.00
RMT.
302.00
300.00
147.00
120.00
b) Hard murum
Cu.Mt.
160.00
158.00
Cu.Mt.
177.00
180.00
d) Soft rock
Cu.Mt.
369.00
352.00
Cu.Mt.
591.00
585.00
Cu.Mt.
909.00
836.00
Cu.Mt.
510.00
506.00
107.00
47.00
b) Hard murum
Cu.Mt.
118.00
51.00
Cu.Mt.
132.00
66.00
d) Soft rock
Cu.Mt.
274.00
80.00
166
Item
No
4
Item Description
Unit
Cu.Mt.
Completed
149.00
Labour
32.00
i) Abutment
Cu.Mt.
156.00
38.00
ii) Piers
Cu.Mt.
218.00
38.00
iii) Returns
Cu.Mt.
59.00
41.00
Cu.Mt.
183.00
38.00
i) Abutment
Cu.Mt.
419.00
36.00
ii) Piers
Cu.Mt.
695.00
36.00
iii) Returns.
Cu.Mt.
195.00
36.00
Cu.Mt.
677.00
36.00
a) M-15
Cu.Mt.
4291.00
475.00
b) M-20
Cu.Mt.
4651.00
475.00
c) M-25
Cu.Mt.
4831.00
475.00
d) M-30
Cu.Mt.
4990.00
475.00
167
Item
No
7
Item Description
Unit
Labour
Cu.Mt.
5262.00
700.00
Cu.Mt.
5450.00
700.00
Cu.Mt.
5638.00
700.00
Cu.Mt.
5736.00
700.00
R.Mt.
219.00
57.00
No.
17967.00
1096.00
2) 6m
12 m
No.
40427.00
2462.00
3) 8 m
16 m
No.
71871.00
4384.00
4) 10 m
20m
No.
112297.00
6849.00
Island Diametre
8m
No.
48872.00
2974.00
No.
No.
69130.00
90559.00
4208.00
3) 8 rn
12 m
16 m
4) 10 m
20m
No.
119035.00
7245.00
2) 6m
168
5512.00
Item Description
Item
Unit
Labour
No.
No.
No.
No.
107605.00
242111.00
430420.00
672531.00
10361.00
23310.00
41441.00
64752.00
No
a) Depth of standing water above 3m & upto 4 m
and height of island 0.5 m above water level.
Well Diametre
1) 4m
2) 6m
3) 8 m
4) 10 m
Island Diametre
Sm
12 m
16 m
20m
10
M.T.
71865.00
14677.00
11
M.T.
65780.00
7571.00
12
No.
6160.00
1037.00
13
No.
1303.00
597.00
14
No.
6250.00
1261.00
169
No
15
Unit
Item Description
Item
Providing & laying in Using Concrete Mixer RCCM20, of trap I granite I quartzite/gneiss meta! for
R.C.C.well curbs including necessary compacting by
Cu.Mt.
Labour
400.00
16
Providing & laying in Using Concrete Mixer--------Span length less than 30mtr. in moderate condition
of trap/granite/quartzite/gneiss metal for R.C.C.well
curbs including necessary compacting by
vibrating, finishing and curing etc. complete.
(excluding reinforcement and including shuttering)
Spec. No.: BR-12 Page No. 112, MoRT&H 1200,
1500& 1700
17
a) RCCM-25
Cu.Mt.
5966.00
407.00
b) RCCM-30
Cu.Mt.
6046.00
407.00
a) RCCM-35
Cu.Mt.
6236.00
407.00
b) RCCM-40
Cu.Mt.
6326.00
407.00
a) M-20
Cu.Mt.
5073.00
893.00
b) M-25
Cu.Mt.
5253.00
893.00
c) M-30
Cu.Mt.
5343.00
893.00
c) M-35
Cu.Mt.
5433.00
893.00
Providing & laying in Using Concrete Mixer------------ Span length more than 30 mtr. in moderate
condition of trap/granite/quartzite/gneiss metal
for R.C.C.well curbs including necessary compacting
by vibrating, finishing and curing etc. complete.
(excluding reinforcement and including shuttering)
Spec. No.: BR-12 Page No. 112, MoRT&H 1200,
1500& 1700
18
170
Item
No
19
20
21
Item Description
Unit
Cu.Mt.
Cu.Mt.
4506.00
984.00
b) M-20
Cu.Mt.
4866.00
984.00
c) M-25
Cu.Mt.
5046.00
984.00
a) M-20
Cu.Mt.
5714.00
836.00
b) M-25
Cu.Mt.
5846.00
836.00
c) M-30
Cu.Mt.
6074.00
836.00
d) M-35
Cu.Mt.
6164.00
836.00
171
Item Description
Item
Unit
No
Sinking of .............. for foundation in soft strata
22
Labour
4664.00
5413.00
8632.00
pneumatic sinking .
Spec. No.: BR.14 Page No. 113
1) 30% Extra for 5 to 10 M depth
2) 40% Extra for 10 to 15 M depth
3) 60% Extra for depth 15 M to 20 M.
4) 100% Extra for depth above 20 M.
23
R.Mt.
R.Mt.
R.Mt.
43165.00
47689.00
69091.00
R.Mt.
92176.00
11477.00
R.Mt.
124398.00
14835.00
R.Mt.
146322.00
17372.00
R.Mt.
R.Mt.
184863.00
190427.00
12939.00
13330.00
R.Mt.
R.Mt.
R.Mt.
197680.00
211145.00
13838.00
14780.00
16557.00
172
R.Mt.
236525.00
271596.00
I 19011.00
Item
No
24
25
Item Description
Unit
Cu.Mt.
Providing and laying in situ controlled grade of--------- with A/B/ C of trap stone metal for R.C.C. works
in cut off walls/curtain walls including necessary
scaffolding, centering compacting by vibrator and
finishing curing complete. with concrete mixer
Spec. No.: BR. 5 Page No. 116
26
a) M-20
Cu.Mt.
4552.80
445.50
b) M-25
Cu.Mt.
4733.00
445.50
a) 450 mm dia.
R.Mt.
1896.00
19.00
b) 500 mm dia.
R.Mt.
2340.00
23.00
c) 600 mm dia.
R.Mt.
3372.00
34.00
d) 800 mm dia.
R.Mt.
5424.00
57.00
e) 900 mm dia.
R.Mt.
6558.00
73.00
f) 1000 mm dia.
R.Mt.
8097.00
90.00
g) 1050 mm dia.
R.Mt.
8401.00
94.00
h) 1100 mm dia.
R.Mt.
9220.00
96.00
i) 1200 mm dia.
R.Mt.
10969.00
133.00
jJ 1500 mm dia.
R.Mt.
17145.00
176.00
173
Item Description
Item
No
27
Unit
Labour
R.Mt.
1912.00
19.00
b) 500 mm dia.
R.Mt.
2360.00
23.00
c) 600 mm dia.
R.Mt.
3399.00
29.00
d) 800 mm dia.
R.Mt.
5344.00
57.00
e) 900 mm dia.
R.Mt.
6610.00
73.00
f) 1000 mm dia.
R.Mt.
8162.00
90.00
g) 1050 mm dia.
R.Mt.
8485.00
94.00
h) 1100 mm dia.
R.Mt.
9314.00
96.00
i) 1200 mm dia.
R.Mt.
11080.00
113.00
j) 1500 mm dia.
R.Mt.
17318.00
176.00
28
M.T.
65972.00
12336.00
29
a) TMT I Fe 415
M.T.
63915.00
6332.00
b) TMT / Fe 500
M.T.
66915.00
6332.00
works.
Spec. No.: BR.28, 37 Page No. 141, 149 MORTH 1600
174
Item Description
Unit
Providing & laying in situ Concrete Grade-----------using With Concrete Mixer Span length upto
30mtr.in severe condition. cement concrete of
trap/granite/quartzite/ gneiss metal for cast in citu
piers, abutment, returns, wings etc. including
provision of "V" shaped false joints to form suitable
panels on the faces to approve design with
compacting by vibrating and curing complete,
including form work centering (excluding
dewatering by means of pump) and including
bailling out water and curing etc. complete. (upto
5.00 mt. height) Note: add 2% for over 5.00
mt.height increase upto 10.00 mt. and 6% height
above 10.00 mt.(height for that particular
structure)
Spec. No.: BR-24, Page No.-137 MoRT& H,cl. 1500,
1700 & 2200
a) M-20
Cu.Mt.
4699.00
800.00
b) M-25
Cu.Mt.
4879.00
800.00
c) M-30
Cu.Mt.
5059.00
800.00
31
4320.00
970.00
32
4570.00
950.00
Item
No
30
etc. complete.
Spec. No.: BR-25, Page No. 125
175
Item
No
33
Unit
Item Description
34
a) M-20
Cu.Mt.
5534.00
445.00
b) M-25
Cu.Mt.
5715.00
445.00
c) M-30
Cu.Mt.
5890.00
445.00
d) M-35
Cu.Mt.
5980.00
445.00
a) M-20
Cu.Mt.
5780.00
700.00
b) M-25
Cu.Mt.
5967.00
700.00
c) M-30
Cu.Mt.
6147.00
700.00
d) M-35
Cu.Mt.
6237.00
700.00
176
Item
No
35
Unit
Item Descrlj:ltion
a) M-20
Cu.Mt.
5791.00
1500.00
b) M-25
Cu.Mt.
5971.00
1500.00
a) M-30
Cu.Mt.
6151.00
1500.00
b) M-35
Cu.Mt.
6241.00
1500.00
37
Cu.Mt.
5924.00
1400.00
38
Cu.Mt.
6104.00
975.00
Cu.Mt.
6284.00
975.00
Cu.Mt.
6374.00
975.00
36
sand.
Spec. No.: BR-38 Page No.-149
a) M-20
,
b) M-30
'
c) M-35
177
Item Description
Item
No
39
Unit
117.00
Labour
30.00
1.30
0.00
M.T.
291.00
54.00
40
Cu.Mt.
Supplying, fitting and fixing in position true to line
and level neoprene elastomeric bearing conforming
to IRC:83 (Pt.-11) section IX and clause 2005 of
MORTH specifications complete including all
accessories as per drawing and technical
specifications.
Spec. No.: MORT & H - 2000 & 2005
41
42
M.T.
583.00
54.00
43
M.T.
234.00
27.00
44
M.T.
232.00
11.00
,178
Item De~cription
Item
No
Supplying, fitting and fixing in position true to line
45
and level POT- PTFE bearing consisting of a metal
piston supported by a disc or unreinforced
elastomer confined within a metal cylinder, sealing
rings, dust seals, PTFE surface sliding against
stainless steel mating surface, complete assembly
to be of cast steel/ fabricated structural steel,
metal and elastomer elements to be as per IRC: 83
part I & II respectively and other parts conforming
to BS:5400, section 9.1 & 9.2 and clause 2006 of
MORTH Specifications complete as per drawing and
approved technical specifications.
Spec. No.: MORT & H - 2000 & 2200
46
Unit
M.T.
Cu.Mt.
1274.00
109.00
47
R.Mt.
129.00
1.00
48
Cu.Mt.
502.00
248.00
49
Cu.Mt.
57.00
248.00
179
Item
No
50
Unit
Item Description
Cu.Mt.
Providing and laying of Filter media with granular
materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of
MORTH specifications to a thickness of not less than
600 mm with smaller size towards the soil and
Providing and laying in situ Concrete--------------using With Concrete Mixer Span length more than
30mtr.in moderate condition. reinforcement
cement concrete-- a to h -of trap/granite/
quartzite/gneiss metal for R.C.C. work in solid slab,/
T-beam & slab I Box girder and balanced cantilever,
including centering,formwork, scaffolding,
ramming, vibrating finishing in cement plaster and
curing etc. complete (excluding reinforcement)
Height upto 5.00.mt.from the lowest bed level.
Note: a) Solid slab i) 5% for height above 5.00 mtr.
to 10.00 mtr. ii) 10 % for height above 10.00 mtr.,
b) T-beam & slab i} 5% upto 5.00mtr. height ii} 10%
for height 5.00mtr. to 10.00mtr. iii) 15% for height
above 10.00mtr.and c) Box girder and balanced
cantilever i) 20% upto 5.00mtr. height ii) add 25 %
for height 5.00mtr. to 10.00mtr. iii) 30% for height above
10.00mtr. d) Add 30% on basic.rate for spat 30 mtr. to 50 mtr.
for creek bridge. e) Add 75% on basic rate for span 50 mtr. &
above for creek bridge.
Spec. No.: BR-31, Page No.142, MoRT&H-1500,1725 &
1700,2300
a) M-20
Cu.Mt.
6380.00
1145.00
b) M-25
Cu.Mt.
6560.00
1145.00
c) M-30
d) M-35
Cu.Mt.
Cu.Mt.
6800.00
6890.00
1145.00
1145.00
e) M-40
Cu.Mt.
6980.00
1145.00
.
180
Item
No
52
Unit
Item Description
Pro11iding and casting special grade in -----------controlled cement concrete for prestressd
concrete work for main girder including slab, cross
girder etc. including centering and scaffolding or
launching including necessary plant &machinery for
the job shuttering, vibrating, curing, finishing etc.
complete. Precast/or cast in situ (height upto 5 mt
) Note : Height 5 to 10 mt add 25 % above 10 mt add 3% For Creek Bridge Span 30 to 50 mt add 30 %
above 50 mt add 75 % .
Spec. No.: BR.31Page142 MoRT&H-1500,1725 &
1700,2300
a) M-35
Cu.Mt.
8032.00
1671.00
b) M-40
Cu.Mt.
8122.00
1671.00
c) M-45
Cu.Mt.
8212.00
1671.00
d) M-50
Cu.Mt.
8302.00
1671.00
M.T.
177072.00
7594.00
Sq.Mt.
1910.00
267.30
53
54
55
R.Mt.
443.00
5.00
56
R.Mt.
24.00
5.00
'
181
No
57
Unit
Item Description
Item
Labour
R.Mt.
1045.00
38.00
R.Mt.
3262.oo
27.00
60
R.Mt.
10503.00
27.00
a) M-20
Sq.Mt.
375.00
48.00
b) M-25
Sq.Mt.
387.00
48.00
Sq.Mt.
400.00
48.00
61
c) M-30
10~
Item
Item Description
Unit
No
labour
62
No.
589.00
117.00
63
No.
682.00
165.00
Cu.Mt.
3136.00
445.00
b) 1:3:6
Cu.Mt.
3466.00
445.00
c) M-15
Cu.Mt.
4042.00
639.00
64
Cu.Mt.
710.00
307.00
65
870.10
130.00
4440.00
483.00
66
183
.,
No
67
Unit
Item Description
Item
Labour
Providing R.C.C.parapet with (15x 60cm) -------cement concrete of trap/ granite I quartzite I
gneiss metal,cast in situ precast panels as per the
detailed drawing including reinforcement,
scaffolding , centering, formwok, compating,
finishing and curing etc. complete. With Concrete
Mixer
Spec. No.: BR-39 (a) Page No. 150
68
69
70
a) M-20
R.Mt.
1768.00
1014.00
b) M-25
R.Mt.
1828.00
1014.00
R.Mt.
2270.00
384.00
a) M-20
R.Mt.
2120.00
578.00
b) M-25
R.Mt.
2225.00
578.00
Sq.Mt.
8067.40
2201.10
184
Item Description
Unit
M.T.
72
M.T.
13161.00
73
Cu.Mt.
23588.00
2467.00
74
Sq.Mt.
286.00
70.40
75
Sq.Mt.
124.00
16.00
Item
No
71
185
Item
No
76
Unit
Item Description
Sand blasting to the concrete surface including all
Sq.Mt.
Labour
855.00
112.00
728.00
74.00
11317.00
1205.00
75.00
77
Sq.Mt.
Guniting surface with cement mortar, 1:3 of 30 to
50 milimetre thick (average 40 milimetre) under
pressure of 2.1 to 2.80 kg. per squre centimetre
including necessary IRC fabric (welded mesh} of 75 x
75 milimetre and 10 gauge reinforcement, forms
with floating, cutting etc complete (excluding
reinforcement)
Spec. No.: As directed by Engineer-in-charge
78
Sq.Mt.
Providing and applying Polymer synthetic
elastomeric coating cum paint, ready to use for
bridge structure in saline as to avoid salt
penitration from marine environmet & U.V effects
of sunrays, fungus developments and to protect the
reinforcement from marine atmoshpere effects in
three coats including scaffolding, sand blasting,
cleaing the surface of concrete, brushing steel
reinforcement and applying polymer coating with
Primer, First coat and Second coat at an interval of
24 hours of approved shade and colour.( But not to
applied on oil, Grease, Tar & Moisture of surface
Note:-Prior approval of S.E. is required.)
Spec. No.: As directed by Engineer-in-charge
79
186
Cu.Mt.
Item
No
80
Unit
Item Description
Providing and injecting epoxy grout including
structuring of crack in the body of slab girder by
Kg.
Sq.Mt.
493.00
30.00
82
Sq.Mt.
2196.00
164.00
83
847.00
212.00
84
Cu.Mt.
1579.00
269.00
85
Cu.Mt.
4526.00
591.00
187
'
Item
Unit
Item Description
No
86
Cu.Mt.
Labour
743.00
266.00
Technical specifications.
Spec. No.: MORT & H-2500
87
Cu.Mt.
4208.00
537.00
Cu.Mt.
1030.00
430.00
89
Sq.Mt.
856.00
109.00
Cu.Mt.
4045.00
1021.00
90
Cu.Mt.
5637.00
773.00
92
Cu.Mt.
1558.00
856.00
188
Item
No
93
Unit
Item Description
Labour
1582.00
91.00
94
Cu.Mt.
3133.00
334.00
95
153.00
39.00
120.00
28.00
2800
96
189
Sq.Mt.
'
Unit
Item Description
Item
Completed
Labour
Cu.Mt.
Cu.Mt.
3872.00
4193.20
498.30
498.30
Cu.Mt.
Providing uncoursed rubble trap/ quartzite/ gneiss
stone masonary in cement mortar 1:5 for piers,
abutments, wings, returns, head-walls, parapet etc.
including striking joints of the non exposed faces
and pointing the exposed faces with cement mortar
1:3 including scaffolding and watering masonary
complete including bailing out of water.
Spec. No.: CD.6 Page.No. 162
3194.40
498.30
No
C. D. lfORK
1
Providing and laying in situ cement concrete of---------- proportion with trap/ granite/ quartzite/ gneiss
metal in foundation including necessary formwork
compacting and curing complete. with reversible
Drum Type mixer I concrete mixer with hopper.
Spec. No.: CD.3 Page.No. 160
a) M 10
b) M 15
a) PCC M-15
b) PCC M-20
Cu.Mt.
Cu.Mt.
4625.50
4986.00
422.40
422.40
Cu.Mt.
4849.08
422.40
190
Item
No
5
Item Description
Unit
Cu.Mt.
Sq.Mt.
Providing trap/ granite/ quartzite/ gneiss rubble
stone paving 15cm.thick in 1:3 cement mortar over
a bedding of 15cm.thick cement concrete of M-10
proportion with trap/ granite/ quartzite/ gneiss
metal including striking joints and watering
583.00
175.00
1212.00
204.60
1838.00
670.00
complete.
Spec. No.: CD.4 Page.No. 160
8
Sq.Mt.
Providing approved quality of trap/ granite/
quartzite/ gneiss khandki stone paving
20.SOcm,,thick in 1:3 cement mortar over a bedding
of 15cm.thick cement concrete of M-10 proportion
with trap/ granite/ quartzite/ gneiss metal including
pointing with cement motar 1:3 and watering etc.
complete.
Spec. No.: CD-3 Page No. 318 / 2012
Cu.Mt.
424.00
200.00
10
Cu.Mt.
9775.00
2201.00
Cu.Mt.
3486.00
480.00
191
Item
No
12
Item Description
Unit
Labour
No.
600.00
66.00
No.
435.00
74.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
1490.00
2077.00
3216.00
3753.00
4323.00
6136.00
325.00
325.00
325.00
325.00
325.00
325.00
R.Mt.
R.Mt.
R.Mt.
R.Mt.
R.Mt.
3510.00
4747.00
6146.00
6799.00
9217.00
550.00
550.00
550.00
550.00
550.00
R.Mt.
R.Mt.
R.Mt.
7200.00
9000.00
10500.00
550.00
550.00
550.00
No.
455.00
401.00
15
16
a) Diameter 900 mm
b) Diameter 1000 mm
c) Diameter 1200 mm
17
192
193.
HORING
...,m
. .:_
Description of Items I
Specification No.
No.&
Unit
Completed
Labour
R.M.
1918.00
35.00
R.M.
2170.00
35.00
R.M.
35.00
35.00
"35.00
R.M.
R.M.
7649.00
4481.00
3684.00
d} in other rock
i) diamond drill
R.M.
2131.00
35.00
R.M.
2003.00
58.00
R.M.
2196.00
58.00
As directed by Engineer-In-Charge
193
.......
Description of Items I
Specification No. c
No.&
--
Unit
Labour
c) in quartzite rock
R.M.
8565.00
58.00
R.M.
6191.00
58.00
R.M.
4052.00
58.00
R.M.
2344.00
58.00
R.M.
2357.00
70.00
R.M.
0.00
0.00
8450.00
70.00
5375.00
70.00
R.M.
R.M.
R.M.
4066.00
70.00
d) in other rock
i) diamond drill
R.M.
2471.00
70.00
R.M.
540.00
465.00
No.
4942.00
465.00
d) in other rock
i) diamond drill
Taking trial bores for detailed investigations
-a!b!cld-150mm.( 6") boring incluiding
all materials such as casing pipes &
accessories, grease.steel balls and other
materials
as required.including
such
conveying such materials and machinery to
site of works, preserving the loose samples
in glass or plastic jar I core sample in box
with core samples serially numbered at site
of work and conveying the same to the
head quarter of concerned office as
directed
Spec.
a) up
As directed by Engineer-In-Charge
to hard murrm
As directed by Engineer-In-Charge
0
194
nem
No.&
-6
Description of Items I
Specification No.
Labour
Unit
As directed by Engineer-In-Charge
No.
14782.00
2409.00
No.
28491.00
2409.00
No.
34665.00
2409.00
No.
107535.00
4408.00
No.
112793.00
4408.00
No.
152868.00
4408.00
No.
4330.00
3836.00
Spec.
As directed by Engineer-In-Charge.
a) 75mm
No.
457.00
266.00
b} 100mm
No.
474.00
266.00
c) 150mm
No.
480.00 ,
266.00
As directed by Engineer-In-Charge
As directed by Engineer-In-Charge
195
,..,m
No.&
-1
Description of Items I
Specification No.
Unit
Km.
948.00
681.00
Km.
1328.00
953.00
Km.
1589.00
1363.00
Km.
1907.00
1635.00
Km.
3497 .00
2998.00
Labour
Comple~ed
196
nem
No.&
ln~
6
0
Description of Items I
Specification No.
Unit
10
3815.00
3271.00
Km.
3497.00
2998.00
No.
3433.00
1363.00
No.
0.00
0.00
No.
0.00
Km.
1232.00
272.00
Km.
249.00
216.00
11
12
Labour
Km.
Completed
197
uem
No.&
,..
__
Description of Items I
Specification No.
13
Unit
14
682.00
0.00
No.
79.00
54.00
No.
629.00
539.00
No.
1575.00
1383.00
No.
5586.00
4906.00
No.
2074.00
1821.00
18
No.
Traverse
survey
of stream
having
catchment area above 100 Acres to 1
square mile with chain and compass
etc.complete.
Spec. - As directed by Engineer-In-Charge.
17
Labour
16
Completed
15
198
ne111
No.&
-19
20
21
Description of Items I
Specification No.
Unit
24
25
Labour
No.
18697.00
16355.00
No.
15519.00
13629.00
Sq.Km.
37248.00
32710.00
Km.
3431.00
3855.00
No.
6820.00
0.00
No.
2793.00
2453.00
No.
2793.00
2453.00
23
Completed
22
199
nem
No.&
~~
26
27
28
Description of Items I
Specification No.
Unit
Labour
Km.
2585.00
856.00
Km.
4793.00
2547.00
No.
5034.00
2453.00
'
200
nem
No.&
,.
__
Description of Items I
Specification No.
SUllVEY l\rOlll{
1
Unit
Labour
As directed by Engineer-In-Charge.
a) excluding fixing of apex stone.
b) including fixing of apex stone.
0.00
0.00
No.
80.00
0.00
Km.
6000.00
0.00
7215.00
8500.00
Procurement
of
Village
map/Forest
map/Land plan from Forest/Revenue
authority for prepartation of land plan
record,including necessary payment for the
plans and other documents as required for
this survey.plotting and demarcation works
etc.complete.
As directed by Engineer-In-Charge.
Km.
Km.
201
Job
300.00
0.00
nem
No.&
-5
Description of Items I
Specification No.
Unit
Km.
2500.00
0.00
Km.
4000.00
0.00
Km.
4500.00
0.00
No.
130.00
0.00
Labour
As directed By Engineer-In-Charge.
8
Completed
202
..em
No.&
10
11
Description of Items I
Specification No.
.
Unit
Labour
Job
2990.00
0.00
Job
3600.00
0.00
12
19670.00
23600.00
0.00
0.00
Sq.Km.
Sq.Km.
20200.00
22900.00
0.00
0.00
13
Job
Job
t.s
Job
directed by Engineer-In-Charge.
203
5060.00
0.00
...,.... I
No.&
14
15
Description of Items I
Specification No.
Unit
Job
Job
32540.00
39050.00
Job
5320.00
Job
Job
11600.00
13930.00
Job
4520.00
Labour
0.00
0.00
0.00
17
Completed
16
0.00
0.00
204
0.00
..em
No.&
-18
Description of Items I
Specification No.
Unit
Labour
Tai.
6670.00
205
6447.00
ne...
No.&
ft20
Description of Items I
Specification No.
Unit
Labour
3340.00
3175.00
206
Dist.
item
Description of Items I
Specification No.
No.&
-1
Unit
Completed
Labour
l 71UEOGllAPB'f
Providing & carrying out video cassettee
hour shooting of roads, bridges, buildings,
other structures and programmes, including
preliminary survey, still shots moving
shooting, transportation of all equipments,
persons required for shooting, lighting
arrangement as may be necessary, editing,
mixing, titling, lettering, sounding including
cost of two coloured cassette (C.D) of
approved quality etc. complete
As Directed by the Engineer-In-Charge
Cassette
hour.
2145.00
0.00
Day
Day
Day
4180.00
5380.00
2345.00
0.00
0.00
0.00
70.00
22.00
104.00
22.00
175.00
40.00
0.00
0.00
0.00
0.00
0.00
0.00
Within 50 Kms
Beyond 50 Kms
Work upto 5 hours per day only
i)
!)a
ii)
ii) a
iii)
iii) a
207
3 Copies
1 each
3 Copies
1 each
3 Copies
1 each
nem
No.&
,.
__
Description of Items I
Specification No.
Unit
Labour
770.00
615.00
530.00
460.00
310.00
0.00
0.00
0.00
0.00
0.00
1 each
1 each
1 each
1 each
1 each
. 2450.00
1850.00
1700.00
1225.00
770.00
0.00
0.00
0.00
0.00
0.00
i) A0(1165X817mm)
1 each
925.00
0.00
1 each
770.00
0.00
1 each
700.00
0.00
1 each
540.00
0.00
v) A4 ( 285 X 196mm)
1 each
390.00
0.00
i)
ii)
iii)
iv)
v)
5
AO ( 1165 X 817mm)
A1 ( 817 X 570mm)
A2 ( 570 X 396mm)
A3 ( 396 X 275mm)
A4 ( 285X196mm)
AO ( 1165 X 817mm)
A1 ( 817 X 570mm)
A2 ( 570 X 396mm )
A3 ( 396 X 275mm)
A4 ( 285 X 196mm)
208
0
LABOUR RATES
l.N'.>.
Description
Unit
Rate
Day
470.00
Day
470.00
Day
452.00
Day
470.00
Below Boy
Day
423.00
Day
452.00
Day
470.00
Day
470.00
Day
0.00
10
Boreman Skilled
Day
470.00
11
Day
452.00
12
Day
497.00
13
Day
470.00
14
Day
452.00
15
Day
452.00
16
Electrician
Day
470.00
17
Day
497.00
18
Day
423.00
19
Day
. 497.00
20
Day
470.00
21
Foreman Skilled
Day
470.00
22
Day
470.00
23
Day
470.00
24
Day
423.00
25
Day
497.00
26
Helper Un Skilled
Day
423.00
27
Day
452.00
28
Day
470.00
29
Khalashi I Diers
Day
470.00
30
Laboratory Assistant
Day
497.00
31
Day
423.00
209
'
I.No.
Description
Unit
Rate
32
Day
423.00
33
Day
452.00
34
Day
423.00
35
Day
470.00
36
Day
497.00
37
Mali
Day
452.00
38
Day
497.00
39
Day
470.00
40
Day
423.00
41
Day
423.00
42
Day
423.00
43
Day
452.00
44
Day
470.00
45
Day
423.00
46
Mechanic
Day
470.00
47
Medical Officer
Day
0.00
48
49
' Day
452.00
Day
497.00
50
Navaghani
Day
452.00
51
New Labour 1
Day
423.00
52
New Labour 2
Day
423.00
53
Operator (grouting)
Day
452.00
54
Day
452.00
55
Day
497.00
56
Day
470.00
57
Day
0.00
58
Day
497.00
59
Day
452.00
60
Day
452.00
61
Skilled Labour
Day
470.00
62
Day
452.00
63
Supervisor I Mate
Day
497.00
'
210
I.No.
Description
Unit
Rate
64
Day
452.00
65
Day
452.00
66
Day
452.00
67
Day
452.00
68
Day
470.00
69
Watchman
Day
470.00
70
Day
470.00
71
Welder Skilled
Day
470.00
211
I.No.
Description
Unit
Rate
MACHINERY RATES
1
Air Compressor
Hour
723.00
Ashphalt Mixer
Hour
328.00
40 - 60 TPH
Hour
8085.00
Hour
8085.00
Hour
8085.00
Hour
8085.00
Hour
1847.00
Benonite Pump
Hour
100.00
Bentonite
Kilogram
35.00
10
Hour
743.00
11
Hour
602.00
12
Metric
192.00
13
Hour
602.00
14
Blow lamp
Day
9.10
15
Boiler (Ashphalt)
Hour
120.00
16
Boulder Hoist
Hour
251.00
17
Bo user
Kilometer
47.00
18
Metric
263.00
19
Day
520.00
20
Day
205.00
21
Hour
2139.00
Hour
1847.00
23
Hour
213.00
24
Concrete Mixer
Hour
218.00
25
Concrete Pump
Hour
720.00
26
Hour
720.00
27
Day
370.00
28
Crane - Light
Hour
938.00
29
Hour
656.00
4
5
6
22
212
Description
I.No.
Unit
Rate
30
Cranes (c ) 3 tonnes
Hour
614.00
31
Crusher
Hour
662.00
32
Hour
361.00
33
Dozer D- 8 -A 12
Hour
2536.00
34
Drill Bits
Day
155.00
35
Hour
3836.00
36
Hour
2000.00
37
Day
217.00
38
Day
223.00
39
Engraver
Day
26.00
40
Hour
115.00
41
Day
12472.00
42
Hour
4000.00
43
Hour
1319.00
44
Hour
1078.00
45
Hour
614.00
46
Generator 100 KV A
Hour
1078.00
47
Generator 33 KVA
Hour
614.00
48
Hour
209.00
49
Hour
1814.00
50
Guiniting Gun
Hour
235.00
51
Hour
2705.00
52
Hour
1105.00
53
Hour
3750.00
54
Hour
1818.00
55
Hour
1818.00
56
Hour
2464.00
57
Hydraulic Piling
Hour
210.00
58
Hour
4042.00
59
Hour
468.00
60
Hydraulicpiling
Hour
210.00
61
Hour
1123.00
""
I.No.
Description
Unit
Rate
62
Jack Hammer
Day
393.00
63
JCB 8to 10 MT
Day
6565.00
64
Hour
392.00
65
Hour
592.00
66
Hour
1643.00
67
Hour
1419.00
68
Cubic Meter
1350.00
69
Cubic Meter
899.00
70
Cubic Meter
1831.00
71
Cubic Meter
2746.00
72
Cubic Meter
1831.00
73
Cubic Meter
2225.00
74
Cubic Meter
1673.00
75
Machinery
Metric
100.00
76
Square
193.00
77
Mastic Cooker
.. .
Hour
393.00
78
Day
2360.00
79
Hour
342.00
80
Mechanical Sprayer
1490.00
81
Motor grader
Metric
Tonne
Hour
82
Hour
1618.00
83
Day
560.00
84
Hour
3181.00
85
Hour
2746.00
86
Pavement Breaker
Hour
339.00
87
Paver finisher
Hour
1175.00
88
Hour
2409.00
89
169.00
90
Plate Vibrator
Running
Meter
Hour
91
Plate Vibrator
Day
584.00
214
1798.00
173.00
I.No.
Description
Unit
Rate
Hour
117.00
Cubic Meter
62.00
Hour
720.00
92
93
Pumping Assembly
94
Pumping Unit
95
484.00
96
Cubic Meter
756.00
97
Rammer
Hour
142.00
98
Trip
400.00
99
Hour
1135.00
100
Day
192.00
101
Hour
412.00
102
Day
4672.00
103
Hour
218.00
104
Hour
495.00
105
Hour
88.00
106
Hour
157.00
107
Hour
643.00
108
Hour
643.00
109
Hour
330.00
110
Day
971.00
111
Hour
1175.00
112
Hour
905.00
113
Surface vibrator
Day
500.00
114
Hour
921.00
115
Day
917.00
116
Hour
24.00
117
Kilometer
60.00
118
Day
3200.00
119
Day
3200.00
120
Hour
472.00
121
Hour
472.00
122
Hour
415.00
215
I.No.
Description
Unit
Rate
123
Trailor 30 MT Capacity
Hour
1820.00
124
Hour
761.00
125
Hour
761.00
126
Tonne I Km
7.60
127
Kilometer
15.33
1'28
Kilometer
58.50
129
Hour
692.00
130
Tonne/ Km
3.45
131
Kilometer
58.50
132
Metric
Tonne
600.00
133
Vibrator (Electrical)
Hour
143.00
134
Hour
725.00
135
Hour
725.00
136
Wagon drill
Day
1105.00
137
Water Pump 10 to 15 HP
Hour
227.00
138
Water Pump 3 HP
Hour
107.00
139
Water Pump 5 to 10 HP
Hour
175.00
140
Hour
239.00
141
Hour
625.00
142
Number
69.00
143
Welding machine
Day
305.00
144
Hour
1940.00
145
Hour
1759.00
216
I.No.
Description
Unit
Rate
Unit
Rate
MATERIAL RATES
Sr.No.
Blasting Powder
Kg.
232.00
Detonator
No.
64.00
Fuse
No.
21.00
No.
24.00
Noble Dynamite
Kg.
141.00
R.Mt.
42.00
Kg.
90.00
No.
10.00
No.
270.00
Cu.Mt.
610.00
Binding Wire
Kg.
118.00
Centering Oil
Ur.
91.00
No.
11.00
Sq.Mt.
491.00
Ur.
115.00
No.
1.90
No.
2.10
No.
2.30
No.
3.65
10
No.
450.00
11
Plasticizer
Cu.Mt.
115.00
12
Fly Ash
Cu.Mt.
8.00
No.
26.00
No.
79.00
No.
80.00
Cu.Mt.
102.00
Khandakies
No.
58.00
No.
85.00
217
Description
I.No.
Unit
Rate
No.
68.00
No.
290.00
No.
84.00
Through Stone
No.
72.00
No.
37.00
No.
25.00
No.
54.00
No.
42.00
No.
50.00
No.
67.00
Kg.
75.00
Cu.Mt.
603.00
R.Mt.
103.00
Ltr.
120.00
Sq.Mt.
73.00
Kg.
65.00
Sq.Mt.
112.00
Bitumen (Compound)
Brick bats
Tar Paper
Kg.
130.00
Ltr.
330.00
10
Sq.Mt.
250.00
Polydee-TP40 Primer.
Kg.
446.00
Polydee-TP40 Primer
Kg.
446.00
Polydee-TP42 Primer
Ltr.
160.00
R.Mt.
482.00
Polydee-LM.
Kg.
448.00
Polydee-LM
Kg.
448.00
R.Mt.
48.00
AG 10 Granules
Kg.
14.00
Kg.
375.00
10
Polydee-MC
Kg.
306.00
11
Polydee-11
Kg.
1068.00
218
Description
I.No.
Unit
Rate
Neeru I Sanala
Kg.
23.00
Kg.
60.00
Texture Material
bags
1000.00
Kg.
220.00
Sq.Mt.
204.00
Sq.Mt.
235.00
Sq.Mt.
393.00
Sq.Mt.
350.00
Sq.Mt.
300.00
Sq.Mt.
275.00
Sq.Mt.
449.00
Sq.Mt.
423.00
Sq.Mt.
320.00
10
Sq.Mt.
320.00
11
Sq.Mt.
349.00
12
Sq.Mt.
461.00
13
Sq.Mt.
466.00
Sq.Mt.
425.00
15
Sq.Mt.
425.00
16
Sq.Mt.
643.00
17
Sq.Mt.
948.00
Sq.Mt.
1017.00
Sq.Mt.
750.00
20
Sq.Mt.
350.00
21
Sq.Mt.
370.00
22
Sq.Mt.
1161.00
23
Sq.Mt.
1152.00
24
Cerami! tiles 45 x 45 x 7 mm
Sq.Mt.
480.00
25
Sq.Mt.
300.00
26
Sq.Mt.
320.00
27
Sq.Mt.
460.00
14
18
19
---
LNo.
Description
Unit
Rate
28
Sq.Mt.
600.00
29
Sq.Mt.
600.00
30
Sq.Mt.
320.00
31
Sq.Mt.
666.00
32
Sq.Mt.
666.00
Sq.Mt.
787.50
34
Sq.Mt.
787.50
35
Sq.Mt.
787.50
Sq.Mt.
544.50
Sq.Mt.
544.50
38
Sq.Mt.
2119.00
39
Green marble
Sq.Mt.
786.00
40
Sq.Mt.
650.00
Sq.Mt.
910.00
Sq.Mt.
1250.00
Sq.Mt.
850.00
Sq.Mt.
1029.00
45
Sq.Mt.
1149.75
46
Calcet Powder
Kg.
42.00
47
Kg.
104.00
48
bags
1750.00
49
Marble chips
Kg.
24.00
50
Sq.Mt.
605.00
51
Sq.Mt.
92.00
52
Doz.
38.00
53
Sq.Mt.
756.00
54
Sq.Mt.
2902.00
55
Sq.Mt.
165.00
56
Sq.Mt.
437.00
57
Kg.
25.00
33
36
37
41
42
43
44
220
I.No.
Description
Unit
Rate
58
Sq.Mt.
519.00
59
Sq.Mt.
675.00
60
Sq.Mt.
274.00
61
Marble Powder
Kg.
15.00
62
Sq.Mt.
255.00
63
Sq.Mt.
411.00
64
Sq.Mt.
828.00
65
Kg.
50.00
66
Sq.Mt.
445.00
67
Sq.Mt.
425.00
Bees wax
Kg.
67.00
Coal Tar
Kg.
53.00
Common Spirit
Ur.
109.00
R.Mt.
162.00
French Polish
Ur.
147.00
Varnish
Ur.
160.00
Malemaine Polish
Ur.
665.00
c 7
Ur.
310.00
Ur.
293.00
Kg.
425.00
Ltr.
184.00
Cement paint
Kg.
107.00
Steel Primer
Ur.
170.00
Ur.
193.00
Putty
Kg.
73.00
Ur.
160.00
10
Ur.
125.00
11
Terpentine
Ur.
87.00
12
Wood Primer
Ur.
159.00
13
No.
97.00
14
No.
257.00
15
Lustre paint
Ur.
270.00
221
I.No.
Description
Unit
Rate
16
Ltr.
370.00
17
Kg.
308.00
18
Kg.
50.00
Neel
Kg.
149.00
Kg.
153.00
Kg.
24.00
Saras
Kg.
126.00
No.
70.00
Dry distemper
Kg.
83.00
Ur.
265.00
Cu.Mt.
88200.00
Cu.Mt.
74526.01)
Cu.Mt.
77060.00
Cu.Mt.
80423.00
R.Mt.
131.00
R.Mt.
151.00
R.Mt.
157.00
R.Mt.
114.00
R.Mt.
32.25
10
R.Mt.
105.00
11
Cu.Mt.
34206.00
12
No.
125.00
13
No.
164.00
14
Sq.Mt.
46.00
15
Sq.Mt.
736.00
16
Sq.Mt.
504.00
17
Sq.Mt.
1062.00
18
Sq.Mt.
665.00
19
Sq.Mt.
544.00
20
Sq.Mt.
731.00
21
Sq.Mt.
945.00
22
Sq.Mt.
609.00
23
Sq.Mt.
235.00
444
I.No.
Description
Unit
Rate
24
Sq.Mt.
324.00
25
Sq.Mt.
354.00
26
Sq.Mt.
388.00
27
Sq.Mt.
838.00
28
Sq.Mt.
424.00
29
Sq.Mt
410.00
30
Sq.Mt.
410.00
31
Sq.Mt.
414.00
32
Sq.Mt.
631.00
33
Sq.Mt.
1085.00
34
Sq.Mt.
700.00
35
Fevicol / Vamicol
Kg.
257.00
36
R.Mt.
66.00
37
Sq.Mt.
2000.00
38
Wooden peg
No.
14.00
Sq.Mt
406.00
Sq.Mt.
324.00
Sq.Mt.
345.00
A.C.Sheet ridge
Pair
304.00
R.Mt.
150.00
Sq.Mt.
252.00
M.T.
57907.00
M.T.
65885.00
Sq.Mt.
963.00
10
Sq.Mt.
447.00
11
G.l.Washers
Kg.
60.00
12
No.
18.00
13
Kg.
100.00
14
No.
26.00
15
No.
48.00
16
No.
656.00
17
No.
140.00
18
Bundle
20.00
19
Sq.Mt.
548.00
223
I.No.
Description
20
21
Gypsum powder
22
23
Unit
Rate
R.Mt.
570.00
Kg.
11.00
Sq.Mt.
16392.00
Kg.
70.00
bags
220.00
24
Plaster Of Paris
25
Sq.Mt.
345.00
26
Sq.Mt.
470.00
27
Sq.Mt.
205.00
28
Sq.Mt.
702.00
29
Bitumen Washer
No.
2.00
No.
249.00
No.
184.00
No.
135.00
No.
1200.00
No.
1200.00
No.
1400.00
No.
1150.00
No.
160.00
No.
71.00
10
No.
450.00
11
No.
298.00
12
No.
54.00
13
No.
84.00
14
No.
68.00
15
No.
64.00
16
No.
47.00
17
No.
104.00
18
No.
220.00
19
No.
185.00
20
No.
230.00
21
No.
133.00
22
No.
61.00
224
I.No.
Description
Unit
Rate
23
No.
76.00
24
No.
35.00
25
No.
15.00
26
No.
76.00
27
No.
54.00
28
No.
49.00
29
No.
.539.00
30
G.l.Screw 125mm
Doz.
362.00
31
G.l.Screw 100mm
Doz.
651.00
32
G.l.Screw 75mm
Doz.
119.00
33
G.l.Screw 50mm
Doz.
178.00
34
G.l.Screw 25mm
Doz.
25.00
35
No.
260.00
36
No.
350.00
37
No.
200.00
38
No.
185.00
39
No.
341.00
40
No.
131.00
41
No.
150.00
42
No.
245.00
43
No.
244.00
44
No.
212.00
45
No.
174.00
46
No.
54.00
47
No.
214.00
48
No.
186.00
49
No.
116.00
No.
150.00
51
No.
109.00
52
No.
102.00
53
No.
85.00
50
225
Description
I.No.
Unit
Rate
54
No.
1088.00
55
No.
1262.00
56
No.
1324.00
57
No.
1380.00
58
No.
1426.00
59
No.
1352.00
No.
1065.00
61
No.
75.00
62
No.
90.00
63
No.
102.00
64
Sq.Mt.
415.00
65
Sq.Mt.
423.00
66
Sq.Mt.
382.00
67
Sq.Mt.
400.00
68
Sq.Mt.
324.00
69
Sq.Mt.
340.00
70
Sq.Mt.
270.00
71
Sq.Mt.
380.00
72
Sq.Mt.
1177.00
73
No.
43.00
74
No.
60.00
75
No.
220.00
No.
300.00
77
Sq.Mt.
1204.00
78
No.
230.00
79
No.
123.00
80
No.
73.00
81
No.
421.00
82
No.
250.00
83
Sq.Mt.
381.00
84
Sq.Mt.
465.00
85
Sq.Mt.
1080.00
60
76
LLO
I.No.
Description
Unit
Rate
86
Sq.Mt.
415.00
87
Sq.Mt.
640.00
88
No.
90.00
89
No.
101.00
90
No.
26.00
91
No.
40.00
92
No.
40.00
93
No.
73.00
94
Sq.Mt.
1390.00
95
No.
79.00
96
No.
64.00
97
No.
10.00
98
No.
217.00
99
Sq.Mt.
2787.00
100
No.
952.00
101
No.
749.00
102
Sq.Ml.
1156.00
103
No.
5.00
104
No.
75.00
105
No.
50.00
106
No.
60.00
107
No.
40.00
108
Alluminium Section
Kg.
381.00
109
R.Mt.
29.00
110
Rubber Lining
R.Mt.
23.00
111
Doz.
23.00
112
No.
145.00
Sq.Mt.
967.60
No.
4500.00
No.
2936.00
116
No.
540.00
117
No.
250.00
118
Powder Coating
Sq.Mt.
115.00
119
Kg.
155.00
113
114
115
Description
I.No.
Unit
Rate
Sg.Mt.
531.00
120
121
f':!p.
80.00
122
No.
101.00
123
Kg.
287.00
124
Welding Electrodes
No.
8.00
125
Kg.
74.00
126
C.R.C. Sheet
Sq.Mt.
528.00
127
No.
620.00
128
Kg.
265.00
129
Sq.Mt.
282.00
130
Sq.Mt.
3140.00
131
Sq.Mt.
3466.00
132
Sq.Mt.
5303.00
133
Sq.Mt.
2655.00
134
R.Mt.
39.00
135
Bison Pannel 8 mm
Sq.Mt.
365.00
136
Bison Pannel 6 mm
Sq.Mt.
290.00
137
Bison Pannel 12 mm
Sq.Mt.
545.00
138
G.l.Hook 25mm
No.
26.00
139
P.V.C. Sheet 5 mm
R.Mt.
914.00
140
No.
1200.00
141
R.Mt.
100.00
142
R.Mt.
100.00
143
40 mm flush door
Sq.Mt.
1614.00
144
ACP sheet 4 mm
Sq.Mt.
1200.00
145
, Sq.Mt.
2500.00
146
Sq.Mt.
451.90
147
Sq.Mt.
1022.20
148
Sq.Mt.
1231.00
149
No.
84.00
150
No.
351.00
R.Mt.
830.00
228
I.No.
Description
Unit
Rate
cement
bags
330.00
R.Mt.
934.00
R.Mt.
140.00
R.Mt.
159.00
R.Mt.
155.00
R.Mt.
170.00
R.Mt.
208.00
R.Mt.
197.00
10
R.Mt.
235.00
11
R.Mt.
241.00
12
R.Mt.
154.00
13
R.Mt.
303.00
14
R.Mt.
326.00
15
R.Mt.
345.00
16
R.Mt.
296.00
17
R.Mt.
452.00
18
R.Mt.
528.00
19
R.Mt.
639.00
20
No.
95.00
21
No.
60.00
22
No.
275.00
23
No.
13.00
24
No.
3481.00
25
No.
68.00
26
No.
5400.00
27
No.
100.00
28
G.l.Screws 30mm
No.
10.00
29
No.
1210.00
30
G.l.Screws 40mm
No.
15.00
31
No.
456.00
32
No.
91.00
33
No.
1944.00
34
No.
140.00
35
No.
2680.00
229
Description
I.No.
Unit
Rate
36
No.
237.00
37
No.
2750.00
38
No.
241.00
39
No.
8540.00
40
No.
456.00
41
No .
22.00
42
No.
8893.00
43
No.
264.00
44
No.
762.00
45
No.
295.00
46
No.
527.00
47
No.
263.00
48
No.
799.00
49
No.
2820.00
50
Ur.
7.75
51
No.
83.50
52
Ltr.
7.90
53
No.
223.00
54
No.
42.00
55
No.
87.60
56
No.
256.00
57
No.
255.00
58
No.
108.00
59
No.
542.00
60
No.
95.00
61
No.
95.00
62
No.
74.00
63
No.
179.20
64
No.
69.00
65
No.
401.25
66
C.l.Brackets
Pair
76.00
67
No.
95.00
68
No.
256.00
69
Rubber lubricant
Ltr.
325.00
L~U
I.No.
Description
Unit
Rate
No.
243.00
R.Mt.
308.00
No.
778.00
R.Mt.
529.00
No.
552.00
R.Mt.
815.00
70
71
72 '
73
74
75
76
No.
227.00
77
Bracket D type C. P.
No.
122.00
78
No.
133.00
79
No.
525.00
80
No.
430.00
81
No.
452.00
82
No.
1349.00
83
RMt.
40.00
84
No.
1245.00
85
RMt.
50.00
86
No.
403.00
87
RMt.
75.00
88
RMt.
100.00
89
RMt.
110.00
90
RM!.
150.00
91
RM!.
250.00
92
RM!.
330.00
93
No.
360.00
94
No.
375.00
95
No.
618.75
96
RMt.
1211.00
97
No.
750.00
98
R.Mt.
2070.00
99
W. C. flush valve
No.
2450.00
100
RM!.
1171.00
101
Kg.
400.00
102
C.l.Shoe 75 mm dia.
No.
414.00
103
No.
410.00
231
I.No.
Description
Unit
Rate
104
C.l.Shoe 150mm
No.
375.00
105
No.
272.00
106.
No.
322.00
107
No.
1238.00
108
No.
2043.00
109
No.
243.00
110
R.Mt.
395.00
111
No.
293.00
112
No.
403.00
113
No.
188.00
114
No.
1623.00
115
No.
1933.00
116
No.
600.00
117
No.
900.00
118
No.
25.00
119
No.
1829.00
120
No.
573.00
121
No.
1338.00
122
No.
1173.00
123
No.
14148.00
124
No.
15735.00
125
No.
336.00
126
No.
685.00.
127
No.
29.00
128
No.
1678.00
129
No.
1413.00
130
No.
2000.00
131
No.
1678.00
132
No.
1595.00
133
No.
2311.00
134
No.
1978.00
135
No.
1856.00
136
No.
2275.00
137
No.
810.00
138
No.
1320.00
'
232
Description
I.No.
Unit
Rate
139
No.
1007.00
140
No.
975.00
141
No.
1653.00
142
No.
1224.00
143
No.
614.00
144
No.
1213.00
145
No.
1061.00
146
No.
926.00
147
No.
1066.00
148
No.
733.00
149
No.
4324.00
150
Bleaching Powder
Kg.
68.00
151
No.
2737.00
152
Potassium Permanganate
Kg.
414.00
153
No.
1500.00
154
Nylon Brush
No.
125.00
155
Duster
No.
20.00
156
Plastic Bucket
No.
150.00
157
Coir
Kg.
85.00
158
Gunny Cloth
R.Mt.
42.00
159
Kharata
No.
50.00
160
No.
213.00
161
No.
258.00
162
No.
361.00
163
No.
54.00
164
No.
64.00
165
No.
82.00
166
No.
98.00
167
No.
136.00
168
No.
45.00
169
No.
48.00
170
No.
55.00
171
No.
58.00
172
No.
77.00
173
Nn.
104.00
174
No.
118.00
,,,
Description
I.No.
Unit
Rate
175
No.
123.00
176
No.
129.00
177
Span Yarn
No.
145.00
178
No.
1975.00
179
No.
513.00
180
No.
651.00
181
No.
1743.00
182
No.
44.00
183
No.
167.00
184
No.
264.00
185
R.Mt.
155.00
186
R.Mt.
221.00
187
R.Mt.
347.00
188
No.
228.00
189
No.
150.00
190
No.
826.00
191
Pair
110.00
192
No.
338.00
193
No.
514.00
194
No.
650.00
195
No.
792.00
196
No.
646.00
197
No.
714.00
198
No.
70.00
199
No.
75.00
200
No.
92.00
201
No.
247.00
202
No.
356.00
203
No.
89.00
204
No.
137.00
205
No.
195.00
206
No.
174.00
207
No.
325.00
208
No.
166.00
209
C.l.Tee
No.
588.00
234
I.No.
Description
Unit
Rate
210
No.
313.00
211
No.
594.00
212
No.
1938.00
213
No.
572.00
214
No.
456.00
215
Pair
143.00
216
No.
645.00
217
Hum Prope
Kg.
119.00
218
No.
40.00
219
No.
52.00
220
R.Mt.
100.00
221
R.Mt.
313.00
222
R.Mt.
359.00
223
Lead plate
Kg.
190.00
224
No.
347.00
225
No.
59.00
226
No.
321.00
227
No.
667.00
228
No.
518.00
229
No.
340.00
230
No.
275.00
231
R.Mt.
24.00
232
Rubber lncertion
Kg.
79.00
233
Rubberised adhesive
Ur.
365.00
234
No.
120.00
235
Sewer trap
No.
327.00
236
No.
251.00
237
R.Mt.
47.00
238
R.Mt.
54.00
239
R.Mt.
77.00
240
R.Mt.
87.00
241
R.Mt.
114.00
242
R.Mt.
155.00
243
R.Mt.
134.00
244
R.Mt.
170.00
245
R.Mt.
78.75
>
I.No.
Description
Unit
Rate
246
R.Mt.
119.75
247
R.Mt.
140.00
248
R.Mt.
245.00
249
R.Mt.
321.00
250
R.Mt.
310.00
251
No.
425.00
252
R.Mt.
370.00
253
R.Mt.
370.00
254
No.
8.00
255
No.
8.00
256
No.
15.00
257
No.
26.00
258
No.
25.00
259
No.
30.00
260
No.
35.00
261
No.
750.00
262
No.
3150.00
No.
2845.00
No.
2120.00
No.
2120.00
No.
1300.00
No.
750.00
No.
1000.00
No.
700.00
No.
3300.00
No.
1350.00
263
264
265
266
267
268
269
270
271
272
R.Mt.
45.00
273
R.Mt.
60.00
274
R.Mt.
105.00
275
R.Mt.
170.00
276
R.Mt.
257.50
236
I.No.
Description
Unit
Rate
277
R.Mt.
305.00
278
No.
231.00
279
No.
206.00
280
No.
444.00
281
No.
1982.00
No.
1226.00
No.
1796.00
282
283
No.
894.00
285
No.
375.00
286
No.
425.00
287
No.
895.00
288
No.
1275.00
289
No.
2200.00
290
No.
3200.00
291
No.
1312.00
292
No.
1771.00
293
No.
2261.00
294
No.
7754.00
295
No.
8225.00
296
No.
7847.00
297
No.
9498.00
284
298
No.
1425.00
299
No.
1745.00
300
No.
4785.00
301
No.
8150.00
302
No.
961.00
303
No.
2350.00
304
No.
64.00
305
No.
1092.00
306
No.
1096.00
307
R.Mt.
95.00
308
No.
75.00
309
No.
348.00
310
R.Mt.
53.00
x 0.30
2s7
Description
I.No.
311
312
Unit
Rate
No.
7.00
R.Mt.
60.00
Barbed Wire
Kg.
118.00
Kg.
30.50
Kg.
358.00
Gripped wire 3' - O" , 4' - O" and 5' - O" wide
Sq.Mt.
164.00
Sq.Mt.
67.00
Nylone Rope
Kg.
266.00
R.Mt.
38.00
Tatti
Sq.Mt.
16.00
Aluminium Strips 50 mm x 3 mm
R.Mt.
358.00
10
Clorophyriphoas
Ltr.
220.00
11
D.D.V.P.
Ltr.
222.00
12
Malathion
Ltr.
160.00
13
Pine Oil
Ur.
68.00
14
R.Mt.
305.00
15
Lightening Conductor
No.
8032.00
16
Chain link 3' - O" , 4' - O" and 5' - O" wide
Sq.Mt.
164.00
17
Salt
Kg.
11.00
18
Ur.
554.00
19
Ur.
760.00
20
P.V.C. Sheet
Sq.Mt.
914.00
R.Mt.
95.00
Sq.Mt.
14060.00
No.
110439.00
Bentonite
Kg.
100.00
Kg.
550.00
Kg.
90.00
CD Works (CD
No.
17942.62
No.
17371.28
No.
13132.34
----
I.No.
Description
Rate
No.
11706.64
No.
10503.54
No.
8117.48
No.
6102.42
No.
4811.34
No.
4020.58
10
No.
7501.62
11
No.
1078.00
12
No.
10844.86
13
No.
1282.00
14
No.
17819.66
15
No.
6504.16
16
No.
748.00
17
No.
5412.36
18
No.
640.00
19
No.
4538.92
20
No.
3199.08
21
No.
428.00
22
No.
2585.34
23
No.
2045.80
24
No.
268.00
25
No.
248.00
26
No.
339.00
27
No.
410.00
28
No.
565.00
29
R.Mt.
7272.00
R.Mt.
9034.00
R.Mt.
5680.00
30
31
,.....
Unit
: Bridge Works)
No.
61.00
No.
1740.00
Cu.Cm.
1015.00
R.Mt.
224.00
---
I.No.
Description
Unit
Rate
R.Mt.
428.00
Kg.
126.00
Kg.
510.00
Sq.Mt.
976.00
7
8
Kg.
56.00
10
No.
338.00
11
R.Mt.
14.00
12
Concrete M 30
Km.
100.00
No.
49000.00
bags
6400.00
Cement
Cement Coloured
Kg.
86.00
No.
7.00
Kg.
47300.00
Mild Steel
Kg.
39900.00
Structural Steel
Kg.
47400.00
Tubular Steel
Kg.
56000.00
TMT FE-500
Kg.
45000.00
Kg.
41540.00
10
Bitumen VG 30 Bulk
M.T.
54695.00
11
Kg.
42560.00
12
Kg.
44100.00
13
Kg.
44870.00
14
Kg.
43850.00
15
Kg.
48000.00
16
Sand - Natural
Cu.Mt.
1500.00
17
Sand - Crushed
Cu.Mt.
825.00
18
Sand - Course
Cu.Mt.
1500.00
19
Sand (Screened)
Cu.Mt.
1584.00
20
Bricks 11 Class
No.
4669.00
21
No.
6450.00
22
No.
7350.00
23
Cu.Mt.
328.00
24
Cu.Mt.
496.00
~CV
I.No.
Description
Unit
Rate
25
Cu.Mt.
496.00
26
Cu.Mt.
496.00
27
Cu.Mt.
584.00
28
Cu.Mt.
654.00
29
Aggregate 25 mrn
Cu.Mt.
704.00
30
Aggregate '20 mm
Cu.Mt.
717.00
Cu.Mt.
714.00
'
31
Aggregate 12 mm
32
Aggregate 10 mm
Cu.Mt.
721.00
33
Aggregate 6 mm
Cu.Mt.
727.00
34
Stone Dust
Cu.Mt.
413.00
35
Soft Murum
Cu.Mt.
110.00
36
Hard Murum
Cu.Mt.
109.00
37
Unslaked lime
M.T.
30.50
38
Water
1000 lit.
134.00
39
White Cement
Kg.
23.20
40
Plastizer
Ltr.
115.00
41
Kg.
210.00
42
Km.
357.00
43
Kerosen
Ltr.
45.00
44
Kg.
100.00
45
Sq.Mt.
267.00
46
Sq.Mt.
870.00
Moorum at Site
Cu.Mt.
18E>.OO
Cu.Mt.
186.00
Cu.Mt.
415.00
Cu.Mt.
674.00
Cu.Mt.
681.00
Cu.Mt.
673.00
Cu.Mt.
659.00
Cu.Mt.
635.00
Cu.Mt.
643.00
4
5
6
7
8
9
10
241
.~
Cu.Mt.
639.00
I.No.
Unit
Rate
Cu.Mt.
631.00
Material 4. 75mm to
Cu.Mt.
639.00
Material 4. 75 mm to
Cu.Mt.
643.00
Material 9.5 mm to
Cu.Mt.
659.00
Material 26.5 mm to
Cu.Mt.
655.00
Material 26.5 mm to
Cu.Mt.
673.00
Material 37.5 mm to
Cu.Mt.
681.00
Material 53 mm to
Cu.Mt.
679.00
Cu.Mt.
413.00
Description
19
20
Cu.Mt.
705.00
21
Cu.Mt.
688.00
22
Aggregates 45 mm to 2.8 mm
Cu.Mt.
684.00
23
Aggregates 45 mm to 22.4 mm
Cu.Mt.
678.00
24
Aggregates 53 mm to 2.8 mm
Cu.Mt.
680.00
25
Aggregates 53 mm to 22.4 mm
Cu.Mt.
679.00
26
Aggregates 63 mm to 2.8 mm
Cu.Mt.
676.00
27
Aggregates 63 mm to 45 mm
Cu.Mt.
684.00
28
Cu.Mt.
690.00
29
Cu.Mt.
712.00
30
Cu.Mt.
648.00
31
Cu.Mt.
746.00
32
Cu.Mt.
693.00
33
Aggregates 13.2 mm to 10 mm
Cu.Mt.
747.00
34
Aggregates 20mmto10mm
Cu.Mt.
699.00
35
Aggregates 25 mm to 10 mm
Cu.Mt.
701.00
36
Aggregates 19mmto6 mm
Cu.Mt.
706.00
37
Aggregates 37.5 mm to 19 mm
Cu.Mt.
708.00
38
Aggregates 37 .5 mm to 25 mm
Cu.Mt.
706.00
39
Cu.Mt.
727.00
40
Cu.Mt.
721.00
41
Cu.Mt.
714.00
42
Cu.Mt.
717.00
43
Aggregates 25 mm
Cu.Mt.
704.00
44
Cu.Mt.
687.00
11
12
13
14
15
16
17
18
nomi~al
size
Descriptio'n
I.No.
Unit
Rate
R.Mt.
105.00
45
46
Ltr.
330.00
47
Barbed wire
Kg.
118.00
48
No.
. 110439.00
No.
23114.00
No.
110439.00
No.
44957.00
No.
49265.00
53
No.
45674.00
54
Bitumen (emulsion)
M.T.
50207.00
55
M.T.
50207.00
56
Sq.Mt.
1445.00
57
Each
1188.00
Cu.Mt.
98.00
R.Mt.
19666.00
1000 Nos.
14.00
Kg.
550.00
62
Kg.
345.00
63
Kg.
52.00
64
Kg.
421.00
65
Sq.Mt.
180.00
66
Kg.
52.00
67
Geomembrane
Sq.Mt.
561.00
68
HTS strand
M.T.
75200.00
69
LOO
Ltr.
73.18
70
M.S. Clamps
No.
49.00
71
M.S.Clamps
Kg.
49.00
72
Kg.
142.00
73
Ltr.
240.00
74
R.Mt.
345.00
75
R.Mt.
633.00
76
Kg.
300.00
49
50
51
52
58
59
60
61
Description
I.No.
Unit
Rate
77
Kg.
74.00
78
No.
6.00
79
Sheathing duct
R.Mt.
145.00
80
Kg.
56.00
81
R.Mt.
16129.00
82
Each
25.00
No.
9350.00
84
M.T.
18000.00
85
Ltr.
175.00
86
Aggregates 13.2 mm to 5 mm
Cu.Mt.
611.00
87
Aggregates 37.50 mm to 20 mm
Cu.Mt.
657.00
83
244
llA.'l'E Sf~HEl)ULE
ANNEXTURE 'A'
MSSIDC LIMITED
F.O.R.Destinatlon basis
Inclusive of 13t1/o S.T. plus
DIA
F.0.R.Destination basis
F.O.R.Destination basis
inclusive of13% S.T. plus inclusive of 13o/o S.T. plus
Trnover Tax & surcharge Trnover Tax & surcharge
on sales tax for non Govt. on sales tax for non Govt.
Depaartment
Depaartment
NP-2
NP-3
NP-4
487.60
510.92
536.36
561.80
551.20
602.08
629.64
677.34
1036.46
510.92
535.30
576.64
630.70
659.32
710.20
1044.10
605.26
662.50
716.56
746.24
1096.04
1394.96
1626.04
1768.08
2045.80
2585.34
3199.08
4538.92
5412.36
6504.16
7501.62
9966.12
10844.86
12797.38
15100.76
17819.66
1845.46
2573.68
3217.10
4020.58
4811.34
6102.42
8117.48
10503.54
11706.64
13132.34
17371.28
17942:62
21172.44
24983.14
29479.66
2274.76
2235.54
3022.06
4083.12
5172.80
6818.98
9423.40
12218.62
14108.60
18053.92
19859.10
21200.00
24670.44
27138.12
29851.72
2 MTR. LENGTH
80
100
150
200
225
250
300
2.5M'fll.LllNGTD
300
350
400
450
500
600
700
800
900
1000
1100
1200
1400
1600
1800
a) Collers
At the half price of full round pipe of cores ponding diameter+ 10% Extra
for NP2, NP-3 and NP-4 class pipes
c) Non-standard
Length Pipes
d) Non-standard Size Rate to be fixed by inier pollation without any extra cost
(diameter) pipe with
rn1~
245
245
Transportation charges over distance 0.05 to 200.00 kms. Including loading & unloading charges.
STATEMENT 'C' FOR THE YEAR 2015-2016
Lead
in
kms
L
Avrg
Speed
km/Hr.
Factor
0.50
15
7.5
3.38
192.1
1.00
16
7.11
5.06
1.50
16.5
6.77
2.00
17
2.50
17.5
3.00
Cost
Qty.
Qty.
of
of
of
Diesel Diesel
Oil
(US))+1)) in Ltrs Rs. in Ltrs
4
6
7
8
No.of
trips N=
(8/(F
Cost Cost of
Hire
of
6
charges
Oil Mazdoor of Truck
Rs.
Rs.
Rs.
Total
Cost
10%
Rs.
overheac
chrges
Rs.
Gross
Total
Cost
per trip
Rs.
Lead
in
kms
L
10
11
12
13
14
(14/4)
Rs.
15
0.1
26.8
2538.00
3200
5956.85
595.69
6552.54
873.67
0.50
287.5
0.14
37.52 2538.00
3200
6063.03
606.3
6669.33
938.02
1.00
6.58
373.9
0.19
50.92 2538.00
3200
6162.80
616.28
6779.08
1001.34
1.50
6.48
7.98
453.4
0.23
61.64 2538.00
3200
6253.06
625.31
6878.37
1061.48
2.00
6.22
9.28
527.3
0.26
69.68 2538.00
3200
6334.97
633.5
6968.47
1120.33
2.50
17.5
5.96
10.44
593.2
0.3
80.4
2538.00
3200
6411.60
641.16
7052.76
1183.35
3.00
3.50
18
5.76
11.58
658
0.33
88.44 2538.00
3200
6484.42
648.44
7132.86
1238.34
3.50
4.00
18
5.54
12.58
714.8
0.36
96.48 2538.00
3200
6549.28
654.93
7204.21
1300.40
4.00
4.50
18.5
5.38
13.61
773.3
0.39
104.5 2538.00
3200
6615.84
661.58
7277.42
1352.68
4.50
5.00
18.5
5.19
14.48
822.8
0.41
109.9 2538.00
3200
6670.63
667.06
7337.69
1413.81
5.00
6.00
19
4.9
16.2
920.5
0.46
123.3 2538.00
3200
6781.76
678.18
7459.94
1522.44
6.00
7.00
19
4.61
17.64
1002
0.5
2538.00
3200
6874.30
687.43
7561.73
1640.29
7.00
8.00
19.5
4.39
19.06
1083
0.54
144.7 2538.00
3200
6965.71
696.57
7662.28
1745.39
8.00
9.00
19.5
4.16
20.22
1149
0.58
155.4 2538.00
3200
7042.34
704.23
7746.57
1862.16
9.00
10.00
20
21.5
1222
0.61
163.5 2538.00
3200
7123.11
712.31
7835.42
1958.86
10.00
15.00
20
3.2
25.5
1449
0.82
219.8 2538.00
3200
7406.67
740.67
8147.34
2546.04
15.00
20.00
25
3.08
32.3
1835
0.92
246.6 2538.00
3200
7819.85
781.98
8601.83
2792.80
20.00
25.00
25
2.67
34.88
1982
2538.00
3200
7987.88
798.79
8786.67
3290.89
25.00
30.00
30
2.67
41.55
2361
1.05
281.4 2538.00
3200
8380.27
838.03
9218.30
3452.55
30.00
35.00
30
2.4
43.5
2472
1.24
332.3 2538.00
3200
8541.99
854.2
9396.19
3915.08
35.00
40.00
35
2.43
50.1
2847
1.29
345.7 2538.00
3200
8930.40
893.04
9823.44
4042.57
40.00
'
"'
134
268
16
45.00
35
2.24
51.9
2949
1.33
356.4 2538.00
3200
9043.40
904.34
9947.74
4440.95
45.00
50.00
35
2.07
53.25
3026
1.36
364.5 2538.00
3200
9128.15
912.81
10040.96
4850.70
50.00
60.00
35
1.81
55.8
3171
1.41
377.9 2538.00
3200
9286.44
928.64
10215.08
5643.69
60.00
70.00
40
1.78
63.8
3625
1.45
388.6 2538.00
3200
9751.72
975.17
10726.89
6026.34
70.00
80.00
40
1.6
65.5
3722
1.49
399.3 2538.00
3200
9859.03
985.9
10844.93
6778.08
80.00
90.00
40
1.45
66.75
3793
1.51
404.7 2538.00
3200
9935.42
993.54
10928.96
7537.21
90.00
100.00
40
1.33
68
3864
1.53
2538.00
3200
8280.44
100.00
~
--a 150.00
125.00
40
1.1
70.25
3992
2.01
538.7 2538.00
3200
125.00
40
0.94
72
4091
2.06
552.1 2538.00
3200
150.00
175.00
40
0.82
73.25
4162
2.09
560.1 2538.00
3200
14031.96
175.00
200.00
40
0.73
74.5
4233
2.12
568.2 2538.00
3200
200.00
410
Cost per
Trip
Earth,
Murum,
Building
Rubish
Sand,
crushed
Metal,
Stone
below
Hand
brokan
metal
aggre.
40mm
40mm,
normal
h'""
normal
Rubble
Steel,
Bulk
Asphalt
Excavated Cement, Bituman in Drum
Rock
R.c.c.
soiling
Blocks,
stone
G.J. Sheet
Bricks Concrete
block&
Laterlte
Stone.
Hot Mix
Bitumino
us
Material
size &
oh"""
Task/
Trip
6.00
(Cum)
5.75
(Cum)
5.50
(Cum)
Unit
Cu mt
cumt
Cumt
Cu mt
perM.T.
per M.T.
45.00
(No)
3500
(No)
per no.
per
1000no.
Cum!
per 1000
No.
persqm
5 Rmt.
Rmt.
Rmt.
Rmt.
L.F. 5.50
(Unit
Cum\
Cu mt
10
11
12
13
14
15
16
17
0.50
873.67
145.61
151.94
158.85
185.89
97.07
116.49
19.41
249.62
145.61
174.73
7.94
29.12
58.24
174.73
158.85
1.00
938.02
156.34
163.13
170.55
199.58
104.22
125.07
20.84
268.01
156.34
187.60
8.53
31.27
62.53
187.60
170.55
1.50
1001.34
166.89
174.15
182.06
213.05
111.26
133.51
22.25
286.10
166.89
200.27
9.10
33.38
66.76
200.27
182.06
2.00
1061.48
176.91
184.60
193.00
225.85
117.94
141.53
23.59
30328
176.91
212.30
9.65
35.38
70.77
212.30
)93.00
2.50
1120.33
186.72
194.84
203.70
238.37
124.48
149.38
24.90
320.10
186.72
224.07
10.18
37.34
74.69
224.07
203.70
3.00
1183.35
197.22
205.80
215.15
251.78
131.48
157.78
26.30
338.10
197.22
236.67
10.76
39.44
78.89
236.67
215.15
3.50
1238.34
206.39
215.36
225.15
263.48
137.59
165.11
27.52
353.81
206.39
247.67
11.26
41.28
82.56
247.67
225.15
4.00
1300.40
216.73
226.16
236.44
276.68
144.49
173.39
28.90
371.54
216.73
260.08
11.82
43.35
86.69
260.08
236.44
4.50
1352.68
225.45
235.25
245.94
287.80
150.30
180.36
30.06
386.48
225.45
270.54
12.30
45.09
90.18
270.54
245.94
5.00
1413.81
235.64
245.88
257.06
300.81
157.09
188.51
31.42
403.95
235.64
282.76
12.85
47, 13
94.25
282.78
257.06
6.00
1522.44
253.74
264.77
276.81
323.92
169.16
202.99
33.83
434.98
253.74
304.49
13.84
50.75
101.50
304.49
276.81
7.00
1640.29
273.38
285.27
298.23
349.00
182.25
218.71
36.45
468.65
273.38
328.06
14.91
54.68
109.35
328.06
298.23
8.00
1745.39
290.90
303.55
317.34
371.36
193.93
232.72
38.79
498.68
290.90
349.08
15.87
58.18
116.36
349.08
317.34
9.00
1862.16
310.36
323.85
338.57
396.20
206.91
248.29
41.38
532.04
310.36
372.43
16.93
62.07
124.14
372.43
338.57
10.00
1958.86
326.48
340.67
356.16
416.78
217.65
261.18
43.53
559.67
326.48
391.77
17.81
65.30
130.59
391.77
356.16
248
15.00
2546.04
424.34
442.79
462.92
541.71
282.89
339.47
56.58
727.44
424.34
509.21
23.15
84.87
169.74
509.21
462.92
20.00
2792.80
465.47
485.70
507.78
594.21
310.31
372.37
62.06
797.94
465.47
558.56
25.39
93.09
186.19
558.56
507.78
25.00
3290.89
548.48
572.33
598.34
700.19
365.65
438.79
73.13
940.25
548.48
658.18
29.92
109.70
219.39
658.18
598.34
30.00
3452.55
575.42
600.44
627.74
734.58
383.62
460.34
76.72
986.44
575.42
690.51
31.39
115.08
230.17
690.51
627.74
35.00
3915.08
652.51
680.88
711.83
833.00
435.01
522.01
87.00
1118.59
652.51
783.02
35.59
130.50
261.01
783.02
711.83
40.00
4042.57
673.76
703.06
735.01
860.12
449.17
539.01
89.83
1155.02
673.76
808.51
36.75
134.75
269.50
808.51
735.01
45.00
4440.95
740.16
772.34
807.45
944.88
493.44
592.13
98.69
1268.84
740.16
888.19
40.37
148.03
296.06
888,19
807.45
50.00
4850.70
808.45
843.60
881.95
1032.06
538.97
646.76
107.79
1385.92
808.45
970.14
44.10
161.69
323.38
970.14
881.95
60.00
5643.69
940.61
981.51
1026.13
1200.78
627.08
752.49
125.42
1612.48
940.61
1128.74
51.31
188. 12
376.25
1128.74
1026. 13
70.00
6026.34
1004.39
1048.06
1095.70
1282.20
669.59
803.51
133.92
1721.81
1004.39
1205.27
54.78
200.88
401.76
1205.27
1095.70
80.00
6778.08
1129.68
1178.80
1232.38
1442.14
753.12
903.74
150.62
1936.59
1129.68
1355.62
61.62
225.94
451.87
1355.62
1232.38
90.00
7537.21
1256.20
1310.82
1370.40
1603.66
837.47
1004.96
167.49
2153.49
1256.20
1507.44
68.52
251.24
502.48
1507.44
1370.40
100.00
8280.44
1380.07
1440.08
1505.53
1761.79
920.05
1104.06
184.01
2365.84
1380.07
1656.09
75.28
276.01
552.03
1656.09
1505.53
125.00 10268.29
1711,38
1785.79
1866.96
2184.74
1140.92
1369. 10
228.18
2933.80
1711.38
2053.66
93.35
342.28
684.55
2053.66
1866.96
150.00 12148.12
2024.69
2112.72
2208.75
2584.71
1349.79
1619.75
269.96
3470.89
2024.69
2429.62
110.44
404.94
809.87
2429.62
2208.75
175.00 14031.96
2338,66
2440.34
2551.26
2985.52
1559.11
1870.93
311.82
4009.13
2338.66
2806.39
127.56
467.73
935.46
2806.39
2551.26
200.00
2646.84
2761.92
2887.47
3378.95
1764.56
2117.48
352.91
4537.45
2646.84
3176.21
144.37
529.37
1058.74
3176.21
288'/.47
15881.07
249
Statement 'C2'
LOADING, UNLOADING & STACKING
Materials
Sr.No.
Unit
Cu.m.
27.47
17.17
17.17
Cu.m.
15.45
10.30
10.30
Cement, Lime
M.T.
53.23
44.63
20.60
M.T.
56.65
48.08
34.34
Bricks
1000 Nos.
34.34
29.19
17.17
Shahabad Stones
Sq.M.
1.90
1.90
1.90
1000 Nos.
20.60
15.45
15.45
M.T.
53.23
53.23
13.74
Timber
Cu.m.
22.32
22.32
9.45
10
Flooring tiles
1000 Nos.
32.61
26.62
20.60
11
M.T.
46.35
46.35
27.47
Description of leads
Unit
Cu.m.
21.18
30.89
Cu.m.
15.97
23.29
Cu.m.
25.41
37.06
250
2014-2015 2015-2016
1:1
1:1.5
1:2
Cement required
in bans.
20.32
16.43
13.96
1:3
10.25
Cu.M.
1:4
8.69
Cu.M.
Sr.No.
1)
.....___
Unit
Cu.M.
Cu.M.
Cu.M.
1:5
1:6
8.89
5.83
Cu.M.
g
h
1:8
1:1.5:3
4.49
8.00
Cu.M.
1:2:4
6.40
4.40
Cu.M.
Cu.M.
i
j
k
1:3:6
1:4:8
1:5:10
n
0
M.100
M.150
M.200
q
r
M.250
M.300
M.350
t
u
M.400
C.C.M.100 With 15% plum
Cu.M.
Cu.M.
3.40
Cu.M.
2.60
4.40
Cu.M.
6.00
Cu.M.
Cu.M.
7.00
7.50
8.00
Cu.M.
Cu.M.
8.25
Cu.M.
Cu.M.
8.50
Cu.M.
3.90
3.74
Cu.M.
Cu.M.
1.50
1.90
Cu.M.
Cu.M.
2.40
Cu.M.
d
a
b
2.58
1.70
2.10
Cu.M.
Cu.M.
3)
(I)
2)
(I)
(II)
d
(II)
a
b
Cu.M.
2.42
3.20
Cu.M.
1.70
Cu.M.
2.05
Cu.M.
2.40
1.02
1.00
Cu.M.
Cu.M.
Cu.M.
1.58
.0.225
Cu.M.
Sq.M.
1.24
Cu.M.
.0.025
Sq.M.
0.03
Sq.M.
4)
5)
l'LOORING
252
Cu.M.
0.57
1 Sq.M.
c.c.
3.65
1 Sq.M.
c.c.
3.00
1 Sq.M.
0.35
1 Sq.M.
0.25
1 Sq.M.
0.02
.0.025
0.030
0.050
0.070
0.10
0.11
0.15
R.M.
0.30
0.15
1.000
0.520
R.M.
R.M.
No.
Sq.M.
2a
6)
a
b
c
d
e
f
g
h
7)
a
b
c
d
..
253
R.M.
R.M.
R.M.
R.M.
R.M.
R.M.
R.M.
GOVERNMENT OF MAHARASTARA
Vigilance & Quality Control Circle
Schedule of Testing charges for construction material used for Government
Works for the Year 2015-16
Effective from 1/ 08 /2015
Name of Test
Sr.
No.
Rate Sanctioned
Test
Rs.
1 Test
3000.00
2100.00
1 Test
550.00
Abrasion Value.
1 Test
950.00
1 Test
700.00
Stripping Value.
1 Test
600.00
Soundness.
1 Test
Bulk Density.
1 Test
300.00
1 Test
13000.00
1 Test
13000.00
2000.00
MIX DESIGN
9
10
FINE AGGREGATES
11
1 Test
1100.00
12
1 Test
650.00
13
Silt Factor.
1 Test
700.00
1 Test
1750.00
BRICKS
14
1 Test
2000.00
16
1 Test
1100.00
GLAZED TILES
253
17
18
1 Test
1300.00
1 Test
600.00
1 Test
1300.00
1 Test
1200.00
1 Test
800.00
MANGLORE TILES
24
25
1 Test
550.00
26
1 Test
11000.00
27
1 Test
600.00
28
Permiability Test.
1 Test
1250.00
29
13000.00
30
1 mix
Design
1 Test
per km.
15.00
1 Test
2000.00
1 Test
550.00
1 Test
1600.00
23
CONCRETE
31
32
33
2300.00
35
STONE/RUBBLE
Crushing Value/Compressive Strength Water Absorption
& Specific Gravitv,
SOIL/MURUM
Sieve Analysis.
1 Test
550.00
36
1 Test
350.00
37
1 Test
900.00
38
1 Test
1500.00
39
1 Test
5500.00
40
1 Test
2100.00
41
per km.
15.00
42
per km.
54.00
43
1 Test
900.00
44
1 Test
650.00
45
Mechanical Analysis.
1 Test
1800.00
45
1 Test
25000.00
47
1 Test
750.00
34
254
BITUMEN
48
49
1 Test
2500.00
1 Test
1550.00
so
1 Test
750.00
51
52
Extraction Test.
Sieve Analysis of Bituminous mix(2 samples of extraction
for one sieve analvsis excludino extraction l
Marshall Stability & Flow measurement. (Set of 3 moulds)
1 Test
1 Test
1300.00
3150.00
1 Test
800.00
1 mix
desian
1 Test
13000.00
57
550.00
58
1 mix
desian
1 Test
2500.00
59
1 Test
1 Test
750.00
900.00
62
1 Test
500.00
63
1 Test
2250.00
per km.
15.00
53
55
56
64
6000.00
BITUMINOUS EMULSION
65
% Residue Test
1 Test
500.00
66
1 Test
300.00
68
1 Test
1600.00
69
1 Test
900.00
1 Test
850.00
1 Test
2200.00
1 Test
2700.00
1 Test
450.00
1 Test
1300.00
WOOD
70
71
72
73
74
255
75
1 Test
1 Test
550.00
650.00
1 Test
750.00
POLYMER MATERIAL
76
77
Water Absorption
1 Test
550.00
78
Bursting Strength
1 Test
400.00
Water Absorption,
1 Test
550.00
Load Bearing
1 Test
300.00
1 Test
200.00
1 Test
250.00
1 Test
200.00
1 Test
900.00
1 Test
2500.00
86
1 Test
450.00
87
1 Test
1900.00
88
1 Test
250.00
89
1 Test
1200.00
90
1 Test
1000.00
1 Test
1300.00
1 Test
3100.00
A.C. SHEETS
79
80
G.I. PIPES
81
82
83
84
85
92
93
1 Test
94
1 Test
3100.00
900.00
91
95
Flowability.(Percentage residue).
1 Test
800.00
96
1 Test
800.00
97
Drying Time.
1 Test
650.00
98
Drying Time.
1 Test
650.00
99
1 Test
600.00
100
Flexibility.
1 Test
250.00
101
Gel Time.
1 Test
400.00
256
<
102
Pot Life.
1 Test
400.00
103
Volume of Solid.
1 Test
850.00
1 Test
3200.00
104
105
per km.
600.00
106
per km.
1200.00
107
per km.
600.00
108
per km.
15.00
OVERLAY DESIGN
109
per km
11300.00
110
1 point
150.00
111
1 point
250.00
Important Note : The above rates are applicable for all Division & Subdivision under P.W.D. & Z.P.
in Maharashtra and for other Govertment I Private Organization the rates shall be twice as
mentioned in DSR.
Suprintending Engineer
Vigilance & Quality Control Circle,
Pune
257
Control Tests & their frequency & specified limits for various construction materials
Material & Tests
Sr.
Specified Limit
Frequency
No.
CEMENT IOPC\
1) Initial setting time.
4) Specific gravity.
3.10 to 3.15
5) Compressive strength.
(in Kg/cm2.)
3.10 to 3.15
33 Grade 43 Grade 53 Grade
a) 160
230
270
b)220
330
370
c) 330
430
530
6) Soundness by
Lechatelier apparatus.
SANO
1) Particle size.
2) Silt content.
3) Fineness modulus.
4) Bulkage.
5) Moisture content.
COARSE AGGREGATE
1) Gradation.
Size of metal.
100 %
Passing
through
sieve size
100% Retained on
sieve size
BO mm.
100mm
50mm
60mm
50mm
40mm
BO mm
50mm
60mm
40mm
63mm
63 mm (0%)
40mm 35 to 40mm (30 to 65%)
70%
12.5mm O 12.5mm (95 to 100%)
to 5 %
40mm to50mm.
63mm
25 mn1
258
2) Impact Value.
7) Specific Gravity
BRICKS
1 )Water absorption shall not
exceed
2)Compressive Strength (wet
condition )
3)Efflorescence
For
For Road work
concrete
IHea'" trafficl
Shall not Shall not exceed 30%
exceed 45%
shall not shall not exceed 17 %
exceed 45%
6) Water absorption
25mm
20mm
12.5mm
10mm
6.3 rnm
4.75mm
3) Crushing value
5) Flakiness Index
50mm
40mm
25mm
20mm
12.5 mm
10 mm
28 days
(Min
70
105
135
170
200
100
150
200
250
300
. . - .
1) Compressive Strength
M100
M150
M200
M250
M300
259
,..,,_
1- 5
6-15 2
16 - 30 3
31-504
50 & Above 4 plus
M350
MANGALORE TILES
235
M400
270
Class AA Class A
19%
24%
For Average
100 (410 x
235)
110 (420x250)
80(410x235)
90(420x250)
110 (425x260)
90(425x260)
90
(410X235)
100 (425
260)
Individual
68(410x235)
3) Permeability Test
400
For
Average
Individual
350
78(420 X250)
78(425 X260)
2.Transverse strength
SOIL/MURUM
1. Proctor Density Shall not be 1.52 gm/cc for Embankment upto 3 One test per 1000 m3 or
mtr. Height
less than
soil.
1.6 gm/cc for subgrade and
2. C.B.R. Value
10 HARD MURUM
1)Gradation
2) Plasticity Index
11 SOFTMURUM
1) Plasticity Index
Below 8
12 STONE
Water Absorption
Compressive Strength
Specific Gravity
Maximum 5/o
1530 kglcm2 minimum
Not less than 3
260
13 GLAZED TILES
1) Water Absorption
To ascertaion the
correct grade of
bitumen
14 BITUMEN
1) Penetration
15 BITUMINOUS MIX
1) Extraction
16 COARSE AGGREGATE
1
Soundness
Bulk Density
FINE AGGREGATE
CL2 & Sulphate Content
3
4
Moisture Content
Bulkage of sand
CONCRETE
Loss with
Sodium - 12% Max.
Maanesium Sulohate 18% Max.
2.4
2.7
2.1
2.3
3.0
3.2
2.5
3.4
Sulphate content - 500 mg/Lt
Chloride content 2000 mg/Lt. for P.C.C.
1000 mg/Lt. for R.C.C.
Mechanical analysis
261
GRADE
BITUMEN
Softenin.IJ point
10
11
12
13
Viscosity
Flash & fire point (Minimum )
Specific gravity( Minimum )
Ductility ( Minimum )
14
15
WATER
PH value
16
17
WOOD
Densiiy
30140
60170
50-65
40-55
80/100
35-50
2 sample not to be
subjected to all or some
min 175
min 175
min.0.99 min.0.99
min 75
min. 75
cm.
cm.
60 to 80 at 25C without coarse
10 to 20 at 25C after addino
min 175
min.0.99
min.50cm.
oieces
Moisture content
STEEL ANTI CORROSIVE
TEST
19 Resistance to applied voltage
'1 Hr.testl
20 Resistance to applied voltage
'30 davs.test)
21 Thickness of coating
18
22
23
262