Professional Documents
Culture Documents
132kv Building - Calculations (R1)
132kv Building - Calculations (R1)
1.1
GENERAL ......................................................................................................................................... 3
1.2
SCOPE............................................................................................................................................... 3
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
2.0
3.0
4.0
4.1
4.2
..................................................................................................................................................................... 13
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.13
4.14
5.0
6.0
8.0
DEFLECTION CHECK..................................................................................................................... 33
9.0
10.0
11.0
12.0
13.0
ATTACHEMENT .............................................................................................................................. 42
DESIGN CRITERIA
GENERAL
1)
2)
3)
4)
1.2
Project
Client
Consultant
Contractor
SCOPE
The scope of this document is to analyse and design the 132/11kV GIS building at Dihan. This document
contains the complete Load calculations, STAAD PRO Output files, Support Reactions & Pile load
Calculations
1.3
UNIT OF MEASUREMENT
The unit of measurement used in the analysis shall be SI units.
1.4
1.5
MATERIAL STRENGTH
1)
2)
3)
4)
1.6
UBC 1997
BS 8110 Part 1
BS 6399 Part 1
BS 6399 Part 2
BS 8007
fc = 40 N/mm2
fc = 35 N/mm2
fy = 500 N/mm2
fy = 460 N/mm2
GEOTECHNICAL PROPERTIES
1)
2)
: 2.35m BGL
: Pile Foundation
Compression
( kN)
1802
Horizontal
( kN)
90.10
Uplift
( kN)
650
Spring Constant
Vertical
Horizontal
(kN/m)
375000
18750
FRICTION FACTOR
1)
2)
3)
1.8
: 0.50
: 0.45
: 0.40
1.9
Concrete to soil
Steel to concrete
Steel to Steel
Overturning
Sliding
Uplift
: Safety Factor
: Safety Factor
: Safety Factor
> 2.00
> 2.00
> 1.50
E11-2011(1)/LNT/DIMN/CO3/30200
E11-2011(1)/LNT/DIMN/CO1/30005
E11-2011(1)/LNT/DIMN/GO1/50007
The above software packages are used in the analysis & design of the building. Input and output
is attached along with this document.
2.0
The building is modelled in STAAD pro as a 3D frame . The structural model includes all the
main frame members like columns and beams of the frames, basement wall & raft of the
building is modelled as 4 nodded finite element. Supports are modelled below column location
as per pile group. Transformer bays will be modelled using 4 nodded rectangular plate element
separated by expansion joint above foundation.
LOADS ABBREVIATIONS
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
4.2
DL
LL
WL
EQ
EPB
EPS
CL
OW
BL
TL
:
:
:
:
:
:
:
:
:
:
Dead Load
Live Load
Wind Load
Seismic load
Earth Pressure due to back fill
Earth Pressure due to surcharge
Crane Load
Oil water load
Blast load
Temperature Load
DEAD LOAD
Self weight of members (in model ) are taken by STAAD based on member size and unit weight
A
Basement Floor
1.0
400mm thk.
150mm thk.
=
=
Total
2.0
13.60 kN/m2
Self-Weight of Slab
400mm thk.
0.4x 25
10.00kN/m2
180mm thk.
0.18x 24
4.32 kN/m2
14.32 kN/m2
400mm thk.
0.4x 25
10.00kN/m2
125mm thk.
0.125x 24
3.00 kN/m2
Total
4.0
10.00kN/m2
3.6 kN/m2
Transformer Area
Total
3.0
0.4x 25
0.15x 24
13.00 kN/m2
Transformer Plinth
Self-Weight of Plinth
3330mm thk.
3.33x 25
83.25kN/m2
83.25 kN/m2
Ground Floor
1.0
200mm thk.
80mm thk.
=
=
Total
2.0
200mm thk.
0.20x 25
5.00kN/m2
80mm thk.
0.080x 24
1.92 kN/m2
5.00kN/m2
1.92 kN/m2
80mm thk.
0.080x 24
7.00 kN/m2
5.00kN/m2
1.92 kN/m2
80mm thk.
Total
5.0
7.00 kN/m2
Total
4.0
7.00 kN/m2
Total
3.0
5.00kN/m2
1.92 kN/m2
0.20x 25
0.080x 24
0.080x 24
7.00 kN/m2
200mm thk
0.20x 25
5.00kN/m2
450mm thk.
80mm thk.
Total
=
=
0.45x 10
0.080x 24
=
4.50 kN/m2
1.92 kN/m2
11.50 kN/m2
Roof Slab
1.0
Lower Roof between Grid L & X - 4 & 2 10 ( Roof above capacitor room )
Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)
2.0
200mm thk.
135mm thk.
Total
=
=
=
0.20x 25
5.00kN/m2
0.135x 24
=
0.50 kN/m2
3.24 kN/m2
8.75 kN/m2
Lower Roof between Grid L & X - 13-4 - ( Roof above 11kV GIS Battery , store & corridor )
Self-Weight of Slab
Water Proofing Load
Self Weight of Screed ( Avg)
False Ceiling
200mm thk.
135mm thk.
=
=
0.20x 25
5.00kN/m2
0.135x 24
0.50 kN/m2
3.24 kN/m2
1.00 kN/m2
3.0
9.75 kN/m2
200mm thk.
100mm thk.
Total
=
=
=
=
0.20x 25
5.00kN/m2
0.100x 24
=
0.50 kN/m2
2.40 kN/m2
1.00 kN/m2
9.00 kN/m2
0.20x 25
5.00kN/m2
200mm thk.
=
120mm thk.
Total
0.120x 24
=
0.50 kN/m2
2.88 kN/m2
8.40 kN/m2
150mm thk.
0.150x 25
3.75kN/m2
0.09x 24
=
0.50 kN/m2
2.16 kN/m2
6.41 kN/m2
90mm thk.
Total
10
=
=
Other load
1.0
300mm thk.
100mm thk.
=
=
7.50kN/m2
2.50 kN/m2
0.3x 25
0.1x 25
Total
10.00 kN/m2
UDL on Midlanding beam ( 0.45m , 3.0m & 5.5m) of Span 1.37m = ( 1.37 x 10/ 2 = 6.85 kN/m )
2.0
Offloading Staircase
Self-Weight of Slab
Avg thk for steps + finishes
200mm thk.
100mm thk.
=
=
5.00kN/m2
2.50 kN/m2
0.2x 25
0.1x 25
Total
7.50 kN/m2
Masonry Weights
External 250mm thick thermo block with 50mm thk
thermal insulation including 20mm plaster ( 290mm thk )
Internal 200mm solid block work with 20mm plaster on
both sides. ( 240mm thk )
Internal 200mm hollow block work with 20mm plaster on
both sides.
Internal 150mm hollow block work with 20mm plaster on
both sides.
E
Masonry Loading on
1.0
Basement floor
240mm thk solid block wall (
5.28 kN/m2)
2.0
=
0.290 x 20
5.8 kN/m2
0.24 x22
= 5.28 kN/m2
0.2x16 + 0.04 x 20
= 4.00 kN/m2
0.15x16 + 0.04 x 20
= 3.2 kN/m2
3.28m high
(2.480+1.5-0.7)
5.28 x 3.28
17.32 kN/m
5.80 x 5.25
30.45 kN/m
5.80 x 5.25
30.45 kN/m
5.80 x 5.25
30.45 kN/m
5.80 x 5.45
31.61 kN/m
4.00 x 5.25
21.00 kN/m
Ground floor
5.25m high
( Capacitor,11kV,NER,SCADA)
( 7.65-1.5-0.9)
Wall on grid 13
5.25m high
( LVAC,Control,Battery,Record,Store )
( 7.65-1.5-0.9)
5.25m high
( 132kV ,11kV )
( 7.65-1.5-0.9)
5.45m high
( Capacitor)
( 7.65-1.5-0.7)
5.25m high
11
( 7.65-1.5-0.9)
5.45m high
( LVAC,NER, SCADA,Battery )
( 7.65-1.5-0.7)
4.00 x 5.45
21.80 kN/m
5.28 x 5.45
28.77 kN/m
5.8 x 3.0
17.40 kN/m
5.8 x 3.0
17.40 kN/m
3.2 x 3.70
11.84 kN/m
5 x1. 5
7.50 kN/m
20 x 2.73
54.60 kN/m
3.0
5.45m high
( 7.65-1.5-0.7)
4.0
3.00m high
( 7.65-11.5-0.9)
5.0
3.00m high
( 7.65-11.55-0.9)
3.7m high
( 7.65-11.55-0.2)
Parapet wall
1.0
1.50m high
1.0
1.50m high
( 2.480 + 0.4-0.15 )
Considering 30% voids the dead weight can be reduced ( = 38.22 kN/m)
12
1
7
Horizontal
Fx( kN )
8.086
-8.105
Vertical
Fy( kN )
3.401
3.4
Horizontal
Fz( kN )
2.356
2.363
0.038
2.623
-2.358
14
-0.019
2.624
-2.361
Node Number
14
7
1
8
J
Independent staad model of claustra created with dead load & the support reaction from that
model are transferred to the supporting beam in the Main model.
13
LIVE LOAD
Basement Floor
1.0
5.00 kN/m2
15.00 kN/m2
1.0 kN/m2
Total
16.00 kN/m2
Cable basement
B
Ground Floor
1.0
2.0
3.0
4.0
5.0
1.0 kN/m2
Total
16.00 kN/m2
15.00 kN/m2
1.0 kN/m2
Total
16.00 kN/m2
Live Load
5.00 kN/m2
Total
5.00 kN/m2
15.00 kN/m2
Offloading Platform
Live Load
Live load due to services
1.0 kN/m2
16.00 kN/m2
1.50 kN/m2
1.00 kN/m2
Total
2.50 kN/m2
Total
C
Roof
1.0
2.0
15.00 kN/m2
14
=
=
5.0 kN/m2
1.0 kN/m2
Total
6.0 kN/m2
5.00 kN/m2
Other Load
1.0
Total
=
5.00 kN/m2
UDL on Midlanding beam ( 0.45m , 3.0m & 5.5m) of Span 1.37m = ( 1.37 x 5/ 2 = 3.50 kN/m )
2.0
Offloading Staircase
Live Load considered
5.00 kN/m2
Total
=
5.00 kN/m2
UDL on supporting beam of Span 3.5m = ( 3.5 x 5.0/ 2 = 8.75 kN/m )
Equipment Load
1.0
2.0
1020kN
=
=
21.71m2
47 kN/m2
31.75kN
=
=
1.85m2
17.20 kN/m2
15
WIND LOAD
Wind load calculation is done using the standard method as per BS-6399 part-2.
1)
Vs
Vb . Sa . Sd . Ss . Sp
2)
Ve
Vs . Sb
3)
Dynamic pressure
qs
0.613 . ( Ve )2
pe
qs . Cpe . Ca
H(m)
Cr
11.5
0.021
Vb
27.0 m/s
Sa
1.001
Sd
Ss
Seasonal factor
Sp
Probability factor
Vs
27.0 x 1.001 x 1 x1 x 1
27.03 m/s
Building Height
11.50 m
He
Effective Height
11.50 m
Sb
1.85
Ve
27.03 x 1.85
50.00 m/s
Dynamic pressure
qs
16
Width
W (m)
36
Height
H (m)
11.50
Long Face
Short Face
Breadth B (m)
83
36
36
83
D/H
3.13
7.22
Scaling length,b
23
23
0.658
0.6
-0.158
-0.100
0.7
0.816
Standard Wind loads
Size effect factor for external pressure , Ca
Site exposure type
Diagonal dimension ( m )
Ca
Pe
83.793
0.824
37.792
0,874
surface
1.03kN/m2
17
Area
Column on Grid-5
( 3.270/2+3.27/2 x 3.51)
Column on Grid-7
(3.27/2 + 6.33/2 x 10 )
16.67
16.67 x 1.03
17.17 kN
4.90kN/m
48 x 1.03
49.50 kN
4.95kN/m
44.65 x 1.03
46.00 kN
4.60kN/m
45.13 x 1.03
46.50 kN
5.25kN/m
33.63 x 1.03
34.63 kN
4.00kN/m
13.71 x 1.03
14.12 kN
2.30kN/m
13.68 x 1.03
14.09 kN
4.00kN/m
13.68 x 1.03
14.09 kN
4.00kN/m
27.46 x 1.03
28.28 kN
4.60kN/m
8.0 x 1.03
8.25 kN
1.35kN/m
39.57 x 1.03
40.76 kN
6.62kN/m
14.34 x 1.03
14.77 kN
5.80kN/m
11.79 x 1.03
12.71 kN
4.76kN/m
48
44.65
Column on Grid-10
( 6.33/2 + 2.6/2 x 10 )
Column on Grid-11
Column on Grid-13
(7.6/2 x 8.85 )
45.13
33.63
Area
13.71
( 2.61/2 + 1.85/2 x6.15)
13.68
Column on Grid-2a
( 7.6/2 x 3.6)
Column on Grid-4
( 7.6/2 x 3.6)
13.68
27.46
Column on Grid-10
Column on Grid-11
( 2.6/2 x 6.15)
8.0
39.57
Column on Grid-7
14.34
Column on Grid-4
Column on Grid-3
18
Area
4.08
Column on Grid-J
( 1.6/2 x 5.1)
Column on Grid-K
(1.60/2 x 51.0 )
4.08
18.00
Column on Grid-L
( 5.830/2 x 6.15 )
Column on Grid-M
Column on Grid-O
Column on Grid-P
Column on Grid-Q
Column on Grid-S
Column on Grid-V
Column on Grid-X
( 5.82/2 x 6.15)
36.16
36.46
26.60
26.60
36.47
36.13
18.00
4.85
Column on Grid-Y
( 1.9/2 x 5.1
4.08 x 1.03
4.20 kN
0.82kN/m
4.08 x 1.03
4.20 kN
0.82kN/m
18.00 x 1.03
18.54 kN
3.01kN/m
36.16 x 1.03
37.55 kN
6.05kN/m
36.46 x 1.03
37.55kN
6.10kN/m
26.60 x 1.03
27.40 kN
4.45kN/m
26.60 x 1.03
27.40 kN
4.45kN/m
36.47 x 1.03
37.56 kN
6.10kN/m
36.13 x 1.03
37.21 kN
6.05kN/m
18.00 x 1.03
18.54 kN
3.01kN/m
4.85 x 1.03
5.00 kN
0.98kN/m
19
Area
10.480
Column on Grid-C
( 2.74/2 x 7.65)
18.80
Column on Grid-D
25.34
Column on Grid-E
35.80
Column on Grid-F
38.32
Column on Grid-G
38.00
Column on Grid-H
Column on Grid-I
Column on Grid-J
Column on Grid-K
( 5.430/2 x 7.65 )
Column on Grid-L
( 7.60/2 x 7.65 )
Column on Grid-N
37.81
40.20
20.77
29.07
45.00
38.60
Column on Grid-O
Column on Grid-P
Column on Grid-R
Column on Grid-T
Column on Grid-U
44.63
40.67
28.61
20.36
Column on Grid-W
Column on Grid-X
27.46
( 2.74/2 + 4.44/2 x 7.65
29.20
)
( 4.44/2 + 3.185/2 x 7.65 )
10.480 x 1.03
10.80 kN
1.42kN/m
18.80 x 1.03
19.36 kN
2.53kN/m
25.34 x 1.03
26.10 kN
3.41kN/m
35.80 x 1.03
36.87 kN
4.82kN/m
38.32 x 1.03
39.46 kN
5.16kN/m
38.00 x 1.03
39.14 kN
5.10kN/m
37.81 x 1.03
38.94 kN
5.09kN/m
40.20 x 1.03
41.40 kN
5.41kN/m
20.77 x 1.03
21.40 kN
2.80kN/m
29.07 x 1.03
30.00 kN
4.00kN/m
45.00 x 1.03
46.35 kN
6.05kN/m
38.60 x 1.03
40.00 kN
5.20kN/m
44.63 x 1.03
45.96kN
6.00kN/m
40.67 x 1.03
42.00 kN
5.74kN/m
28.62 x 1.03
29.50 kN
3.85kN/m
20.36 x 1.03
21.00 kN
2.74kN/m
27.46 x 1.03
28.28 kN
3.70kN/m
29.20 x 1.03
30.07 kN
4.00kN/m
20
Length
L (m)
63.40
A
63.481
0.842
Zone A
Zone B
Zone C
Zone D
Solidity
Cp
1
2.1
1
1.8
1
1.4
1.2
Pe ( kN/m2 )
1.64
1.406
1.094
0.937
2.46
2.10
1.64
1.405
(1.64 x 1.5 )
( 1.406 x 1.5 )
( 1.094 x 1.5 )
( 0.937 x1. 5 )
1.85
1.57
1.23
1.05
(1.64 x1.5/2 )
(1.405 x1.5/2 )
height ( Kn/m)
Moment on the Beam supporting
Parapet wall ( kNm/m )
( 2.46 x1.5/2 )
( 2.10 x1.5/2 )
21
Wind loads are applied to a independent staad model of claustra & the support reaction are
transferred to the supporting beam in the Main model.
22
SEISMIC LOADS
0.15
Importance Factor
1.0
SC
Cv
0.25
Ca
0.18
Ct
0.073
Structural System
5.50
Ct ( h )3/4
0.073 ( 10.325)
0.42 Seconds
Structure in Seconds
The Seismic loads are calculated according to the seismic coefficient method using Staad Pro.
the loads including dead loads & live loads are applied as joint/member/floor weights on the structure.
For Seismic case actual equipment load (100%) will be considered for lump mass calculation. And
Under Seismic lump mass calculation roof live load to be considered as 25% as per UBC 1997.
The total design base shear shall be determined from the following
VBASE
= Cv x I x W/ ( R xT )
=
=
The total design base shear need not exceed the following
VBASE
= 2.5 x Ca x I x W/ R
=
=
The total design base shear shall not be less than the following
VBASE
= 0.11 x Ca x I x W
=
=
23
Soil Coefficient
Unit weight of soil ( )
16 kN/m3
0.5
Height of soil ( h )
Ko . . h
0.5 x 16 x 3.0
4.9
24.00 kN/m2
= 33.33 kN/m2
= 41.66 kN/m2
= 0.5
= 41.66 x 0.5
= 20.83 kN/m2
10.00 kN/m2
0.5
10.00 x 0.5
5.00 kN/m2
24
50.00 kN
=
=
=
=
=
=
=
=
=
=
50.00
42.07
10.00
52.07
4.50
37.46
12.85
4
5.115
2.50
kN
kN
kN
kN
kN
kN
kN
nos
m
m
L
Vmax
46.83
=
=
=
=
=
=
(P*(L-a)+P*L)/L
70.76 kN
1.87
kN/m
9.57
kN
80.33 kN
33.84 kN
=
=
1.36
2.06
kN
kN
=
=
1.87
3.75
kN
kN
Vmax
4.0
Fy (kN)
Fy (kN)
Fz (kN)
(Vertical
max)
(Vertical
min)
(transverse)
82.0
34.0
3.0
25
kN
The Section Size for the Runway beam as per design is UB457X191X98kg/m
Area = 12530 mm2
Width of the section = 192.80 mm
Thickness of Flange = 19.60 mm
Thickness of Web = 11.40 mm
4.11 OIL WATER LOAD IN TRANSFORMER COMPOUND
2.88m high
( 2.480 + 0.4 )
2.88 x 10
28.80 kN/m
Since the Transformer compound is filled with corbel stones only the 30% void space will be
filled with oil ( 28.80 x 0.3 = 8.64 kN/m )
4.12 BLAST LOAD
Water table is at the bottom of raft , for uplift calculation seasonal variation of 1.0m
considering
Uplift Load
10.00 kN/m2
( 1.0 ) x10
26
STAAD MODEL
27
7.0
28
29
30
31
32
DEFLECTION CHECK
Storey drift is check by taking results of storey drift staad output
Maximum deflection
M = 0.7 R S
S = Storey Drift as per STAAD
R = Response reduction factor = 5.5
Calculated storey drift using M shall not exceed 0.020 times the storey height(h ) as structures having a
fundamental period of less than 0.574 seconds i.e. Less than 0.7sec.
From below table maximum deflection is in Z-Direction for node no.9 which is 16.076 mm and for same
load combination deflection at bottom node no.19 in Z-Direction is 2.07 mm.
Therefore Storey drift, S
= 16.07-2.07 =13.97 mm
33
Deflection on grid-C
34
Deflection on Grid-F
Deflection on Grid-H
35
Deflection on Grid-J
Deflection on Grid-K
36
Deflection on Grid-O
37
38
39
=
=
=
=
2346 kN
32.04 kN
12.07 kN
-57.67 kNm
Load of Pile P1 = P + Mx
2
1.875
2346 + 57.67 = 1204 kN
2
1.875
Load of Pile P2 = P
2
- Mx
1.875
40
41