Kratkoroni investicioni program


2013-2015 god.
EBRD
IZVOD IZ PROGRAMA
SANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I
KANALIZACIONOG SISTEMA
2009-2018
(Sarajevo, septembar 2009)

Sarajevo, decembar 2012.

Pogon Vodovod tel:532-430, Pogon Kanalizacija tel: 668-260


Banke: UniCredit Bank dd: 3389002208274753
Raiffeisen Bank dd: 1610000063850067

ISO 9001 Q-349

Podruje certifikacije:
Proizvodnja i distribucija vode i
odvoenje otpadnih voda

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Dodatno pojanjenje
uz Kratkoroni investicioni Program 2013-2015.
(izvod iz Program sanacije dotrajalih dijelova vodovodnog i kanalizacionog sistema 2009-2018.)

U skladu sa zakljukom Skuptine preduzea iz 2008.godine (Skuptinu preduzea inila Vlada


Kantona Sarajevo), Radni tim preduzea pripremio je 10-godinji Program sanacije dotrajalih
dijelova vodovodnog i kanalizacionog sistema 2009-2018.
Zaostatak ulaganja u obnovu dotrajalih segmenata vodovodnog i kanalizacionog sistema, potrebno
je nadoknaditi u najmanje 10-godinjem periodu kako bi i efekti obnove dali svoje rezultate.
Ulaganjem u kraem vremenskom periodu, oekuje se samo zaustavljanje dalje desrtukcije sistema,
ali oekivanih veih efekata nee biti.
Na ovako pripremljen Program kosultantska kua koju je angaovao EBRD, konzorcij od talijanskih
firmi APRI i DIAPOLONIJA dala je svoju saglasnost, odnosno potvdila da su u programu
sadrani najkritiniji segmenti sistema, koji zahtijevaju hitnu intervenciju i ulaganje (2009.). Takoer za
realizaciju kredita EBRD-a, u visini od 30 mil ,dogovoreno je da se napravi Izvod iz Programa, za 3godinji period implementacije, otprilike u visini godinje amortizacije VIK-a (10 mil ) i da se
obezbjedi Projektna dokumentacija za Prvu tranu od 10 mil , to je ViK i uradio. Implementacijom
ovog programa oekuje se poveenje sigurnosti vodosnabdijevanja i smanjenje gubitaka do 5% na
godinjem nivou.
S obzirom da implementacija Programa Sanacija dotrajalih dijelova vodovodnog i kanalizacionog
sistema za period 2009-2018g, nije realizovana u planiranom periodu, u meuvremenu smo
napravili odreene korekcije u programu.
Naime, izvrene su manje izmjene odreenih dionica koje su bile predviene ali je u meuvremenu
zbog urgentnosti rjeavanja dotrajlih dionica VIK izvro njihovu zamjenu. Izvrene su izmjene godina
na koju se program odnosi. Takoer, u ovoj verziji (2012.g) ukinuto je poglavlje koje se odnosi na
rekonstrukciju postrojenja za preiavanje otpadnih voda Butila, s obzirom da je u meuvremenu
dolo do realizacije kredita Svjetske banke (WB) koji se implementira za ovu namjenu. Banka je u
meuvremenu (2012g.) objavila krajnji projektni ugovor u kojem nema pozicije 4. 'Odravanje i razvoj
informacionih tehnologija u preduzeu', tako da smo ukinuli i to poglavlje.
U sklopu ovog dokumenta data je originalna verzija Uvodnih napomena pripremljenog Programa iz
2008.g. kako bi itaoci imali uvid u slijedivost izrade i nastanka prvobitne verzije 10-godinjeg
programa.

Radni tim

Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Sadraj
SADRAJ..................................................................................................................................2
Uvodne napomene............................................................................................................................... 5

1. REKONSTRUKCIJA VODOVODNE I KANALIZACIONE MREE....................................7


1.1.
Rekonstrukcija vodovodne i kanalizacione mree za 2013.g................................................7
1.1.1.
Cjevovod DN 300 na potezu Butila - Rajlovac....................................................................................................7
1.1.2.
Cjevovod DN 300 u ulici Safeta Zajke od ulice Smaje ikala do ulice Alije Kuukalia...................................8
1.1.3.
Cjevovod PS Alipain Most - PS Centar......................................................................................................8
1.1.4.
Cjevovod u ulici Demala Bijedia na potezu Halilovii Alije Kuukalia.....................................................8
1.1.5.
Zona Skenderija, Podzona Marijin dvor..............................................................................................................9
1.1.6.
Zona Bjelave......................................................................................................................................................11
1.1.7.
Rekonstrukcija kanalizacione mree u podzoni Marijin dvor............................................................................14
1.2.
Rekonstrukcija vodovodne i kanalizacione mree za 2014.................................................16
1.2.1.
Zona Skenderija.................................................................................................................................................16
1.2.2.
Zona Kovaii....................................................................................................................................................24
1.2.3.
Zona Hrid...........................................................................................................................................................25
1.2.4.
Zona Pogledine...................................................................................................................................................28
1.2.5.
Zona Kovaii, kanalizaciona mrea.................................................................................................................31
1.3.
Rekonstrukcija vodovodne i kanalizacione mree za 2015.................................................32
1.3.1.
Zona Hambina Carina, vodovodna mrea..........................................................................................................32
1.3.2.
Zona Hambina Carina, kanalizaciona mrea.....................................................................................................35

2. UPRAVLJANJE VODOVODNIM SISTEMOM..................................................................38


2.1.
Mjerno- regulacioni objekti i oprema za 2013.g..................................................................38
2.1.1.
Automatski regulacijski ventili..........................................................................................................................38
2.1.2.
Mjerni ahtovi....................................................................................................................................................39
2.1.3.
Mjerna oprema...................................................................................................................................................40
2.2.
Mjerno- regulacioni objekti i oprema za 2014.g..................................................................41
2.2.1.
Mjerni ahtovi....................................................................................................................................................41
2.3.
Mjerno- regulacioni objekti i oprema za 2015.g..................................................................42
2.3.1.
Mjerni ahtovi....................................................................................................................................................42
2.3.2.
Mjerna oprema...................................................................................................................................................42
2.3.3.
Automatski-regulacioni ventili...........................................................................................................................43

3. OBEZBJEENJE POGONSKE SIGURNOSTI SISTEMA...............................................45


3.1.
Rekonstrukcija elektro energetskog pogona za 2013.g......................................................45
3.1.1.
Rekonstrukcuja 10-20 KV postrojenja i TS 10-20/0,4KV, 1x100 KVA Baevo...........................................45
3.1.2.
Pumpna stanica Baevo-Mojmilo..................................................................................................................45
3.1.3.
Pumpna stanica Alipain Most - faza I.........................................................................................................45
3.2.
Rekonstrukcija elektro energetskog pogona, vodovodnih objekata i sistema za dezinfekciju
vode u 2014.g...................................................................................................................................... 46
3.2.1.
Nabavka zamjenskih pumpnih agregata.............................................................................................................46
3.2.2.
Rekonstrukcija pumpnih stanica u cilju zamjene pumpnih agregata.................................................................47
3.2.3.
Frekventni zamjenski regulatori i elektro-energetska oprema...........................................................................49
Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

3.3.
Rekonstrukcija elektro energetskog pogona, vodovodnih objekata i sistema za dezinfekciju
vode u 2015.g...................................................................................................................................... 51
3.3.1.
Rekonstrukcija pumpne stanice Hambina Carina..............................................................................................51
3.3.2.
Rekonstrukcija hlornog odjela na rezervoaru i pumpnoj stanici Baevo uz stvaranje uslova za prelazak na
potpuni automatski rad........................................................................................................................................................52
3.3.3.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na izvoritu Kovaii.......................52
3.3.4.
Uspostavljanje sistema neutralizacije na svim postrojenjima za dezinfekciju vode..........................................52
3.3.5.
Uspostavljanje automatskog sistema dezinfekcije vode na svim tehnolokim objektima pogona Vodovoda...52
3.3.6.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na filter postrojenju Moanica........53
3.3.7.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na vrelu Crnil....................................53

REKAPITULACIJA..................................................................................................................58

Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Uvodne napomene
U skladu sa Zakljucima (2,3 i 5) doneenim na sjednici Skuptine Preduzea odranoj dana
12.05.2008.g., pripremljen je Program sanacije dotrajalih dijelova vodovodnog i kanalizacionog
sistema za 2009.g., koji bi se u normalnim okolnostima, trebalo da finansiraju sredstvima
obezbjeenim naplatom od potoaa, po osnovu ukljuenih trokova obrauna amortizacije u cijeni
vode. Naalost, zbog izuzetno tekih finansijskih problema veeg dijela stanovnitva Sarajeva, nije
realno oekivati da se u skoroj budunosti, potroaima ispostavljaju rauni u skladu sa cijenom
kotanja, nego je i dalje neophodno obraun vriti prema tkz. cijeni u primjeni koja je na nivou cca
50% od cijene kotanja.
Realizacija ovog Programa bi trebalo da predstavlja poetak neophodne promjene u odnosu prema
instaliranoj infrastrukturi (vodovodnoj i kanalizacionoj mrei), kao i ostaloj elektro-mainskoj opremi,
graevinskim objektima i drugoj imovini koju koristi ovo preduzee. Naime, injenica da je vie od 60
% vodovodne i kanalizacione mree, kao i ostale obimne i vrlo vrijedne opreme i objekata,
knjigovodstveno otpisano, a to je direktna posljedica dugogodinjeg (vie od 30 godina) posebnog
odnosa prema trokovima amortizacije. Jednostavnije reeno, jedna od mjera zatite standarda naih
graana, kao po pravilu je bila vezana za cijenu vode. Ovakav odnos je proizveo vie nego ozbiljan
problem, koji bi se mogao manifestvovati u postupnom pogoranju kvaliteta funkcija
vodosnabdjevanja i kanalizacije. Svakako, dodatno je stanje zakomplicirano i pogorano oteenjima
koja su direktna posljedica rata 1992-1995.g.
Obzirom da se u periodu od deset godina mora kontinuirano ulagati u prozvane take Programa,
pripremili smo i program za period 2010. 2018. godinu, kao dopuna programa za 2009. godinu. Dati
su finansijski okviri za investicije u periodu od deset godina za najvitalnije, odnosno najugroenije
dijelova sistema. Ukoliko bi se 10-godinji Program realizovao u potpunosti, realno je oekivati da e
Preduzee KJKPVodovod i Kanalizacija putem redovne naplate svojih usluga, obezbjediti sredstva
neophodna za adekvatno odravanje vodovodnog i kanalizacionog sistema, odnosno za ouvanje
vodosnadbijevanja Sarajeva i odravanje kvalitetnog nivoa funkcije kanalizacije.
Ovaj Program sanacije dotrajalih dijelova vodovodnog i kanalizacionog sistema, za 2009.g.,
koncipiran je na osnovnoj problematici vodovodnog sistema, odnosno obuhvata rekonstrukciju
dotrajalih distributivnih i transportnih cjevovoda na kojima su registrovani gubici vode i odabran je
pristup jednog lokaliteta - podzone u najkritinijem dijelu zone Skenderija. Transportni cjevovodi koji
su predloeni za rekonstrukciju, odabrani su za dionice koje u vodovodnom sistemu ine vitalni
transport za uredno snadbijevanje Grada.
Prijedlog za rekonstrukciju kanalizacionog sistema usklaen je sa dionicama zamjene vodovodne
mree.
Sa stanovita upravljanja vodovodnim sistemom a prevashodno za obezbjeenje postepenog, ali
hitnog smanjenja gubitaka u vodovodnoj mrei predvidjeli smo realizaciju projekta regulacije
(smanjenja) pritiska kroz kandidirane take u drugom poglavlju Programa. Ovaj segment Programa bi
trebalo da automatski kontrolie isporuku vode prema programiranom dnevnom rasporedu.
U treem poglavlju, a sa stanovita obezbjeenja pogonske sigurnosti sistema kandidirali smo
najznaajnije rekonstrukcije elektro energetskog pogona, pumpnih stanica i sistema dezinfekcije
vode.
Takoer smo kandidirali i program za odravanje i razvoj informacionih tehnologija u preduzeu.
Navedena ulaganja u IT odnose se na kupovinu HW opreme a emu je razlog zastarjelost opreme i
nemogunost rada na starim tehnologijama, i licencnog sistemskog software-a to je obaveza zbog
legalizacije i direktno ovisi o broju raunara koje posjedujemo.
NAPOMENA: Zakljuci (2,3 i 5) sa sjednice Skuptine Preduzea odranoj 12.05.2008. Citiramo
navedene Zakljuke:
Na osnovu prezentiranih informacija iz KJKP ViK Skuptina preduzea podrava zahtjeve da se, u
Planu za 2009.g. planira 80% prihoda izraunatog na osnovu cijene kotanja, pri emu se ukupan
prihod moe sastojati od vie djelova i to:
dio koji bi se obezbjeivao putem naplate uz obraun po odobrenoj cijeni u primjeni.
dio koji bi se obezbjeivao po osnovu subvencija za socijalno ugroene kategorije potroaa, putem
nadlenog Ministarstva u Vladi Kantona.
Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

dio koji bi se obezbjeivao putem nadlenih Ministarstava za povlastice u obraunu trokova za


potroenu vodu, koje koriste potroai iz oblasti zdravstva, obrazovanja, nauke i kulture, socijalne
zatite i vojske, koji plaaju vodu po cijeni.
dio koji bi se obezbjeivao po osnovu finansiranja zajednike komunalne potronje (odvoenje
atmosferskih voda, odravanje javnih esama i fontana i naknade za utroenu vodu)
dio koji bi se obezbjeivao iz budeta Kantona po osnovu primjene Zakona o komunalnoj privredi,
odnosno pokrivanje razlike u prihodu koji se ostvaruje sa cjenom u primjeni i prihoda koji bi se
ostvario sa cijenom kotanja (koja ukljuuje pokrivanje trokova amortizacije). Ovaj dio moe biti
dijelom namjenjen za otplatu eventualnog realiziranih kreditnih zaduenja KJKPViK.
U Planu poslovanja za 2010.g. planirani prihod treba da bude na nivou 90%, a u 2013.g. na nivou
100% u odnosu na prihod izraunat primjenom cijene kotanja.
Zaduuje se KJKP ViK da pripremi do 01.oktobra 2008.g., Program utroka 80% sredstava
amortizacije planiranih za 2009.g., i isti dostavi Vladi Kantona putem resornog Ministarstva.
Preporuuje se Upravi preduzea da priprema dokumentaciju potrebnu za podnoenje aplikacija za
kreditno zaduenje, kako bi se zagovarane inicijative Vlade Kantona u vezi sa ovim spremno
doekale. Obzirom da je KJKP ViK kreditno nesposobno, Vlada Kantona e pokuati obezbjediti
garanciju prema kojoj bi Kanton preuzeo obavezu doznaavanja sredstava za otplatu kreditnih
anuiteta, a na teret pokria razlike izmeu cjene vode u primjeni i cijene kotanja utvrene u skladu
sa Zakonom o komunalnoj privredi.
Sarajevo, 02.06.2008.g.

Direktor
Pilavdi Fahrudin, dipl.ing.ma.

Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

1. REKONSTRUKCIJA VODOVODNE I KANALIZACIONE


MREE
1.1. Rekonstrukcija vodovodne i kanalizacione mree za 2013.g
Glavni cilj ovog dijela programa je rekonstrukcija dotrajale i vie godina stare (od 70 do 30 godina
starosti) vodovodne mree od materijala kao to su azbestcement i liveno eljezo, te polaganje novog
daktilnog cjevovoda. Radi se o znaajnim cjevovovodima u sistemu vodosnadbijevanja sa izraenim
gubicima vode. Izabrano je est lokacija za ovaj dio programa i to su:
- Dovodno distributivni cjevovod DN 300 na potezu Butila - Rajlovac
- Distributivni cjevovod DN 300 u ul. Safeta Zajke od ul. Smaje ikala do ul. A. Kuukalia
- Potisni cjevovod PS Alipain Most - PS Centar
- Distributivni cjevovod u ulici Demala Bijedia na potezu Halilovii Alije Kuukalia
- Distributivni cjevovodi u Zoni Skenderija, Podzona Marijin dvor
- Zona Bjelave
Kanalizaciona mrea grada Sarajeva je separatnog tipa iako na pojedinim podrujima egzistiraju
kanalizacioni kanali mjeovitog tipa. Nivo pokrivenosti podruja vodovodnim sitemom je znatno vei
od nivoa pokrivenosti podruja javnom gradskom kanalizacionom mreom. Trenutno stanje
kanalizacione mree zahtijeva rekonstrukciju iz vie razloga:
- Izgradnja kanalizacione mree do nivoa istovjetne pokrivenosti podruja koju ima vodovodni
sistem
- Izgradnja kanalizacione mree za nova naselja
- Razdvajanje postojeeg mjeovitog sistema kanalizacije u separatni tip kanalizacione mree
- Rekonstrukcija postojee kanalizacione mree iz razloga : starosti i dotrajalosti kanalizacionih
kanala, loeg cijevnog materijala i samih spojeva cijevi, nedovoljan profil kanalizacionih cijevi
(nedovoljan hidrauliki kapacitet), visok nivo infiltracije i eksfiltracije voda u kanalizacione
kanale i vanj njih. Ovim programom je samo malim djelom dat prijedlog rekonstrukcije
kanalizacione mree.
Ovim programom je samo malim djelom dat prijedlog rekonstrukcije kanalizacione mree. I to se
odnosi na Zonu Skenderija, Podzona Marijin dvor odnosno usaglaavanje sa rekonstrukcijom
vodovodne mree
Cjevovod DN 300 na potezu Butila - Rajlovac
Namjera projekta je izvoenje novog, na mjesto postojeeg dotrajalog (van upotrebe) postojeeg
livenoeljeznog cjevovoda DN 300. Na ovaj nain e se omoguiti isporuka potrebnih koliina vode
iz zone rez. Igman, odnosno PS Stup u dosadanju zonu rez. Mojmilo, odnosno naselja
Rajlovac, Zabre itd.
Rekonstrukcija ove dionice cjevovoda DN 300 od mosta na Miljacki (lokalitet Butila) pa sve do
Rajlovca uklapa se, po vaeoj urbanistiko provedbenoj regulativi, u konano rjeenje
vodosnadbijevanja gore navedenih prostora.
Postojei cjevovod od livenog eljeza je star tridesetak godina, te je zbog starosti i dotrajalosti cijevi,
spojeva, estih kvarova i curenja, naruena funkcionalnost i cjevovod iskljuen iz upotrebe (tabela 1.).
Tabela 1. Postojei cjevovod na potezu Butila-Rajlovac
Ulica
Profil (mm)
Materijal
Godina ugradnje
Butila-Rajlovac
100 L
1986
150 AC
1984
L
1986
300
1984
L
1987
Radni tim
Sarajevo, decembar2012. godine

Napomena
distributivna
ispust
ispust
distributivna
distributivna

Duina (m)
29,7
210,6
26,8
36,2
1850,1
7

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

80

1986

distributivna

Ukupno (m)

75,9
2229,4

Planira se izvoenje novog daktil cjevovoda DN 300 u duini cca 1950 m po postojeoj Trasi.
Prilog 1.

Postoji projektna dokumentacija na nivou Glavnog-izvedbenog projekta.


DN 300 ........................................... 1 950,0 m'
DN 150 ........................................... 200,0 m'
Procjena investicije za izvoenje ovih radova ................................................... cca 940.000,00 KM
Cjevovod DN 300 u ulici Safeta Zajke od ulice Smaje ikala do ulice Alije
Kuukalia
Namjera projekta je rekonstrukcija postojeeg cjevovoda od azbestcementa i livenog eljeza DN 200 i
DN 125, te je zbog starosti i dotrajalosti cijevi, spojeva, estih kvarova i curenja, naruena
funkcionalnost. (tabela 2.).
Tabela 2. Postojei cjevovod u ulici Safeta Zajke (na dionici Smaje ikala-Alije Kuukalia)
Ulica
Profil (mm) Materijal
Godina ugradnje Napomena
Duina (m)
SAFETA ZAJKE
125 AC
1982 Distributivna
256,3
200 AC
1980 Distributivna
929,0
L
1980 Distributivna
39,4
40 L
1984 Prikljuna
41,4
80 L
1983 Prikljuna
34,6
Ukupno (m)
1300,6

Planira se izvoenje novog daktil cjevovoda DN 300 u duini cca 1650 m i DN 80 u duini cca 60 m.
Prilog 2.

DN 300 ........................................... 1 650,0 m'


DN 80 .............................................
60,0 m'
Procjena investicije za izvoenje ovih radova ................................................... cca 800.000,00 KM
Cjevovod PS Alipain Most - PS Centar
Namjera ovog projekta je nastavak rekonstrukcije potisnog cjevovoda DN 500 Alipain most-Centar u
duini cca 3300 m. Radi se o liveno-eljeznom cjevovodu iz 1962 godine i sa aspekta
vodosnadbijevanja ini jedan od primarnih cjevovoda za snadbijevanje Grada.
cjevovod DN 500 ..........................................cca 3300,0 m'
Prilog 3.

Procjena investicije za izvoenje ovih radova ................................................ cca 1.980.000,00 KM


Cjevovod u ulici Demala Bijedia na potezu Halilovii Alije Kuukalia
Namjera projekta je rekonstrukcija postojeeg cjevovoda od livenog eljeza razliitih profila. Starost
postojeeg cjevovoda je oko 25 godina, te je zbog starosti i dotrajalosti cijevi, spojeva, estih kvarova
i curenja, naruena funkcionalnost. (tabela 3). Specifikacija postojeeg cjevovoda prikazana je u
tabeli 3.
Prilog 4.
Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Tabela 3. Postojei cjevovod u ulici Demala Bijedia (potez Halilovii - A. Kuukalia)


Ulica
Profil (mm) Materijal
Godina ugradnje Napomena
Duina
(m)
Demala Bijedia
100 L
Prikljuna
467,6
1984 Distributivna
140,4
Ispust
4,4
125 L
1983 Prikljuna
18,1
150 L
1984 Prikljuna
28,6
200 L
1984 Distributivna
198,8
300 L
1984 Distributivna
89,6
350 L
1984 Distributivna
1002,8
40 L
1984 Ispust
35,1
400 L
1984 Distributivna
291,3
80 L
1984 Prikljuna
259,2
np nm
1984 Prikljuna
19,6
Ukupno (m)
2555,5

Planira se izvoenje novog daktil cjevovoda DN 300 u duini cca 1400 m i DN 400 u duini cca 600
m.
DN 300 ........................................... 1 400,0 m'
DN 400 ............................................. 600,0 m'
Procjena investicije za izvoenje ovih radova ................................................... cca 930.000,00 KM
Zona Skenderija, Podzona Marijin dvor
Namjera projekta je rekonstrukcija postojeeg cjevovoda od livenog eljeza razliitih profila. Starost
postojeeg cjevovoda u planiranom obuhvatu kree se od 18 do 73 godina, te je zbog starosti i
dotrajalosti cijevi, spojeva, estih kvarova i curenja, naruena funkcionalnost. (tabela 4.). Specifikacija
postojeeg cjevovoda u navedenim ulicama prikazana je u tabeli 5. Prilog 5.
Spisak ulica koje se nalaze u planiranom obuhvatu rekonstrukcije cjevovoda vodovodne mree:
Fra Anela Zvizdovia, Vrbanja, Kotromania, Dr. Safeta Mujia, Hiseta, Valtera Peria, Turhanija,
oke Mazalia, Vrazova, Marala Tita, Dolina, Magribija, Augusta Brauna, Kranjevia, Terezija,
Herceg Stjepana, Maglajska, Kalmija Baruha, Hamida Dizdara, i Kralja Tvrtka.
Tabela 4. Pregled postojeeg cjevovoda u ulicama planiranim za rekonstrukciju vodovodne mree
Ulica
Profil Materijal
Godina ugradnje Napomena
Duina (m)
(mm)
Fra Anela Zvizdovia
100 L
1950 Distributivna
168,2
350 L
1980 Distributivna
230,9
Fra Anela Zvizdovia -Kralja
80 L
1955 Distributivna
62,8
Tvrtka
Ukupno (m)
461,9
Vrbanja
200 L
1974 Ispust
13,2
400 L
1971 Distributivna
45,1
1974 Distributivna
278,2
1979 Distributivna
54,8
1980 Distributivna
25,3
Ukupno (m)
416,5
Kotromania
40 L
1976 Prikljuna
33,3
60 L
1976 Prikljuna
16,7
80 L
1976 Prikljuna
446,4
100 L
1976 Distributivna
475,9
Ukupno (m)
972,4
Dr. Safeta Mujia
40 L
1935 Distributivna
89,7
Radni tim
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Ulica

Ukupno (m)
Hiseta
Hiseta-Vrbanja

Ukupno (m)
Valtera Peria

Ukupno (m)
Turhanija
Ukupno (m)
oke Mazalia
Ukupno (m)
Vrazova
Ukupno (m)
Marala Tita
Ukupno (m)
Dolina

Ukupno (m)
Magribija
Ukupno (m)
Augusta Brauna

Ukupno (m)
Kranjevia

Ukupno (m)
Terezija
Ukupno (m)
Herceg Stjepana
Ukupno (m)
Maglajska
Ukupno (m)
UKUPNO (m)

Profil
(mm)
100

Materijal

Godina ugradnje

Napomena

1970

Distributivna

400
60
80
100
200

L
L
L
L
L

1963
1935
1935
1955
1955

Distributivna
Prikljuna
Prikljuna
Distributivna
Distributivna

50
60
80
100

L
L
L
L

1935
1935
1935
1982

Prikljuna
Distributivna
Distributivna
Distributivna

100

1985

Distributivna

100

1935

Distributivna

100

1990

Distributivna

350

1962

Distributivna

40
60
80
100

L
L
L
L

1935
1935
1940
1970

Prikljuna
Distributivna
Distributivna
Distributivna

40
100

L
L

1935
1988

Distributivna
Distributivna

60
80
100

L
L
L

1960
1960
1965

Distributivna
Distributivna
Distributivna

60
80
150

L
L
L

1955
1955
1988

200

1988

Prikljuna
Prikljuna
Distributivna
Prikljuna
Distributivna

350

1971

Distributivna

60

1935

Distributivna

40
100

L
L

1935
1964

Prikljuna
Prikljuna

Duina (m)
31,0
120,7
417,7
197,2
59,4
108,8
161,9
945,0
3,8
106,4
68,7
61,6
240,5
47,1
47,1
90,4
90,4
129,8
129,8
622,1
622,1
20,2
34,8
138,3
30,1
223,4
121,0
90,3
211,3
83,0
28,9
46,2
158,2
7,1
37,7
47,2
44,6
438,1
574,6
699,2
699,2
86,3
86,3
11,7
26,4
38,1
6037,5 m

U ulicama Kralja Tvrtka i Hamida Dizdara izvrena je rekonstrukcija cjevovoda u 2007. i 2006 godini i
ugraen je daktilni cjevovod profila DN 100. U ulicama Kalmija Baruha i Maglajska nema poloenog
cjevovoda, te je za te ulice Regulacionim planom predviena izgradnja novog cjevovoda profila
DN100. U tabeli 5 dat je pregled planiranih profila, duina novog cjevovoda i procjena investicije po
gore navedenim ulicama.
Radni tim
Sarajevo, decembar2012. godine

10

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Tabela 5. Rekonstrukcija cjevovoda Zona Skenderija, podzona Marijin dvor


Ulica lokacija
Profil
Duina
Projektna
Procjena Napomena
predvienih radova
(mm)
(m)
dokum.
(KM)
Ulice fra Anela Zvizdovia
400
600 da
270000 Jedan dio uslovljen Alta Shoping
i Vrbanja
Centru.
(potez od ul.Terezije do ul.
Kranjevieva)
Ulica Kotromania
Ulica Dr. Safeta Mujia
Ulica Kalmija Baruha

150
200
100

510
130
95

da
da

Ulica Maglajska

100

70

da

16800

Ulica Hiseta

200
400

225
390

Da
da

74250
175500

Ulica Valtera Peria

100

200

da

48000

Ulica Hamida Dizdara


Ulica Turhanija

100
100

50

da

12000

Ulica oke Mazalia

100

90

da

21600

Ulica Vrazova

100

130

da

31200

Ulica Marala Tita


Ulica fra Anela Zvizdovia

400
100

540
140

da
da

243000
33600

Ulica Kralja Tvrtka

100

Ulica Dolina

100

200

da

50000

Ulica Magribija
Ulica Augusta Brauna
Ulica Kranjevieva

100
100
500
200
400

160
220
470
470
680

da
da
da

38400
52800
235000
155100
306000

Ulica Terezije

147900
42900
22800

Prema RP predviena izgradnja


novog cjevovoda u ovoj ulici.
Prema RP predviena izgradnja
novog cjevovoda.
Za cjevovod profila DN 200 mm
prema RP predvieno polaganje
novih 80 m cjevovoda,a ostali dio
rekonstrukcija.
Potez od ulice Vrazova do ulice
.Mazalia rekonstruisan.
Uraen Ductilni cjevovod.
U ostalom dijelu ulice izvrena
rekonstrukcija a prema RP za ovaj
dio ulice predvieno polaganje novog
cjevovoda.
U ostalom dijelu ulice izvrena
rekonstrukcija.
U ostalom dijelu ulice izvrena
rekonstrukcija.

Uraen Ductilni cjevovod.

da

Predloena u planovima
rekonstrukcije za 2008.godinu.

Prilog 5.

Procjena investicije za izvoenje ovih radova ................................................ cca 1.980.000,00 KM


Zona Bjelave
Namjera projekta je rekonstrukcija postojeeg cjevovoda od livenog eljeza razliitih profila. Starost
postojeeg cjevovoda u planiranom obuhvatu kree se od 18 do 73 godina, te je zbog starosti i
dotrajalosti cijevi, spojeva, estih kvarova i curenja, naruena funkcionalnost. (tabela 6.). Specifikacija
postojeeg cjevovoda u navedenim ulicama prikazana je u tabeli . Prilog 6.
Tabela 6. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Bjelave
Ulica
Postojee stanje
Potrebna
Materijal Duina rekonstrukcije
ABDESTHANA
Radni tim
Sarajevo, decembar2012. godine

VD

316,3

duina

Cijena (KM)

0
11

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Ulica

Postojee stanje
Materijal Duina

Potrebna
rekonstrukcije

ADEMOVIA

384,8

DN 100 mm, L=200 m


DN 400 mm, L=200 m

ALEKSE ANTIA
ALIJE ISAKOVICA
ARMAGANUA

KARPUZOVA

VD
L
L
nn
L
L
VD
L
L
nn
L
L
VD
L
VD
L
nn
VD
L
L
L
VD
L
L
PL
L
L
VD
L
VD
L
L
VD
L
L
nn
L
L
L
L
L
VD
L
VD
L
VD
VD
L
L

81,3
70,1
534,9
18,4
152,1
133,8
113,5
296,5
698,2
4,0
249,5
376,4
80,6
114,3
236,3
171,0
3,6
101,1
309,6
45,1
113,5
1,0
64,9
155,4
74,6
213,8
189,1
154,7
94,7
132,7
303,2
335,7
156,4
195,4
234,8
4,2
114,7
184,1
188,3
55,5
105,9
157,6
84,2
50,4
334,2
409,4
124,3
91,4
307,8

KASIMA EF. DOBRAE

309,6

BRAE ESKENAZI
BUKA
CURAK
ADORDINA
EKALUA
EMERLINA
DALMATINSKA
DOLA
DENETIA IKMA

DIDIKOVAC
DININA
EDHEMA MULABDIA
ENVERA OLAKOVIA
FADIL PAE ERIFOVIA
GABELINA
GLOINA
HADI IDRIZOVA
HADI SULEJMANOVA
HADI-KAJMAKOVA
HALILBAIA
HASANA KAIMIJE
HAZIMA ABANOVIA
HRGIA
IVANA CANKARA
JAGODICA
JAROSLAVA ERNIJA
JEKOVAC
JOSIPA TADLERA
JOSIPA VANCAA
KAPTOL

Radni tim
Sarajevo, decembar2012. godine

duina

Cijena (KM)

DN 100 mm, L=300 m


DN 200 mm, L=700 m

48.000
90.000
0
18.000
93.600
128.700
37.200
33.600
0
72.000
231.000

DN 150 mm, L=250 m


DN 100 mm, L=380 m
DN 100 mm, L=115 m

72.500
91.200
27.600

DN 100 mm, L=80 m

19.200

DN 100 mm, L=260 m

62.400

DN 100 mm, L=45 m


DN 100 mm, L=115 m
DN 100 mm, L=50 m

10.800
27.600
12.000

DN 100 mm, L=230 m

55.200

DN 100 mm, L=215 m


DN 100 mm, L=190 m
DN 100 mm, L=95 m

51.600
45.600
22.800

DN 100 mm, L=305 m

73.200

DN 100 mm, L=340 m


DN 200 mm, L=200 m

81.600
48.000

DN 100 mm, L=235 m

56.400

DN 100 mm, L=150 m


DN 100 mm, L=185 m
DN 150 mm, L=190 m
DN 100 mm, L=55 m
DN 100 mm, L=105 m
DN 100 mm, L=85 m

36.000
44.400
55.100
13.200
25.200
20.400

DN 150 mm, L=335 m

97.150

DN 150 mm, L=95 m

27.550

DN 400 mm, L=50 m


DN 100 mm, L=310 m
DN 400 mm, L=170 m

22.500
74.400
76.500

0
DN 100 mm, L=75 m
DN 100 mm, L=390 m
DN 200 mm, L=390 m
DN 100 mm, L=155 m
DN 100 mm, L=140 m
0

12

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Ulica

KEINA
KEVRIN POTOK
KOVAI
KOVAI IKMA
KRAULE
LOGAVINA
MARALA TITA
MEHMED BEGA
KAPETANOVIA LJUBUAKA
MEHMED PAE SOKOLOVIA
MEHMEDA HANDIA
MEHMEDA SPAHE
MEJTA
MEJTA-DALMATINSKA
MUSE AZIMA ATIA
NA VAROI
NADMLINI
NIKOLE KAIKOVIA
NIKOLIA IKMA
NIE BANJE
OAKTANUM
PATKE
PEHLIVANUA
PETRAKIJINA
PIRUA
POTOK
POTOKLINICA
PRIJEPOLJEVA
PRUAKOVA
R.JEKOVAC
RIZAHA STETIA
SAFET BEGA BAAGIA
SAGARDIJE
SARA ISMAILOVA

SEPETAREVAC
STAKE SKENDEROVE
IROKAC
TAHIA SOKAK
TINA UJEVICA
Radni tim
Sarajevo, decembar2012. godine

Postojee stanje
Materijal Duina

Potrebna
rekonstrukcije

duina

Cijena (KM)

nn
L
VD
L

3,1
378,7
242,7
328,3

DN 100 mm, L=145 m


DN 100 mm, L=380 m

34.800
91.200

L
VD
L
nn
VD
VD

38,8
175,6
347,3
2,1
100,3
96,6

DN 300 mm, L=245 m


DN 400 mm, L=70 m
DN 100 mm, L=40 m

90.650
31.500
9.600

DN 100 mm, L=350 m

84.000

DN 100 mm, L=70 m

16.800

L
VD
L
nn
VD
L
L
nn
L
L
VD
L
L
L
L
VD
L
VD
L
VD
VD
L
L
VD
VD
L
L
VD
L
nn
VD
VD
L
nn
VD
nn
VD
L
L
L
VD

69,5
303,4
253,5
2,8
121,9
264,0
121,5
4,2
69,7
271,8
87,7
202,9
114,5
63,0
53,0
526,4
119,4
355,8
92,1
221,0
121,6
167,5
297,3
79,3
81,3
147,8
174,1
209,1
873,4
16,1
477,1
1,7
188,6
2,7
123,2
9,3
46,4
54,3
228,7
17,6
157,5

DN 400 mm, L=135 m


DN 100 mm, L=85 m
DN 150 mm, L=265 m

60.750
20.400
76.850

DN 300 mm, L=110 m

40.700

DN 100 mm, L=70 m


DN 100 mm, L=275 m

16.800
66.000

DN 200 mm, L=205 m


DN 150 mm, L=115 m
DN 100 mm, L=65 m
DN 100 mm, L=55 m

67.650
33.350
15.600
13.200

DN 100 mm, L=120 m


DN 150 mm, L=95 m

28.800
27.550

DN 100 mm, L=170 m


DN 100 mm, L=300 m

40.800
72.000

DN 100 mm, L=150 m

36.000

DN 300 mm, L=175 m

64.750

DN 400 mm, L=195 m


DN 150 mm, L=455 m

87.750
131.950

DN 300 mm, L=245 m


DN 200 mm, L=125 m
DN 100 mm, L=235 m

90.650
41.250
56.400

DN 100 mm, L=55 m

13.200

DN 300 mm, L=230 m


DN 100 mm, L=50 m
DN 100 mm, L=125 m

85.100
12.000
30.000
13

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Ulica

Postojee stanje
Materijal Duina

TOROMANOVA
ULOMLJENICA
Potisni cjevovod od PS Centar
do rezervoara Bjelave
Distributivni cjevovod DN 400
mm od rezervoara Bjelave do
granice zone
ukupno

L
L
nn
L
nn
VD
L
L

125,6
425,0
9,9
83,8
3,2
661,0
435,0
180,0

Potrebna
rekonstrukcije

duina

DN 400 mm, L=210 m


DN 100 mm, L=125 m
DN 400 mm, L=60 m
DN 100 mm, L=50 m
DN 300 mm, L=1.100 m
DN 400 mm, L=180 m

19862,4

Cijena (KM)

94.500
30.000
27.000
12.000
407.000
81.000
4.241.750

Prilog 6.

Procjena investicije za izvoenje ovih radova .................................................. cca 4.241.750,00 KM


Rekonstrukcija kanalizacione mree u podzoni Marijin dvor
Ovim programom radova predvia se rekonstrukcija vodovodne mree, samim tim na predvienim
dionicama pojedinih ulica potrebno je izvriti i rekonstrukciju kanlizacionih kanala. Tako da se po
ovom osnovu za rekonstrukciju kanalizacionih kanala predlau slijedee ulice, kako je navedeno u
tabeli 7.
Tabela 7. Rekonstrukcija kanalizacionih kanala u zoni Skenderija, Podzona Marijin dvor
Ulica lokacija predvienih
radova
VRBANJA od ul. Kotromania
do ul Fra Anela Zvizdovia izgradnja fekalnog kanala
Ulica Kotromania- izgradnja
fekalnog kanala
Ulica Dr. Safeta Mujiaizgradnja separatne
kanalizacije
Ulica Kalmija Baruhaizgradnja separatne
kanalizacije
Ulica Maglajska- izgradnja
separatne kanalizacije
Ulica Hiseta

Profil
(mm)
400

Duina
(m)
170

Projektna
dokum.
ne

Procjena
(KM)
102.000

300

425

ne

217.600

300
300

124

ne

60.264

Prema R.P. uslovljeno Magrosu

300
300

85

40.970

Prema RP uslovljeno SEED


d.o.o.

300
300

61

ne

27.816

300

77

ne

39.424

300

180

ne

92.160

Prema RP predviena izgradnja


kanalizacije.
Nema potreba za izgradnjom
kanalizacione mree
Nema potreba za izgradnjom
kanalizacione mree
Nema potreba za izgradnjom
kanalizacione mree
Nema potreba za izgradnjom
kanalizacione mree
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini

ne

Ulica Valtera Peria


Ulica Hamida Dizdara
Ulica Turhanija
Ulica oke Mazaliaizgradnja fekalnog kanala
Ulica Vrazova- izgradnja
fekalnog kanala
Ulica Marala Tita
Ulica fra Anela Zvizdovia
Radni tim
Sarajevo, decembar2012. godine

Napomena
Prema R.P.104m uslovljeno
Magrosu.
-

Nema potreba za izgradnjom


kanalizacione mree
Nema potreba za izgradnjom
kanalizacione mree
14

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Ulica lokacija predvienih


radova
Ulica Kralja Tvrtka- izgradnja
fekalnog kanala
Ulica Dolina- izgradnja
fekalnog kanala
Ulica Magribija- izgradnja
fekalnog kanala
Ulica Augusta Braunaizgradnja fekalnog kanala
Ulica Kranjevieva
Ulica Terezije- izrada fekalnog
kanala

Profil
(mm)
300

Duina
(m)
88

Projektna
dokum.

Procjena
(KM)
45.056

300

150

ne

76.800

300

120

ne

61.140

300

82

ne

41.984

700

300

ne

340.000

Napomena
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini
Prema R.P. postojei mjeoviti
kanal se zadrava kao kini
Nema potreba za izgradnjom
kanalizacione mree

Procjena investicije za izvoenje ovih radova ................................................ cca 1.145.214,00 KM


UKUPNO 1.1. za 2013.g. ....................................................................................cca 12.016.964,00 KM

Radni tim
Sarajevo, decembar2012. godine

15

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

1.2. Rekonstrukcija vodovodne i kanalizacione mree za 2014.


Za 2013. godinu izabrane su kritine dionice cjevovoda koje je neophodno zamijeniti u to brem
roku. Planiranom dinamikom i na osnovu prioriteta, u periodu 2014. 2015.g. bi se vrila zamjena
cjevovoda u pojedinim zonama. Za 2014.g. Izabrane su zone vodosnabdjevanja sa najstarijim
cjevovodom:
- nastavak rekonstrukcije u zoni Skenderija
- zona Kovaii
- zona Hambina Carina
- zona Hrid
- zona Pogledine
Zona Skenderija
Tabela 8. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Skenderija
ULICA
ABADILUK

Profil
iz
GIS-a
100
150

ADILA GREBE
ALAJBEGOVIA
ALIPAINA

AILUK

BJELINA IKMA
BORAK
BRANILACA
SARAJEVA

Radni tim
Sarajevo, decembar2012. godine

100
150
400
200

45
5
195
445

4,2
33,0

80
80
100
60

PL
L
L
L
L
VAC
L
L
DI
L
L
L
L

14,6
28,9
46,2
83,0
2,5
4,3
46,5
80,9
133,3
68,7
25,8
5,1
467,4
40,2

pr.

6,7
9,7
92,7
136,1
65,1
108,5
3,5

pr.

60

L
DI
DI
DI
L
L
L

100
40

DI
L

19,7
25,0

60
100
150
100
100
200
100

BESARINA IKMAHOTEL DRINA


BISTRIK

Procjen
Procjena
Napomena
a
(KM)
(KM/m')
Rekonstrukcija e se vriti u toku izgradnje kamenih ploa

VD
L

BENTBAA

predvien
a Duina

100
100

BAZARDANI

Predvi
eni profil

17,6
44,6
48,0
76,6
42,3
4,5
190,1
440,8
2,4
115,9
34,2

100

BAARIJA

Duina
(m)

L
VD
L
VD
L
L
L
L
VD
L

100
80
150
400
200

AILUK VELIKI
AILUKKUNDURDILUK
AT MEJDAN
AUGUSTA BRAUNA

Materijal
iz GIS-a

80
100
150
200
100
2''

100

35

240
290
450
330

240

10800
1450
87750
146850
0
0
0

paral
cjevovod sa
DI 100 mm

0
8400

0
0
0
0
Rekonstrukcija e se vriti u toku izgradnje kamenih ploa

100

30

240

200
100

470
45

330
240

pr.

7200
0
155100
10800

pr.

0
0
0
0
15600
26400
0

pr.

0
0

100
100

65
110

240
240

16

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

BRANISLAVA
UREVA

Profil
iz
GIS-a
80
150
80

BRAVADILUK

BRODAC
EMALUA

IZMEDILUK
OBANIJA

UMURIJA MOST
DANIJELA OZME

L
L
L

71,0
72,0
191,6

200
40
100
60
100

DI
L
L
L
DI
L
L
L
DI
L
DI
L
PL
DI
DI
DI
DI
L
DI
L
L
DI
L
L
L
L
L
L
L
L
L
L

81,4
3,8
20,2
65,2
63,8
7,0
7,3
121,1
234,0
66,5
11,5
150,6
21,7
3,4
25,8
202,4
6,3
42,9
49,5
43,9
19,9
211,0
86,7
2,0
20,2
29,1
34,8
138,3
6,1
75,7
31,0
89,7
11,6
41,6

L
L
DI
DI
DI
DI
L
L
L
L
L
L
L

121,0
1,0
1,0
72,0
43,4
4,1
111,0
90,4
1,0
3,4
5,0
14,1
35,9
115,0
191,6

40
100
60
80
80
100
100
40
150
100

DOM LJILJANA
DR. SAFETA MUJIA
DUBROVAKA

DUGI SOKAK
DENETIA IKMA
DIDIKOVAC
DULAGINA
DULAGINA IKMA
OKE MAZALIA

60
100
100

80
100
100
150
80
200
80
150
100

UMURIJA

DESPIA
DOLINA

35,1
533,8
52,6

100
80
400
150
19
100
40

URILUK VELIKI

60
80
100
100
100
100

EDHEMA MULABDIA
EJUBA ADEMOVIA

100
200
100
150
400
5/2"

Radni tim
Sarajevo, decembar2012. godine

Duina
(m)

L
DI
L

UMURIJA
URILUK MALI

Materijal
iz GIS-a

Predvi
eni profil

predvien
a Duina

Procjen
a
(KM/m')

pr.
100

55

240

Procjena
(KM)

Napomena

0
0
13200

100
75
240
18000
100
75
240
18000
Rekonstrukcija e se vriti u toku izgradnje kamenih ploa

100
160

240

100
100

125
235

240
240

100

50

240

150

215

290

100

80

240

150

45

290

100

125

240

150
150
100

40
155
195

290
290
240

pr.

pr.

pr.

isp.
pr.

0
0
38400
0
0
0
0
30000
56400
0
0
0
0
0
0
0
0
0
12000
0
0
62350
0
0
0
0
0
0
0
19200
0
0
0
13050

30000
0
0
0
0
0
0
0
0
0
0
0
11600
44950
46800

promjena
prof. Zbog
pri. Banke

zona skend
zona skend
zon h. carina
17

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Profil
iz
GIS-a
500

EKMIA IKMA
FEHIMA EFENDIJE
URIA

16,0
16,4
172,1
21,3
35,4

L
L
L
L
DI
L
L
L
L

89,6
5,4
24,2
31,7
159,9
53,9
356,3
94,7
2,5

100

L
L
L
L
L
L
DI
L
L

3,0
34,5
152,0
218,9
10,2
21,8
97,2
234,4
15,2

80
400

L
L

62,8
54,8

300
150

L
DI

63,4
3,5

100

DI
L

143,0
55,0

L
DI
L
L
L
L
L
DI
DI
L
L

0,6
12,9
6,7
68,8
125,1
44,2
101,4
47,3
1,0
76,5
55,9
1,5

L
L
L
DI
L
L
DI
L
DI
L

7,9
31,0
51,5
172,0
32,8
159,8
233,4
185,3
151,4
657,2
14,5

100
60
40
80
150
100
150
200

FRA ANELA ZVIZDI


FRA ANELA
ZVIZDIA

150
400
100
350
100
80
150
FRA ANELA
ZVIZDIA-KRALJA
TVRTKA
FRA ANELA
ZVIZDIA-VRBANJA
GAJEV TRG
GAZI HUSREVBEGOVA

GIMNAZIJSKA

100
80
300
150
80
40
100
100
100
400

GORUA
HADI DAMJANOVA
HADI IDRIZOVA
HADIRISTIA
HALAI
HAMDIJE
KREEVLJAKOVIA
-

50
40
150
80
300
200
100
Radni tim
Sarajevo, decembar2012. godine

Duina
(m)

DI
L
L
L

40
80

FERHADIJA

Materijal
iz GIS-a

Predvi
eni profil

predvien
a Duina

500
500
500
100

20
20
175
25

Procjen
a
(KM/m')
520
520
520
240

100

90

240

21600

100
100

25
50

240
240

150
150
prik UNITIK-a

55
360

290
290

6000
12000
0
15950
104400
0
0

pr.

Procjena
(KM)

Napomena

10400
10400
91000
6000
0

pr.

izm profila

0
0
0
0
0
0
0
0
0

UNITIK
UNITIK
UNITIK
UNITIK

0
0
300

65

370

0
0

poploa
no
pr
pr
100
300
150
100
100

70
130
45
105
50

240
370
290
240
240

100

60

240

100
150

55
175

240
290

300

235

370

300

155

370

pr

pr

24050
0

0
0
0
16800
48100
13050
25200
12000
0
0
14400
0
0
0
13200
50750
0
0
86950
0
57350
0
0

izm profila

18

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA
HAMDIJE
KREEVLJAKOVIAUMURIJA MOST
HAMIDA DIZDARA
HAMZA HUME
HAMZE HUME

Profil
iz
GIS-a
300

Materijal
iz GIS-a
L

53,7

DI
L
L
L
DI
-

10,2
44,4
3,0
2,6
72,7
148,9
157,8
5,0

89,9
29,1

0
0

L
DI
L
L
L
L
L
DI
L
L
DI
L
L
L
L
L
DI
DI
DI
L
L
L
L
L
L
L
L
L
DI
L
L
L
DI
L
DI
L
L
L
L
DI
L

54,5
136,8
3,3
83,0
1,8
417,7
26,4
1,3
2,5
178,6
4,5
1,0
77,9
4,9
6,3
10,6
141,6
2,7
78,0
60,5
70,6
91,7
13,2
224,9
338,4
6,0
16,7
33,3
446,4
475,9
5,4
65,8
0,8
12,0
21,7
1,0
8,8
229,8
7,1
8,5
30,5
91,7
380,6
39,1
26,5

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
34800
1450
0
0
0
22800
0
54000
112200
0
0
0
0
0
0
0
1850
5550
8250
0
0
0
0
0
0
0
0
0
0

100
400
350
400
300

HAMZE HUMEALIPAINA

300
400

HAMZE HUME-MOST
SKENDERIJA
HASANA KIKIA
HERCEG STJEPANA
HISETA
HISETA-MAGLAJSKA
ISEVIA SOKAK
JADRANSKA

100
350
60
400
100
100
100

JAROSLAVA ERNIJA
JELIA
JEZERO

100
100
50
80
60
100
150
100
100
100
60
40
100
200

KAPTOL
KAZANDILUK
KAZAZI
KEMAL BEGOVA
KONAK
KOEVO
KOTROMANIA

60
40
80
100
80
100
300
250
200
100
60
100
60

KOTUROVA
KOVAI

KRAULE
KRALJA TVRTKA
KRANJEVIA
-

KUJUNDILUK MALI
KULOVIA
Radni tim
Sarajevo, decembar2012. godine

80
150
200
100
40

Duina
(m)

Predvi
eni profil
300

400

predvien
a Duina
55

Procjen
a
(KM/m')
370

450

pr

pr
pr
pr
100
150

145
5

240
290

100

95

240

100
200

225
340

240
330

300
300
200

5
15
25

370
370
330

pr

pr

Procjena
(KM)

Napomena

20350

0
0
2250
0
0
0
0
0

19

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Profil
iz
GIS-a
100

KUNDURDILUK

MAGLAJSKA
MAGRIBIJA

MARALA TITA

300
100

1,0

150
40
80
300
250
80
200

L
L
L
L
L
L
L

1,5
4,9
36,0
39,9
47,1
758,5
51,8
68,6

100
200
60

DI
L
L

1,0
1,0
40,4

300
200
100

100
200
400
200
350
500
250
100
100

MUHAMEDA
KANTARDIA
MULA MUSTAFE
BAESKIJE
-

MUSALA
MUSTAJ PAIN
MEJDAN
NA VAROI
NADMLINI
NOVA
Radni tim
Sarajevo, decembar2012. godine

Napomena

44,2
7,1
204,5
159,7
3,4
4,4
15,5
28,2
35,3
2,6
280,1
41,6
91,4
17,9
100,3

200
100

MUDELETI MALI
MUDELETI VELIKI

Procjena
(KM)

DI
DI
L

L
L

DI
DI
L
L

60
40
80

MOST SKENDERIJA

Procjen
a
(KM/m')

168,3
17,5
233,3
36,2
49,9
11,7
90,3
117,8
11,6
43,9
15,4
622,1
5,1
9,6
15,8
16,1
82,4
102,0
410,0
21,9
670,6
53,2
23,5
1,0

MEHMED BEGA
KAPETANOVIA
LJUBUAKA
MIS IRBINA

predvien
a Duina

DI
L
L
DI
L
L
L
L
DI
L
L
L
L
L
DI
L
L
DI
L
L
DI
L
L

40
100
40
100
80
40
350

MALI BRAVADILUK

Predvi
eni profil

239,1
8,0
13,6

150
40
80
100

LULEDINA

Duina
(m)

DI
L
L

13

LA BENEVOLENCIJA

Materijal
iz GIS-a

0
0
0

?
poplan
o
pr
100

235

240

100

50

240

100

45

240

100

45

240

200

160

330

0
0
56400
0
12000
0
0
0
0
10800
0
0
0
0
0
0
0
0
0
0
0
0
0
0

10800
0
0
52800
0
0
0
0
0
0
0
0
0
0
0

100

40

240

200
200
100
200

50
760
55
70

330
330
240
330

0
0
9600
0
16500
250800
13200
23100

200
100

1
50

330
240

0
330
12000

izm prof
izm. Prof.

20

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

OBALA ISA-BEGA
ISAKOVIA

Profil
iz
GIS-a
80
-

DI
L
DI
L
DI
L
L
L
L
L

L
L

3,4
12,7
151,5
45,2
526,9
9,8
9,2
16,2
56,3
436,0
449,5
73,9
850,3
13,0

DI
L
DI
L
DI
L
DI
DI
L

41,4
289,0
85,9
6,9
27,3
98,4
120,3
0,9
5,2

n.m
AC

18,8
110,1
471,2

200
150
100
200
80

L
DI
DI
DI
L
-

3,7
22,4
4,8
10,1
159,7
8,0

nema

80
40
100
350

L
L
L
L

15,0
21,2
203,1
223,1

pr
pr

200

279,1

100

2,1

250

27,1

100

DI

113,9

80
150
100
100
100
65
80

L
L
DI
DI
DI
PL
L

2,0
99,2
122,7
196,2
31,2
96,0
4,0
7,6

150
40
100
200
300
400
80
100
OPRKANJ
PEHLIVANUA
PODGAJ
PROTE BAKOVIA
PRUAKOVA
PS ALIPAIN MOSTR.CENTAR
PS CENTAR
R.SKENDERIJATEREZIJA
RADIEVA

100
150
80
100
100
100
200
n.p.
400
600

RADIEVA

REISA DEMALUDINA
AUEVIA

SAFET BEGA
BAAGIA
SAGARDIJE-SAFET
BEGA BAAGIA
SALIHA
HADIHUSEJNOVIA
SARAI

SAVE SKARIA
SAVE KARIA
SIME MILUTINOVIA
SKENDER PAINA
Radni tim
Sarajevo, decembar2012. godine

Predvi
eni profil

88,9
7,9

200

OBALA MAKA
DIZDARA

Duina
(m)

L
-

100

OBALA KULINA BANA

Materijal
iz GIS-a

100

predvien
a Duina
90

Procjen
a
(KM/m')
240

200

50

330

150

10

290

300
300
400
400

440
450
75
855

370
370
450
450

100

440

240

150

10

290

100

100

240

400
600

1150
475

450
570

100

160

240

Procjena
(KM)

Napomena

21600
0
0
0
0
16500
0
2900
0
0
0
162800
166500
33750
384750
0
0
105600
0
2900
0
24000
0
0
0
0
517500
270750
0
0
0
0
38400
0

100
300

205
225

240
370

0
0
49200
83250

200

280

330

92400

paral.
Cjevod
paral.
Cjevod

0
200

30

330

9900
0

poplo
poplo
poplo

pr
pr

0
0
0
0
0
0
0
0
21

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

SKENDERIJA

SKENDERIJA IKMA
SOUKBUNAR

STOLAKA

EHER-EHAJINA
IKMA
EHERIJA MOST

Profil
iz
GIS-a
100
60
65
150
200
100
300
40
300
150
200
300
500
40
6/4"

TELALI
TELIROVIA

TEPEBAINA
TEREZIJA

200

60

Radni tim
Sarajevo, decembar2012. godine

predvien
a Duina

Procjen
a
(KM/m')

Procjena
(KM)

155

240

200

10

330

100

70

240

100
300

60
90

240
370

150
200
300
500

6
90
110
185

290
330
370
520

100

165

240

0
37200
0
0
3300
0
16800
0
14400
33300
0
1740
29700
40700
96200
0
39600

339,8

200

340

330

112200

61,6

100

65

240

15600

L
L
L
L
L
L
L
L
L
L
DI
L
L
DI
L
L
L

DI
L

L
L

2,7
12,7
55,4
165,2
108,8
21,4
49,8
68,7
2,6
22,3
72,1
198,1
223,2
2,7
59,9
165,3
76,2
12,6
12,8
14,7
92,1
103,5
128,2
135,1
206,8
693,7
4,5

100
200
100
100
100
100
100
100
100
200

15
60
245
110
25
50
70
5
25
75

240
330
240
240
240
240
240
240
240
330

200

225

330

100

60

240

150

80

290

29,4
67,6
3,8
2,0
79,4
77,9

100

70

240

100

L
L
DI
L
L

100
100

80
80

240
240

100
100
50

L
L
L

97,9
47,1
3,8

100

100

240

125
100
150
80
150
400
100
200
700
500
350
350
300
40
100

TRG FRA GRGE


MATIA
TRGOVKE
TURHANIJA
VALTERA PERIA

Predvi
eni profil
100

TEREZIJA-ISPUST
MILJACKA
TODORA VRAKIA
TOPLIK

82,8
152,1
4,0
4,7
8,5
11,3
68,7
625,7
59,8
88,2
1,6
5,7
88,9
105,2
182,2
16,9
162,7

100
200
100
100
100
80
80
60
40
200
100
200

TABANICA
TEKIJA

Duina
(m)

DI
L
PL
DI
L
L
DI
L

L
L
L
L
L
L

ENOINA
TROSMAJROVA
TABACI

Materijal
iz GIS-a

pr

pr

0
3600
19800
58800
26400
6000
12000
16800
1200
6000
24750
0
74250
0
14400
0
23200
0
0
0
0
0
0
0
0
0
0

Napomena

paral.
Cjevod
paral.
Cjevod

izm profila

0
16800
0
0
19200
19200
24000
0
0
22

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

VELIKI ALIFAKOVAC
VLADISLAVA KARIA
VRAZOVA
VRBANJA
ZELENIH BERETKI

Profil
iz
GIS-a
100
80
60
350
200
100
100
400
60
80
40
125
150

UKUPNO

Materijal
iz GIS-a

Duina
(m)

L
L
L
L
L
DI

61,6
68,7
106,4
10,9
17,8
113,3

L
L
L
L
L
L
DI

129,8
1,0
0,5
7,1
8,8
16,7
144,3
314,8
32454,1

Predvi
eni profil

predvien
a Duina

300
200

15
20

Procjen
a
(KM/m')

370
330

pr
pr
100
150

20
145

240
290

Procjena
(KM)

Napomena

0
0
0
5550
6600
0
0
0
0
0
0
4800
42050
0
5104570

U zoni Skenderija planirano je za zamjenu 15482 m cjevovoda.


Prilog 7.

Procjena investicije za izvoenje ovih radova ................................................ cca 5.104.570,00 KM

Radni tim
Sarajevo, decembar2012. godine

23

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Zona Kovaii
Tabela 9. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Kovaii
Ulica

Postojee stanje iz GIS-a


Prenik

BLEDSKA

DERVIA NUMIA

EMERIKA BLUMA

Materijal

Duina

DI

43,769

80

34,901

100

253,927

200

23,819

DN 200 mm, L=25 m

8.250

150

238,361

DN 150 mm, L=240 m

69.600

60

56,582

80

107,555

DI

8,701

DN 100 mm, L=290 m

69.600

DI

167,378

126,217

GABRIJELE MORENO LOCATELLI

100

DI

143,802

GORNJO VAKUFSKA

400

121,36

60

54,589

100

DI

143,727

100

73,721

300

3,181

400

609,183

NEVESINJSKA

100

DI

209,84

PS KOVAII

350

24,449

12,754

200

59,804

350

85,228

(blank)

29,647

LJUBLJANSKA

R.KOVAII
(blank)
RADNIKA

40

6,075

50

12,797

60

38,861

80

72,828

PL

19,557

100

323,923

125

24,746

200

400

Radni tim
Sarajevo, decembar2012. godine

69.600

DN 400 mm, L=125 m

56.250

DN 100 mm, L=55 m

13.200

DN 100 mm, L=75 m

18.000

DN 400 mm, L=610 m

274.500
0

770,872

DN 200 mm, L=770 m

254.100

13,484

DN 400 mm, L=15 m

PL

161,398

19,172

60

238,339

80

205,454

6.750

DI

47,244

286,904

DI

89,151

125

40,686

150

47,027

DN 150 mm, L=50 m

9.500

200

42,978

DN 200 mm, L=45 m

14.850

300

171,218

93,416

DN 300 mm, L=265 m

98.050

DN 100 mm, L=135 m

32.400

DN 150 mm, L=135 m

39.150

(blank)

TRNOVSKA

DN 100 mm, L=290 m

163.200

100

AIRA SIKIRIA

DN 100 mm, L=680 m

2"
SPLITSKA

Cijena (KM)

100

100

IVANA GORANA KOVAIA

Potrebna duina i
profil rekonstrukcije

(blank)

186.000

11,83

40

106,245

100

26,415

150

DN 100 mm, L=775 m

DI

18,62

133,464

24

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Postojee stanje iz GIS-a

Ulica

Prenik
VISOKA
VRELO KOVAII
ZAGREBAKA

Materijal

Potrebna duina i
profil rekonstrukcije

Duina

60

79,696

80

34,607

150

87,021

40

13,46

80

77,578

100

159,338

200

AC

75,9

6,245

Ukupno

Cijena (KM)

DN 100 mm, L=115 m

27.600

DN 100 mm, L=330 m

79.200

6190,352

1.489.800

U zoni Kovaii planirano je za zamjenu 5025 m cjevovoda.


Prilog 8.
Procjena investicije za izvoenje ovih radova ................................................ cca 1.489.800,00 KM
Zona Hrid
Tabela 10. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Hrid
ULICA
ALIFAKOVAC

BISTRIK

Materij
al iz
GIS-a
DI
L

AC
DI

Profil
iz GISa
100
40
125
350
80
80
100
200
80
150
200

Duina (m)
72,682
14,641
105,867
139,358
88,167
64,816
7,314
456,124
69,31
2
60,172

Predvie
ni profil

predvie
na
Duina

Procjena
(KM/m')

Procje
na
(KM)

100
150
300
100

15
110
140
90

240
290
370
240

100

70

240

200

65

330

3600
31900
51800
21600
0
0
0
16800
0
21450

100

290

240

69600

100

35

240

100
200

50
45

240
330

BISTRIK BASAMACI

100

286,847

BISTRIK MEDRESA

DI
L
DI

100
100
80
100
100
200
(blank)

298,432
32,743
85,398
153,979
47,044
42,376
2,322

L
DI

100
150

101,646
149,734

100

105

240

25200
0

100
150
200

78,313
262,869
70,593

150
150
200

80
265
75

290
290
290

23200
76850
21750

97,505

100

100

240

24000

BISTRIK POTOK

L
(blank)
BISTRIK POTOKBISTIK
BASAMACI
GARAPLINA

6/4"

HAZIMA IBRAHIMA TREBINJCA

HENDINA
Radni tim
Sarajevo, decembar2012. godine

Napomena

Cijevovodi
su paralelni

0
8400
0
0
12000
14850
0

200

108,748

200

110

290

31900

350
80

84,171
39,956

300
100

85
40

370
240

31450
9600

izmjena
profila

izmjena
profila

izmjena
profila

25

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Materij
al iz
GIS-a

240

19200

150
60
80
150
100
(blank)
200

42,66
72,08
211,861
63,264
145,728
5,655
135,192

150
100
100
150
100

175
75
215
65
145

290
240
240
290
240

200

140

330

50750
18000
51600
18850
34800
0
46200

350

167,235

400

170

450

76500

200
150
(blank)

4,252
137,836
9,523

200

450

2250
0
0

100
100
60

2
2,059
109,475

100

240

1200
0

80

169,049

125

130

150

130

290

350
(blank)

130
1,783

300

130

370

350
6/4"
6/4"
100
100
350

103,99
2,409
2,357
312,818
131,495
39,488

300
?
?

105

370

100
400

135
50

240
450

L
DI
L

350
100
100
3/4''

126,116
89,06
46,626
86,519

400

130

450

100
100

50
90

240
240

DI
L

100
100
350
6/4"
150
40

101,246
17,966
49,568
125,701
1
28,4

100
300
100

20
50
130

240
370
240

100

30

240

IZA HRIDA

IZA HRIDA-HAZIMA IBRAHIMA


TREBINJCA

IZA HRIDA-KAMENICA
JEDILERI

L
DI
(blank)

KAMENICA
KONAK
MAGUDA

L
L
L

VELIKI ALIFAKOVAC

ZA BEGLUKOM
BALIBEGOVIA

Procje
na
(KM)

80

L
(blank)
L

R.HRIDA-IZA HRIDA
TOPLIK

Procjena
(KM/m')

100

HULUSINA

R.HRID

predvie
na
Duina

206,578

PODCARINA

Duina (m)

Predvie
ni profil

100

HRVATIN

MEGARA IKMA

Profil
iz GISa

(blank)
L

VP
DI
L
L

PL
DI
L

58500
0
12000
21600
0
4800
18500
31200
0
7200

82,29
4

200

125

330

200

365,771

200

370

330

41250
0
12210
0

AVDAGE AHINAGIA

DI

BRDO DAMIJA

100
200
100
200

56,684
253,339
82,953
11,863

100
200

85
15

240
330

0
0
20400
4950

121,795
126,761

100
100

125
130

240
240

30000
31200

Sarajevo, decembar2012. godine

L
L

5/4"
1"

2 m ulazi u
zonu

38850
0
0
0
32400
22500

200
150

HENDINA-BUDAK
ALIJE BEJTIA
Radni tim

izmjena
profila

dati profili
neodgovara
ju profilima
u GIS-u
provj prof.
Cjevi
provj prof.
Cjevi

DI

HUREMUA

Napomena
izmjena
duine
izmjena
duine

duina u
tabeli nije
ista ko u
GOS-u

26

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Materij
al iz
GIS-a

HOIN BRIJEG
ISEVIA SOKAK

L
L

BAKAREVIA

FRANJEVAKA

(blank)
L

Profil
iz GISa
3/4''
40
60
100
13
40
80

Duina (m)
35,102
1
15,609
268,941
34,604
75,067
57,707

150
(blank)
60

368,441
3,991
27,43

100

125

39,446

200
100
(blank)
80
(blank)
40

567,4
144,997
11,173
166,422
3,522
60,411

BABIA BATA
TELIROVIA

125

55,917

DEMALA ELIA

40
125
350

39,823
8,935
132,883

6/4"
L

60
80

Procjena
(KM/m')
240

100
100
pr.
100
100

15
270

240
240

75
60

240
240

150

370

290

100

30

240

20,462

PL
(blank)
L
(blank)
L

BUDAK

predvie
na
Duina
35

Predvie
ni profil
100

38,995
110
24

40

240

200
?

570

330

100

170

240

100

65

240

9600
18810
0
0
0
40800
0
15600

100
dati
profili
neodgov
araju
prema
podacim
a gisa
Gis100
100

60

240

14400

110
25

240
240

6/4"

138,868

100

140

240

BISTRIK DAMIJA
ELJIGOVII

DI
L

100
80
100
150
(blank)

96,447
140
183,676
210,565
1,246

100
100
150

140
185
215

240
240
290

100

185,423

MEHMEDA MUJEZINOVIA

DI
L

MUHAMEDA ENVERI KADIA

DI
(blank)

BISTRIK GORNJA IKMA


BRAE MORI
MAGUDA IKMA

DI
L
L

ukupno

paralelni
cjevovod sa
DN 200 mm
paralelni
cjevovod sa
DN 200 mm

izmjena
profila

0
26400
6000

33600

ulica je
Muje
Hrnjice

0
44400
62350
0
0

100

12,211

80
(blank)

148,895
5,946

0
0

80
100
40

32,997
184,066
57,98
10471,9

Napomena

0
0
0

MEHMEDA TIMURANOVAELJIGOVII

(blank)

Procje
na
(KM)
8400
0
3600
64800
0
18000
14400
10730
0
0
7200

100
100

185
60

240
240

na mjestu
postoji
bajpas

0
44400
14400
20365
00

U zoni Hrid planirano je za zamjenu 7565 m cjevovoda.


Prilog 9.
Radni tim
Sarajevo, decembar2012. godine

27

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Procjena investicije za izvoenje ovih radova ................................................ cca 2.036.500,00 KM


Zona Pogledine
Tabela 11. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Pogledine
ULICA

Materij
al iz
GIS-a

BEGOVAC

DI

Profil iz
GIS-a

Duina
(m)

Predvieni
profil

100

68,761

200

39,131

60

63,816

100

350

120,637

u toku izv.

predviena
Duina

Procjena
(KM/m')

Procjena
(KM)

65

240

15600
0

BISTRIK

100

61,93

100

65

240

15600

BJELAVICA

80

156,167

100

160

240

38400

100

30,918

100

35

240

8400

BRAJKOVAC

HAMBINA CARINA

DI

DI
----

100

82,343

400

420,941

100

3,536

400

115,583

3,841

0
0

----

IZA GAJA

100

KAMENICA

DI

100

149,161

100

477,082

100

480

240

115200

6/4"

118,462

100

120

240

28800

6/4"

188,101

100

190

240

45600

PL
KOMATIN

KRKA

DI

100

84,076

80

131,078

100

135

240

32400

0
100

240

240

57600

100

237,173

DI

100

17,373

100

499,758

100

500

240

120000

69,355

100

70

240

16800

100

80

240

19200

2''

KURTIN SOKAK

100

79,632

LIPE

DI

100

50,075

100

201,677

MAHMUTOVAC

DI

100

101,919

NALINA

DI

150

188,317

100

15,382

100

15

240

3600

150

308,844

150

310

290

89900

100

41,715

200

33,684

80

202,43

100

350

147,287

u toku izv.

3/4''

51,52

100

----

4,331

44,217

PAJE

DI
L

---PAJE MALTA

PAJE MALTA-NALINA
Radni tim
Sarajevo, decembar2012. godine

0
100

200

51,897

200

350

410,082

u toku izv.

87,667

5/4"
6/4"

100

240

49200

205

240

49200
0

55

240

13200

55

330

18150

100

90

240

21600

52,18

100

55

240

13200

11,866

100

15

240

3600

15,838

prelaz

100

205

DI

3/4''

Napomena

28

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Materij
al iz
GIS-a

Profil iz
GIS-a
200

R.HAMBINA CARINA

R.HRID

R.HRID-NALINA

R.KOMATIN

R.POGLEDINE
SUTORINSKA

TANDAREVA

350
1"

Duina
(m)

Predvieni
profil

predviena
Duina

Procjena
(KM/m')

386,586

Procjena
(KM)

28,615

128,929

100

130

240

31200

100

284,314

100

285

240

68400

100

9,222

100

10

240

2400

350

67,991

u toku izv.

DI

100

69,243

400

71,567

100

74,721

150

124,354

100

34,93

100

DI

TOKA

BOGUEVAC

0
40

240

9600

80

33,4

100

35

240

8400

100

116,489

100

120

240

28800

350

174,507

u toku izv.
100

145

240

34800

100

565

240

135600

2''

140,29

----

----

2,023

MOILA

2''

TRIVODE

DI

150

31,062

100

718,148

100

720

240

172800

2"

158,455

160

240

38400

3/4''

130,119

100
paral sa
100

MALI KAANIK

560,279

0
0

DI

150

55,42

100

201,722

100

205

240

49200

VELIKI KAANIK

150

176,441

150

180

290

52200

HOIN BRIJEG

DI

150

175,216

40

158,302

100

170

240

40800

100

212,165

100

215

240

51600

150

247,558

150
paral sa
100

250

290

72500

1"
MALA BERKUA

DI

163,203

80

18,728

100

5,442

80

216,331

100

220

240

52800

JAREDOLI

100

241,608

100

245

240

58800

DEKA

100

185,622

100

190

240

45600

350

475,849

u toku izv.

186,619

100

190

240

45600

6/4"
----

----

0
0

DI

100

47,824

HOIN BRIJEG-TRIVODE

100

212,937

BERKUA MALA-BERKUA
VELIKA

DI

100

120,1

Radni tim
Sarajevo, decembar2012. godine

13,11

R.KOMATIN-BOSTARII

Napomena

100

215

240

51600

29

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

ULICA

Materij
al iz
GIS-a

Profil iz
GIS-a

VELIKA BERKUA

MOILA-KOZIJA UPRIJA

BOSTARII

DI

TRIVODE-HOIN BRIJEG

HADIBAJRIA

BERKUA MALA

DI

BERKUA VELIKA
ukupno

DI

Duina
(m)

Predvieni
profil

predviena
Duina

Procjena
(KM/m')

Procjena
(KM)

80

64,15

100

65

240

15600

200

47,982

200

50

330

16500

80

25,17

100

25

240

6000

528,487

100

530

240

127200

2''
100

3/4''

Napomena

203,536

100

205

240

49200

40

91,672

100

100

240

24000

100

124,622

400

105,571

100

128,499

400

131,05

13153,963

2064850

U zoni Pogledine planirano je za zamjenu 8410 m cjevovoda.


Prilog 10.
Procjena investicije za izvoenje ovih radova ................................................ cca 2.064.850,00 KM

Radni tim
Sarajevo, decembar2012. godine

30

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Zona Kovaii, kanalizaciona mrea


Tabela 12. Kanalizaciona mrea u zoni Kovaii
Naziv ulice
Banjaluka
LD 207,185 d,
186c
Borak
LD 186c
Dervia Numia
LD 186C,208 a,
208,207,
Emerika Bluma
LD 186 D
Gornjo Vakufska
LD 208,208a
Ivana Gorana Kovaia
LD 187a,166b
Ljubljanska
LD 186d,b,187a,
166c
Radnika
LD 186c,d,208

Splitska
LD 186b,d,

aira Sikiria
LD186d
Trnovska
LD 186 b
Visoka
LD 187a

Postojei cjevovod
MB-300mm L=75 m
FK 150 mm L=45 m

Potreba za izgradnju
nove kanalizacije

Procjena kotanja
68.300,00

F =45m 300mm
K= 120m 300mm
F =121 m 300mm
K =121 m 300mm

83.006.00

FB-300 L=608
MB-500 L=575
MB-750 L=193
FK-250 L=163 m

-----------------------K= 163m 300 mm

-----------------81.500,00

MB- 300 L= 380m


MK 200 L= 75m

F = 450m 300mm
K = 450m 300mm

308.700,00
99.470,00

MK-250 L=145m

F = 145m 300mm
K =145m 300mm

MB-250 L=121

FB-300 L=573M
AB-800 L=231m
AB-600 L=151 m
AB-400 L=211 m
FB-300 L=488M
MB 90110 L=139m
AB-1000 L=179m
AB-500 L=25m
AB-300 L=83 m
FK-250 L=260m
FB-300 L=50 m
AB-300 L=68m
MB-500 L=100m
ACC-400 L=469m
AB-400 L=294m
MK-200 L=196
FK-200 L=196m
FK-300 L=88m
AB-300 L=40m
FK-300 L=141m
ACC-200 L=40m
ACC-300 L=48m
ACC-500 L=25m
MK-250 L=56m

----------------------F =350 m 300 mm


K =350 m 300 mm

Projektna
dok.
DA / NE
NE

NE

-------NE

NE
NE
-------------------

--------

240.100,00

NE

268.360,00

NE

K = 220 m 300mm
F = 220m 300 mm

150.920,00

NE

K =35 m 300mm

17.500,00

F =440 m 300 mm
K =260 m 300mm

F= 56m 300mm
K = 56m 300mm

NE
38.416,00

NE

Procjena investicije za izvoenje ovih radova .................................................cca 1.273.266,00 KM


UKUPNO 1.2. za 2014.g......................................................................................cca 11.968.986,00 KM

Radni tim
Sarajevo, decembar2012. godine

31

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

1.3. Rekonstrukcija vodovodne i kanalizacione mree za 2015.


Za 2015.g. izabrana je rekonstrukcija vodovodne i kanalizacione mree u zoni Hambina Carina.
Zona Hambina Carina, vodovodna mrea
Tabela 13. Rekonstrukcija cjevovoda u zoni vodosnabdjevanja Hambina Carina
Postojee stanje iz GIS-a
Ulica
BALIBEGOVIA

BISTRIK

Prenik
DI
L
DI
L

BISTRIK BRIJEG
BISTRIK-TOKA

DI
L

BJELAVICA
BORAK

L
L

BRDO DAMIJA

BRDO SOKAK
CICIN HAN

L
L

OBANIJA
DEBELO BRDO

(blank)
L
L

Materijal
100
200
80
150
100
150
200
80
100
200
300
80
2''
6/4"
100
200
40
80
80
100
200
300
80
(blank)
100
100
2''
80

Duina iz
GIS-a
3,694
2
290,866
69,798
2
130,071
23,15
1,028
281,838
1,968
42,075
38,186
0,371
344,874
100,85
39,268
163,896
98,752
89,034
4,683
402,968
263,08
481,895
9,407
79,893
95,186
98,247
140,302

Potrebna duina i
profil rekonstrukcije

DEBELO BRDO-PORODICE FOHT


DR. JUSUFA TANOVIA
FIRDUZBEGOVA

L
AC
DI

80
80
100

22,206
222,693
424,094

GABRIJELE MORENO LOCATELLI


GOLODERICA

DI
DI
L
L
DI
DI
L
(blank)

100
100
100
40
100
300
300

332,381
103,1
126,421
54,547
210,388
290,076
67,768
2,172
197,261
1,598
289,73
60,775
166,352
191,256
6,834
194,012
204,633

GRLICA
HADIABDNICA
HAMBINA CARINA

HAMBINA CARINA-CICIN HAN


HAMIDA DIZDARA

HARISA OSMANOVIA
HUREMUA
IZA BAA
IZA HRIDA
Radni tim
Sarajevo, decembar2012. godine

L
DI
DI
L
L

(blank)
300
100
300
40
80
150
100
150
200

Cijena (KM)

DN 100 mm, L=295 m

70.800

DN 150 mm, L=135 m


DN 200 mm, L=25 m

39.150
8.250

DN 300 mm, L=45 m


DN 100 mm, L=40 m

16.650
9.600

DN 100 mm, L=350 m

84.000

DN 100 mm, L=365 m


DN 200 mm, L=40 m

87.600
13.200

DN 100 mm, L=90 m


DN 100 mm, L=330 m

21.600
79.200

DN 200 mm, L=670 m

221.100

DN 100 mm, L=85 m

20.400

DN 100 mm, L=335 m

80.400

DN 100 mm, L=25 m


DN 100 mm, L=225 m
0

6.000
54.000
0

31.200
14.400
0

DN 100 mm, L=130 m


DN 100 mm, L=60 m

DN 300 mm, L=70 m

25.900

Ukinut cjevovod
DN 300 mm, L=290 m
DN 100 mm, L=65 m
DN 100 mm, L=170 m
0
DN 150 mm, L=200 m
DN 200 mm, L=205 m

107.300
15.600
40.800
0
58.000
67.650

32

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Postojee stanje iz GIS-a


Ulica
IZA HRIDA-KAMENICA
KAMENICA

KOMATIN

KURTIN SOKAK

KURTIN SOKAK-BISTRIK BRIJEG


MAHMUTOVAC

Prenik
L
DI
L

(blank)
DI
L
(blank)

Materijal
200
100
100
200
40
100
300
80
(blank)
100
200
(blank)

(blank)
DI
L

(blank)

(blank)

POITELJSKA
POD HRIDOM

(blank)
DI
L
L
L

PORODICE FOHT

PORODICE FOHT-CICIN HAN


PS HAMBINA CARINA

L
DI

80
100

93,707
225,583
15,638
14,379
5,887
154,439
56,613
496,259
471,697
242,605
331,269
154,284
76,318
195,104
88,652
2,758
33,707
159,621
341,259
135,854
17,637
2
281,874
68,682
4,176
192,908
72,976
50,764
6,96
87,497
200,338
399,161
53,919
46,335
83,749
117,506
244,218
1,896
89,16
40

PS SKENDERIJA-R.HAMBINA CARINA

R.HAMBINA CARINA

AC
L
L
L

300
350
200
350
200
40

325,414
389,36
29,087
99,574
74,658
82,087

MALA BERKUA

MALI KAANIK
MJEDENICA
MRAKUA

DI
DI
L
L

L
DI
DI
L

100
100
200
200
300
80
100
150
100

Duina iz
GIS-a
107,989
2,281
145,418
229,4
10,675
77,771
1,218
4,233
4,149
295,421
172,658
23,202

1"
100
6/4"

MUJEZINOVA
MUJKANOVIA
NADMEJDAN
NALINA
NURIJE POZDERCA
OKRUGLA
OKRUGLA-HUREMUA
PAJE

PASTRMA

PEINA

L
DI
L
DI
L
L
DI

40
100
200
150
200
100
100
150
100
200
200
60

DI
DI
L

100
300
80
100
2''
100
100
150
40
100
200
5/4"

R.HRID
R.HRID-KAMENICA
Radni tim
Sarajevo, decembar2012. godine

Potrebna duina i
profil rekonstrukcije
DN 200 mm, L=110 m

Cijena (KM)
36.300

DN 100 mm, L=155 m


DN 200 mm, L=230 m

37.200
75.900

DN 100 mm, L=85 m

20.400

DN 200 mm, L=175 m

57.750

DN 200 mm, L=15 m

4.950

DN 300 mm, L=10 m


DN 100 mm, L=160 m
DN 100 mm, L=60 m

3.700
38.400
14.400

DN 100 mm, L=730 m

175.200

DN 100 mm, L=80 m


0
DN 200 mm, L=90 m
DN 200 mm, L=35 m
DN 100 mm, L=160 m

19.200
0
29.700

11.550
38.400
0

DN 200 mm, L=285 m


DN 100 mm, L=70 m

94.050
16.800

DN 300 mm, L=75 m


DN 100 mm, L=50 m

27.750
12.000

DN 100 mm, L=200 m


DN 100 mm, L=400 m
DN 100 mm, L=140 m
DN 150 mm, L=50 m

48.000
96.000
33.600
14.500

DN 100 mm, L=120 m


DN 200 mm, L=245 m

28.800
80.850

Predvieno ukidanje

DN 300 mm, L=715 m

264.550

Ispust iz rezervoara
DN 300 mm, L=100 m
DN 200 mm, L=75 m
DN 100 mm, L=85 m

37.000
24.750
20.400

33

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Postojee stanje iz GIS-a


Ulica
SAVE SKARIA
SAVE KARIA
SOUKBUNAR

Prenik
DI
L
DI
L

(blank)
SOUKBUNAR-NURIJE POZDERCA
ERINA
TALE LIANINA

L
L
L

TALE LIANINA-TERZIBAINA
TANDAREVA

L
DI
L

TEKIJA
TERZIBAINA

L
L

TIMURHANOVA

TOKA

TREBEVIKA-POITELJSKA
URIJAN DEDINA

L
AC

Duina iz
GIS-a
196,242
5,913
307,401
154,946
274,078
141,595
74,712
15,379

Potrebna duina i
profil rekonstrukcije

100
40
40
80
40
100
150
300
80
40
100
200
100
150
40
100
300
40
100
40
80
100
150
40

121,011
120,239
46,581
46,745
41,666
76,814
2
108,775
2,635
131,371
59,004
177,772
109,709
201,806
20,757
97,142
105,31
6,625
124,72
83,626
235,702
10,22
609,014
42,915
200,048
201,151

DN 100 mm, L=120 m


DN 100 mm, L=120 m

28.800
28.800

DN 100 mm, L=95 m

22.800

DN 100 mm, L=40 m

9.600

DN 300 mm, L=110 m

40.700

DN 100 mm, L=130 m


DN 100 mm, L=60 m
DN 200 mm, L=180 m
DN 100 mm, L=130 m
DN 150 mm, L=205 m

31.200
14.400
59.400
31.200
59.450

DN 100 mm, L=105 m


DN 300 mm, L=110 m

25.200
40.700

DN 100 mm, L=125 m

30.000

DN 100 mm, L=775 m

186.000

DN 150 mm, L=610 m

176.900

DN 100 mm, L=170 m

40.800

DN 100 mm, L=215 m

51.600

DN 200 mm, L=25 m

8.250

DN 100 mm, L=95 m

22.800

DN 100 mm, L=325 m

78.000

Materijal
100
150
150
100
150
200
80
(blank)

5/4"
6/4"
URIJAN DEDINA-GABRIIJELE MORENO
LOCATELL

40

129,136

URIJAN DEDINA-GABRIJELE MORENO


LOCATELLI
VEFIKA KARABDIA
VELIKI KAANIK
VRANJAE
ZA BEGLUKOM

L
L
L
L
DI

100
80
150
200
100
150
100
100
100
40

40,181
214,139
2
21,76
49,475
338,17
94,487
243,966
69,009
61,013
194,859
19511,48

ZAGRII

L
DI
L
6/4"

ukupno (m)

0
Komad preko Mjedenice
DN 100 mm, L=295 m
DN 150 mm, L=275 m

Cijena (KM)
0

70.800
79.750

Ukinut cjevovod

3.672.050

U zoni Hambina Carina planirano je za zamjenu 13265 m cjevovoda.


Prilog 11.
Procjena investicije za izvoenje ovih radova ................................................ cca 3.672.050,00 KM

Radni tim
Sarajevo, decembar2012. godine

34

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Zona Hambina Carina, kanalizaciona mrea


Tabela 14. Kanalizaciona mrea u zoni Hambina Carina
Naziv ulice

Postojei cjevovod

Bistrik
LD 149 d,
168b,d 189 b,d

Bjelavica
LD 189b
Borak
LD 166c,187a,b
Brdo Sokak
LD 168 c
Cicin Han
LD 188 a,b, c

FAC-300 L=295
AAC-400 L=310
AB-250 L=106
FK-200 L=830
FB-200 L=48
FAC-300 L=164
AB160/160L=308
MK-200 L=82
MB-200 L=86
MK-200 L=36
FB-200
MB-300
MB-400
MB-600
MB-200

L=121
L=49
L=36
L=65
L=68

Debelo Brdo
LD 187 d

AD -300 L=114
FD- 300 L=175
FB- 300 L= 73
AB- 200 L= 10
AB 300 L= 102
FB 300 L=112
FB- 300 L=208
MB-250 L=30

Goloderica
LD 168c,189a

FK-200 L=208
AK-250 L=127

Grlica
LD 168a
Hambina Carina
LD210,188b,d
Hamida Dizdara
LD 189a
Iza Hrida LD169c
KamenicaLD
169c,190a,190

Komatin
LD 189a,c

FK-200 L=41
AK-250 L=57
FAC-300 L=16
Rigol
L=141
DPL-250 L=240
FB-300 L=282
DPL-250 L=74
MB-300 L=190
MAC-300 L=30
MB-200 L=199
FAC-300 L=86
MB-300 L=248
MB-400 L=147
FAC-300 L=367
AAC-500 L=176
AAC-300 L=202
MB-250 L=136
FAC-300 L=224
AAC-300 L=80

Kurtin Sokak
LD 189d,189b

FK-200 L=26
MK-200 L=253
MB-200 L=46

Mahmutovac
LD 190 a,c

FD 300 L=107
AD-300 L=105
AAC-300 L=201
FAC-300 L=262
MB-200 L= 74

Mujezinova
LD 169a,b
Nadmejdan
LD-168 c,
Nurije Poziderca
Radni tim
Sarajevo, decembar2012. godine

MB-200 L=90

Potreba za izgradnju nove


kanalizacije

Procjena kotanja

Projektna
dok.DA / NE

F =960m 300mm
K= 960m 300mm

658.560,00

NE

F =126 m 300mm
K =126 m 300mm

86.436.00

NE

F = 270 m 300mm
K = 270 m 300 mm

185.220.00
NE

F = 70m 300mm
K = 70m 300mm

48.000,00

NE

F = 150m 300mm
K = 150m 300mm

102.900,00

DA

137.216,00

DA

229.810,00

NE

41.160,00

NE

754.600,00

NE

130.340,00

NE

----------------

---------------

---------

F =360m 300mm
K = 360m 300mm

246.960,00

NE

F=325m 300mm
K=325m 300mm

222.950,00

NE

-----------------

----------------

--------

F = 30 m 300mm
K =238m 300mm
F =335 m 300mm
K =335 m 300 mm
F =60 m 300 mm
K =60 m 300 mm
F =960 m 300 mm
K =1240 m 300mm
K = 190 m 300mm
F = 190 m 300 mm
F = 200 m 300 mm
K =200 m 300mm

F=100m 300mm
K=100m 300 mm
F=100m 300mm
K=100m 300 mm

68.600,00

DA

68.600,00

NE

AB-300 L=101
35

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Naziv ulice

Postojei cjevovod

LD 187b
Paje
LD 190a,c,189d

FB-300 L=101
MK 200 L=346
MB-200 L=264

Pastrma
LD 189b
Pod Hridom
LD 169c,d

MK 200 L=159

Porodice Foht
LD 188c,187d
Tandareva
LD 189a
Tekija
LD 166d

Timurhanova
LD 169a,c
Toka LD189b
Urijan Dedina
LD 187a,b,c,d
Za Beglukom
LD 168a,c, 189a
Balibegovica
LD 168 c,d,189a

Vranjae
LD 209,187d,
188c,
Mali Kaanik
LD 169b,d,

FB-300 L=128
FB-200 L=29
FK-250 L=176
AB-600 L=38
AB-800 L=130
FK-150 L=132
MB-200 L=110
FAC-300 L=63
Kanal 130/120 l=19
MB-200 L=137
MB 300 L=403
MB 400 L=35
MB-500 L=24
APL-200 L=76
FK 200 L=170
AB-300 L=116
AAC-300 L=302
FAC-300 L=302
MB-200 L=177
FB-150 L=33
FB-200 L=96
FK-300 L=52
FK-200 L=183
AB-60/110 L=90
APL-200 L=58
MB-250 L=54
FCP-200 L=79
FB-300 L=401
MK-200 L=52
MB-200 L=192
MB-200 L=173

Brdo Damija
LD 168 c,d,

MB-200 L=234
MK-200 L=19
FK-200 L=86

Mala Berkua
LD 189

MB-200 L=172
MK-200 L=70
FB-300 L=166
AB-800 L=46
AB-1000 L=120
FAC-300 L=200
AK-200 L=7
AAC-300 L=144
MAC 300 L=239

agrii
LD 167 d
Save Skaria
Radni tim
Sarajevo, decembar2012. godine

F =750m 300mm
K= 750m 300mm
------------------

MB-200 L=114
MB-130/120L=116
FAC-300 L=67
FB-300 L=52
FB-300 L=366
AB-300 L=218
FK 200 L=129
AK-200 L= 60
MK-200 L=89
FK-200 L=73
AK-200 L=74

Veliki Kaanik
LD 169 b

Iza Baa
LD 190a

Potreba za izgradnju nove


kanalizacije
-----------------

F =140m 300mm
K= 140m 300mm

Procjena kotanja
-------------------514.500,00

-------------------

Projektna
dok.DA / NE
----------NE

-------------

96.040,00

NE

F =463m 300mm
K= 463m 300mm

317.618,00

NE

F =290m 300mm
K= 290m 300mm
-------------------

198.940,00

NE

-------------------

F =170m 300mm
K= 135m 300mm

104.615,00

NE

F =246m 300mm
K= 246m 300mm

168.756,00

NE

F =670m 300mm
K= 670m 300mm

459.620,00

------------

NE

F =170m 300mm
K= 60m 300mm

78.890,00

NE

F =400m 300mm
K= 300m 300m

240.100,00

DA

F =150m 300mm
K= 550m 300m

358.400,00

DA

164.640,00

NE

137.200,00

NE

233.240,00

NE

288.120,00

NE

F =240m 300mm
K= 240m 300m
F =200m 300mm
K= 200m 300m
F= 340m 300m
K= 340m 300m
F =420m 300mm
K= 420m 300m

-----------------F =240m 300mm


K= 240m 300m

----------------164.640,00

----------DA

AAC 300 L=100


36

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Naziv ulice

Postojei cjevovod

LD 167b,d,

AK-250 L=100
AK-200 L=7
MK-200 L=20
FK-200 L=144
FAC-300 L=66
AB-300 L=7
MB-200 L=363
FAC-300 L=122
FB-300 L=152
AK-250 L=18
AK-350 L=65
AK-400 L=15
AB-60/110 L=66
FK-200
L=151
FK-250
L=79
MB-200 L=102

Mrakua
LD 188a,167c
Terzibaina
LD 168c,189a

erina
LD 169b,d
Poiteljska
LD 187c,d

FB-300
L=250
APL-200 L=237
FCP-200 L=185
FB-300 L=64
FK-150 L=30
FAC-300 L=234
AB-400 L=57
AB-300 L=50
AAC-500 L=167
AAC-800 L=65
FB-300 L=48
FB-300 L=176
FK-200 L=93
AB-300 L=176
AK-200 L=94
MK-200 L26
MB-200 L=81

obanija
LD 167b,d

Peina
LD 187 b,d

Tale Lianina
LD 168 c,
Harisa Osmanovia
LD 187d,188c

NEMA KANALIZACIJE U
ULICI

Dr.Jusufa Tanovia
LD 187d,b 188a

NEMA KANALIZACIJE U
ULICI

Vefika Karabdia

NEMA KAN.U ULICI

Potreba za izgradnju nove


kanalizacije
----------------------

Procjena kotanja

-----------------

Projektna
dok.DA / NE
---------

F =150m 300mm
K= 150m 300m

102.900,00

NE

F =990m 300mm
K= 1260m 300m

771.750,00

NE

72.030,00

NE

164.640,0

NE

F =105m 300mm
K= 105 m 300m
F =240m 300mm
K= 240 m 300m

---------------------

---------------------

------------

----------------------

-----------------------

------------

F =125m 300mm
K= 125m 300m
F =165m 300mm
K= 165m 300m
F =235m 300mm
K= 235m 300m
F =215m 300mm
K= 215m 300m

85.750,00

NE

113.190,00

NE

161.120,00

NE

147.490,00

NE

Procjena investicije za izvoenje ovih radova ................................................cca 8.125.541, 00 KM


UKUPNO 1.3. za 2015.g......................................................................................cca 11.797.591,00 KM

Radni tim
Sarajevo, decembar2012. godine

37

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

2. UPRAVLJANJE VODOVODNIM SISTEMOM


2.1. Mjerno- regulacioni objekti i oprema za 2013.g
Urbanizacija i stalni porast broja stanovnika u Kantonu zaotrili su problem snadbijevanja vodom.
Svakodnevno u Kantonu se zahtijeva neprekidno snadbijevanje velikim koliinama vode visokog
kvaliteta, a svaki prekid u snadbijevanju dobija osudu javnosti i veliki publicitet. KJKP ViK Sarajevo
mora da obavlja svoje zadatke to bre, bolje i efikasnije i to sve pod stalnom kontrolom javnosti. Pod
takvim okolnostima neophodno je unaprijediti manipulaciju i upravljanje vodovodnim sistemom
pomou mjerno regulacione opreme.
Automatski regulacijski ventili
Aktivna kontrola pritiska je najbolja metoda za smanjenje gubitaka u cjelokupnom sistemu.
Smanjivanjem oscilacija pritiska smanjuje se i rizik od pojave novih kvarova. Kontrola pritiska ima
vanu ulogu u smanjenju postojeih gubitaka koje uzrokuju mnogobrojne male pukotine, a
prekomjerni pritisak takoer utjee na poveanje intenziteta postojeih kvarova. Takoer, ventili za
reduciranje pritiska neutraliziraju hidraulike udare koji se javljaju u sistemu i negativno utiu na
elemente sistema.
Postojei ventili za reduciranje pritiska imaju ogranienu djelotvornost s obzirom na mehaniko
podeavanje vrijednosti pritiska. Ti ventili imaju mogunost smanjenja na jednu kontinuiranu
vrijednost koja je prilagoena maksimalnoj potronji. Meutim, u dijelovima dana kada dolazi do
smanjenja potronje, nepotrebno je sistem optereivati visokim pritiscima. Automatskim ventilima
mogue je imati vie razliitih vrijednosti pritisaka (unaprijed programirane i kontrolirane) tokom dana
ime se omoguava bolje snadbijevanje potroaa a ujedno i titi vodovodna mrea. Vano je
istaknuti da se smanjenjem prekomjernog pritiska smanjuju i rizici od pojave novih kvarova a isto tako
utie i na smanjenje isticanja na postojeim mjestima puknua.
Prilog 12.

Izabrane su sljedee lokacije za ugradnju automatskih regulacionih ventila:


- U ulici Terezija (zona Skenderija) neophodno je izvriti prepravku postojeeg ahta, na cijevi DN
500 zamjenu reducir ventila, ugradnju regulacionog automatskog ventila protoka, ugradnju
mjeraa
protoka,
i
daljinski
prenos
informacija
u
Komandni
centar.
.............................................................................................................................cca
150.000,00 KM
- U ulici Soukbunar (zona Skenderija) neophodno je izvriti prepravku postojeeg ahta, na cijevi
DN 200 zamjenu reducir ventila, ugradnju regulacionog automatskog ventila protoka, ugradnju
mjeraa protoka, i daljinski prenos informacija u Komandni centar
.............................................................................................................................cca 100.000,00 KM
- U ulici Kranjevia (zona Skenderija) neophodno je izvriti prepravku postojeeg ahta, na cijevi
DN 200 zamjenu reducir ventila, ugradnju regulacionog automatskog ventila protoka, ugradnju
mjeraa
protoka,
i
daljinski
prenos
informacija
u
Komandni
centar...................................................................................................................cca 100.000,00 KM
- U ulici Hamze Hume (zona Skenderija) neophodno je izvriti izgradnju ahta, na cijevi DN 300
ugradnju regulacionog automatskog ventila protoka, ugradnju mjeraa protoka, i daljinski prenos
informacija u Komandni centar. ..........................................................................cca 100.000,00 KM
- U zoni Mojmilo-Dobrinja neophodno je izvriti prepravku postojeeg ahta, na cijevi DN 400
ugradnju reducir ventila, ugradnju regulacionog automatskog ventila protoka, daljinski prenos
informacija u Komandni centar............................................................................cca 150.000,00 KM
- U ulici Hamida Beirevia (zona Sedrenik) neophodno je izvriti izgradnju ahta, na cijevi DN 200
ugradnju regulacionog elektro zatvaraa, ugradnju mjeraa protoka, daljinski prenos informacija u
Komandni centar....................................................................................................cca 61.000,00 KM
Radni tim
Sarajevo, decembar2012. godine

38

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

U ulici Streljaka (zona Hladivode) neophodno je izvriti izgradnju ahta, na cijevi DN 100
ugradnju regulacionog elektro zatvaraa, ugradnju mjeraa protoka, reducir ventil i daljinski
prenos informacija u Komandni centar..................................................................cca 60.000,00 KM
U ulici Zaima Topia (zona Stup-Igman) neophodno je izvriti izgradnju ahta, na cijevi DN 300
ugradnju regulacionog elektro zatvaraa, ugradnju mjeraa protoka, daljinski prenos informacija u
Komandni centar. ..................................................................................................cca 51.000,00 KM

Procjena investicije za izvoenje ovih radova ................................................... cca 772.000,00 KM


-

Za ve postojee reducir ventile - na 40 lokacija, izvriti nadogradnju za automatsku regulaciju i


digitalni prenos podataka u Dispeerski centar. NAPOMENA: s obzirom da nemamo iskustva sa
ovim radovima ne moemo dati procjenu o visini investicije za ove radove. Takoer, u ovom
trenutku ne moemo znati da li se neki od ovih postojeih ventila treba zamijeniti novim, a to
zavisi od tehnikih uslova nadogradnje.

Procjena investicije za izvoenje ovih radova ................................................... cca 536.000,00 KM


UKUPNO 2.1.1...................................................................................................... cca 1.308.000,00 KM
Mjerni ahtovi
Namjera projekta je da se unaprijedi manipulacija i upravljanje vodovodnim sistemom putem ugradnje
potrebnih mjerno regulacionih ureaja i opreme u prethodno izvedene betonske ahtove.
U zavisnosti od lokacije i traenih rezultata u upravljanju sistemom, ugraene su odgovarajue
armature i fazonski komadi.
Elektro-fazom je predvien dovod elektrine energije do regulacionih ahtova, razvod za
obezbjeenje pouzdanog i propisanog rada ugraene elektro-opreme i instalacije u objektima, kao i
daljinski prenos informacija u Komandni centar.
Lokacija Baruthana
Na postojeem cjevovodu DN 200 kod kua Hamzia potrebno je ugraditi ureaje i opremu za
mjerenje i regulaciju protoka. Isti se ugrauju u aht.
U ahtu unutranjih dimenzija 2,60x1,10x1,80 m u trotoaru saobraajnice i zelenoj povrini se
ugrauju elektromagnetni mjera protoka i elektromotorni zatvara na meusobnoj udaljenosti 1200
mm obezbijeenoj ugradnjom FF komada, a iza ahta na istoj udaljenosti od EM mjeraa protoka
ugrauje se obini EV ovalni zatvara u podzemnoj izvedbi.
Prilog 13.

Procjena investicije za izvoenje ovih radova ................................................... cca 190.000,00 KM


Lokacija Grliia brdo
Na postojeem cjevovodu DN 200 u blizini mezarja takoe je potrebno ugraditi ureaje i opremu za
mjerenje i regulaciju protoka u aht unutarnjih dimenzija 3,20x2,0x1,80 m lociran u saobraajnoj
povrini.
Za razliku od prethodnog sluaja, u ovaj regulacioni aht ugrauje se dvosmjerni elektro-magnetni
mjera protoka i dva elektromotorna zatvaraa.
Prilog 14.

Procjena investicije za izvoenje ovih radova ................................................... cca 150.000,00 KM

Radni tim
Sarajevo, decembar2012. godine

39

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Lokacija Jukieva
Na postojeem cjevovodu DN 200 na uglu ulice Husrefa Redia potrebno je ugraditi ureaje i
opremu za mjerenje i regulaciju protoka, kao i za obaranje pritiska u mrei. Oprema se montira u dva
ahta.
U prvom ahtu se ugrauje elektomagnetni mjera protoka i elektromotorni zatvara razdvojeni FF
komadom duine 1200 mm, a iza ahta na istoj udaljenosti od EM mjeraa protoka ugrauje se
obini EV ovalni zatvara u podzemnoj izvedbi.
U drugom ahtu se montiraju dva reducir ventila, etiri ovalna EV zatvaraa i dvije montanodemontane flane.
Prilog 15.

Procjena investicije za izvoenje ovih radova ................................................... cca 190.000,00 KM


Napominjemo da za sve navedene regulacione ahtove postoji projektna dokumentacija na nivou
glavnog projekta i za hidrograevinski dio i za elektro-fazu.
UKUPNO 2.1.2......................................................................................................... cca 530.000,00 KM

Mjerna oprema
Da bi se moglo precizno elaborirati sa svim vrstama gubitaka vode u vodovodnom sistemu, potrebno
je uspostaviti kvalitetan monitoring na osnovu koga e se dobiti tani podaci o koliini vode koja ulazi
u sistem i koliini koja se isporuuje potroaima u odreenom vremenskom periodu. Svaka
netanost u mjerenju, bilo ulaznog ili izlaznog podatka, dovodi do nerealne ocjene gubitaka, to znai
da je kvalitetno praenje i precizno kontinuirano mjerenje koliina vode preduslov za razmatranje
problema gubitaka vode. U skladu sa obezbjeenjem uslova za taniji proraun gubitaka po
metodologiji Meunarodne asocijacije za vode IWA planirano je obezbjeenje mjerne opreme na
rezervoarima i vodovodnoj mrei.
Za 2013. godinu izabrane su sljedee lokacije:
-

U ulici Obala Kulina Bana kod prikljuka za fontanu na cijevi DN 400 (zona Skenderija)
neophodno je izvriti izgradnju ahta i ugradnju mjeraa protoka, daljinski prenos informacija u
Komandni centar
U ulici Jukieva na cijevi DN 400 i DN 500 (zona Kobilja Glava) neophodno je izvriti izgradnju
dva ahta i ugradnju mjeraa protoka, daljinski prenos informacija u Komandni centar
U ulici Kovai na cijevi DN 500 (zona Igman) neophodno je izvriti izgradnju ahta i ugradnju
mjeraa protoka, daljinski prenos informacija u Komandni centar
U ulici Blaujska cesta na cijevi DN 300 (zona Igman) neophodno je izvriti izgradnju ahta i
ugradnju mjeraa protoka, daljinski prenos informacija u Komandni centar

Procjena investicije za izvoenje ovih radova ................................................... cca 162.000,00 KM

UKUPNO 2.1.za 2013.g........................................................................................ cca 2.000.000,00 KM

Radni tim
Sarajevo, decembar2012. godine

40

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

2.2. Mjerno- regulacioni objekti i oprema za 2014.g


U navedenom periodu, idalje se planira ugradnja mjerno regulacione opreme, a sve u cilju tanijeg
mjerenja isporuenih koliina i smanjenja gubitaka u mrei.
Mjerni ahtovi
Izabrane su zona Igman, zona Skenderija i zona Kobilja glava . U tim zonama na postojeim
lokacijama izvrie se nadogradnja postojeih ahtova sa mjerno regulacionom opremom. U tabeli
15. dat je pregled lokacija, u 2012. g planiramo raditi do rednog broja 10.
Napomena: dvije lokacije u zoni Skenderija ubaene u 2014. godinu (crveni font), dodate druge dvije
(zeleni font), iznos ostaje isti. Pozicije u kolonama koje su markirane utim prenose se za 2015.
godinu.
Tabela 15. Lokacije postojeih ahtova u zonama Igman, Skenderija i Kobilja Glava

br.

1
2
3
4

Lokacija ahta
ZONA MojmiloDObrinja
Naselje MojmiloOlimpijska
ZONA MojmiloHrasno
Naselje Otokartava Faizma
ZONA
SKENDERIJA
Skenderija
-Terezija
Skenderija
Soukbunar
Skenderija
.akovi tram.
stanica
Skenderija- Hiseta

materijal

Profil
cijevi

Deb.
stijenke

Vanjski
prenik

mjera
protoka

elektro
zatvara

Liveno
eljezo

200

10,5

221

da

Liveno
eljezo

300

13

326

gus

500

15

daktil

200

gus
gus

reducir
ventil/na
dogradnj
a

teleme
trija

cijena
ukupna

da

da

200000

da

da

da

200000

530

da

da

da

da

200000

15

230

da

da

da

da

200000

400
400

16,50
16,5

433
433

da
da

da
da

da
da

200000
200000

ZONA KOBILJA
GLAVA
5

Jukieva (Veleii)

elik

400

10

420

da

da

da

200000

Jukieva
(Koevsko brdo)

gus

500

15

530

da

da

da

200000

Stadion Koevo

gus

300

13

326

da

da

da

200000

Dumae

gus

200

10,5

221

da

da

da

200000

elik

500

14

528

da

da

da

200000

10

Pravac Sokolovii
Idu Dani
(pr.Blauj)

elik

300

12

324

da

da

da

200000

11

Idu Dani (pr.Ilida)

elik

500

14

528

da

da

da

200000

12

Pravac Butmir

gus

300

14,5

329

da

da

da

200000

ZONA IGMAN
9

13

Butile

gus

400

16,5

433

da

da

da

200000

14

Plandite - Osjek

daktil

200

12

224

da

da

da

200000

15

Luani

gus

300

14,5

329

da

da

da

200000

16

Blauj kod crkve

gus

300

15

330

da

da

da

200000

Procjena investicije za izvoenje ovih radova ................................................ cca 2.000.000,00 KM


UKUPNO 2.2.za 2014.g............................................ ........................................... cca 2.000.000,00 KM

Radni tim
Sarajevo, decembar2012. godine

41

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

2.3. Mjerno- regulacioni objekti i oprema za 2015.g


Mjerni ahtovi
Nastavak rekonstrukcije mjernih ahtova u zoni Igman. (tabela 15., od rednog broja11.).
br.

Lokacija ahta

materij
al

Profil
cijevi

Deb.
stijenke

Vanjski
prenik

mjera
protoka

elektro
zatvara

reducir
ventil/nado
gradnja

teleme
trija

cijena ukupna

ZONA IGMAN
1

Pravac Sokolovii

elik

500

14

528

da

da

da

200000

Idu Dani (pr.Blauj)

elik

300

12

324

da

da

da

200000

Idu Dani (pr.Ilida)

elik

500

14

528

da

da

da

200000

Pravac Butmir

gus

300

14,5

329

da

da

da

200000

Butile

gus

400

16,5

433

da

da

da

200000

Plandite - Osjek

daktil

200

12

224

da

da

da

200000

Luani

gus

300

14,5

329

da

da

da

200000

Blauj kod crkve

gus

300

15

330

da

da

da

200000

Procjena investicije za izvoenje ovih radova ................................................ cca 1.200.000,00 KM

Mjerna oprema
Tabela 16. Nedostajui mjerai protoka po tehnolokim objektima Vodovoda

Lokacija
Baevo
Sokolovii-2 kom.
Bua potok I
Bua potok II
ebedije
Vogoa I (gornja)
Hambina carina
Skenderija
Hrasno
Lukavac
Kovaii
Hrid
Pogledine
Hrasnica
Hladivode

mjera
Integrator na mjerau protoka za Alipain most
Integrator na mjerau protoka sa bunara IB1
Zbirni mjera protoka za Mojmilo sa ahtom i
telemetriom
Mjera na dolazu sa A. Mosta
Mjra na potisu za Bua potok II
Mjera na dolazu sa Bua potoka I
Elektromagnetni, regulacioni zatvara
Mjera na odlazu za Vogou II (donju)
Mjera na dolazu sa Skenderije
Mjera na odlazu za grad
Mjera na odlazu za Pogledine
Mjera na odlazu za Hambinu carinu
Mjera na odlazu za Skenderiju sa ahtom
Mjera za Lukavac pravac anac
Mjera za Lukavac pravac Milinkladska
Mjera protoka dvosmjerni (odlaz-dolaz)
Mjera protoka na hidrofleksima
Mjera na odlazu za grad
Mjera na odlazu za Vraca
Mjera na odlazu za grad sa ahtom
Mjera na odlazu za grad dvosmjerni
Mjera na dolazu sa Trebevia
Mjera na odlazu za grad sa ahtom i
telemetriom
Mjera na odlazu za rezervoar sa ahtom
Mjera na dolazu

Radni tim
Sarajevo, decembar2012. godine

profil
DN500
DN300

cijena
mjeraa
protoka (KM)
10000
6500

DN450
DN300
DN300
DN300
DN200
DN300
DN300
DN300
DN300
DN350
DN700
DN300
DN300
DN300
DN100
DN400
DN300
DN350
DN300
DN300

30000
6500
6500
6500

DN200
DN200
DN200

17000
5000
4500

6500
6500
6500
6500
8500
20000
6500
6500
6500
3500
9000
6500
12000
6500
6500

cijena elektrozatvaraa (KM)

7000
8000
8000

8500
8500

42

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Lokacija
Brusulje
Hrasniki stan
Babin do
Tabla

mjera
Mjera na odlazu za grad
Mjera na dolazu
Mjera na odlazu za grad
Mjera na dolazu sa PS Igman
Mjera na odlazu za Babin do
Mjera na odlazu za Tablu
Dolaz sa Hrasnikog stana
Odlaz za zonu
Dolaz sa Hrasnikog stana
Odlaz za zonu

Ukupno (mjera,
zatvara)
montani radovi
UKUPNO

profil
DN200
DN200
DN200
DN200
DN200
DN100
DN300
DN300
DN100
DN300

cijena
mjeraa
protoka (KM)
4500
4500
4500
4500
4500
3500
6500
6500
3500
6500
259500
100000
449100

cijena elektrozatvaraa (KM)


7000
7000

5800
8000
8000
5800
8000
89600

Procjena investicije za izvoenje ovih radova ................................................... cca 449.100,00 KM


Automatski-regulacioni ventili
Ugradnja automatskih regulacionih ventila na lokacijama koje su izostavljene u prethodnim godinama,
a spadaju u prioritetne.
Procjena investicije za izvoenje ovih radova ................................................... cca 350.900,00 KM

UKUPNO 2.3.za 2015.g.........................................................................................cca 2.000.000,00 KM

Radni tim
Sarajevo, decembar2012. godine

43

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Napomena:
Shodno implementaciji i realizaciji sredstava za mjerno regulacionu opremu potrebno bi bilo izvriti
zamjenu svih glavnih vodomjera u zonama u kojima e se vriti rekonstrukcija vodovodne mree i
prikljuaka. Ugradnjom vodomjera sa daljinskim oitanjem omoguilo bi se efikasnije upravljanje
sistemom vodosnabdjevanja, u navedenim zonama, i to bi se manifestovalo kroz poveanje
uinkovitosti rada, tanost oitanja, smanjenje trokova rada, smanjenje nelegalnih aktivnosti na
mjernim mjestima, podaci sa mjernih mjesta bi bili dostupni 24 sata dnevno, isl.

Radni tim
Sarajevo, decembar2012. godine

44

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

3. OBEZBJEENJE POGONSKE SIGURNOSTI SISTEMA


3.1. Rekonstrukcija elektro energetskog pogona za 2013.g
Glavni cilj ovog dijela projekta je rekonstrukcija i proirenje postrojenja Baevo, Sokolovii i Alipain
most i to zbog starosti i mogunosti prikljuenja novog broja potroaa.
Prilog 16.
Prilog 17.

Rekonstrukcuja 10-20 KV postrojenja i TS 10-20/0,4KV, 1x100 KVA Baevo


Radi starosti 10kV rasklopnog postrojenja i obezbjeenja dvostranog napajanja elektrinom energijom
potrebno je izvriti rekonstrukciju i proirenje postrojenja, ime bi se stvorili i uslovi za prikljuenje
novih potroaa. Prije svega za rekonstrukciju Pumpne Stanice Baevo. Postrojenje se nalazi na
izvoritu Baevo i ima funkciju energetske logistike svih objekata na ovom izvoritu, a oni imaju
tretman najvanijih u Sarajevskom vodovodnom sistemu.
Postoji projektna dokumentacija na nivou Glavnog-izvedbenog projekta.
Procjena investicije za izvoenje ovih radova .................................................. cca 800.000,00 KM
Pumpna stanica Baevo-Mojmilo
Postojea Pumpna Stanica Baevo ima ulogu i transporta vode u rezervoar Mojmilo. Dugi niz godina
osjea se potreba za poveanjem kapaciteta transporta vode na ovom najznaajnijem
pravcu
transporta vode prema gradu. Sa druge strane i postojei pumpni kapaciteti su stari i dotrajali.
Rekonstrukcija PS Baevo je mogua nakon zavretka rekonstrukcije Visoko naponskog postrojenja
Baevo a koje se tretira u drugom gore prethodno navedenom projektu.
Rekonstrukcija podrazumijeva instaliranje novih pumpnih kapaciteta, etiri pumpna postrojenja
pojedinanih karakteristika
Q=100l/s, N= 200kW sa pripadajuim vodovodnim instalacijama do
mjesta spoja na postojei potisni cjevovod.
Postoji projektna dokumentacija na nivou Glavnog-izvedbenog projekta.
Procjena investicije za izvoenje ovih radova ................................................... cca 850.000,00 KM
Pumpna stanica Alipain Most - faza I
Postojea Pumpna Stanica Alipain Most ima ulogu transporta vode u tri pravca vodosnadbijevanja,
a preko objekata rezervoara Kobilja Glava, Centar i Bua potok. Nakon hitne poratne rekonstrukcije,
koja je uraena u okviru donacije, u proteklom periodu eksploatacije pokazalo se da su pumpna
postrojenja nedovoljna, novonastalim potrebama vodsnadbijevanja i da su sklona estim kvarovima.
Najvei nedostatak postojeeg proizvodnog procesa transporta vode je ne postojanje rezervnih
pumpnih kapaciteta, u sluaju kvara, ali i nemogunosti njihovog instaliranja usljed ogranienog
energentskog bilansa.
Namjera projekta je da se izvri rekonstrukcija, dogradnja energetskih kapaciteta, instaliranje novih
pumpnih agregata, i na taj nain bi se obezbijedila rezerva u sistemu transporta vode. U okviru prve
faze rekonstrukcije planirano je izvoenje:
trafo stanica 1 000 kVA ........................................................................... 170.000,00 KM
kablovski prikljuak .................................................................................... 100.000,00 KM
Radni tim
Sarajevo, decembar2012. godine

45

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

pumpna postrojenja, pripadajue armature i FF komadi, cjevovodi, itd. (H=160,0 m, Q=150 l/s,
N=350 kW ; 2 kom) .................................................................................... 350.000,00 KM
elektro faza, telemetrija, elektromotorni razvod, itd ..................................150.000,00 KM
Postoji projektna dokumentacija na nivou Idejnog rjeenja.
Procjena investicije za izvoenje ovih radova ................................................... cca 770.000,00 KM
Za ovaj projekat neophodno je izvriti izgradnju novog rasklopnog postrojenja.
Energentsku pogonsku spremnost Pumpne stanice Alipain Most obezbjeuju: rasklopno10kV
postrojenje i dvije trafo stanice (2X1000KVA) smjeteni u objektu pumpne stanice. Rasklopno 10kV
postrojenje je zastarilo i problematino je za odravanje, jer je nemogue nai rezervne dijelove. Na
ovaj nain je kontinuirano ugroena i pogonska spremnost postojeih pumpnih agregata. Cilj ovog
projekta je totalna zamjena postojeeg postrojenja. Postoji projektna dokumentacija na nivou
Glavnog-izvedbenog projekta.
Procjena investicije za izvoenje ovih radova ................................................... cca 250.000,00 KM
UKUPNO 3.1.3.. ....................................................................................................cca 1.020.000,00 KM

UKUPNO 3.1. za 2013..g.......................................................................................cca 2.670.000,00 KM

3.2. Rekonstrukcija elektro energetskog pogona, vodovodnih


objekata i sistema za dezinfekciju vode u 2014.g
Glavni cilj ovog dijela projekta je nastavak radova na rekonstrukciji i proirenju elektro energetskih
postrojenja i pumpnih stanica i to zbog starosti i mogunosti prikljuenja novog broja potroaa, kao i
obezbjeenje sigurnosti sistema za dezinfekciju vode.
Nabavka zamjenskih pumpnih agregata
Tabela 17. prikaz potrebne zamjene pumpnih agregata u 2013.g.
Pravac pumpanja
Q
H
(l/sec)
(m)
190

75

Jedinina
cijena
(KM)
120.000

100130
100

135

80.000

320.000

100

80.000

80.000

Pumpni agregat za bunar MB8-Izvorite Baevo

55

145

60.000

60.000

Pumpni agregat za bunar SKB3-Izvorite


1
Sokolovii
Pumpni agregat za P.S. Zahvat na rijeci Bosni

30

135

40.000

40.000

400

10

100.000

100.000

Pumpni agregati P.S. Baevo za pravac pumpanja


R.Igman
Pumpni agregati za sistem bunara za pravac
pumpanja R.Mojmilo
Pumpni agregat za bunar IB1-Izvorite Baevo

Kom.

Ukupno
(KM)
240.000

NAPOMENA: U decembru 2012 godine ubaena pozicija za nabavku ovog agregata u iznosu 40.000,00 KM, tako da
krajnji iznos za poziciju 'Pogonske sigurnosti sistema' u 2014.iznosi cca 3.253.000,00 KM. to mijenja i ukupnu sumu za
sve pozicije u 2014g na 17.221.986,00 KM.
Radni tim
46
Sarajevo, decembar2012. godine

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Pumpni agregati-potopni za vodozahvate WEDE


na Izvoritu Baevo
Pumpni agregat P.S Baevo za pravac pumpanja
R.Mojmilo
Pumpni agregat P.S Centar za pravac pumpanja
R.Podhrastovi
Pumpni agregat P.S Centar za pravac pumpanja
R.Bjelave
Pumpni agregat P.S Hrasno za pravac pumpanja
R.Skenderija
Pumpni agregati za Filtersko postrojenje Vogoa
(Moanica)
UKUPNO:

80

45

6.000

36.000

85

105

35.000

35.000

105

150

80.000

80.000

60

85

60.000

60.000

100

60

60.00

60.00

8.000

48.000

40

40

1.159.000

Procjena investicije za izvoenje ovih radova ........................................... cca 1.159.000,00 KM

Rekonstrukcija pumpnih stanica u cilju zamjene pumpnih agregata

Tabela 18. Zamjena pumpnih agregata u P.S. Baevo za pravac pumpanja R.Alipain Most
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregati P.S. Baevo za pravac
305
25
2
100.000
200.000
pumpanja R.Alipain Most
hidro-mainska oprema (el.motorni zatvarai, nepovratne klapne,MDK komadi,redukcije)
40.000
mjerno-regulaciona oprema

5.000

graevinski radovi (demontaa starih i izrada novih temelja, proboj AB ploe)


montano demontani radovi
elektro radovi

2.000
5.000
5.000

UKUPNO

257.000

Tabela 19. Zamjena pumpnih agregata P.S. Alipain Most za pravac pumpanja R.Kobilja Glava:
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregati P.S. Alipain Most za pravac
100
155
2
80.000
160.000
pumpanja R.Kobilja Glava
hidro-mainska oprema (el.motorni zatvarai, nepovratne klapne,MDK komadi,redukcije)
50.000
mjerno-regulaciona oprema

6.000

graevinski radovi (demontaa starih i izrada novih temelja, proboj AB ploe)


montano demontani radovi
elektro radovi

6.000
6.000
6.000

UKUPNO

Radni tim
Sarajevo, decembar2012. godine

234.000

47

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Tabela 20. Zamjena pumpnih agregata P.S. Alipain Most za pravac pumpanja R.Centar
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregati P.S. Alipain Most za pravac
150
75
3
80.000
240.000
pumpanja R.Centar
hidro-mainska oprema (el.motorni zatvarai, nepovratne klapne,MDK komadi,redukcije)
50.000
mjerno-regulaciona oprema

5.000

graevinski radovi (demontaa starih i izrada novih temelja, proboj AB ploe)


montano demontani radovi
elektro radovi

6.000
6.000
5.000

UKUPNO

312.000

Tabela 21. Zamjena bunarskog pumpnog agregat za bunar BSK 4 na Izvoritu Skolovii
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregat za bunara BSK 4 na izvoritu
100 130
1
80.000
80.000
Skolovii za pravc pumpanja R.Mojmilo
frekventni uputa za pokretanje pumpnog agregata snage 300 kW
1
40.000
40.000
daljinski nadzor i upravljanje bunarom
bunarska kolona, armature,fazonski komadi i ostali pripadajui materijal
UKUPNO

25.000
35.000
180.000

Tabela 22. Dogradnja poz.br.5 sa pumpnim agregatom P.S. Hrasno za pravac pumpanja R.Skenderija
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregat za poz.br.5 P.S.Hrasno za
100
60
1
60.000
60.000
pravc pumpanja R.Skenderija
hidro-mainska oprema (el.motorni zatvara, nepovratna klapna,MDK,cijevi)
35.000
elektro oprema
montano demontani radovi
UKUPNO

15.000
2.000
112.000

Tabela 23. Zamjena pumpnog agregata P.S. Skenderija za pravac pumpanja R.Hambina Carina
Pravac pumpanja
Q
H
Kom. Jedinina
Ukupno
(l/sec) (m)
cijena
(KM)
(KM)
pumpni agregata za poz.br.2 P.S. Skenderija za
105 135 1
50.000
50.000
pravac pumpanja R.Hambina Carina:
Radni tim
Sarajevo, decembar2012. godine

48

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

hidro-mainska oprema (el.motorni zatvarai, nepovratne klapne,MDK komadi,redukcije


za tri pumpna agregata u mainskoj hali P.S.Skenderija)
mjerno-regulaciona oprema
montano demontani radovi
elektro radovi
UKUPNO
Tabela 24. Izrada projektne dokumentacije i rekonstrukcija pumpne stanice Kromolj
Projektno rijeenje P.S.Kromolj i nabavka nove hidromainske i el.opreme
UKUPNO

50.000
5.000
4.000
5.000
114.000

50.000
50.000

Tabela 25. Izrada projektne dokumentacije sa izvoenjem radova i atestacijom


za pumpnu stanicu Centar

Projekat,izvoenje i atest za kran i kransku stazu u dijelu mainske hale


P.S.CENTAR iznad inastaliranih pumpnih agregata za pravac pumpanja
R.BJELAVE

30.000

UKUPNO

30.000

Tabela 26. Izrada projektne dokumentacije sa izvoenjem radova i atestacijom


za pumpnu stanicu Turkuii

Projekat,izvoenje i atest za kran i kransku stazu u dijelu R.Mojmilo


tj.P.S.Turkuii.

30.000

UKUPNO

30.000

Procjena investicije za izvoenje ovih radova ................................................ cca 1.319.000,00 KM

Frekventni zamjenski regulatori i elektro-energetska oprema


Tabela 27. Uvezivanje VN opreme na bunarima izvorita Sokolovii u petlju
Nabavka modularnog gasnog 10/20 kV postrojenja ( 3 vodne i 1 trafo elija) i njegova
montaa u novom prostoru
Materijal i graevinski radovi za obezbjeenje prostora za smjetaj postrojenja
Materijal i radovi za demontau postojeeg postrojenja i uvezivanje novog postrojenja
UKUPNO
Radni tim
Sarajevo, decembar2012. godine

30.000
15.000
5.000
50.000
49

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Tabela 28. Zamjena starih VN postrojenja na Mojmilskim bunarima


Zamjena dotrajalih postrojenja na bunarima MB7, MB8, MB9,
MB10, MB11

Kom 5

23.000

115.000

Demontaa postojeeg i montaa novog

Kom 5

3.000

15.000

UKUPNO

130.000

Tabela 29. Nabavka novih frekventnih uputaa za objekte


Nabavka frekventnog uputaa do 300 kW za bunar SKB5

Kom 1

40.000

Montaa povezivanje i putanje u rad


Nabavka frekventnog uputaa 75 kW za bunar KB10(R7)

40.000
4.000

Kom 1

20.000

Montaa povezivanje i putanje u rad

20.000
2.000

UKUPNO

66.000

Tabela 30. Nabavka zamjenskih frekventnih i soft uputaa za objekte


Frekventni regulator Hydrovar 45 kW za hidrofleks Turkuii

Kom 2

20.000

40.000

Frekventni uputa do 130 kW za pumpne stanice sirove i iste


vode F. Bosna faza I i II.
Frekventni uputa 250 kW za bunare: IB1, MB13, MB5, SKB2

Kom 2

20.000

40.000

Kom 2

40.000

80.000

Soft uputa 250kW za bunare MB12, MB3, MB6, MB7, MB9,


MB10
Frekventni uputa 11kW za hidrofleks postrojenja: R. Kobilja
glava, Borak, C.vrh
UKUPNO

Kom 1

20.000

20.000

Kom 1

10.000

10.000
190.000

Tabela 31. Zamjena starih NN postrojenja na bunarima izvorita Baevo


NN razvodni ormar opremljen soft uputaem, kompaktnim
strujnim prekidaem i ostalom opremom za pokretanje pumpnog
agregata snage do 250kW za bunare MB1,MB2 i MB4
Demontaa postojee opreme te montaa, povezivanje i putanje
u rad nove opreme na bunarima MB1,MB2 i MB4
NN razvodni ormar opremljen soft uputaem, kompaktnim
strujnim prekidaem i ostalom opremom za pokretanje pumpnog
agregata snage do 150kW za bunare AB2, AB4 i MB8
Demontaa postojee opreme te montaa, povezivanje i putanje
u rad nove opreme na bunarima AB2, AB4 i MB8
UKUPNO

Kompl 3

35.0000

105.000

Kompl 3

4.000

12.000

Kompl 3

25.000

75.000

Kopl 3

3.000

9.000
201. 000

Tabela 32. Dorada daljinskog nadzora i upravljanja na objektima


Radni tim
Sarajevo, decembar2012. godine

50

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Proirenje plc-a i izmjene softvera na bunaru MB5 i u podcentru Baevo kako bi se sa


raunara omoguilo upravljanje bunarom zadavanjem frekvencije.
Uvezivanje 2 pumpna agregata u pumpnoj stanici Baevo za pravac pumpanja
rezervoar Mojmilo u sistem daljinskog nadzora i upravljanja.
UKUPNO

10.000
15.000
25.000

Procjena investicije za izvoenje ovih radova ................................................... cca 662.000,00 KM

3.2.4

Opremanje servisa za remont pumpnih agregata

Izrada projekta ispitne stanice i nabavka mjerno-regulacione opreme

113.000,0
0

UKUPNO 3.2 .za 2014.g....................................................................................... cca 3.253.000,00 KM

3.3. Rekonstrukcija elektro energetskog pogona, vodovodnih


objekata i sistema za dezinfekciju vode u 2015.g
Kvalitet vode, kao jedan od osnovnih zadataka naeg preduzea, u direktnoj je zavisnosti od
funkcionalnosti sistema za dezinfekciju vode. Dezinfekcija vode na tehnolokim objektima pogona
vodovod, kako u predtretmanu tako i u zavrnom tretmanu vode, vri se plinskim i tenim hlorom.
Primjenjeni sistemi za osiguranje slobodnog (rezidualnog) hlora od vrste dezinfekta (teni ili plinski
hlor), variraju od dosta jednostavnih sistema, tzv. kapavaca, do automatizovanih i
poluautomatizovanih sistema sa dozirnim pumpama ili vakumskim sistemom doziranja i regulisanja
gasnog hlora.
Na tehnolokim objektima Pogona vodovoda instalisano je 13 visokosofisticiranih postrojenja za
dezinfekciju vode gasnim hlorom, proizvoaa Wallace & Tiernan i Jesco. Instalisana oprema
predvia i omoguava automatski, a kao alternativu nudi runi reim. Sva postrojenja, sa tehnikotehnolokog aspekta, su u funkciji ili se mogu staviti u funkciju u zavisnosti od potreba tehnologije
voenja pogona. Meutim, sa stanovita sigurnosti rada i bezbjednosti ljudi kao i mogueg uticaja na
okolinu gotovo sva postrojenja, izuzev bunara R5 i ureaja za preiavanje Filter Bosna (poslijeratna
izgradnja), su na vrlo niskom nivou. Ovim programom predvidjeli smo najznaajniji projekat
rekonstrukcije hlornog odjela na Baevu.
Rekonstrukcija pumpne stanice Hambina Carina
Planiranim projektom podrazumjeva se prvenstveno sanacija iber komore koja je ve dui vremenski
period ugroena zbog pojave klizita. U 2007/2008. godini izvrena je sanacija okolnog prostora i
klizite stabilizovano te su stvoreni uslovi i za sanaciju iber komore.
U toku implementacije ovog projekta procjena je da e biti neophodno izvriti zamjenu postojeih
armatura, pumpi , te pratee elektro mainske opreme.
Postoji izvedbeni projekat sanacije iber komore.
Procjena investicije za izvoenje ovih radova ................................................... cca 577.000,00 KM
Radni tim
Sarajevo, decembar2012. godine

51

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Rekonstrukcija hlornog odjela na rezervoaru i pumpnoj stanici Baevo uz


stvaranje uslova za prelazak na potpuni automatski rad
Projekat rekonstrukcije hlornog odjela na rezervoaru i pumpnoj stanici Baevo uz stvaranje uslova za
prelazak na potpuni automatski rad obuhvata:
- zamjenu instalisanog sistema sa elinim hlor-gasnim bocama kontejnerima od 1 000 kg;
- prepravku instalacija unutranjeg razvoda gasnog hlora;
- nabavku potrebne opreme za uvezivanje kontejnera u jedinstven sistem (automatski prebacivai,
vakuum regulatori i sl.);
- graevinsku rekonstrukciju cjelokupnog dijela objekta gdje je smjeteno postrojenje za dezinfekciju
vode;
- dogradnju odjela za neutralizaciju na suhom principu;
- nabavku i ugradnju tzv. Skruber sistema za neutralizaciju;
- prepravku postojeih instalacija u cilju stvaranja uslova za prelazak na automatski rad;
- izradu glavnog projektova.
Procjena investicije za izvoenje ovih radova ....................................................cca 700 000,00 KM

Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na


izvoritu Kovaii
Na izvoritu Kovaii, koje u sistemu vodosnabdijevanja predstavlja jedno od znaajnijih izvorita,
dezinfekcija vode trenutno se vri sa tenim hlorom, na sistemu tzv. kapavca, koji je zastario i
primitivan nain dezinficiranja
sa izuzetno izraenom nepouzdanou. Iz tog razloga neophodno je izgraditi savremeno postrojenje
za automatsku dezinfekciju gasnim hlorom.
Procjena investicije za izvoenje ovih radova ....................................................cca 200.000,00 KM
Uspostavljanje sistema neutralizacije na svim postrojenjima za dezinfekciju vode
Svako postrojenje za dezinfekciju gasnim hlorom mora biti opremljeno sa odgovarajuim sistemom za
neutralizaciju eventualno nekontrolisano isteklog hlora to, izuzev tri postrojenja od postojeih 13 nije
obezbjeeno. Iz tog razloga na ovim postrojenjima neophodno je osigurati sistem neutralizacije
isteklog hlora pri moguim akcidentnim situacijama, to podrazumjeva instalisanje i dogradnju
sprinkler sistema, neutralizacionih bazena sa natrijumtiosulfatom i aktivnim ugljem u kojima se odvija
proces neutralizacije i manje graevinske zahvate za isputanje neutralizacionog sadraja u najblii
recipijent.
Procjena investicije za izvoenje ovih radova ....................................................cca 150.000,00 KM
Uspostavljanje automatskog sistema dezinfekcije vode na svim tehnolokim
objektima pogona Vodovoda
Tabela 21. Objekti vodovoda za uspostavljanje automatskog sistema dezinfekcije vode
R.
br.

Lokacija
hlorne stanice

Proizvoa

Prijsjek potrebnih radova

Radni tim
Sarajevo, decembar2012. godine

obezbjeenja napajanja elektrinom energijom


graevinsko ureenje objekta
ugradnja nedostajuih komponenti: senzor, blic lampu,
karbonski filter, automatski prebaciva, vakum sigurnosni
ventil
rekonstrkcija linije radne vode

Procjenjena
vrijednost

120 000,00
52

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

R.
br.

Lokacija
hlorne stanice

Proizvoa

1.

P.S
HRASNICA

WALLACE
& TIERNAN

Prijsjek potrebnih radova

2.

REZERVOAR
NAHOREVO

WALLACE
& TIERNAN

3.

P.S VRELO
BOSNE

JESCO

FILTER
VOGOA
4.

JESCO

ugradnja mjeraa protoka i sa istoga obezbjeenje


signala za upravljanje
uvezivanje u telemetrijski sisitem
graevinsko ureenje objekta sa dogradnjom skladinog
odjela
ugradnja mjeraa protoka i sa istoga obezbjeenje
signala za upravljanje
rekonstrukcija linije uzorkovanja
instalisati nedostajue komponente: karbonski filter,
hlorinator, injektor, automatski prebaciva, vakum
regulacioni ventil i vakum sigurnosni ventil
uvezivanje u telemetrijski sisitem

150 000,00

graevinsko ureenje objekta


ugradnja mjeraa protoka i sa istoga obezbjeenje
signala za upravljanje
rekonstrukcija linija uzorkovanja, injektovanja i radne vode
instalisati nedostajue komponente: karbonski filter,
hlorinator, injektor, automatski prebaciva, vakum
regulacioni ventil i vakum sigurnosni ventil
uvezivanje u telemetrijski sisitem

120 000,00

instalisati/kompletirati
nedostajue
komponente:
karbonske filtere, regulacione ventile, setove za optimalno
podeavanje rada injektora na obadvije hlorinacije,
prekidae vakuma i obezbijediti rezervne pravce
injektovanja
uvezivanje u telemetrijski sisitem

5.

PERAKO
VRELO

JESCO

6.

VRELO
MOANICA

JESCO

7.

SOKOLOVI
KOLONIJA

JESCO

Procjenjena
vrijednost

instalisati nedostajue komponente: karbonske filtere,


prekidae vakuma, automatski preklopnik, injektor i
rezervnu liniju injektovanja
uvezivanje u telemetrijski sisitem
graevinski urediti prostor sa hlornim bocama
instalisati nedostajue komponente: karbonske filtere,
blic lampu, senzor hlora, injektor i rezervnu liniju
injektovanja
na Topax-u obezbjediti signal sa mjeraa protoka za
upravljaku funkciju
uvezivanje u telemetrijski sisitem
instalisati nedostajue komponente: karbonske filtere,
blic lampu, zvunu sirenu, prekidae vakuma
zbog
poddimenzionisati
zamijeniti
injektore,
rotometre i elektromagnetne regulacione ventile
uvezivanje u telemetrijski sisitem

150 000,00

100 000,00

100 000,00

70 000,00

Procjena investicije za izvoenje ovih radova ....................................................cca 810.000,00 KM

Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na filter


postrojenju Moanica
Na filterskom postrojenju Moanica, dezinfekcija vode trenutno se vri sa tenim hlorom, preko
peristaltinih dozir pumpi sa izuzetno izraenom nepouzdanou i sigurnou. Iz tog razloga
neophodno je izgraditi savremeno postrojenje za automatsku dezinfekciju gasnim hlorom.
Procjena investicije za izvoenje ovih radova ....................................................cca 200.000,00 KM

Radni tim
Sarajevo, decembar2012. godine

53

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na vrelu


Crnil
Na Vrelu Crnil, dezinfekcija vode trenutno se vri sa tenim hlorom, na sistemu tzv. kapavca, koji je
zastario i primitivan nain dezinficiranja sa izuzetno izraenom nepouzdanou. Iz tog razloga
neophodno je izgraditi savremeno postrojenje za automatsku dezinfekciju gasnim hlorom.
Procjena investicije za izvoenje ovih radova ....................................................cca 150.000,00 KM

UKUPNO 3.3.za 2015.g.........................................................................................cca 2.787.000,00 KM

1. REKONSTRUKCIJA VODOVODNE I KANALIZACIONE MREE....................................7


1.1.
Rekonstrukcija vodovodne i kanalizacione mree za 2013.g................................................7
1.1.1.
Cjevovod DN 300 na potezu Butila - Rajlovac....................................................................................................7
Prilog 1..........................................................................................................................................................................8
Procjena investicije za izvoenje ovih radova ................................................... cca 940.000,00 KM.....................8
1.1.2.
Cjevovod DN 300 u ulici Safeta Zajke od ulice Smaje ikala do ulice Alije Kuukalia...................................8
Prilog 2..........................................................................................................................................................................8
Procjena investicije za izvoenje ovih radova ................................................... cca 800.000,00 KM.....................8
1.1.3.
Cjevovod PS Alipain Most - PS Centar......................................................................................................8
Prilog 3..........................................................................................................................................................................8
Procjena investicije za izvoenje ovih radova ................................................ cca 1.980.000,00 KM.....................8
1.1.4.
Cjevovod u ulici Demala Bijedia na potezu Halilovii Alije Kuukalia.....................................................8
Prilog 4..........................................................................................................................................................................9
Procjena investicije za izvoenje ovih radova ................................................... cca 930.000,00 KM.....................9
1.1.5.
Zona Skenderija, Podzona Marijin dvor..............................................................................................................9
Prilog 5........................................................................................................................................................................11
Procjena investicije za izvoenje ovih radova ................................................ cca 1.980.000,00 KM...................11
1.1.6.
Zona Bjelave......................................................................................................................................................11
Prilog 6........................................................................................................................................................................14
Procjena investicije za izvoenje ovih radova .................................................. cca 4.241.750,00 KM.................14
1.1.7.
Rekonstrukcija kanalizacione mree u podzoni Marijin dvor............................................................................14
Procjena investicije za izvoenje ovih radova ................................................ cca 1.145.214,00 KM...................15
UKUPNO 1.1. za 2013.g. ....................................................................................cca 12.016.964,00 KM.............15
1.2.

Rekonstrukcija vodovodne i kanalizacione mree za 2014.................................................16

Radni tim
Sarajevo, decembar2012. godine

54

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

1.2.1.
Zona Skenderija.................................................................................................................................................16
Prilog 7........................................................................................................................................................................23
Procjena investicije za izvoenje ovih radova ................................................ cca 5.104.570,00 KM...................23
1.2.2.
Zona Kovaii....................................................................................................................................................24
Prilog 8........................................................................................................................................................................25
Procjena investicije za izvoenje ovih radova ................................................ cca 1.489.800,00 KM...................25
1.2.3.
Zona Hrid...........................................................................................................................................................25
Prilog 9........................................................................................................................................................................28
Procjena investicije za izvoenje ovih radova ................................................ cca 2.036.500,00 KM...................28
1.2.4.
Zona Pogledine...................................................................................................................................................28
Prilog 10......................................................................................................................................................................30
Procjena investicije za izvoenje ovih radova ................................................ cca 2.064.850,00 KM...................30
1.2.5.
Zona Kovaii, kanalizaciona mrea.................................................................................................................31
Procjena investicije za izvoenje ovih radova .................................................cca 1.273.266,00 KM...................31
UKUPNO 1.2. za 2014.g......................................................................................cca 11.968.986,00 KM.............31
1.3.
Rekonstrukcija vodovodne i kanalizacione mree za 2015.................................................32
1.3.1.
Zona Hambina Carina, vodovodna mrea..........................................................................................................32
Prilog 11......................................................................................................................................................................35
Procjena investicije za izvoenje ovih radova ................................................ cca 3.672.050,00 KM...................35
1.3.2.
Zona Hambina Carina, kanalizaciona mrea.....................................................................................................35
Procjena investicije za izvoenje ovih radova ................................................cca 8.125.541, 00 KM...................37
UKUPNO 1.3. za 2015.g......................................................................................cca 11.797.591,00 KM.............37

2. UPRAVLJANJE VODOVODNIM SISTEMOM..................................................................38


2.1.
Mjerno- regulacioni objekti i oprema za 2013.g..................................................................38
2.1.1.
Automatski regulacijski ventili..........................................................................................................................38
Prilog 12......................................................................................................................................................................38
Procjena investicije za izvoenje ovih radova ................................................... cca 772.000,00 KM...................39
Procjena investicije za izvoenje ovih radova ................................................... cca 536.000,00 KM...................39
UKUPNO 2.1.1...................................................................................................... cca 1.308.000,00 KM.............39
2.1.2.
Mjerni ahtovi....................................................................................................................................................39
Prilog 13......................................................................................................................................................................39
Procjena investicije za izvoenje ovih radova ................................................... cca 190.000,00 KM...................39
Prilog 14......................................................................................................................................................................39
Procjena investicije za izvoenje ovih radova ................................................... cca 150.000,00 KM...................39
Prilog 15......................................................................................................................................................................40
Procjena investicije za izvoenje ovih radova ................................................... cca 190.000,00 KM...................40
UKUPNO 2.1.2......................................................................................................... cca 530.000,00 KM.............40
2.1.3.
Mjerna oprema...................................................................................................................................................40
Procjena investicije za izvoenje ovih radova ................................................... cca 162.000,00 KM...................40
UKUPNO 2.1.za 2013.g........................................................................................ cca 2.000.000,00 KM.............40
2.2.
Mjerno- regulacioni objekti i oprema za 2014.g..................................................................41
2.2.1.
Mjerni ahtovi....................................................................................................................................................41
Procjena investicije za izvoenje ovih radova ................................................ cca 2.000.000,00 KM...................41
UKUPNO 2.2.za 2014.g............................................ ........................................... cca 2.000.000,00 KM.............41
2.3.
Mjerno- regulacioni objekti i oprema za 2015.g..................................................................42
2.3.1.
Mjerni ahtovi....................................................................................................................................................42
Procjena investicije za izvoenje ovih radova ................................................ cca 1.200.000,00 KM...................42
2.3.2.
Mjerna oprema...................................................................................................................................................42
Procjena investicije za izvoenje ovih radova ................................................... cca 449.100,00 KM...................43
2.3.3.
Automatski-regulacioni ventili...........................................................................................................................43
Procjena investicije za izvoenje ovih radova ................................................... cca 350.900,00 KM...................43
UKUPNO 2.3.za 2015.g.........................................................................................cca 2.000.000,00 KM.............43

3. OBEZBJEENJE POGONSKE SIGURNOSTI SISTEMA...............................................45


Radni tim
Sarajevo, decembar2012. godine

55

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

3.1.

Rekonstrukcija elektro energetskog pogona za 2013.g......................................................45


Prilog 16 i 17...............................................................................................................................................................45
3.1.1.
Rekonstrukcuja 10-20 KV postrojenja i TS 10-20/0,4KV, 1x100 KVA Baevo...........................................45
Procjena investicije za izvoenje ovih radova .................................................. cca 800.000,00 KM...................45
3.1.2.
Pumpna stanica Baevo-Mojmilo..................................................................................................................45
Procjena investicije za izvoenje ovih radova ................................................... cca 850.000,00 KM...................45
3.1.3.
Pumpna stanica Alipain Most - faza I.........................................................................................................45
Procjena investicije za izvoenje ovih radova ................................................... cca 770.000,00 KM...................46
Procjena investicije za izvoenje ovih radova ................................................... cca 250.000,00 KM...................46
UKUPNO 3.1.3.. ....................................................................................................cca 1.020.000,00 KM.............46
UKUPNO 3.1. za 2013..g.......................................................................................cca 2.670.000,00 KM.............46

3.2.
Rekonstrukcija elektro energetskog pogona, vodovodnih objekata i sistema za dezinfekciju
vode u 2014.g...................................................................................................................................... 46
3.2.1.
Nabavka zamjenskih pumpnih agregata.............................................................................................................46
Procjena investicije za izvoenje ovih radova ........................................... cca 1.119.000,00 KM........................46
3.2.2.
Rekonstrukcija pumpnih stanica u cilju zamjene pumpnih agregata.................................................................47
Procjena investicije za izvoenje ovih radova ................................................ cca 1.319.000,00 KM...................49
3.2.3.
Frekventni zamjenski regulatori i elektro-energetska oprema...........................................................................49
Tabela 31. Zamjena starih NN postrojenja na bunarima izvorita Baevo............................................................50
Tabela 32. Dorada daljinskog nadzora i upravljanja na objektima.........................................................................50
Procjena investicije za izvoenje ovih radova ................................................... cca 662.000,00 KM...................51
3.2.4 Opremanje servisa za remont pumpnih agregata......................................................................................51
Izrada projekta ispitne stanice i nabavka mjerno-regulacione opreme...................................................................51
113.000,00..............................................................................................................................................................51
UKUPNO 3.2 .za 2014.g....................................................................................... cca 3.213.000,00 KM.............51
3.3.
Rekonstrukcija elektro energetskog pogona, vodovodnih objekata i sistema za dezinfekciju
vode u 2015.g...................................................................................................................................... 51
3.3.1.
Rekonstrukcija pumpne stanice Hambina Carina..............................................................................................51
Procjena investicije za izvoenje ovih radova ................................................... cca 577.000,00 KM...................51
3.3.2.
Rekonstrukcija hlornog odjela na rezervoaru i pumpnoj stanici Baevo uz stvaranje uslova za prelazak na
potpuni automatski rad........................................................................................................................................................52
Procjena investicije za izvoenje ovih radova ....................................................cca 700 000,00 KM...................52
3.3.3.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na izvoritu Kovaii.......................52
Procjena investicije za izvoenje ovih radova ....................................................cca 200.000,00 KM...................52
3.3.4.
Uspostavljanje sistema neutralizacije na svim postrojenjima za dezinfekciju vode..........................................52
Procjena investicije za izvoenje ovih radova ....................................................cca 150.000,00 KM...................52
3.3.5.
Uspostavljanje automatskog sistema dezinfekcije vode na svim tehnolokim objektima pogona Vodovoda...52
Procjena investicije za izvoenje ovih radova ....................................................cca 810.000,00 KM...................53
3.3.6.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na filter postrojenju Moanica........53
Procjena investicije za izvoenje ovih radova ....................................................cca 200.000,00 KM...................53
3.3.7.
Izgradnja postrojenja za automatsku dezinfekciju vode gasnim hlorom na vrelu Crnil....................................53
Procjena investicije za izvoenje ovih radova ....................................................cca 150.000,00 KM...................54
UKUPNO 3.3.za 2015.g.........................................................................................cca 2.787.000,00 KM.............54

Radni tim
Sarajevo, decembar2012. godine

56

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

Radni tim
Sarajevo, decembar2012. godine

57

Kratkoroni investicioni program 2013-2015 god. -EBRD


IZVOD IZ PROGRAMASANACIJA DOTRAJALIH DIJELOVA VODOVODNOG I KANALIZACIONOG SISTEMA

REKAPITULACIJA

Pozicija iz Programa

2013.

2014.

2015.

12.016.964,00

11.968.986,00

11.797.591,00

2. UPRAVLJANJE VODOVODNIM
SISTEMOM

2.000.000,00

2.000.000,00

2.000.000,00

3. OBEZBJEENJE POGONSKE
SIGURNOSTI SISTEMA

2.670.000,00

3.253.000,00

2.787.000,00

16.686.964,00

17.221.986,00

16.584.591,00

1. REKONSTRUKCIJA VODOVODNE I
KANALIZACIONE MREE

UKUPNO:

Prilog 18.
Implementacija projekta zamjene vodovodne mree po zonama vodosnabdijevanja u periodu
2013 2015. godina.