1262R/2 Pg 26 of 31

refer to mezzanine
slab for reinforcement

Notes

790

435

max step

site prior to construction,


450

ordering or manufacture

450

400

All dimensions to be checked on

trench mesh

of items.
2

Do not scale this drawing.

2N16 'Z' bars

Amendments

FOOTING STEP DETAILS (NTS)

Date

2R20 dowel bars

top & bottom 600 long min


@ 600 cts. Bitumen paint
& expansion cap to one end.

10 jointex

600

max 600

450

piers required
pier to stiff natural
clay strata (min 250 kPa
bearing strata)

BN24 starters

Y16-200 U bars

both ways

top & bottom

1200 x 1200

TYPICAL FOOTING JOINT DETAIL

(at 18m max cts)

OLYMPIC

DESIGNS

*************************************************

55 Olympic Parade

Ph: 1234 5678

Homebush NSW 2140

Fax: 1234 5679

PROPOSED FACTORY UNITS

& OFFICE SPACE


for

BY24 bars

2R10 ties at
250 centres

Tasmegs Development Pty Ltd


7 Layland Way

Banksia
SECTION Z

TYPICAL CONCRETE COLUMN ELEVATION

AND PAD FOOTING (PF4)

Structural Details

Scale

1:20

Job No TAS7

Date

Dwg No