Interim Valuation Format - Lump Sum Contract
Interim Valuation Format - Lump Sum Contract
Interim Valuation Format - Lump Sum Contract
DESCRIPTION
BOQ AMOUNT
PREVIOUS
17,275,652.00
14,015,357.15
36,163,110.00
28,074,851.45
1,791,592.96
1,176,782.02
TENDER 1 - 17 ROOMS IN
GROUND FLOOR AT AHUNGALLA
2
AMENDMENTS
SUB TOTAL
###
###
-
###
(3,230,354.96)
(2,531,118.95)
###
###
Date : 28.11.2016
CURRENT
CUMILATIVE
2,515,507.08
16,530,864.23
6,430,262.47
34,505,113.92
599,332.34
1,776,114.36
9,545,101.89
52,812,092.51
9,545,101.89
(558,388.46)
8,986,713.43
52,812,092.51
(3,089,507.41)
49,722,585.10
(2,600,000.00)
(10,363,963.96)
36,758,621.14
(8,226,843.63)
(6,832,683.66)
(9,009,009.01)
(4,504,504.50)
8,185,580.34
1,227,837.05
9,413,417.39
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
GENERAL NOTES
1
The bidders shall visit the site prior to submitting the Bid and ensure that
all preliminary items required as listed below and any other work required
or deemed to be required for the project is included in the pricing. No
claim shall be entertained for additional items due to bidders failure in
obtaining information when inspect site and its surrounding.
Note
The Contractor shall use the service entrance or any other entrance or
exit points instructed by the Hotel for enter into the site, exit from site and
for removal of all debris and material arising from demolition or
Contractor's any other work related to the Contract and shall carry out all
the works as instructed by the Hotel.
Note
DESCRIPTION
The contractor shall be responsible for maintaining the site in a clean and
orderly manner at all times during the entire contract period. Materials,
equipment, tools etc., shall be kept neatly stacked on the site with all
access - ways kept clear. All dust, debris and rubbish etc., arising out of
his own work shall be continuously cleared and removed from the site.
The burying or burning of rubbish and debris on site will not be allowed.
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
Note
5
The Contractor's staff must wear overalls with company name, safety
shoes and company Identity Card, by following all necessary safety
measures to workmen at site confirming to the latest industrial safety
regulations, while they are within the hotel premises for the entire duration
of the Contract and the cost incurred deemed included in the Contractor's
Bid.
Note
The equipment, Power tools or any other tools used for the Works must
be equipped with the standard safety gear and connecting devices and all
the staff of the Contractor must abide by Hotel Security procedures.
Note
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
Note
9
10
Note
11
12
The Contractor shall educate and instruct all
adhere to rules and procedures of the Hotel.
13
Contractor shall give notice to authorities etc., obtaining permits and the
payment of fees in compliance with the requirement of the by-laws and
regulations lawfully imposed by the Government or Semi Governmental
or other local authorities.
Note
14
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
15
The Contractor is paid only to the BOQ Items actually executed at site.
The Hotel may remove any of the work items from the Contractor's scope
at the discretion of the Hotel.
Note
Note
Note
16
17
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
10
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
PRELIMINARIES
1.A.1
1.A.2
1.A.3
1.A.4
1.A.5
1.A.6
15,000.00
15,000.00
85%
12,750.00
Item
175,000.00
175,000.00
85%
148,750.00
Item
120,000.00
120,000.00
85%
102,000.00
Item
225,000.00
225,000.00
85%
191,250.00
Item
45,000.00
45,000.00
85%
38,250.00
Item
150,000.00
150,000.00
85%
127,500.00
Allow for connection of temporary water for the work with seperate
meter for workers consumption, including storage and distribution
system required for the work and
payment for
monthly
consumption by workers during construction period
11
DESCRIPTION
1.A.7
Allow for Scaffolding required for the entire project including shifting,
maintaining and removal on completion
1.A.8
1.A.9
1.A.10
1.A.11
1.A.12
1.A.13
Allow for providing safety netting around the building includng maintaining
and removal on completion
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
AMOUNT
Item
75,000.00
75,000.00
85%
63,750.00
Item
125,000.00
125,000.00
85%
106,250.00
Item
300,000.00
300,000.00
85%
255,000.00
Item
150,000.00
150,000.00
Item
75,000.00
75,000.00
Item
210,000.00
210,000.00
100%
210,000.00
12
Rev 1
1/7/2016
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
1,665,000.00
PREVIOUS
AMOUNT
1,255,500.00
13
(TENDER 1)
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
14
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
15
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
16
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
17
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
18
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
19
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
10%
1,500.00
95%
14,250.00
10%
17,500.00
95%
166,250.00
10%
12,000.00
95%
114,000.00
85%
191,250.00
0%
10%
4,500.00
95%
42,750.00
10%
15,000.00
95%
142,500.00
20
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
15%
11,250.00
100%
75,000.00
15%
18,750.00
100%
125,000.00
15%
45,000.00
100%
300,000.00
0%
75%
0%
0%
56,250.00
75%
56,250.00
100%
210,000.00
21
CURRENT
%
AMOUNT
CUMILATIVE
%
181,750.00
AMOUNT
1,437,250.00
22
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
Notes
1
All material samples shall be submitted to the Hotel for the approval
and the approved samples to be submitted to the person specified by
Hotel.
Note
Hotel shall remove all loose furniture and equipment from the room
prior to handing over the site to the Contractor.
Note
All the work remained without change shall be covered and protected
during execution of work to prevent any damage on such work.
Damage on such work due to Contractors default shall be rectified or
replaced at his own expenses.
Note
23
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
Note
8
The location of Electrical, Sanitary and any other fittings and fixtures to
be fixed within the room may change at the installation and no extra
payment is allowed for such location shifting within the room
Note
10
11
Note
Bidder shall verify all the quantities indicated in this BOQ when visited
site prior to pricing and bring to the notice of the Client if there is any
discrepancy.
Note
24
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
25
2.A
2.A.1
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
BATH ROOM
Demolition
Notes
Note
Note
Note
26
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
Note
8
27
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT
28
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
93
Nr
375.00
34,875.00
100%
34,875.00
Remove existing switches and socket outlets and hand over to the
Hotel
28
Nr
150.00
4,200.00
100%
4,200.00
Item
225,000.00
225,000.00
100%
225,000.00
2.A.1.1
2.A.1.2
2.A.1.3
Remove all existing sanitary fittings and accessories
and stack
carefully at a location allocated by Hotel, for reuse (WC , Towel rail
grab bar , shower rose ,bib tap , mirror, bidet shower, cistern tank and
all other removable accessories in the bathroom except wash Basin)
(for 18 bathrooms)
2.A.1.4
2.A.1.5
Remove existing floor tiles and tile backing upto structural floor and
remove debris
1077
Sq.ft
190.00
204,630.00
100%
204,630.00
Remove existing wall tiles with tile backing upto structural wall and
remove debris
1106
Sq.ft
220.00
243,320.00
100%
243,320.00
Chip and roughen cut cement finish on walls and remove inferior
quality plaster entirely and remove debris
3161
Sq.ft
180.00
568,980.00
100%
568,980.00
140.00
16,520.00
100%
16,520.00
2.A.1.6
2.A.1.7
118
Sq.ft
2.A.1.8
17
Nr
3,500.00
59,500.00
100%
59,500.00
Remove exsisting tempered glass sliding door, size 2'-5"x 7'0" in room
no 126
Nr
3,500.00
3,500.00
100%
3,500.00
2.A.1.9
29
2.A.2
DESCRIPTION
QTY
UNIT
0
0
Note
Note
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Waterproofing
Notes
2
Approved water proofing system shall be with 10 years warranty and
shall be applied as per manufacturer's instruction/specification to suit
the structure and the location. including levelling and preparation of
surfaces, protective screeds, angle fillets and any other work necessary
for proper completion of waterproofing system.
On bathroom floor
1076
Sq.ft
210.00
225,960.00
100%
225,960.00
2.A.2.2
On vertical surface - shower area walls and upto 1' high on perimeter
walls
1818
Sq.ft
210.00
381,780.00
100%
381,780.00
30
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Rev 1
1/7/2016
Page total carried to next page
1,968,265.00
1,968,265.00
31
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
1,968,265.00
2.A.3
PREVIOUS
AMOUNT
1,968,265.00
Plumbing
Hot and Cold water supply and Waste water disposal
2.A.3.1
2.A.3.2
18
Nr
850.00
15,300.00
100%
15,300.00
2.A.3.3
18
Nr
850.00
15,300.00
100%
15,300.00
18
Nr
3,500.00
63,000.00
0%
18
Nr
3,200.00
57,600.00
65%
2.A.3.5
Installation of "PRESTO" brand Dual Flush Valve system replacing
present cistern tank including service connection with 1" pipe and new
gate valve with necessary accessories and service connection for
proper functioning of the system (Duel flush valve and gate valve
supplied by CPD of Hotel)
37,440.00
32
RATE (Rs)
PREVIOUS
DESCRIPTION
QTY
UNIT
AMOUNT (Rs)
AMOUNT
18
Nr
2,200.00
39,600.00
70%
27,720.00
17
Nr
750.00
12,750.00
70%
8,925.00
11
Nr
650.00
7,150.00
88%
6,292.00
2.A.3.6
2.A.3.7
2.A.3.8
Rev 1
1/7/2016
33
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,178,965.00
AMOUNT
2,079,242.00
34
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,178,965.00
AMOUNT
2,079,242.00
2.A.3.9
Installation of new bidet shower at shifted location with, fixing
accessories and service connection for proper functioning of the
system.(Bidet shower with angle valve supplied by CPD of Hotel)
Nr
650.00
4,550.00
88%
4,004.00
17
Nr
125,000.00
2,125,000.00
76%
1,615,000.00
Replacing hot and cold water 1 /2 " angle valves (in pair) with
flexible hoses in wash basin (Angle valve supplied by CPD of
Hotel)
20
Nr
5,300.00
106,000.00
75%
79,500.00
18
Nr
750.00
13,500.00
18
Nr
750.00
13,500.00
58%
7,830.00
58,500.00
58,500.00
60%
35,100.00
2.A.3.10
2.A.3.11
2.A.3.12
2.A.3.13
2.A.3.14
Installation of new robe hook, Toilet paper holder, Soap Holder,
Tissue box and Towel rail, "Grohe" with fixing accessories (Robe
hook,Toilet paper holder, Soap Holder, Tissue box and Towel rail,
supplied by CPD of Hotel) - for 18 Nr bath rooms
Item
35
2.A.4
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Electrical Installation
Final sub circuit point wiring
Notes
2
3
2.A.4.1
2.A.4.2
0
0
Final sub circuit point wiring for the following outlets with PVC conduit,
switches and connectors Including other materials required to make
complete installation as specified by the Hotel. (Selected switches
supplied by CPD of the Hotel)
0
0
Note
0
0
0
Note
43
Nr
2,800.00
120,400.00
80%
96,320.00
Nr
2,800.00
8,400.00
80%
6,720.00
Note
36
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
4,628,815.00
AMOUNT
3,923,716.00
37
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
4,628,815.00
AMOUNT
3,923,716.00
2.A.4.3
2.A.4.4
2.A.4.5
50
Nr
650.00
32,500.00
65%
21,125.00
37
Nr
650.00
24,050.00
35%
8,417.50
17
Nr
5,000.00
85,000.00
65%
55,250.00
2.A.4.6
28
Nr
750.00
21,000.00
50%
10,500.00
2.A.4.7
18
Nr
750.00
13,500.00
65%
8,775.00
18
Nr
6,200.00
111,600.00
75%
83,700.00
Telephone
2.A.4.8
Pipe music
38
DESCRIPTION
2.A.4.9
Wiring for pipe music with CU/PVC Twin speaker cables with
transparent insulation in AWG 18/ 0.83 sq.mm. from bed side
controler to twin speakers points in bath room ceiling and AC
return grill area adjacent to bath room for parallel operation. (Make
: Kelani Cables)
QTY
UNIT
19
Nr
RATE (Rs)
7,500.00
PREVIOUS
AMOUNT (Rs)
142,500.00
88%
AMOUNT
125,400.00
Rev 1
1/7/2016
Page total carried to next page
5,058,965.00
4,236,883.50
39
DESCRIPTION
QTY
UNIT
Rate for tiling shall include for providing adhesive and tile grout in
approved quality which has no effect to the tiles or any efflorescence.
AMOUNT
4,236,883.50
Finishes
Notes
AMOUNT (Rs)
5,058,965.00
2.A.5
RATE (Rs)
PREVIOUS
0
0
0
0
0
0
Note
0
0
Note
0
0
Note
0
0
Note
Note
Note
The Contractor shall submit shop drawings and tile layout for floor and
wall tiles for approval prior to commencement of work.
The Contractor shall coordinate the work on finishes with installation of
services such as electrical fittings, fixtures, and plumbing layouts.
Rates for tilling shall include for laying to pattern and design shown in
the approved tile layout including laying of sample areas for approval.
(Selected tile supplied by CPD of the Hotel)
Floor Finishes
40
DESCRIPTION
2.A.5.1
Fixing of Porcelain tile, size 2' X 2' "GOBM 50 PEA from DAVINCI" on
and including 1:3 cement sand bedding to maintain the levels and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
1077
Sq.ft
360.00
387,720.00
57%
221,000.40
2668
Sq.ft
385.00
1,027,180.00
88%
903,918.40
1753
Sq.ft
385.00
674,905.00
88%
593,916.40
Wall Finishes
2.A.5.2
2.A.5.3
Fixing of Porcelain tile, size 2' X 2' "from DAVINCI" on and including
1:3 cement sand bedding and fixing tile with approved adhesive
including grouting with water proof, anti fungal, high quality polymer
grout to match with tile as approved by the ID Consultant and the Hotel.
(Selected tile supplied by CPD of the Hotel) and making all SS
access plates under wash basins and jacuzzies, as to flush with
new tile wall.
Fixing Mosaic tile, size 4' X 4' (48mm 48mm) "VERDANT TG (S) - 074
from DAVINCI" on and including 1:3 cement sand bedding and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
41
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
7,148,770.00
AMOUNT
5,955,718.70
42
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
7,148,770.00
2.A.6
PREVIOUS
AMOUNT
5,955,718.70
2.A.6.1
Sq.ft
85.00
87,465.00
65%
56,852.25
369
Sq.ft
180.00
66,420.00
88%
58,449.60
2.A.7
Miscellaneous
Hair drier
2.A.7.1
19
Nr
650.00
12,350.00
2.A.7.2
Door Stoppers
Installation of door stopper to Bathroom door.
19
Nr
650.00
12,350.00
Ceiling
43
DESCRIPTION
QTY
UNIT
2.A.7.3
304
Sq.ft
RATE (Rs)
490.00
PREVIOUS
AMOUNT (Rs)
148,960.00
%
88%
AMOUNT
131,084.80
Rev 1
1/7/2016
TOTAL - A. BATHROOM CARRIED TO COLLECTION
7,476,315.00
6,202,105.35
44
2.B
2.B.1
DESCRIPTION
QTY
UNIT
121
Nr
Remove existing bell shape light fittings and carefully stack for reuse
48
Nr
Remove existing switches and socket outlets and hand over to the
Hotel
259
Remove AC grille and hand over to the Hotel for powder coating
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
2.B.1.1
375.00
45,375.00
100%
45,375.00
375.00
18,000.00
100%
18,000.00
Nr
150.00
38,850.00
100%
38,850.00
22
Nr
1,500.00
33,000.00
100%
33,000.00
Disconnecting and removing FCU and hand over to the hotel for
necessary upgrades
19
Nr
3,500.00
66,500.00
100%
66,500.00
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
1466
Sq.ft
190.00
278,540.00
100%
278,540.00
Removing full length mirror with light switch and the mirror light
carefully for reuse after work
14
Nr
2,500.00
35,000.00
100%
35,000.00
2.B.1.2
2.B.1.3
2.B.1.4
2.B.1.5
2.B.1.6
2.B.1.7
45
2.B.2
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
19
Nr
5,600.00
106,400.00
88%
93,632.00
84
Nr
2,800.00
235,200.00
88%
206,976.00
15
Nr
2,800.00
42,000.00
88%
36,960.00
17
Nr
3,500.00
59,500.00
88%
52,360.00
135
Nr
3,200.00
432,000.00
88%
380,160.00
Electrical Installation
Final sub circuit point wiring
Refer Notes under Electrical Installation
2.B.2.1
2.B.2.2
2.B.2.3
2.B.2.4
2.B.2.5
46
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Rev 1
1/7/2016
Page total carried to next page
1,390,365.00
1,285,353.00
47
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
1,390,365.00
AMOUNT
1,285,353.00
2.B.2.6
86
Nr
650.00
55,900.00
88%
49,192.00
2.B.2.7
17
Nr
650.00
11,050.00
88%
9,724.00
2.B.2.8
51
Nr
650.00
33,150.00
88%
29,172.00
2.B.2.9
Nr
650.00
5,850.00
88%
5,148.00
2.B.2.10
15
Nr
1,200.00
18,000.00
88%
15,840.00
2.B.2.11
188
Nr
750.00
141,000.00
88%
124,080.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
Wiring for Master/Key card switch wiring connected to all power points
in the room except mini bar and FCU
DND/Make my room
2.B.2.13
48
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
38
Nr
6,200.00
235,600.00
65%
153,140.00
17
Nr
6,200.00
105,400.00
65%
68,510.00
7,500.00
142,500.00
88%
125,400.00
Telephone
2.B.2.14
Television
2.B.2.15
Wiring TV point using 75 Ohm kelani cable c/w all conduit and
fixing accessories
Data
2.B.2.16
Wiring for data point, using cat 6 data cable from service duct to
data switch
Deleted
Pipe music
2.B.2.17
Wiring for pipe music supply cables from service duct to the bed
side controller with 2 core, CU/PVC/SCR/PVC screened 3 cables
in IO219020 ZZ / 2x1.55sqmm (30/0.25 x/mm). (Make - Kelani
cables)
19
Nr
49
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Rev 1
1/7/2016
Page total carried to next page
2,257,815.00
1,942,909.00
50
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,257,815.00
AMOUNT
1,942,909.00
Nr
4,000.00
76,000.00
88%
66,880.00
19
Nr
14,500.00
275,500.00
88%
242,440.00
19
Nr
1,500.00
28,500.00
65%
18,525.00
1467
Sq.ft
360.00
528,120.00
88%
464,745.60
Thermostat
2.B.2.19
2.B.2.20
2.B.3
Finishes
Refer "Notes" under Finishes
Floor Finishes
2.B.3.1
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sandbedding to maintain the levels and fixing tile with approved
adhesive including grouting to match with tile as approved by the ID
Consultant and the Hotel. (Selected tile supplied by CPD of the Hotel).
51
DESCRIPTION
2.B.4
2.B.4.1
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
1037
Sq.ft
45.00
46,665.00
65%
30,332.25
3611
Sq.ft
72.00
259,992.00
65%
168,994.80
1037
Sq.ft
85.00
88,145.00
65%
57,294.25
Floor Polishing
2.B.4.2
Cut and polish existing terrazo floor and finish to the quality accepted
by the Hotel
Internal wall painting
2.B.4.3
2.B.4.4
52
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,560,737.00
AMOUNT
2,992,120.90
53
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,560,737.00
AMOUNT
2,992,120.90
Timber surfaces
Water base paint, matt with DULUX, "Teak 321" including 1
undercoats and 2 finishing coats on timber surfaces
2.B.4.5
2.B.4.6
680
On existing Furniture
Sq.ft
180.00
122,400.00
90%
110,160.00
85.00
510.00
90%
459.00
105,500.00
105,500.00
490.00
76,930.00
65%
50,004.50
Deleted
Pergola painting
2.B.4.7
2.B.5
Sq.ft
Nr
157
Sq.ft
Miscellaneous
Double sash door
2.B.5.1
(Follow detail given in Drg No. PRE-001-16 - only the door sash &
timber verticals only)
Teak double door sash fixed to timber verticals in either sides with 1"
thick door sash in Room No. 126
Ceiling
2.B.5.2
54
RATE (Rs)
PREVIOUS
DESCRIPTION
QTY
UNIT
AMOUNT (Rs)
AMOUNT
17
Nr
2,500.00
42,500.00
100%
42,500.00
Magic eye
Fix magic eye "hafel" with fixing accessories (magic eye supplied by
CPD of Hotel)
17
Nr
500.00
8,500.00
35%
2,975.00
Safety latch
Fix new safety latch with fixing accessories (Safety latch and chain
supplied by CPD of Hotel)
17
Nr
500.00
8,500.00
65%
5,525.00
17
Nr
750.00
12,750.00
65%
8,287.50
17
Nr
500.00
8,500.00
2.B.5.3
2.B.5.4
2.B.5.5
55
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,946,827.00
AMOUNT
3,212,031.90
56
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,946,827.00
AMOUNT
3,212,031.90
Mirror
2.B.5.9
Fix mirror with protective film at the back, 5mm St Gobian India to the
existing 4" wide timber frame to cover Titanium finish wall at bagage
rack,( with frame) by maintaining required gap for proper ventilation and
frame stain & finish to match other furniture (Mirror supplied by CPD of
Hotel)
19
Nr
6,500.00
123,500.00
Fix mirror, 5mm St Gobian India with 4" teak timber frame to
cover Titanium finish wall at bed side,stain & finish to match other
furniture (Mirror supplied by CPD of Hotel)
14
Nr
13,500.00
189,000.00
TV Bracket
Installation of TV bracket to mound TV on wall
19
Nr
750.00
14,250.00
35%
4,987.50
210
Sq.ft
250.00
52,500.00
55%
28,875.00
Clean existing UPVC french Window and replace all ironmongery with
corrosion resistant material as approved by the ID Consultant and Hotel
1736
Sq.ft
140.00
243,040.00
65%
157,976.00
17
Nr
3,400.00
57,800.00
2.B.5.10
2.B.5.11
AC grille
2.B.5.12
2.B.5.13
Threshold
2.B.5.14
57
DESCRIPTION
QTY
UNIT
17
Nr
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
2.B.5.15
Installation of wall puicture with necessary accessories
500.00
8,500.00
Rev 1
1/7/2016
TOTAL - B. ROOM ENTRANCE , LIVING ROOM AND BED ROOM
CARRIED TO COLLECTION
4,635,417.00
3,403,870.40
58
DESCRIPTION
2.C
BALCONY
2.C.1
Demolition
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
40
Nr
375.00
15,000.00
100%
15,000.00
3428
Sq.ft
190.00
651,320.00
100%
651,320.00
3428
Sq.ft
210.00
719,880.00
94%
676,687.20
40
Nr
650.00
26,000.00
65%
16,900.00
2.C.2
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
Waterproofing
Refer "Notes" under 2.A.2 Waterproofing
2.C.2.1
On balcony floor
2.C.3
Electrical Installation
Refer "Notes" under 2.A.4 Electrical Installation
Installation of light fixtures
Installation of the fixture with other materials required to make
complete installation as specified by the Hotel. (Selected light fixtures
supplied by CPD of the Hotel)
2.C.3.1
59
DESCRIPTION
2.C.3.2
2.C.4
QTY
UNIT
Nr
3428
510
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
2,800.00
5,600.00
65%
3,640.00
Sq.ft
360.00
1,234,080.00
94%
1,160,035.20
L.ft
130.00
66,300.00
94%
62,322.00
Finishes
Refer "Notes" under 2.A.5 Finishes
Floor Finishes
2.C.4.1
2.C.4.2
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sand bedding to maintain the levels and fixing tile with or
approved adhesive including grouting to match with tile as approved by
the ID Consultant and the Hotel. (Selected tile supplied by CPD of the
Hotel).
Rev 1
1/7/2016
60
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,718,180.00
AMOUNT
2,585,904.40
61
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
2,718,180.00
2.C.5
PREVIOUS
AMOUNT
2,585,904.40
2.C.5.1
Sq.ft
65.00
215,475.00
70%
150,832.50
1726
Sq.ft
85.00
146,710.00
70%
102,697.00
25
Sq.ft
85.00
2,125.00
100%
2,125.00
Ceiling painting
2.C.5.2
pergola painting
2.C.5.3
2.C.6
Miscellaneous
Aluminium French window
2.C.6.1
Clean existing Aluminium French Window and replace all
ironmongery with corrosion resistant material as approved by the
ID Consultant and Hotel
Deleted
62
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
Rev 1
1/7/2016
TOTAL - C. BALCONY CARRIED TO COLLECTION
3,082,490.00
2,841,558.90
63
2.D.1
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT
2112
Sq.ft
65.00
137,280.00
75%
102,960.00
3722
Sq.ft
75.00
279,150.00
75%
209,362.50
PASSAGE
2.D.1.1
Ceiling painting
2.D.1.2
64
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
416,430.00
AMOUNT
312,322.50
65
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT
COLLECTION
BATH ROOM
7,476,315.00
6,202,105.35
4,635,417.00
3,403,870.40
BALCONY
3,082,490.00
2,841,558.90
PASSAGE
416,430.00
312,322.50
66
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
15,610,652.00
AMOUNT
12,759,857.15
67
AMOUNT
CUMILATIVE
%
AMOUNT
68
AMOUNT
CUMILATIVE
%
AMOUNT
69
AMOUNT
CUMILATIVE
%
AMOUNT
70
AMOUNT
CUMILATIVE
%
AMOUNT
71
AMOUNT
CUMILATIVE
%
AMOUNT
72
AMOUNT
CUMILATIVE
%
AMOUNT
73
AMOUNT
CUMILATIVE
%
AMOUNT
0%
100%
34,875.00
0%
100%
4,200.00
0%
100%
225,000.00
0%
100%
204,630.00
0%
100%
243,320.00
0%
100%
568,980.00
0%
100%
16,520.00
0%
100%
59,500.00
0%
100%
3,500.00
74
AMOUNT
CUMILATIVE
%
AMOUNT
0%
100%
225,960.00
0%
100%
381,780.00
75
CUMILATIVE
AMOUNT
AMOUNT
1,968,265.00
76
CUMILATIVE
AMOUNT
AMOUNT
0%
1,968,265.00
100%
15,300.00
100%
15,300.00
99%
62,370.00
99%
62,370.00
35%
20,160.00
100%
57,600.00
77
CUMILATIVE
AMOUNT
AMOUNT
29%
11,484.00
99%
39,204.00
29%
3,697.50
99%
12,622.50
11%
786.50
99%
7,078.50
78
AMOUNT
98,498.00
CUMILATIVE
%
AMOUNT
2,177,740.00
79
CUMILATIVE
AMOUNT
AMOUNT
98,498.00
2,177,740.00
11%
500.50
99%
4,504.50
24%
510,000.00
100%
2,125,000.00
25%
26,500.00
100%
106,000.00
97%
13,095.00
97%
13,095.00
39%
5,265.00
97%
13,095.00
39%
22,815.00
99%
57,915.00
80
AMOUNT
CUMILATIVE
%
AMOUNT
19%
22,876.00
99%
119,196.00
19%
1,596.00
99%
8,316.00
81
AMOUNT
701,145.50
CUMILATIVE
%
AMOUNT
4,624,861.50
82
AMOUNT
CUMILATIVE
%
AMOUNT
701,145.50
4,624,861.50
35%
11,375.00
100%
32,500.00
62%
14,911.00
97%
23,328.50
35%
29,750.00
100%
85,000.00
47%
9,870.00
97%
20,370.00
32%
4,320.00
97%
13,095.00
25%
27,900.00
100%
111,600.00
83
12%
AMOUNT
17,100.00
816,371.50
CUMILATIVE
%
100%
AMOUNT
142,500.00
5,053,255.00
84
AMOUNT
816,371.50
CUMILATIVE
%
AMOUNT
5,053,255.00
85
AMOUNT
CUMILATIVE
%
AMOUNT
39%
151,210.80
96%
372,211.20
8%
82,174.40
96%
986,092.80
8%
53,992.40
96%
647,908.80
86
AMOUNT
1,103,749.10
CUMILATIVE
%
AMOUNT
7,059,467.80
87
AMOUNT
CUMILATIVE
%
AMOUNT
1,103,749.10
7,059,467.80
34%
29,738.10
99%
86,590.35
11%
7,306.20
99%
65,755.80
97%
11,979.50
97%
11,979.50
100%
12,350.00
100%
12,350.00
88
AMOUNT
16,385.60
1,181,508.50
CUMILATIVE
%
AMOUNT
99%
147,470.40
7,383,613.85
89
AMOUNT
CUMILATIVE
%
AMOUNT
0%
100%
45,375.00
0%
100%
18,000.00
0%
100%
38,850.00
0%
100%
33,000.00
0%
100%
66,500.00
0%
100%
278,540.00
0%
100%
35,000.00
90
AMOUNT
CUMILATIVE
%
AMOUNT
12%
12,768.00
100%
106,400.00
12%
28,224.00
100%
235,200.00
12%
5,040.00
100%
42,000.00
12%
7,140.00
100%
59,500.00
12%
51,840.00
100%
432,000.00
91
AMOUNT
105,012.00
CUMILATIVE
%
AMOUNT
1,390,365.00
92
CUMILATIVE
AMOUNT
AMOUNT
105,012.00
1,390,365.00
12%
6,708.00
100%
55,900.00
12%
1,326.00
100%
11,050.00
9%
2,983.50
97%
32,155.50
9%
526.50
97%
5,674.50
9%
1,620.00
97%
17,460.00
9%
12,690.00
97%
136,770.00
35%
20,825.00
100%
59,500.00
35%
20,825.00
100%
59,500.00
93
AMOUNT
CUMILATIVE
%
AMOUNT
35%
82,460.00
100%
235,600.00
35%
36,890.00
100%
105,400.00
12%
17,100.00
100%
142,500.00
94
AMOUNT
308,966.00
CUMILATIVE
%
AMOUNT
2,251,875.00
95
AMOUNT
CUMILATIVE
%
AMOUNT
308,966.00
2,251,875.00
12%
9,120.00
100%
76,000.00
12%
33,060.00
100%
275,500.00
32%
9,120.00
97%
27,645.00
12%
63,374.40
100%
528,120.00
96
AMOUNT
CUMILATIVE
%
AMOUNT
34%
15,866.10
99%
46,198.35
34%
88,397.28
99%
257,392.08
34%
29,969.30
99%
87,263.55
97
AMOUNT
557,873.08
CUMILATIVE
%
AMOUNT
3,549,993.98
98
CUMILATIVE
AMOUNT
AMOUNT
557,873.08
3,549,993.98
9%
11,016.00
99%
121,176.00
10%
51.00
100%
510.00
100%
105,500.00
100%
105,500.00
26%
20,001.80
91%
70,006.30
99
AMOUNT
0%
AMOUNT
100%
42,500.00
62%
5,270.00
97%
8,245.00
32%
2,720.00
97%
8,245.00
32%
4,080.00
97%
12,367.50
0%
CUMILATIVE
0%
100
AMOUNT
706,511.88
CUMILATIVE
%
AMOUNT
3,918,543.78
101
AMOUNT
CUMILATIVE
%
AMOUNT
706,511.88
0%
0%
0%
0%
62%
8,835.00
97%
13,822.50
42%
22,050.00
97%
50,925.00
35%
85,064.00
100%
243,040.00
0%
3,918,543.78
0%
102
AMOUNT
0%
AMOUNT
0%
822,460.88
CUMILATIVE
4,226,331.28
103
AMOUNT
CUMILATIVE
%
AMOUNT
0%
100%
15,000.00
0%
100%
651,320.00
6%
43,192.80
100%
719,880.00
32%
8,320.00
97%
25,220.00
104
AMOUNT
CUMILATIVE
%
AMOUNT
35%
1,960.00
100%
5,600.00
5%
61,704.00
99%
1,221,739.20
5%
3,315.00
99%
65,637.00
105
AMOUNT
118,491.80
CUMILATIVE
%
AMOUNT
2,704,396.20
106
AMOUNT
CUMILATIVE
%
AMOUNT
118,491.80
30%
64,642.50
100%
215,475.00
29%
42,545.90
99%
145,242.90
100%
2,125.00
0%
2,704,396.20
107
AMOUNT
225,680.20
CUMILATIVE
%
AMOUNT
3,067,239.10
108
AMOUNT
CUMILATIVE
%
AMOUNT
25%
34,320.00
100%
137,280.00
25%
69,787.50
100%
279,150.00
109
AMOUNT
104,107.50
CUMILATIVE
%
AMOUNT
416,430.00
110
AMOUNT
CUMILATIVE
%
AMOUNT
1,181,508.50
7,383,613.85
822,460.88
4,226,331.28
225,680.20
3,067,239.10
104,107.50
416,430.00
111
AMOUNT
2,333,757.08
CUMILATIVE
%
AMOUNT
15,093,614.23
112
DESCRIPTION
1,665,000.00
15,610,652.00
Total - 1
Less
AMOUNT (Rs)
17,275,652.00
Discount if any %
17,275,652.00
113
BOQ
NO
DESCRIPTION
AMOUNT (Rs)
114
PREVIOUS
CURRENT
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
AMOUNT (Rs)
1,255,500.00
181,750.00
1,437,250.00
12,759,857.15
2,333,757.08
15,093,614.23
14,015,357.15
2,515,507.08
16,530,864.23
14,015,357.15
2,515,507.08
16,530,864.23
115
PREVIOUS
CURRENT
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
AMOUNT (Rs)
116
REFURBISHMENT TO HERITANCE. GALLE ROAD, AHUNGALLA - 34 ROOMS IN 1ST & 2ND FLOORS (TENDER
BILL NO. 03 - GENERAL NOTES AND PRELIMINARIES
BOQ
NO
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
GENERAL NOTES
1
The bidders shall visit the site prior to submitting the Bid and ensure that all
preliminary items required as listed below and any other work required or
deemed to be required for the project is included in the pricing. No claim
shall be entertained for additional items due to bidders failure in obtaining
information when inspect site and its surrounding.
Note
The Contractor shall use the service entrance or any other entrance or exit
points instructed by the Hotel for enter into the site, exit from site and for
removal of all debris and material arising from demolition or Contractor's
any other work related to the Contract and shall carry out all the works as
instructed by the Hotel.
Note
The contractor shall be responsible for maintaining the site in a clean and
orderly manner at all times during the entire contract period. Materials,
equipment, tools etc., shall be kept neatly stacked on the site with all
access - ways kept clear. All dust, debris and rubbish etc., arising out of his
own work shall be continuously cleared and removed from the site. The
burying or burning of rubbish and debris on site will not be allowed.
Note
117
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
Note
6
The Contractor's staff must wear overalls with company name, safety shoes
and company Identity Card, by following all necessary safety measures to
workmen at site confirming to the latest industrial safety regulations, while
they are within the hotel premises for the entire duration of the Contract and
the cost incurred deemed included in the Contractor's Bid.
Note
118
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
119
DESCRIPTION
The equipment, Power tools or any other tools used for the Works must be
equipped with the standard safety gear and connecting devices and all the
staff of the Contractor must abide by Hotel Security procedures.
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
Note
8
10
Note
11
Workers access is restricted only to work site (area of construction) and the
workers accommodation and prohibited to use any of the guest/room
facilities and also prohibited to enter any other areas of the hotel
Note
12
The Contractor shall educate and instruct all his sub contractors to adhere
to rules and procedures of the Hotel.
13
Note
Contractor shall give notice to authorities etc., obtaining permits and the
payment of fees in compliance with the requirement of the by-laws and
regulations lawfully imposed by the Government or Semi Governmental or
other local authorities.
Note
120
DESCRIPTION
14
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
Note
15
The Contractor is paid only to the BOQ Items actually executed at site,
limiting maximum amount paid as indicated in Cotractor's quoted price. The
Hotel may remove any of the work items from the Contractor's scope at the
discretion of the Hotel.
Note
Note
Note
16
17
121
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
122
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
PRELIMINARIES
3.A.1
3.A.2
3.A.3
3.A.4
3.A.5
3.A.6
3.A.7
Item
30,000.00
30,000.00
-
85%
Item
350,000.00
350,000.00
-
85%
Item
240,000.00
240,000.00
-
85%
Item
225,000.00
225,000.00
-
75%
Item
90,000.00
90,000.00
-
85%
Item
300,000.00
300,000.00
85%
Item
150,000.00
150,000.00
85%
Allow for connection of temporary water for the work with seperate
meter for workers consumption, including storage and distribution
system required for the work and payment for monthly consumption
by workers during construction period
Allow for providing temporary access to the site including breaking existing
boundary walls and making good after completion of the Works.
Allow for Scaffolding required for the entire project including shifting,
maintaining and removal on completion
123
DESCRIPTION
3.A.8
Allow for providing safety netting around the building includng maintaining
and removal on completion
QTY
UNIT
Item
RATE (Rs)
250,000.00
PREVIOUS
AMOUNT (Rs)
250,000.00
85%
3.A.9
3.A.10
3.A.11
3.A.12
3.A.13
600,000.00
600,000.00
-
Item
300,000.00
300,000.00
-
Item
150,000.00
150,000.00
-
Item
440,000.00
440,000.00
-
85%
Any other Preliminary Item requied for the completion of the Works
Item
124
Rev 1
1/7/2016
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,125,000.00
125
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
126
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
127
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
128
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
129
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
130
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
131
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
25,500.00
10%
3,000.00
95%
28,500.00
297,500.00
10%
35,000.00
95%
332,500.00
204,000.00
10%
24,000.00
95%
228,000.00
168,750.00
10%
22,500.00
85%
191,250.00
76,500.00
10%
9,000.00
95%
85,500.00
255,000.00
10%
30,000.00
95%
285,000.00
127,500.00
15%
22,500.00
100%
150,000.00
132
S
PREVIOUS
AMOUNT (Rs)
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
212,500.00
15%
37,500.00
100%
250,000.00
510,000.00
15%
90,000.00
100%
600,000.00
100%
440,000.00
440,000.00
133
S
PREVIOUS
AMOUNT (Rs)
2,317,250.00
CURRENT
%
AMOUNT (Rs)
273,500.00
CUMILATIVE
%
AMOUNT (Rs)
2,590,750.00
134
REFURBISHMENT TO HERITANCE. GALLE ROAD, AHUNGALLA - 34 ROOMS IN 1ST & 2ND FLOORS (TENDER
BILL NO. 04 - REFURBISHMENT TO BUILDING - Main Bill
FIRST FLOOR - NUMBER OF ROOM 17
BOQ
NO
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Notes
1
All material samples shall be submitted to the Hotel for the approval
and the approved samples to be submitted to the person specified by
Hotel.
Note
Hotel shall remove all loose furniture and equipment from the room
prior to handing over the site to the Contractor.
Note
All the work remained without change shall be covered and protected
during execution of work to prevent any damage on such work.
Damage on such work due to Contractors default shall be rectified or
replaced at his own expenses.
Note
135
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Note
8
The location of Electrical, Sanitary and any other fittings and fixtures to
be fixed within the room may change at the installation and no extra
payment is allowed for such location shifting within the room
Note
10
11
Note
Bidder shall verify all the quantities indicated in this BOQ when visited
site prior to pricing and bring to the notice of the Client if there is any
discrepancy.
Note
136
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
137
4.A
4.A.1
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
BATH ROOM
Demolition
Notes
Note
Note
Note
138
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Note
8
139
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
140
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
104
Nr
375.00
39,000.00
100%
39,000.00
Remove existing switches and socket outlets and hand over to the
Hotel
31
Nr
150.00
4,650.00
100%
4,650.00
Item
225,000.00
225,000.00
100%
225,000.00
4.A.1.1
4.A.1.2
4.A.1.3
Remove all existing sanitary fittings and accessories
and stack
carefully at a location allocated by Hotel, for reuse (WC , Towel rail
grab bar , shower rose ,bib tap , mirror, bidet shower, cistern tank and
all other removable accessories in the bathroom except wash Basin)
(for 18 bathrooms)
4.A.1.4
4.A.1.5
Remove existing floor tiles and tile backing upto structural floor and
remove debris
1151
Sq.ft
190.00
218,690.00
100%
218,690.00
Remove existing wall tiles with tile backing upto structural wall and
remove debris
1165
Sq.ft
220.00
256,300.00
100%
256,300.00
Chip and roughen cut cement finish on walls and remove inferior
quality plaster entirely and remove debris
3139
Sq.ft
180.00
565,020.00
100%
565,020.00
17
Nr
3,500.00
59,500.00
100%
59,500.00
Remove exsisting tempered glass sliding door, size 2'-5"x 7'0" in room
no 251
Nr
3,500.00
3,500.00
100%
3,500.00
4.A.1.6
4.A.1.7
4.A.1.8
141
4.A.2
DESCRIPTION
QTY
UNIT
0
0
Note
Note
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Waterproofing
Notes
2
Approved water proofing system shall be with 10 years warranty and
shall be applied as per manufacturer's instruction/specification to suit
the structure and the location. including levelling and preparation of
surfaces, protective screeds, angle fillets and any other work necessary
for proper completion of waterproofing system.
Approved waterproofing system including vertical termination, etc. in
accordance with manufacturer's specification.
4.A.4.1
On bathroom floor
1150
Sq.ft
210.00
241,500.00
100%
241,500.00
4.A.4.2
On vertical surface - shower area walls and upto 1' high on perimeter
walls
2288
Sq.ft
210.00
480,480.00
100%
480,480.00
Rev 1
1/7/2016
142
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,093,640.00
AMOUNT (Rs)
2,093,640.00
143
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
2,093,640.00
4.A.3
PREVIOUS
AMOUNT (Rs)
2,093,640.00
Plumbing
Hot and Cold water supply and Waste water disposal
4.A.3.1
4.A.3.2
18
Nr
850.00
15,300.00
100%
15,300.00
4.A.3.3
18
Nr
850.00
15,300.00
100%
15,300.00
18
Nr
3,500.00
63,000.00
18
Nr
3,200.00
57,600.00
65%
37,440.00
4.A.3.5
Installation of "PRESTO" brand Dual Flush Valve system replacing
present cistern tank including service connection with 1" pipe and new
gate valve with necessary accessories and service connection for
proper functioning of the system (Duel flush valve and gate valve
supplied by CPD of Hotel)
144
RATE(Rs)
PREVIOUS
DESCRIPTION
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
18
Nr
2,200.00
39,600.00
70%
27,720.00
17
Nr
750.00
12,750.00
70%
8,925.00
11
Nr
650.00
7,150.00
88%
6,292.00
4.A.3.6
4.A.3.7
4.A.3.8
Rev 1
1/7/2016
145
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,304,340.00
AMOUNT (Rs)
2,204,617.00
146
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,304,340.00
AMOUNT (Rs)
2,204,617.00
4.A.3.9
Installation of new bidet shower at shifted location with, fixing
accessories and service connection for proper functioning of the
system.(Bidet shower with angle valve supplied by CPD of Hotel)
Nr
650.00
4,550.00
-
88%
4,004.00
17
Nr
125,000.00
2,125,000.00
76%
1,615,000.00
Replacing hot and cold water 1 /2 " angle valves (in pair) with
flexible hoses in wash basin (Angle valve supplied by CPD of
Hotel)
20
Nr
5,300.00
106,000.00
-
75%
79,500.00
18
Nr
750.00
13,500.00
18
Nr
750.00
13,500.00
58%
7,830.00
58,000.00
58,000.00
60%
34,800.00
4.A.3.10
4.A.3.11
4.A.3.12
4.A.3.13
4.A.3.14
Installation of new robe hook, Toilet paper holder, Soap Holder,
Tissue box and Towel rail, "Grohe" with fixing accessories (Robe
hook,Toilet paper holder, Soap Holder, Tissue box and Towel rail,
supplied by CPD of Hotel) - for 18 Nr bath rooms
Item
147
4.A.4
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Electrical Installation
Final sub circuit point wiring
Notes
2
3
4.A.4.1
4.A.4.2
0
0
Final sub circuit point wiring for the following outlets with PVC conduit,
switches and connectors Including other materials required to make
complete installation as specified by the Hotel. (Selected switches
supplied by CPD of the Hotel)
0
0
Note
0
0
0
Note
48
Nr
2,800.00
134,400.00
-
80%
107,520.00
Nr
2,800.00
2,800.00
80%
2,240.00
Note
148
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Rev 1
1/7/2016
Page total carried to next page
4,762,090.00
4,055,511.00
149
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
4,762,090.00
AMOUNT (Rs)
4,055,511.00
4.A.4.3
4.A.4.4
4.A.4.5
57
Nr
650.00
37,050.00
65%
24,082.50
42
Nr
650.00
27,300.00
65%
17,745.00
17
Nr
5,000.00
85,000.00
65%
55,250.00
4.A.4.6
31
Nr
750.00
23,250.00
50%
11,625.00
4.A.4.7
18
Nr
750.00
13,500.00
65%
8,775.00
17
Nr
6,200.00
105,400.00
75%
79,050.00
Telephone
4.A.4.8
Pipe music
150
DESCRIPTION
4.A.4.9
Wiring for pipe music with CU/PVC Twin speaker cables with
transparent insulation in AWG 18/ 0.83 sq.mm. from bed side
controler to twin speakers points in bath room ceiling and AC
return grill area adjacent to bath room for parallel operation. (Make
: Kelani Cables)
QTY
UNIT
19
Nr
RATE(Rs)
7,500.00
PREVIOUS
AMOUNT (Rs)
142,500.00
88%
AMOUNT (Rs)
125,400.00
Rev 1
1/7/2016
Page total carried to next page
5,196,090.00
4,377,438.50
151
DESCRIPTION
QTY
UNIT
Rate for tiling shall include for providing adhesive and tile grout in
approved quality which has no effect to the tiles or any efflorescence.
AMOUNT (Rs)
4,377,438.50
Finishes
Notes
AMOUNT (Rs)
5,196,090.00
4.A.5
RATE(Rs)
PREVIOUS
0
0
0
0
0
0
Note
0
0
Note
0
0
Note
0
0
Note
Note
Note
The Contractor shall submit shop drawings and tile layout for floor and
wall tiles for approval prior to commencement of work.
Rates for tilling shall include for laying to pattern and design shown in
the approved tile layout including laying of sample areas for approval.
(Selected tile supplied by CPD of the Hotel)
152
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
1151
Sq.ft
360.00
414,360.00
57%
236,185.20
2821
Sq.ft
390.00
1,100,190.00
88%
968,167.20
1734
Sq.ft
390.00
676,260.00
88%
595,108.80
Floor Finishes
4.A.5.1
Fixing of Porcelain tile, size 2' X 2' "GOBM 50 PEA from DAVINCI" on
and including 1:3 cement sand bedding to maintain the levels and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
Wall Finishes
4.A.5.2
4.A.5.3
Fixing of Porcelain tile, size 2' X 2' "from DAVINCI" on and including
1:3 cement sand bedding and fixing tile with approved adhesive
including grouting with water proof, anti fungal, high quality polymer
grout to match with tile as approved by the ID Consultant and the Hotel.
(Selected tile supplied by CPD of the Hotel) and making all SS
access plates under wash basins and jacuzzies, as to flush with
new tile wall.
Fixing Mosaic tile, size 4' X 4' (48mm 48mm) "VERDANT TG (S) - 074
from DAVINCI" on and including 1:3 cement sand bedding and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
153
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
7,386,900.00
AMOUNT (Rs)
6,176,899.70
154
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
7,386,900.00
4.A.6
PREVIOUS
AMOUNT (Rs)
6,176,899.70
4.A.6.1
Sq.ft
85.00
97,835.00
65%
63,592.75
369
Sq.ft
180.00
66,420.00
88%
58,449.60
19
Nr
650.00
12,350.00
19
Nr
650.00
12,350.00
4.A.7
Miscellaneous
Hair drier
4.A.7.1
4.A.7.2
155
DESCRIPTION
QTY
UNIT
4.A.7.3
304
Sq.ft
RATE(Rs)
490.00
PREVIOUS
AMOUNT (Rs)
148,960.00
%
81%
AMOUNT (Rs)
120,657.60
Rev 1
1/7/2016
TOTAL - A. BATHROOM CARRIED TO COLLECTION
7,724,815.00
6,419,599.65
156
4.B
4.B.1
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
106
Nr
375.00
39,750.00
100%
39,750.00
Remove existing bell shape light fittings and carefully stack for reuse
49
Nr
375.00
18,375.00
100%
18,375.00
Remove existing switches and socket outlets and hand over to the
Hotel
221
Nr
150.00
33,150.00
100%
33,150.00
Remove AC grille and hand over to the Hotel for powder coating
22
Nr
1,500.00
33,000.00
100%
33,000.00
Disconnecting and removing FCU and hand over to the hotel for
necessary upgrades
19
Nr
3,500.00
66,500.00
100%
66,500.00
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
1164
Sq.ft
190.00
221,160.00
100%
221,160.00
Removing full length mirror with light switch and the mirror light
carefully for reuse after work
15
Nr
2,500.00
37,500.00
100%
37,500.00
4.B.1.1
4.B.1.2
4.B.1.3
4.B.1.4
4.B.1.5
4.B.1.6
4.B.1.7
157
4.B.2
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
19
Nr
5,600.00
106,400.00
88%
93,632.00
89
Nr
2,800.00
249,200.00
88%
219,296.00
24
Nr
2,800.00
67,200.00
88%
59,136.00
17
Nr
3,500.00
59,500.00
-
88%
52,360.00
139
Nr
3,200.00
444,800.00
88%
391,424.00
Electrical Installation
Final sub circuit point wiring
Refer Notes under Electrical Installation
4.B.4.1
4.B.4.2
4.B.4.3
4.B.4.4
4.B.4.5
Rev 1
1/7/2016
158
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
1,376,535.00
AMOUNT (Rs)
1,265,283.00
159
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
1,376,535.00
AMOUNT (Rs)
1,265,283.00
4.B.4.6
98
Nr
650.00
63,700.00
88%
56,056.00
4.B.4.7
17
Nr
650.00
11,050.00
88%
9,724.00
4.B.4.8
48
Nr
650.00
31,200.00
88%
27,456.00
4.B.4.9
Nr
650.00
3,250.00
88%
2,860.00
4.B.4.10
14
Nr
1,200.00
16,800.00
88%
14,784.00
4.B.4.11
102
Nr
750.00
76,500.00
88%
67,320.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
Wiring for Master/Key card switch wiring connected to all power points
in the room except mini bar and FCU
DND/Make my room
4.B.4.13
160
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
38
Nr
6,200.00
235,600.00
65%
153,140.00
17
Nr
6,200.00
105,400.00
65%
68,510.00
7,500.00
142,500.00
88%
125,400.00
Telephone
4.B.4.14
4.B.4.15
Wiring TV point using 75 Ohm kelani cable c/w all conduit and
fixing accessories
Data
4.B.4.16
Wiring for data point, using cat 6 data cable from service duct to
data switch
Deleted
Pipe music
4.B.4.17
Wiring for pipe music supply cables from service duct to the bed
side controller with 2 core, CU/PVC/SCR/PVC screened 3 cables
in IO219020 ZZ / 2x1.55sqmm (30/0.25 x/mm). (Make - Kelani
cables)
19
Nr
Rev 1
1/7/2016
161
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,181,535.00
AMOUNT (Rs)
1,867,883.00
162
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,181,535.00
AMOUNT (Rs)
1,867,883.00
Nr
4,000.00
Thermostat
4.B.4.19
4.B.4.20
4.B.3
76,000.00
-
88%
66,880.00
Nr
14,500.00
275,500.00
-
88%
242,440.00
19
Nr
1,500.00
28,500.00
-
88%
25,080.00
88%
148,579.20
Finishes
Refer "Notes" under Finishes
Floor Finishes
4.B.3.1
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sandbedding to maintain the levels and fixing tile with approved
adhesive including grouting to match with tile as approved by the ID
Consultant and the Hotel. (Selected tile supplied by CPD of the Hotel).
469
Sq.ft
360.00
168,840.00
163
DESCRIPTION
4.B.4
4.B.4.1
QTY
UNIT
2293
Sq.ft
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Floor painting
4.B.4.2
Water base paint, matt with DULUX, "Teak 321" including 1 undercoats
and 2 finishing coats on timber floor and skirting
180.00
412,740.00
-
65%
268,281.00
4013
Sq.ft
72.00
288,936.00
-
60%
173,361.60
2762
Sq.ft
85.00
234,770.00
-
60%
140,862.00
88%
107,712.00
Ceiling painting
4.B.4.4
4.B.4.5
4.B.4.6
680
Sq.ft
180.00
122,400.00
Deleted
164
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
3,789,221.00
AMOUNT (Rs)
3,041,078.80
165
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
3,789,221.00
4.B.5
PREVIOUS
AMOUNT (Rs)
3,041,078.80
Miscellaneous
Sliding door
4.B.5.1
Sliding door, size 4'-0" x 7'-0" including timber frame with necessary
ironmongary, finish to match with exsisting in room no 259 (follow door
detail in drg no. PRE-001-16. Only change in width due to the
intermediate column)
Nr
95,000.00
95,000.00
-
Nr
105,500.00
105,500.00
-
157
Sq.ft
490.00
76,930.00
65%
50,004.50
17
Nr
2,500.00
42,500.00
-
100%
42,500.00
35%
2,975.00
65%
5,525.00
4.B.5.2
(Follow detail given in Drg No. PRE-001-16 - only the door sash &
timber verticals only)
Teak double door sash fixed to timber verticals in either sides with 1"
thick door sash in Room No 251
Ceiling
4.B.5.3
4.B.5.4
Modification to door by increasing ragal width by fixing 1/2" thick
two "Teak" timber planks on either side of door and keep ready to
fix new electronic door lock (Door lock supply and fix by CPD of
Hotel)
Magic eye
4.B.5.5
Fix magic eye "hafel" with fixing accessories (magic eye supplied by
CPD of Hotel)
17
Nr
500.00
Safety latch
4.B.5.6
Fix new safety latch with fixing accessories (Safety latch and chain
supplied by CPD of Hotel)
8,500.00
-
17
Nr
500.00
8,500.00
-
166
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
4.B.5.7
Fix Door bell and indicator device, new with service indicator DND and
Make my room with fixing accessories (Door bell and indicator device
supplied by CPD of Hotel)
Fire evacuation plan
17
Nr
750.00
12,750.00
-
17
Nr
500.00
8,500.00
-
Fix mirror with protective film at the back, 5mm St Gobian India to the
existing 4" wide timber frame to cover Titanium finish wall at bagage
rack,( with frame) by maintaining required gap for proper ventilation and
frame stain & finish to match other furniture (Mirror supplied by CPD of
Hotel)
19
Nr
6,500.00
123,500.00
-
Fix mirror, 5mm St Gobian India with 4" teak timber frame to
cover Titanium finish wall at bed side,stain & finish to match other
furniture (Mirror supplied by CPD of Hotel)
14
Nr
13,500.00
189,000.00
65%
8,287.50
4.B.5.8
Fix efficient fire evacuation plan at the back of main door with fixing
accessories (Fire evacuation plan supplied by CPD of Hotel)
Mirror
4.B.5.9
4.B.5.10
167
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
4,459,901.00
AMOUNT (Rs)
3,150,370.80
168
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
4,459,901.00
AMOUNT (Rs)
3,150,370.80
TV Bracket
4.B.5.11
19
Nr
750.00
14,250.00
35%
4,987.50
225
Sq.ft
250.00
56,250.00
55%
30,937.50
Clean existing UPVC French Window and replace all ironmongery with
corrosion resistant material as approved by the ID Consultant and Hotel
1769
Sq.ft
140.00
247,660.00
65%
160,979.00
17
Nr
3,500.00
59,500.00
17
Nr
500.00
8,500.00
AC grille
4.B.5.12
4.B.5.13
Threshold
4.B.5.14
4.B.5.15
Installation of wall puicture with necessary accessories
Rev 1
169
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
1/7/2016
4,846,061.00
3,347,274.80
170
DESCRIPTION
4.C
BALCONY
4.C.1
Demolition
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
40
Nr
375.00
15,000.00
100%
15,000.00
2857
Sq.ft
190.00
542,830.00
100%
542,830.00
2857
Sq.ft
210.00
599,970.00
100%
599,970.00
40
Nr
650.00
26,000.00
65%
16,900.00
Nr
2,800.00
5,600.00
65%
3,640.00
4.C.2
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
Waterproofing
Refer "Notes" under 2.A.2 Waterproofing
4.C.4.1
On balcony floor
4.C.3
Electrical Installation
Refer "Notes" under 2.A.4 Electrical Installation
Installation of light fixtures
Installation of the fixture with other materials required to make
complete installation as specified by the Hotel. (Selected light fixtures
supplied by CPD of the Hotel)
4.C.3.1
4.C.3.2
171
4.C.4
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
2857
Sq.ft
360.00
1,028,520.00
94%
966,808.80
495
L.ft
130.00
64,350.00
94%
60,489.00
Finishes
Refer "Notes" under 2.A.5 Finishes
Floor Finishes
4.C.4.1
4.C.4.2
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sand bedding to maintain the levels and fixing tile with or
approved adhesive including grouting to match with tile as approved by
the ID Consultant and the Hotel. (Selected tile supplied by CPD of the
Hotel).
Rev 1
1/7/2016
172
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
2,282,270.00
AMOUNT (Rs)
2,205,637.80
173
DESCRIPTION
QTY
UNIT
RATE(Rs)
AMOUNT (Rs)
2,282,270.00
4.C.5
PREVIOUS
AMOUNT (Rs)
2,205,637.80
4.C.5.1
2034
Sq.ft
65.00
132,210.00
70%
92,547.00
2034
Sq.ft
85.00
172,890.00
-
70%
121,023.00
25
Sq.ft
85.00
Ceiling painting
4.C.5.2
4.C.4.4
4.C.6
Miscellaneous
Aluminium French window
4.C.6.1
Clean existing Aluminium French Window and replace all
ironmongery with corrosion resistant material as approved by the
ID Consultant and Hotel
Deleted
of the
Deleted
174
DESCRIPTION
QTY
UNIT
Remove existing paint upto timber surface and apply wood putty
to make even surface on timber and apply primer and Deluxe
enamel matt black paint, 2 coats on existing hand rail and finish
with necessary repairs for the stability of handrail.
340
ft
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
4.C.6.3
675.00
229,500.00
2,816,870.00
88%
201,960.00
2,621,167.80
175
4.D.1
DESCRIPTION
RATE(Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
3233
Sq.ft
65.00
210,145.00
75%
157,608.75
3689
Sq.ft
75.00
276,675.00
75%
207,506.25
PASSAGE
4.D.1.1
Ceiling painting
4.D.1.2
4.E
176
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Supply & laying The mastic sealant shall be compatible with the
substrate and shall be able to with stand the UV exposure, salt spray
attack and shall be able to Permit structural movement without breaking
or loosening and adhereto the vertical concrete surfaces while
permitting the required movement of the structure across the joint. The
Mastic sealant shall confirm to the required performance class of EN
ISO 11600 in order to satisfy above requirements.
4.E.1
As above in floors
TOTAL -D. PASSAGE CARRIED TO COLLECTION
60.00
L.ft
5,250.00
315,000.00
801,820.00
365,115.00
177
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
BATH ROOM
7,724,815.00
6,419,599.65
4,846,061.00
3,347,274.80
BALCONY
2,816,870.00
2,621,167.80
PASSAGE
801,820.00
365,115.00
178
DESCRIPTION
QTY
UNIT
RATE(Rs)
PREVIOUS
AMOUNT (Rs)
16,189,566.00
AMOUNT (Rs)
12,753,157.25
179
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
180
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
181
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
182
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
183
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
184
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
185
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
39,000.00
0%
100%
4,650.00
0%
100%
225,000.00
0%
100%
218,690.00
0%
100%
256,300.00
0%
100%
565,020.00
0%
100%
59,500.00
0%
100%
3,500.00
186
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
241,500.00
0%
100%
480,480.00
187
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
2,093,640.00
188
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
%
-
AMOUNT (Rs)
2,093,640.00
0%
100%
15,300.00
0%
100%
15,300.00
99%
62,370.00
99%
62,370.00
35%
20,160.00
100%
57,600.00
189
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
30%
11,880.00
100%
39,600.00
29%
3,697.50
99%
12,622.50
11%
786.50
99%
7,078.50
190
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
98,894.00
CUMILATIVE
%
AMOUNT (Rs)
2,303,511.00
191
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
98,894.00
AMOUNT (Rs)
2,303,511.00
11%
500.50
99%
4,504.50
24%
510,000.00
100%
2,125,000.00
25%
26,500.00
100%
106,000.00
97%
13,095.00
97%
13,095.00
39%
5,265.00
97%
13,095.00
39%
22,620.00
99%
57,420.00
192
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
20%
26,880.00
100%
134,400.00
20%
560.00
100%
2,800.00
193
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
704,314.50
CUMILATIVE
%
AMOUNT (Rs)
4,759,825.50
194
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
704,314.50
AMOUNT (Rs)
4,759,825.50
35%
12,967.50
100%
37,050.00
32%
8,736.00
97%
26,481.00
35%
29,750.00
100%
85,000.00
47%
10,927.50
97%
22,552.50
32%
4,320.00
97%
13,095.00
25%
26,350.00
100%
105,400.00
195
OR - NUMBER OF ROOM 17
CURRENT
%
12%
AMOUNT (Rs)
17,100.00
814,465.50
CUMILATIVE
%
100%
AMOUNT (Rs)
142,500.00
5,191,904.00
196
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
814,465.50
CUMILATIVE
%
AMOUNT (Rs)
5,191,904.00
197
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
42%
174,031.20
99%
410,216.40
11%
121,020.90
99%
1,089,188.10
11%
74,388.60
99%
669,497.40
198
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
1,183,906.20
CUMILATIVE
%
AMOUNT (Rs)
7,360,805.90
199
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
1,183,906.20
AMOUNT (Rs)
7,360,805.90
34%
33,263.90
99%
96,856.65
11%
7,306.20
99%
65,755.80
97%
11,979.50
97%
11,979.50
100%
12,350.00
100%
12,350.00
200
OR - NUMBER OF ROOM 17
CURRENT
%
18%
AMOUNT (Rs)
26,812.80
1,275,618.60
CUMILATIVE
%
99%
AMOUNT (Rs)
147,470.40
7,695,218.25
201
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
39,750.00
0%
100%
18,375.00
0%
100%
33,150.00
0%
100%
33,000.00
0%
100%
66,500.00
0%
100%
221,160.00
0%
100%
37,500.00
202
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
12%
12,768.00
100%
106,400.00
12%
29,904.00
100%
249,200.00
12%
8,064.00
100%
67,200.00
12%
7,140.00
100%
59,500.00
12%
53,376.00
100%
444,800.00
203
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
111,252.00
CUMILATIVE
%
AMOUNT (Rs)
1,376,535.00
204
OR - NUMBER OF ROOM 17
CURRENT
%
CUMILATIVE
AMOUNT (Rs)
111,252.00
AMOUNT (Rs)
1,376,535.00
12%
7,644.00
100%
63,700.00
12%
1,326.00
100%
11,050.00
9%
2,808.00
97%
30,264.00
9%
292.50
97%
3,152.50
9%
1,512.00
97%
16,296.00
9%
6,885.00
97%
74,205.00
35%
20,825.00
100%
59,500.00
35%
20,825.00
100%
59,500.00
205
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
35%
82,460.00
100%
235,600.00
35%
36,890.00
100%
105,400.00
12%
17,100.00
100%
142,500.00
206
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
309,819.50
CUMILATIVE
%
AMOUNT (Rs)
2,177,702.50
207
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
309,819.50
AMOUNT (Rs)
2,177,702.50
12%
9,120.00
100%
76,000.00
12%
33,060.00
100%
275,500.00
9%
2,565.00
97%
27,645.00
11%
18,572.40
99%
167,151.60
208
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
32%
132,076.80
97%
400,357.80
39%
112,685.04
99%
286,046.64
39%
91,560.30
99%
232,422.30
11%
13,464.00
99%
121,176.00
209
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
722,923.04
CUMILATIVE
%
AMOUNT (Rs)
3,764,001.84
210
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
722,923.04
3,764,001.84
100%
95,000.00
100%
95,000.00
100%
105,500.00
100%
105,500.00
35%
26,925.50
100%
76,930.00
100%
42,500.00
0%
AMOUNT (Rs)
62%
5,270.00
97%
8,245.00
32%
2,720.00
97%
8,245.00
211
OR - NUMBER OF ROOM 17
CURRENT
%
32%
AMOUNT (Rs)
4,080.00
CUMILATIVE
%
AMOUNT (Rs)
97%
0%
0%
0%
0%
0%
0%
12,367.50
212
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
962,418.54
CUMILATIVE
%
AMOUNT (Rs)
4,112,789.34
213
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
962,418.54
4,112,789.34
62%
8,835.00
97%
13,822.50
42%
23,625.00
97%
54,562.50
35%
86,681.00
100%
247,660.00
0%
0%
0%
0%
214
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
1,081,559.54
CUMILATIVE
%
AMOUNT (Rs)
4,428,834.34
215
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
15,000.00
0%
100%
542,830.00
0%
100%
599,970.00
35%
9,100.00
100%
26,000.00
35%
1,960.00
100%
5,600.00
216
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
6%
61,711.20
100%
1,028,520.00
6%
3,861.00
100%
64,350.00
217
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
76,632.20
CUMILATIVE
%
AMOUNT (Rs)
2,282,270.00
218
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
76,632.20
AMOUNT (Rs)
2,282,270.00
29%
38,340.90
99%
130,887.90
30%
51,867.00
100%
172,890.00
219
OR - NUMBER OF ROOM 17
CURRENT
%
12%
AMOUNT (Rs)
27,540.00
194,380.10
CUMILATIVE
%
100%
AMOUNT (Rs)
229,500.00
2,815,547.90
220
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
21%
44,130.45
96%
201,739.20
25%
69,168.75
100%
276,675.00
221
OR - NUMBER OF ROOM 17
CURRENT
%
90%
AMOUNT (Rs)
283,500.00
396,799.20
CUMILATIVE
%
90%
AMOUNT (Rs)
283,500.00
761,914.20
222
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
1,275,618.60
7,695,218.25
1,081,559.54
4,428,834.34
194,380.10
2,815,547.90
396,799.20
761,914.20
223
OR - NUMBER OF ROOM 17
CURRENT
%
AMOUNT (Rs)
2,948,357.44
CUMILATIVE
%
AMOUNT (Rs)
15,701,514.69
224
REFURBISHMENT TO HERITANCE. GALLE ROAD, AHUNGALLA - 34 ROOMS IN 1ST & 2ND FLOORS (TENDER
SECTION II - BILL NO. 05 - REFURBISHMENT TO BUILDING - Main Bill
SECOND FLOOR - NUMBER OF ROOM 17
BOQ
NO
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Notes
1
All material samples shall be submitted to the Hotel for the approval
and the approved samples to be submitted to the person specified by
Hotel.
Note
Hotel shall remove all loose furniture and equipment from the room
prior to handing over the site to the Contractor.
Note
All the work remained without change shall be covered and protected
during execution of work to prevent any damage on such work.
Damage on such work due to Contractors default shall be rectified or
replaced at his own expenses.
Note
225
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Note
The location of Electrical, Sanitary and any other fittings and fixtures to
be fixed within the room may change at the installation and no extra
payment is allowed for such location shifting within the room
Note
10
Note
226
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
227
5.A
5.A.1
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
BATH ROOM
Demolition
Notes
Note
Note
Note
228
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
Note
8
229
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
PREVIOUS
%
AMOUNT (Rs)
230
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
78
Nr
375.00
29,250.00
100%
29,250.00
Remove existing switches and socket outlets and hand over to the
Hotel
29
Nr
150.00
4,350.00
100%
4,350.00
Item
225,000.00
225,000.00
100%
225,000.00
5.A.1.1
5.A.1.2
5.A.1.3
Remove all existing sanitary fittings and accessories
and stack
carefully at a location allocated by Hotel, for reuse (WC , Towel rail
grab bar , shower rose ,bib tap , mirror, bidet shower, cistern tank and
all other removable accessories in the bathroom except wash Basin)
(for 18 bathrooms)
5.A.1.4
5.A.1.5
Remove existing floor tiles and tile backing upto structural floor and
remove debris
1280
Sq.ft
190.00
243,200.00
100%
243,200.00
Remove existing wall tiles with tile backing upto structural wall and
remove debris
1481
Sq.ft
220.00
325,820.00
100%
325,820.00
Chip and roughen cut cement finish on walls and remove inferior
quality plaster entirely and remove debris
3030
Sq.ft
180.00
545,400.00
100%
545,400.00
140.00
16,520.00
100%
16,520.00
5.A.1.6
5.A.1.7
118
Sq.ft
5.A.1.8
17
Nr
3,500.00
59,500.00
100%
59,500.00
Remove exsisting tempered glass sliding door, size 2'-5"x 7'0" in room
no. 349
Nr
3,500.00
3,500.00
100%
3,500.00
5.A.1.9
231
5.A.2
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Waterproofing
Notes
2
Approved water proofing system shall be with 10 years warranty and
shall be applied as per manufacturer's instruction/specification to suit
the structure and the location. including levelling and preparation of
surfaces, protective screeds, angle fillets and any other work necessary
for proper completion of waterproofing system.
Note
On bathroom floor
1280
Sq.ft
210.00
268,800.00
100%
268,800.00
5.A.2.2
On vertical surface - shower area walls and upto 1' high on perimeter
walls
1971
Sq.ft
210.00
413,910.00
100%
413,910.00
Rev 1
1/7/2016
232
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,135,250.00
AMOUNT (Rs)
2,135,250.00
233
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
2,135,250.00
5.A.3
PREVIOUS
AMOUNT (Rs)
2,135,250.00
Plumbing
Hot and Cold water supply and Waste water disposal
5.A.5.1
5.A.5.2
18
Nr
850.00
15,300.00
100%
15,300.00
5.A.5.3
18
Nr
850.00
15,300.00
100%
15,300.00
18
Nr
3,500.00
63,000.00
18
Nr
3,200.00
57,600.00
65%
37,440.00
5.A.5.5
234
RATE (Rs)
PREVIOUS
DESCRIPTION
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
18
Nr
2,200.00
39,600.00
70%
27,720.00
17
Nr
750.00
12,750.00
88%
11,220.00
11
Nr
650.00
7,150.00
-
88%
6,292.00
Nr
650.00
4,550.00
-
88%
4,004.00
17
Nr
125,000.00
2,125,000.00
76%
1,615,000.00
5.A.5.6
5.A.5.7
5.A.5.8
5.A.5.9
5.A.5.10
235
DESCRIPTION
Rev 1
1/7/2016
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
4,475,500.00
AMOUNT (Rs)
3,867,526.00
236
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
4,475,500.00
PREVIOUS
Replacing hot and cold water 1 /2 " angle valves (in pair) with
flexible hoses in wash basin (Angle valve supplied by CPD of
Hotel)
20
Nr
5,300.00
106,000.00
18
Nr
750.00
13,500.00
18
Nr
750.00
58,500.00
AMOUNT (Rs)
3,867,526.00
75%
79,500.00
13,500.00
58%
7,830.00
58,500.00
60%
35,100.00
5.A.5.12
5.A.5.13
5.A.5.14
Installation of new robe hook, Toilet paper holder, Soap Holder,
Tissue box and Towel rail, "Grohe" with fixing accessories (Robe
hook,Toilet paper holder, Soap Holder, Tissue box and Towel rail,
supplied by CPD of Hotel) - for 18 Nr bath rooms
Item
237
5.A.4
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Electrical Installation
Final sub circuit point wiring
Notes
3
5.A.4.1
5.A.4.2
0
0
Final sub circuit point wiring for the following outlets with PVC conduit,
switches and connectors Including other materials required to make
complete installation as specified by the Hotel. (Selected switches
supplied by CPD of the Hotel)
0
0
Note
0
0
0
Note
43
Nr
2,800.00
.
120,400.00
80%
96,320.00
Nr
2,800.00
2,800.00
-
80%
2,240.00
Note
238
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Rev 1
1/7/2016
4,790,200.00
4,088,516.00
239
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
4,790,200.00
AMOUNT (Rs)
4,088,516.00
5.A.4.3
5.A.4.4
5.A.4.5
52
Nr
650.00
33,800.00
65%
21,970.00
42
Nr
650.00
27,300.00
35%
9,555.00
17
Nr
5,000.00
85,000.00
65%
55,250.00
5.A.4.6
29
Nr
750.00
21,750.00
50%
10,875.00
5.A.4.7
18
Nr
750.00
13,500.00
65%
8,775.00
17
Nr
6,200.00
105,400.00
75%
79,050.00
19
Nr
7,500.00
142,500.00
88%
125,400.00
Telephone
5.A.4.8
Pipe music
5.A.4.9
Wiring for pipe music with CU/PVC Twin speaker cables with
transparent insulation in AWG 18/ 0.83 sq.mm. from bed side
controler to twin speakers points in bath room ceiling and AC
return grill area adjacent to bath room for parallel operation. (Make
: Kelani Cables)
240
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Rev 1
1/7/2016
Page total carried to next page
5,219,450.00
4,399,391.00
241
DESCRIPTION
QTY
UNIT
Rate for tiling shall include for providing adhesive and tile grout in
approved quality which has no effect to the tiles or any efflorescence.
AMOUNT (Rs)
4,399,391.00
Finishes
Notes
AMOUNT (Rs)
5,219,450.00
5.A.5
RATE (Rs)
PREVIOUS
0
0
0
0
0
0
Note
0
0
Note
0
0
Note
0
0
Note
Note
Note
The Contractor shall submit shop drawings and tile layout for floor and
wall tiles for approval prior to commencement of work.
Rates for tilling shall include for laying to pattern and design shown in
the approved tile layout including laying of sample areas for approval.
(Selected tile supplied by CPD of the Hotel)
242
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
1322
Sq.ft
360.00
475,920.00
57%
271,274.40
2802
Sq.ft
390.00
1,092,780.00
82%
896,079.60
2114
Sq.ft
390.00
824,460.00
80%
659,568.00
Floor Finishes
5.A.5.1
Fixing of Porcelain tile, size 2' X 2' "GOBM 50 PEA from DAVINCI" on
and including 1:3 cement sand bedding to maintain the levels and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
Wall Finishes
5.A.5.2
5.A.5.3
Fixing of Porcelain tile, size 2' X 2' "from DAVINCI" on and including
1:3 cement sand bedding and fixing tile with approved adhesive
including grouting with water proof, anti fungal, high quality polymer
grout to match with tile as approved by the ID Consultant and the Hotel.
(Selected tile supplied by CPD of the Hotel) and making all SS
access plates under wash basins and jacuzzies, as to flush with
new tile wall.
Fixing Mosaic tile, size 4' X 4' (48mm 48mm) "VERDANT TG (S) - 074
from DAVINCI" on and including 1:3 cement sand bedding and fixing
tile with approved adhesive including grouting to match with tile as
approved by the ID Consultant and the Hotel. (Selected tile supplied by
CPD of the Hotel).
243
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
7,612,610.00
AMOUNT (Rs)
6,226,313.00
244
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
7,612,610.00
5.A.6
PREVIOUS
AMOUNT (Rs)
6,226,313.00
5.A.6.1
1322
Sq.ft
85.00
112,370.00
65%
73,040.50
410
Sq.ft
180.00
73,800.00
88%
64,944.00
19
Nr
650.00
12,350.00
19
Nr
650.00
12,350.00
304
Sq.ft
490.00
148,960.00
80%
119,168.00
5.A.7
Miscellaneous
Hair drier
5.A.7.1
245
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Rev 1
1/7/2016
TOTAL - A. BATHROOM CARRIED TO COLLECTION
7,972,440.00
6,483,465.50
246
5.B
5.B.1
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
72
Nr
375.00
27,000.00
-
100%
27,000.00
Remove existing bell shape light fittings and carefully stack for reuse
48
Nr
375.00
18,000.00
-
100%
18,000.00
Remove existing switches and socket outlets and hand over to the
Hotel
221
Nr
150.00
33,150.00
-
100%
33,150.00
Remove AC grille and hand over to the Hotel for powder coating
22
Nr
1,500.00
33,000.00
-
100%
33,000.00
Disconnecting and removing FCU and hand over to the hotel for
necessary upgrades
19
Nr
3,500.00
66,500.00
-
100%
66,500.00
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
1911
Sq.ft
190.00
363,090.00
-
100%
363,090.00
Removing full length mirror with light switch and the mirror light
carefully for reuse after work
Nr
2,500.00
10,000.00
100%
10,000.00
5.B.1.1
5.B.1.2
5.B.1.3
5.B.1.4
5.B.1.5
5.B.1.6
5.B.1.7
247
5.B.2
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
19
Nr
5,600.00
106,400.00
88%
93,632.00
87
Nr
2,800.00
243,600.00
88%
214,368.00
23
Nr
2,800.00
64,400.00
88%
56,672.00
17
Nr
3,500.00
59,500.00
-
88%
52,360.00
139
Nr
3,200.00
444,800.00
88%
391,424.00
Electrical Installation
Final sub circuit point wiring
Refer Notes under Electrical Installation
5.B.2.1
5.B.2.2
5.B.2.3
5.B.2.4
5.B.2.5
Rev 1
1/7/2016
248
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
1,469,440.00
AMOUNT (Rs)
1,359,196.00
249
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
1,469,440.00
AMOUNT (Rs)
1,359,196.00
5.B.2.6
94
Nr
650.00
61,100.00
88%
53,768.00
5.B.2.7
17
Nr
650.00
11,050.00
88%
9,724.00
5.B.2.8
48
Nr
650.00
31,200.00
88%
27,456.00
5.B.2.9
Nr
650.00
3,250.00
88%
2,860.00
5.B.2.10
17
Nr
1,200.00
20,400.00
88%
17,952.00
5.B.2.11
102
Nr
750.00
76,500.00
88%
67,320.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
17
Nr
3,500.00
59,500.00
65%
38,675.00
Wiring for Master/Key card switch wiring connected to all power points
in the room except mini bar and FCU
DND/Make my room
5.B.2.13
250
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
38
Nr
6,200.00
235,600.00
65%
153,140.00
17
Nr
6,200.00
105,400.00
65%
68,510.00
7,500.00
142,500.00
88%
125,400.00
Telephone
5.B.2.14
5.B.2.15
Wiring TV point using 75 Ohm kelani cable c/w all conduit and
fixing accessories
Data
5.B.2.16
Wiring for data point, using cat 6 data cable from service duct to
data switch
Deleted
Pipe music
5.B.2.17
Wiring for pipe music supply cables from service duct to the bed
side controller with 2 core, CU/PVC/SCR/PVC screened 3 cables
in IO219020 ZZ / 2x1.55sqmm (30/0.25 x/mm). (Make - Kelani
cables)
19
Nr
Rev 1
1/7/2016
251
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,275,440.00
AMOUNT (Rs)
1,962,676.00
252
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
2,275,440.00
AMOUNT (Rs)
1,962,676.00
Nr
4,000.00
76,000.00
88%
66,880.00
19
Nr
14,500.00
275,500.00
88%
242,440.00
19
Nr
1,500.00
28,500.00
65%
18,525.00
521
Sq.ft
360.00
187,560.00
88%
165,052.80
Thermostat
5.B.2.19
5.B.2.20
5.B.3
Finishes
Refer "Notes" under Finishes
Floor Finishes
5.B.5.1
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sandbedding to maintain the levels and fixing tile with approved
adhesive including grouting to match with tile as approved by the ID
Consultant and the Hotel. (Selected tile supplied by CPD of the Hotel).
253
DESCRIPTION
5.B.4
5.B.4.1
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
Floor Polishing
5.B.4.2
Cut and polish existing terrazo floor and finish to the quality
accepted by the Hotel
Deleted
Floor painting
5.B.4.3
Water base paint, matt with DULUX, "Teak 321" or "Nadun" including 1
undercoats and 2 finishing coats on timber floor and skirting
2984
Sq.ft
180.00
537,120.00
65%
349,128.00
4812
Sq.ft
72.00
346,464.00
65%
225,201.60
254
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,726,584.00
AMOUNT (Rs)
3,029,903.40
255
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
3,726,584.00
AMOUNT (Rs)
3,029,903.40
Ceiling painting
5.B.4.5
Sq.ft
85.00
297,925.00
65%
193,651.25
90%
110,160.00
Timber surfaces
Water base paint, matt with DULUX, "Teak 321" including 1
undercoats and 2 finishing coats on timber surfaces
5.B.4.6
5.B.4.7
680
Sq.ft
180.00
122,400.00
Deleted
Pergola painting
5.B.4.8
256
5.B.5
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
Nr
95,000.00
95,000.00
Teak double door sash fixed to timber verticals in either sides with 1"
thick door sash in Room No 349
Nr
105,500.00
105,500.00
-
Ceiling
Supply and installation of Cement fibre 6mm thick Ceiling sheet to
match with existing
157
Sq.ft
490.00
76,930.00
65%
50,004.50
17
Nr
2,500.00
42,500.00
-
100%
42,500.00
35%
2,975.00
Miscellaneous
Sliding door
5.B.5.1
5.B.5.2
5.B.5.3
(Follow detail given in Drg No. PRE-001-16 - only the door sash &
timber verticals only)
Teak double door sash fixed to timber verticals in either sides with 1"
thick door sash in Room No 349
Double sash door
Ironmongery/door modification
5.B.5.4
Modification to door by increasing ragal width by fixing 1/2" thick
two "Teak" timber planks on either side of door and keep ready to
fix new electronic door lock (Door lock supply and fix by CPD of
Hotel)
Magic eye
5.B.5.5
Fix magic eye "hafel" with fixing accessories (magic eye supplied by
CPD of Hotel)
Safety latch
17
Nr
500.00
8,500.00
-
257
DESCRIPTION
QTY
UNIT
5.B.5.6
Fix new safety latch with fixing accessories (Safety latch and chain
supplied by CPD of Hotel)
17
Nr
RATE (Rs)
500.00
PREVIOUS
AMOUNT (Rs)
8,500.00
%
65%
AMOUNT (Rs)
5,525.00
Rev 1
1/7/2016
4,483,839.00
3,434,719.15
258
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
4,483,839.00
AMOUNT (Rs)
3,434,719.15
17
Nr
750.00
12,750.00
17
Nr
500.00
8,500.00
Fix mirror with protective film at the back, 5mm St Gobian India to the
existing 4" wide timber frame to cover Titanium finish wall at bagage
rack,( with frame) by maintaining required gap for proper ventilation and
frame stain & finish to match other furniture (Mirror supplied by CPD of
Hotel)
19
Nr
6,500.00
123,500.00
-
Fix mirror, 5mm St Gobian India with 4" teak timber frame to
cover Titanium finish wall at bed side,stain & finish to match other
furniture (Mirror supplied by CPD of Hotel)
14
Nr
13,500.00
189,000.00
5.B.5.10
259
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
19
Nr
750.00
14,250.00
-
35%
4,987.50
225
Sq.ft
250.00
56,250.00
35%
19,687.50
Clean existing UPVC french Window and replace all ironmongery with
corrosion resistant material as approved by the ID Consultant and Hotel
1824
Sq.ft
140.00
255,360.00
-
65%
165,984.00
758
Sq.ft
490.00
371,420.00
-
35%
129,997.00
17
Nr
3,500.00
59,500.00
-
TV Bracket
5.B.5.11
5.B.5.12
5.B.5.13
Partition board
5.B.5.14
Supply and installation of cement fibre sheet to match with wall
Threshold
5.B.5.15
5.B.5.16
Installation of wall puicture with necessary accessories
17
Nr
500.00
8,500.00
Rev 1
1/7/2016
260
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
5,582,869.00
AMOUNT (Rs)
3,755,375.15
261
DESCRIPTION
5.C
BALCONY
5.C.1
Demolition
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
40
Nr
375.00
15,000.00
100%
15,000.00
2597
Sq.ft
190.00
493,430.00
100%
493,430.00
2597
Sq.ft
210.00
545,370.00
100%
545,370.00
Nr
2,800.00
5,600.00
65%
3,640.00
5.C.2
Remove existing floor tiles with skirting and tile backing upto structural
floor and remove debris
Waterproofing
Refer "Notes" under 2.A.2 Waterproofing
5.C.2.1
On balcony floor
5.C.5.2
262
5.C.3
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
AMOUNT (Rs)
40
Nr
650.00
26,000.00
65%
16,900.00
2597
Sq.ft
360.00
934,920.00
94%
878,824.80
Electrical Installation
Refer "Notes" under 2.A.4 Electrical Installation
Installation of light fixtures
Installation of the fixture with other materials required to make
complete installation as specified by the Hotel. (Selected light fixtures
supplied by CPD of the Hotel)
5.C.5.1
5.C.4
Finishes
Refer "Notes" under 2.A.5 Finishes
Floor Finishes
5.C.4.1
Fixing Porcelain tile, size 2' X 2' 94M "Rocell" on and including 1:3
cement sand bedding to maintain the levels and fixing tile with or
approved adhesive including grouting to match with tile as approved by
the ID Consultant and the Hotel. (Selected tile supplied by CPD of the
Hotel).
263
DESCRIPTION
QTY
UNIT
5.C.4.2
520
L.ft
RATE (Rs)
130.00
PREVIOUS
AMOUNT (Rs)
67,600.00
%
94%
AMOUNT (Rs)
63,544.00
Rev 1
1/7/2016
2,087,920.00
2,016,708.80
264
DESCRIPTION
QTY
UNIT
RATE (Rs)
AMOUNT (Rs)
2,087,920.00
5.C.5
PREVIOUS
AMOUNT (Rs)
2,016,708.80
5.C.5.1
Sq.ft
65.00
207,935.00
70%
145,554.50
2498
Sq.ft
85.00
212,330.00
70%
148,631.00
Ceiling painting
5.C.5.2
5.C.6
Miscellaneous
Aluminium French window
5.C.6.1
Clean existing Aluminium French Window and replace all
ironmongery with corrosion resistant material as approved by the
ID Consultant and Hotel
Deleted
Deleted
265
DESCRIPTION
5.C.6.3
Remove existing paint upto timber surface and apply wood putty
to make even surface on timber and apply primer and Deluxe
enamel matt black paint, 2 coats on existing hand rail and finish
with necessary repairs for the stability of handrail.
QTY
UNIT
451
ft
RATE (Rs)
675.00
PREVIOUS
AMOUNT (Rs)
304,425.00
81%
AMOUNT (Rs)
246,584.25
Rev 1
1/7/2016
TOTAL - C. BALCONY CARRIED TO COLLECTION
2,812,610.00
2,557,478.55
266
5.D.1
DESCRIPTION
RATE (Rs)
PREVIOUS
QTY
UNIT
AMOUNT (Rs)
3125
Sq.ft
65.00
203,125.00
3700
Sq.ft
75.00
277,500.00
AMOUNT (Rs)
PASSAGE
5.D.1.1
Ceiling painting
5.D.1.2
5.E
Rev 1
1/7/2016
208,125.00
Supply & laying The mastic sealant shall be compatible with the
substrate and shall be able to with stand the UV exposure, salt spray
attack and shall be able to Permit structural movement without breaking
or loosening and adhereto the vertical concrete surfaces while
permitting the required movement of the structure across the joint. The
Mastic sealant shall confirm to the required performance class of EN
ISO 11600 in order to satisfy above requirements.
267
DESCRIPTION
As above in floors
QTY
60.00
UNIT
L.ft
RATE (Rs)
5,250.00
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
315,000.00
480,625.00
208,125.00
268
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
AMOUNT (Rs)
BATH ROOM
7,972,440.00
6,483,465.50
5,582,869.00
3,755,375.15
BALCONY
2,812,610.00
2,557,478.55
PASSAGE
480,625.00
208,125.00
269
DESCRIPTION
QTY
UNIT
RATE (Rs)
PREVIOUS
AMOUNT (Rs)
16,848,544.00
AMOUNT (Rs)
13,004,444.20
270
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
271
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
272
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
273
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
274
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
275
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
276
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
29,250.00
0%
100%
4,350.00
0%
100%
225,000.00
0%
100%
243,200.00
0%
100%
325,820.00
0%
100%
545,400.00
0%
100%
16,520.00
0%
100%
59,500.00
0%
100%
3,500.00
277
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
268,800.00
0%
100%
413,910.00
278
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
2,135,250.00
279
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
2,135,250.00
0%
100%
15,300.00
0%
100%
15,300.00
99%
62,370.00
99%
62,370.00
34%
19,584.00
99%
57,024.00
280
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
29%
11,484.00
99%
39,204.00
11%
1,402.50
99%
12,622.50
11%
786.50
99%
7,078.50
11%
500.50
99%
4,504.50
24%
510,000.00
100%
2,125,000.00
281
AMOUNT (Rs)
606,127.50
CUMILATIVE
%
AMOUNT (Rs)
4,473,653.50
282
AMOUNT (Rs)
CUMILATIVE
%
606,127.50
AMOUNT (Rs)
4,473,653.50
25%
26,500.00
100%
106,000.00
97%
13,095.00
97%
13,095.00
39%
5,265.00
97%
13,095.00
35%
20,475.00
95%
55,575.00
283
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
20%
24,080.00
100%
120,400.00
20%
560.00
100%
2,800.00
284
AMOUNT (Rs)
696,102.50
CUMILATIVE
%
AMOUNT (Rs)
4,784,618.50
285
AMOUNT (Rs)
CUMILATIVE
%
696,102.50
AMOUNT (Rs)
4,784,618.50
35%
11,830.00
100%
33,800.00
62%
16,926.00
97%
26,481.00
35%
29,750.00
100%
85,000.00
47%
10,222.50
97%
21,097.50
32%
4,320.00
97%
13,095.00
25%
26,350.00
100%
105,400.00
12%
17,100.00
100%
142,500.00
286
AMOUNT (Rs)
812,601.00
CUMILATIVE
%
AMOUNT (Rs)
5,211,992.00
287
AMOUNT (Rs)
812,601.00
CUMILATIVE
%
AMOUNT (Rs)
5,211,992.00
288
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
42%
199,886.40
99%
471,160.80
15%
163,917.00
97%
1,059,996.60
17%
140,158.20
97%
799,726.20
289
AMOUNT (Rs)
1,316,562.60
CUMILATIVE
%
AMOUNT (Rs)
7,542,875.60
290
AMOUNT (Rs)
CUMILATIVE
%
1,316,562.60
AMOUNT (Rs)
7,542,875.60
34%
38,205.80
99%
111,246.30
12%
8,856.00
100%
73,800.00
97%
11,979.50
97%
11,979.50
100%
12,350.00
100%
12,350.00
19%
28,302.40
99%
147,470.40
291
AMOUNT (Rs)
1,416,256.30
CUMILATIVE
%
AMOUNT (Rs)
7,899,721.80
292
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
0%
100%
27,000.00
0%
100%
18,000.00
0%
100%
33,150.00
0%
100%
33,000.00
0%
100%
66,500.00
0%
100%
363,090.00
0%
100%
10,000.00
293
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
12%
12,768.00
100%
106,400.00
12%
29,232.00
100%
243,600.00
12%
7,728.00
100%
64,400.00
12%
7,140.00
100%
59,500.00
12%
53,376.00
100%
444,800.00
294
AMOUNT (Rs)
110,244.00
CUMILATIVE
%
AMOUNT (Rs)
1,469,440.00
295
CUMILATIVE
AMOUNT (Rs)
110,244.00
AMOUNT (Rs)
1,469,440.00
12%
7,332.00
100%
61,100.00
12%
1,326.00
100%
11,050.00
9%
2,808.00
97%
30,264.00
9%
292.50
97%
3,152.50
9%
1,836.00
97%
19,788.00
9%
6,885.00
97%
74,205.00
35%
20,825.00
100%
59,500.00
35%
20,825.00
100%
59,500.00
296
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
35%
82,460.00
100%
235,600.00
35%
36,890.00
100%
105,400.00
12%
17,100.00
100%
142,500.00
297
AMOUNT (Rs)
308,823.50
CUMILATIVE
%
AMOUNT (Rs)
2,271,499.50
298
AMOUNT (Rs)
CUMILATIVE
%
308,823.50
AMOUNT (Rs)
2,271,499.50
12%
9,120.00
100%
76,000.00
12%
33,060.00
100%
275,500.00
32%
9,120.00
97%
27,645.00
11%
20,631.60
99%
185,684.40
299
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
32%
171,878.40
97%
521,006.40
32%
110,868.48
97%
336,070.08
300
AMOUNT (Rs)
663,501.98
CUMILATIVE
%
AMOUNT (Rs)
3,693,405.38
301
AMOUNT (Rs)
CUMILATIVE
%
663,501.98
AMOUNT (Rs)
3,693,405.38
31%
92,356.75
96%
286,008.00
10%
12,240.00
100%
122,400.00
302
AMOUNT (Rs)
0%
AMOUNT (Rs)
0%
100%
105,500.00
100%
105,500.00
35%
26,925.50
100%
76,930.00
100%
42,500.00
97%
8,245.00
0%
62%
CUMILATIVE
5,270.00
303
AMOUNT (Rs)
2,720.00
908,514.23
CUMILATIVE
%
97%
AMOUNT (Rs)
8,245.00
4,343,233.38
304
AMOUNT (Rs)
CUMILATIVE
%
908,514.23
97%
12,367.50
AMOUNT (Rs)
4,343,233.38
97%
0%
0%
0%
0%
0%
0%
12,367.50
305
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
62%
8,835.00
97%
13,822.50
62%
34,875.00
97%
54,562.50
35%
89,376.00
100%
255,360.00
65%
241,423.00
100%
371,420.00
0%
0%
0%
0%
306
AMOUNT (Rs)
1,295,390.73
CUMILATIVE
%
AMOUNT (Rs)
5,050,765.88
307
AMOUNT (Rs)
0%
100%
15,000.00
0%
100%
493,430.00
0%
100%
545,370.00
100%
5,600.00
35%
AMOUNT (Rs)
CUMILATIVE
1,960.00
308
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
35%
9,100.00
100%
26,000.00
6%
56,095.20
100%
934,920.00
309
AMOUNT (Rs)
4,056.00
71,211.20
CUMILATIVE
%
100%
AMOUNT (Rs)
67,600.00
2,087,920.00
310
AMOUNT (Rs)
CUMILATIVE
%
71,211.20
AMOUNT (Rs)
2,087,920.00
27%
56,142.45
97%
201,696.95
27%
57,329.10
97%
205,960.10
311
13%
AMOUNT (Rs)
39,575.25
224,258.00
CUMILATIVE
%
94%
AMOUNT (Rs)
286,159.50
2,781,736.55
312
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
100%
203,125.00
100%
203,125.00
25%
69,375.00
100%
277,500.00
313
AMOUNT (Rs)
283,500.00
272,500.00
CUMILATIVE
%
90%
AMOUNT (Rs)
283,500.00
480,625.00
314
AMOUNT (Rs)
CUMILATIVE
%
AMOUNT (Rs)
1,416,256.30
7,899,721.80
1,295,390.73
5,050,765.88
224,258.00
2,781,736.55
272,500.00
480,625.00
315
AMOUNT (Rs)
3,208,405.03
CUMILATIVE
%
AMOUNT (Rs)
16,212,849.23
316
Description
Amount (Rs)
SECTION I
16,189,566.00
16,848,544.00
Total - 1
Less
3,125,000.00
36,163,110.00
Discount if any %
36,163,110.00
317
BOQ
No
Description
Amount (Rs)
318
PREVIOUS
CURRENT
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
AMOUNT (Rs)
2,317,250.00
273,500.00
2,590,750.00
12,753,157.25
2,948,357.44
15,701,514.69
13,004,444.20
3,208,405.03
16,212,849.23
28,074,851.45
6,430,262.47
34,505,113.92
28,074,851.45
6,430,262.47
34,505,113.92
319
PREVIOUS
CURRENT
CUMILATIVE
AMOUNT (Rs)
AMOUNT (Rs)
AMOUNT (Rs)
320
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
Tender 1
17 Rooms in Ground Floor
2.A.1.10
New Item
Removing of existing speaker, bath room telephone, exhaust fan and grill.
And hand over to hotel for re-use.
17.00
Nr
5,500.00
93,500.00
100%
2.A.3.11
20.00
Nr
5,300.00
5,600.00
6,000.00
75%
2.A.5.4
New item
Granite top of the cistern tank to be modified as to make it openable,
after laying of new wall tiles
17.00
Nr
3,250.00
55,250.00
10%
2.A.5.5
New item
Make all the SS access plates under wash basins and jacuzzies, as to
flush with new tile wall.
17.00
Nr
3,000.00
51,000.00
10%
2.A.5.1
1,077.00
Sq.ft
360.00
375.00
16,155.00
57%
2.A.5.2
2,668.00
Sq.ft
385.00
400.00
40,020.00
88%
321
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
261,925.00
261,925.00
2.A.5.3
1,753.00
Sq.ft
385.00
400.00
26,295.00
88%
2.B.3.1
Anti fungal high qulity groute should be used for tiling works
1,467.00
Sq.ft
360.00
375.00
22,005.00
88%
2.B.4.2
1,037.00
Sq.ft
45.00
70.00
25,925.00
65%
2.B.5.13
17.00
Sq.ft
14,296.47
21,618.91
124,481.48
65%
2,112.00
Sq.ft
65.00
85.00
42,240.00
75%
2.D.1.1
322
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
2.D.1.2
DESCRIPTION
Following statement need to be added to item description.
"Rate should be include for the repairing of minor cracks."
QTY
UNIT
3,722.00
Sq.ft
RATE
NEW RATE
75.00
95.00
ADDITION
74,440.00
%
75%
577,311.48
Tender 2
17 Rooms in First Floor
2.A.1.10
New Item
Removing of existing speaker, bath room telephone, exhaust fan and grill.
And hand over to hotel for re-use.
17.00
Nr
5,500.00
93,500.00
100%
2.A.3.11
20.00
Nr
5,300.00
5,600.00
6,000.00
75%
323
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
2.A.5.4
New item
Granite top of the cistern tank to be modified as to make it openable,
after laying of new wall tiles
17.00
Nr
3,250.00
55,250.00
10%
2.A.5.5
New item
Make all the SS access plates under wash basins and jacuzzies, as to
flush with new tile wall.
17.00
Nr
3,000.00
51,000.00
10%
2.A.5.1
360.00
375.00
17,265.00
57%
1,151.00
Sq.ft
223,015.00
223,015.00
2.A.5.3
2.B.1.5
1,734.00
19.00
Sq.ft
Nr
390.00
405.00
26,010.00
88%
3,500.00
4,300.00
15,200.00
100%
324
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
2.B.3.1
Anti fungal high qulity polimer groute should be used for tiling works.
Brand/model should be removed from the item description.
2.B.5.13
QTY
UNIT
RATE
NEW RATE
ADDITION
469.00
Sq.ft
360.00
375.00
7,035.00
88%
17.00
Sq.ft
14,568.24
21,890.68
124,481.48
65%
2,034.00
Sq.ft
65.00
85.00
40,680.00
70%
2.C.5.1
2.C.5.2
436,421.48
436,421.48
2,034.00
Sq.ft
85.00
###
325
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
2.D.1.1
3,233.00
Sq.ft
65.00
85.00
64,660.00
70%
2.D.1.2
3,689.00
Sq.ft
75.00
95.00
73,780.00
75%
326
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
574,861.48
New Item
Removing of existing speaker, bath room telephone, exhaust fan and grill.
And hand over to hotel for re-use.
17.00
Nr
5,500.00
93,500.00
100%
3.A.3.11
20.00
Nr
5,300.00
5,600.00
6,000.00
75%
3.A.3.1
1,322.00
Sq.ft
360.00
375.00
19,830.00
70%
3.A.3.2
2,802.00
Sq.ft
390.00
405.00
42,030.00
70%
3.A.3.3
2,114.00
Sq.ft
390.00
405.00
31,710.00
70%
327
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
193,070.00
193,070.00
3.A.5.4
New item
Granite top of the cistern tank to be modified as to make it openable,
after laying of new wall tiles
17.00
Nr
3,250.00
55,250.00
10%
3.A.5.5
New item
Make all the SS access plates under wash basins and jacuzzies, as to
flush with new tile wall.
17.00
Nr
3,000.00
51,000.00
10%
3.A.6.1
85.00
105.00
26,440.00
70%
3.B.1.5
17.00
Nr
3,500.00
4,300.00
13,600.00
100%
3.B.2.20
19.00
Nr
1,500.00
1,650.00
2,850.00
88%
1,322.00
Sq.ft
328
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
3.B.3.1
DESCRIPTION
Anti fungal high qulity polimer groute should be used for tiling works.
Brand/model should be removed from the item description.
QTY
521.00
UNIT
Sq.ft
RATE
360.00
NEW RATE
375.00
ADDITION
7,815.00
350,025.00
350,025.00
%
65%
3.C.4.1
Anti fungal high qulity polimer groute should be used for tiling works.
Brand/model should be removed from the item description.
2,597.00
Sq.ft
360.00
375.00
38,955.00
70%
3.C.3.1
3,199.00
Sq.ft
65.00
85.00
63,980.00
70%
3.C.3.2
2,498.00
Sq.ft
85.00
105.00
49,960.00
70%
329
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
QTY
UNIT
RATE
NEW RATE
ADDITION
3.D.1.1
3,125.00
65.00
85.00
62,500.00
75%
3.D.1.2
3,700.00
75.00
95.00
74,000.00
75%
639,420.00
SUMMARY
Tender 1
Total Addition (17 Rooms Ground Floor)
577,311.48
Tender 2
Total Addition (17 Rooms First Floor)
Total Addition (17 Rooms Second Floor)
574,861.48
639,420.00
330
REFURBISHMENT OF GUEST ROOMS (17 ROOMS IN GROUND FLOOR AND 34 ROOMS IN 1ST AND 2ND FLOORS) AT AHUNGALLA
Amendments to BOQ
PREVIOUS
ITEM
DESCRIPTION
TOTAL ADDITION
QTY
UNIT
RATE
NEW RATE
ADDITION
1,791,592.96
331
PREVIOUS
AMOUNT
CURRENT
%
AMOUNT
93,500.00
CUMILATIVE
%
AMOUNT
100%
93,500.00
4,500.00
25%
1,500.00
100%
6,000.00
5,525.00
89%
49,172.50
99%
54,697.50
5,100.00
90%
45,900.00
100%
51,000.00
9,208.35
39%
6,300.45
96%
15,508.80
35,217.60
8%
3,201.60
96%
38,419.20
332
PREVIOUS
AMOUNT
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
153,050.95
106,074.55
259,125.50
153,050.95
106,074.55
259,125.50
23,139.60
8%
2,103.60
96%
25,243.20
19,364.40
12%
2,640.60
100%
22,005.00
16,851.25
34%
8,814.50
99%
25,665.75
80,912.96
35%
43,568.52
100%
124,481.48
31,680.00
25%
10,560.00
100%
42,240.00
333
PREVIOUS
AMOUNT
55,830.00
CURRENT
%
25%
380,829.16
AMOUNT
18,610.00
%
100%
192,371.77
93,500.00
4,500.00
CUMILATIVE
25%
1,500.00
AMOUNT
74,440.00
573,200.93
100%
93,500.00
100%
6,000.00
334
PREVIOUS
AMOUNT
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
5,525.00
89%
49,172.50
99%
54,697.50
5,100.00
90%
45,900.00
100%
51,000.00
9,841.05
42%
7,251.30
99%
17,092.35
118,466.05
103,823.80
222,289.85
118,466.05
103,823.80
222,289.85
22,888.80
11%
2,861.10
15,200.00
99%
25,749.90
100%
15,200.00
335
PREVIOUS
AMOUNT
CURRENT
%
CUMILATIVE
AMOUNT
AMOUNT
6,190.80
11%
773.85
99%
6,964.65
80,912.96
35%
43,568.52
100%
124,481.48
28,476.00
29%
11,797.20
99%
40,273.20
272,134.61
162,824.47
434,959.08
272,134.61
162,824.47
434,959.08
100%
336
PREVIOUS
AMOUNT
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
45,262.00
26%
16,811.60
96%
62,073.60
55,335.00
25%
18,445.00
100%
73,780.00
337
PREVIOUS
AMOUNT
CURRENT
%
372,731.61
AMOUNT
CUMILATIVE
%
198,081.07
93,500.00
AMOUNT
570,812.68
100%
93,500.00
4,500.00
25%
1,500.00
100%
6,000.00
13,881.00
29%
5,750.70
99%
19,631.70
29,421.00
27%
11,348.10
97%
40,769.10
22,197.00
27%
8,561.70
97%
30,758.70
338
PREVIOUS
AMOUNT
CURRENT
%
CUMILATIVE
AMOUNT
AMOUNT
163,499.00
27,160.50
190,659.50
163,499.00
27,160.50
190,659.50
5,525.00
89%
49,172.50
99%
54,697.50
5,100.00
89%
45,390.00
99%
50,490.00
18,508.00
29%
7,667.60
99%
26,175.60
100%
13,600.00
97%
2,764.50
13,600.00
2,508.00
9%
256.50
339
PREVIOUS
AMOUNT
5,079.75
CURRENT
%
34%
AMOUNT
2,657.10
CUMILATIVE
%
99%
AMOUNT
7,736.85
213,819.75
132,304.20
346,123.95
213,819.75
132,304.20
346,123.95
27,268.50
30%
11,686.50
100%
38,955.00
44,786.00
27%
17,274.60
97%
62,060.60
34,972.00
27%
13,489.20
97%
48,461.20
340
PREVIOUS
AMOUNT
CURRENT
%
AMOUNT
CUMILATIVE
%
AMOUNT
46,875.00
25%
15,625.00
100%
62,500.00
55,500.00
25%
18,500.00
100%
74,000.00
423,221.25
208,879.50
632,100.75
380,829.16
192,371.77
573,200.93
372,731.61
423,221.25
198,081.07
208,879.50
570,812.68
632,100.75
341
PREVIOUS
AMOUNT
1,176,782.02
CURRENT
%
AMOUNT
599,332.34
CUMILATIVE
%
AMOUNT
1,776,114.36
342
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Ground Floor
01
02
03
04
05
06
07
08
Item
Description
%
120
121
122
123
124
125
126
127
09
128
10
129
2.A
2.A.1
2.A.1.1
2.A.1.2
2.A.1.3
2.A.1.4
Labour accomodation
Electricity
Water
Break boundry wall
Supervision
Hording
Scaffolding
Safety netting
Lighting, watchmen
Shop drawings
Demobilization
Bonds
Other preliminaries
95%
95%
95%
85%
95%
95%
100%
100%
100%
0%
75%
100%
BATHROOM
Demolition
Light fittings
Switches
Sanitary fittings
Floor tiles
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
343
02
121
1.00
1.00
1.00
1.00
1.00
03
122
1.00
1.00
1.00
1.00
1.00
04
123
1.00
1.00
1.00
1.00
1.00
05
124
1.00
1.00
1.00
1.00
1.00
06
125
1.00
1.00
1.00
1.00
1.00
07
126
1.00
1.00
1.00
1.00
1.00
08
127
1.00
1.00
1.00
1.00
1.00
09
128
1.00
1.00
1.00
1.00
1.00
10
129
1.00
1.00
1.00
1.00
1.00
2.A.2 Waterproofing
2.A.2.1 Floor
2.A.2.2 Walls
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.A.3
2.A.3.1
2.A.3.2
2.A.3.3
2.A.3.4
2.A.3.5
2.A.3.6
2.A.3.7
2.A.3.8
100%
100%
99%
100%
99%
99%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Plumbing
Hot water valve
Cold water valve
Water closet cistern
Flush valve system
Water closet
Telephone shower
Bidet shower
344
2.A.4.3
2.A.4.4
2.A.4.5
2.A.4.6
2.A.4.7
2.A.4.8
2.A.4.9
2.A.5
2.A.5.1
2.A.5.2
2.A.5.3
Finishes
Floor tile
Wall tile
Mosaic tile
02
121
1.00
1.00
1.00
03
122
1.00
1.00
1.00
04
123
1.00
1.00
1.00
05
124
1.00
1.00
1.00
06
125
1.00
1.00
1.00
07
126
1.00
1.00
1.00
08
127
1.00
1.00
1.00
09
128
1.00
1.00
1.00
10
129
1.00
1.00
1.00
99%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
97%
100%
97%
97%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
96%
96%
96%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
345
2.B
02
121
03
122
04
123
05
124
06
125
07
126
08
127
09
128
10
129
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.B.1
2.B.1.1
2.B.1.2
2.B.1.3
2.B.1.4
2.B.1.5
2.B.1.6
2.B.1.7
Demolition
Light fittings
Bell shape light
switches
AC Grille
FCU
Floor tiles
Mirror
100%
100%
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.B.2
2.B.2.1
2.B.2.2
2.B.2.3
2.B.2.4
2.B.2.5
Electrical Installation
Wiring 2-way light
Wiring ceiling lamp
Wiring bell lamp
Wiring master switch
Wiring 13A switch
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
346
02
121
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
03
122
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
04
123
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
05
124
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
06
125
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
07
126
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
08
127
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
09
128
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10
129
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
97%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
1.00
1.00
1.00
NA
1.00
1.00
1.00
NA
1.00
1.00
Note
99%
99%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
347
2.B.5
2.B.5.1
2.B.5.2
2.B.5.3
2.B.5.4
2.B.5.5
2.B.5.6
2.B.5.8
2.B.5.9
2.B.5.10
2.B.5.11
2.B.5.12
2.B.5.13
2.B.5.14
2.B.5.15
2.C
Miscellaneous
Double sash door
Cement fibre ceiling
Door modification
Fix magic eye
Fix safety latch
Fix door bell
Fix fire evacuation plan
100%
91%
100%
97%
97%
97%
0%
Fix mirror
Fix mirror with frame
Install TV bracket
Install AC grille
Clean UPVC window
Teak threshold
Install wall picture
0%
0%
97%
97%
100%
0%
0%
02
121
03
122
04
123
05
124
06
125
07
126
NA
NA
NA
NA
NA
NA
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
08
127
09
128
10
129
1.00
NA
NA
1.00
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
BALCONY
348
02
121
03
122
04
123
05
124
06
125
07
126
08
127
09
128
10
129
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.C.2 Waterproofing
2.C.2.1 Floor
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
97%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100% 1.00
1.00
1.00
1.00
99% 1.00
1.00
1.00
1.00
100% N/A
N/A
N/A
N/A
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 N/A
2.C.4 Finishes
2.C.4.1 Floor tile
2.C.4.2 Skirting
2.C.5
2.C.5.1
2.C.5.2
2.C.5.3
2.C.6
2.C.6.1
1.00
1.00
1.00
1.00
1.00
1.00
1.00 N/A
N/A
Deleted
349
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Ground Floor
01
02
03
04
05
06
07
08
Item
Description
%
120
121
122
123
124
125
126
127
D
PASSAGE
2.D.1 Painting and Decoration
2.D.1.1 Weathershield paint wall
2.D.1.2 Weather shield paint ceiling
09
128
10
129
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
99%
100%
96%
96%
96%
100%
99%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
AMENDMENTS
2.A.1.10
2.A.3.11
2.A.5.4
2.A.5.5
2.A.5.1
2.A.5.2
2.A.5.3
2.B.3.1
2.B.4.2
2.B.5.13
2.D.1.1
2.D.1.2
350
11
130
1.00
1.00
1.00
1.00
12
131
1.00
1.00
1.00
1.00
13
132
1.00
1.00
1.00
1.00
14
133
15
134
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16
135
1.00
1.00
1.00
1.00
17
136
1.00
1.00
1.00
1.00
Total
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
351
11
130
1.00
1.00
1.00
1.00
1.00
12
131
1.00
1.00
1.00
1.00
1.00
13
132
1.00
1.00
1.00
1.00
1.00
14
133
1.00
1.00
1.00
1.00
1.00
15
134
1.00
1.00
1.00
1.00
1.00
16
135
1.00
1.00
1.00
1.00
1.00
17
136
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
0.75
0.75
0.75
17.00
17.00
16.75
17.00
16.75
16.75
16.75
1.00
1.00
0.99
1.00
0.99
0.99
0.99
1.00
1.00
1.00
0.75
1.00
1.00
16.75
17.00
17.00
0.99
1.00
1.00
352
11
130
1.00
1.00
1.00
12
131
1.00
1.00
1.00
13
132
1.00
1.00
1.00
14
133
1.00
1.00
1.00
15
134
1.00
1.00
1.00
16
135
1.00
1.00
1.00
17
136
0.50
0.50
0.75
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.50
16.50
16.75
0.97
0.97
0.99
0.80
0.80
16.80
16.80
0.99
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.50
0.50
1.00
1.00
17.00
16.50
17.00
16.50
16.50
17.00
17.00
1.00
0.97
1.00
0.97
0.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.90
0.90
0.90
16.40
16.40
16.40
0.96
0.96
0.96
1.00
1.00
1.00
1.00
0.90
0.90
16.90
16.90
0.99
0.99
353
11
130
12
131
13
132
14
133
15
134
16
135
17
136
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.90
16.50
17.00
16.90
0.97
1.00
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
354
11
130
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12
131
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13
132
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14
133
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
15
134
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16
135
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17
136
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.50
16.50
16.50
16.50
17.00
17.00
17.00
17.00
0.97
0.97
0.97
0.97
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
17.00
17.00
16.50
1.00
1.00
0.97
1.00
1.00
1.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
0.75
16.75
16.75
16.75
0.99
0.99
0.99
1.00
1.00
1.00
0.75
16.75
0.99
355
11
130
12
131
13
132
14
133
15
134
16
135
17
136
NA
NA
NA
NA
NA
NA
NA
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
NA
0.75
1.00
1.00
1.00
1.00
NA
0.75
1.00
1.00
1.00
1.00
NA
0.75
1.00
1.00
1.00
1.00
NA
0.25
1.00
0.50
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
1.00
Total
1.00
1.00
1.00
15.50
17.00
16.50
16.50
16.50
-
1.00
0.91
1.00
0.97
0.97
0.97
-
16.50
16.50
17.00
-
0.97
0.97
1.00
-
356
11
130
12
131
13
132
14
133
15
134
16
135
17
136
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
16.50
17.00
0.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
16.75
16.75
0.99
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
N/A
N/A
N/A
N/A
N/A
N/A
N/A
17.00
16.75
3.00
1.00
0.99
1.00
357
11
130
12
131
13
132
14
133
15
134
16
135
17
136
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
0.90
0.90
0.90
1.00
0.75
1.00
1.00
1.00
17.00
17.00
16.75
17.00
16.40
16.40
16.40
15.00
16.75
17.00
17.00
17.00
1.00
1.00
0.99
1.00
0.96
0.96
0.96
1.00
0.99
1.00
1.00
1.00
358
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - First Floor
01
02
03
04
05
06
07
08
Item
Description
%
245
246
247
248
249
250
251
252
09
253
10
254
4.A
4.A.1
4.A.1.1
4.A.1.2
4.A.1.3
4.A.1.4
Labour accomodation
Electricity
Water
Break boundry wall
Supervision
Hording
Scaffolding
Safety netting
Lighting, watchmen
Shop drawings
Demobilization
Bonds
Other preliminaries
95%
95%
95%
85%
95%
95%
100%
100%
100%
0%
75%
100%
BATHROOM
Demolotion
Light fittings
Switches
Sanitary fittings
Floor tiles
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
359
02
246
1.00
1.00
1.00
1.00
03
247
1.00
1.00
1.00
1.00
04
248
1.00
1.00
1.00
1.00
05
249
1.00
1.00
1.00
1.00
06
250
1.00
1.00
1.00
1.00
07
251
1.00
1.00
1.00
1.00
08
252
1.00
1.00
1.00
1.00
09
253
1.00
1.00
1.00
1.00
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Rate only
100% 1.00
100% 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
4.A.3
4.A.3.1
4.A.3.2
4.A.3.3
Plumbing
Replace gully
Hot water valve
Cold water valve
4.A.3.4
4.A.3.5
4.A.3.6
4.A.3.7
4.A.3.8
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.A.3.9
4.A.3.10
4.A.3.11
4.A.3.12
4.A.3.13
99%
100%
100%
97%
97%
360
02
246
1.00
03
247
1.00
04
248
1.00
05
249
1.00
06
250
1.00
07
251
1.00
08
252
1.00
09
253
1.00
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.A.2.3
4.A.2.4
4.A.2.5
4.A.2.6
4.A.2.7
4.A.2.8
4.A.2.9
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.A.5
Finishes
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Floor Finishes
4.A.5.1 Floor tile
4.A.5.2 Wall tile
4.A.5.3 Mosaic tile
4.A.6
100%
100%
99%
99%
99%
1.00
1.00
1.00
361
02
246
03
247
04
248
05
249
06
250
07
251
08
252
09
253
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.A.7
4.A.7.1
4.A.7.2
4.A.7.3
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.B
4.B.1
4.B.1.1
4.B.1.2
4.B.1.3
4.B.1.4
4.B.1.5
4.B.1.6
4.B.1.7
4.B.2
Miscellaneous
Install hair drier
Install door stopper
Cement fibre ceiling sheets
97%
100%
99%
100%
100%
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Electrical Installation
Final sub circuit wiring
362
4.B.2.6
4.B.2.7
4.B.2.8
4.B.2.9
4.B.2.10
4.B.2.11
02
246
1.00
1.00
1.00
1.00
1.00
03
247
1.00
1.00
1.00
1.00
1.00
04
248
1.00
1.00
1.00
1.00
1.00
05
249
1.00
1.00
1.00
1.00
1.00
06
250
1.00
1.00
1.00
1.00
1.00
07
251
1.00
1.00
1.00
1.00
1.00
08
252
1.00
1.00
1.00
1.00
1.00
09
253
1.00
1.00
1.00
1.00
1.00
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Telephone
4.B.2.14 Wiring telephone
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Televition
4.B.2.15 Wiring TV
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
363
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - First Floor
01
02
03
04
05
06
07
08
Item
Description
%
245
246
247
248
249
250
251
252
Data
4.B.2.16 Wiring data
Deleted
09
253
10
254
Pipe music
4.B.2.17 Wiring pipe music
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
97%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
97%
99%
99%
99%
Deleted
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.B.3 Finishes
4.B.3.1 Floor tile
4.B.4
4.B.2.2
4.B.2.3
4.B.2.4
4.B.2.5
4.B.2.6
4.B.5
4.B.5.1
4.B.5.2
4.B.5.3
4.B.5.4
4.B.5.5
Miscellaneous
Sliding door
Double sash door
Cement fibre ceiling
Door modification
Fix magic eye
100% NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
100% NA
NA
NA
NA
NA
NA
1.00 NA
NA
NA
100% 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100% 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
97% 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
364
4.B.5.11
4.B.5.12
4.B.5.13
4.B.5.14
4.B.5.15
02
246
1.00
1.00
03
247
1.00
1.00
04
248
1.00
1.00
05
249
1.00
1.00
06
250
1.00
1.00
07
251
1.00
1.00
08
252
1.00
1.00
09
253
1.00
1.00
10
254
1.00
1.00
97%
97%
100%
0%
0%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.C.1 Demolition
4.C.1.1 Light fittings
4.C.1.2 Floor tiles
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.C.2 Waterproofing
4.C.2.1 Floor
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
4.C
Install TV bracket
Install AC grille
Clean UPVC window
Teak threshold
Install wall picture
BALCONY
365
4.C.5
4.C.5.1
4.C.5.2
4.C.5.3
4.C.6
4.C.6.1
4.C.6.2
4.C.6.3
4.D
02
246
03
247
04
248
05
249
06
250
07
251
08
252
09
253
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Deleted
Deleted
100% 1.00
1.00
1.00
1.00
1.00
1.00 N/A
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
100%
0%
PASSAGE
4.E
4.E.1
96%
100%
1.00
1.00
1.00
1.00
366
02
246
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
03
247
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
04
248
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
05
249
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
06
250
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
07
251
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
08
252
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
09
253
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10
254
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
367
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - First Floor
01
02
03
04
05
06
07
08
Item
Description
%
245
246
247
248
249
250
251
252
09
253
10
254
368
11
255
1.00
1.00
1.00
1.00
12
256
1.00
1.00
1.00
1.00
13
258
1.00
1.00
1.00
1.00
14
259
15
260
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16
261
1.00
1.00
1.00
1.00
17
262
1.00
1.00
1.00
1.00
Total
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
369
11
255
1.00
1.00
1.00
1.00
12
256
1.00
1.00
1.00
1.00
13
258
1.00
1.00
1.00
1.00
14
259
1.00
1.00
1.00
1.00
15
260
1.00
1.00
1.00
1.00
16
261
1.00
1.00
1.00
1.00
17
262
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
1.00
0.75
0.75
16.75
17.00
17.00
16.75
16.75
0.99
1.00
1.00
0.99
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
1.00
0.50
0.50
16.75
17.00
17.00
16.50
16.50
0.99
1.00
1.00
0.97
0.97
370
11
255
1.00
12
256
1.00
13
258
1.00
14
259
1.00
15
260
1.00
16
261
1.00
17
262
0.75
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.75
0.99
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.50
0.50
1.00
1.00
17.00
16.50
17.00
16.50
16.50
17.00
17.00
1.00
0.97
1.00
0.97
0.97
1.00
1.00
1.00
1.00
1.00
0.90
0.90
0.90
16.90
16.90
16.90
0.99
0.99
0.99
371
11
255
12
256
13
258
14
259
15
260
16
261
17
262
Total
1.00
1.00
1.00
1.00
1.00
1.00
0.90
16.90
0.99
1.00
1.00
1.00
1.00
1.00
1.00
0.75
16.75
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.75
16.50
17.00
16.75
0.97
1.00
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
372
11
255
1.00
1.00
1.00
1.00
1.00
12
256
1.00
1.00
1.00
1.00
1.00
13
258
1.00
1.00
1.00
1.00
1.00
14
259
1.00
1.00
1.00
1.00
1.00
15
260
1.00
1.00
1.00
1.00
1.00
16
261
1.00
1.00
1.00
1.00
1.00
17
262
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
17.00
17.00
16.50
16.50
16.50
16.50
1.00
1.00
0.97
0.97
0.97
0.97
1.00
1.00
17.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
373
11
255
12
256
13
258
14
259
15
260
16
261
17
262
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
17.00
17.00
16.50
1.00
1.00
0.97
1.00
1.00
1.00
1.00
1.00
1.00
0.75
16.75
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.75
0.90
0.75
16.50
16.75
16.90
16.75
0.97
0.99
0.99
0.99
NA
NA
NA
1.00 NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
1.00
17.00
17.00
16.50
1.00
1.00
1.00
1.00
0.97
374
11
255
1.00
1.00
12
256
1.00
1.00
13
258
1.00
1.00
14
259
1.00
1.00
15
260
1.00
1.00
16
261
1.00
1.00
17
262
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.50
16.50
-
0.97
0.97
-
0.50
0.50
1.00
16.50
16.50
17.00
-
0.97
0.97
1.00
-
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
375
11
255
12
256
13
258
14
259
15
260
16
261
17
262
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
16.75
17.00
-
0.99
1.00
-
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.25
1.00
16.25
17.00
0.96
1.00
0.90
0.90
376
11
255
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12
256
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13
258
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14
259
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
15
260
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16
261
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17
262
1.00
1.00
0.75
1.00
0.90
0.90
1.00
0.75
1.00
0.75
1.00
0.25
1.00
Total
17.00
17.00
16.75
17.00
16.90
16.90
17.00
16.75
17.00
16.75
17.00
16.25
17.00
1.00
1.00
0.99
1.00
0.99
0.99
1.00
0.99
1.00
0.99
1.00
0.96
1.00
377
11
255
12
256
13
258
14
259
15
260
16
261
17
262
Total
378
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Second Floor
01
02
03
04
05
06
07
08
Item
Description
%
343
344
345
346
347
348
349
350
09
351
10
352
BATH ROOM
Demolition
Light fittings
Switches
Sanitary fittings
Floor tiles
Wall tiles
Cut cement
Plaster
Tmprd glass shower cubical
Tempered glass sliding door
5.A.2 Waterproofing
5.A.2.1 Floor
5.A.2.2 Walls
5.A.3
5.A.3.1
5.A.3.2
5.A.3.3
5.A.3.4
5.A.3.5
Plumbing
Replace gully
Hot water valve
Cold water valve
Water closet cistern
Water closet cistern+granite
100%
100%
100%
100%
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Rate only
100% 1.00
100% 1.00
99% 1.00
99% 1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
379
02
344
1.00
1.00
1.00
1.00
1.00
03
345
1.00
1.00
1.00
1.00
1.00
04
346
1.00
1.00
1.00
1.00
1.00
05
347
1.00
1.00
1.00
1.00
1.00
06
348
1.00
1.00
1.00
1.00
1.00
07
349
1.00
1.00
1.00
1.00
1.00
08
350
1.00
1.00
1.00
1.00
1.00
09
351
1.00
1.00
1.00
1.00
1.00
10
352
1.00
1.00
1.00
1.00
1.00
5.A.3.11
5.A.3.12
5.A.3.13
5.A.3.14
5.A.4
5.A.4.1
5.A.4.2
100%
97%
97%
95%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.A.4.3
5.A.4.4
5.A.4.5
5.A.4.6
5.A.4.7
5.A.4.8
5.A.4.9
100%
97%
100%
97%
97%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
380
02
344
03
345
04
346
05
347
06
348
07
349
08
350
09
351
10
352
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
99%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.A.7
5.A.7.1
5.A.7.2
5.A.7.3
97%
100%
99%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.B
5.B.1
5.B.1.1
5.B.1.2
5.B.1.3
5.B.1.4
5.B.1.5
5.B.1.6
5.B.1.7
Miscellaneous
Install hair drier
Install door stopper
Cement fibre ceiling sheets
100%
100%
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
381
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Second Floor
01
02
03
04
05
06
07
08
Item
Description
%
343
344
345
346
347
348
349
350
5.B.2
5.B.2.1
5.B.2.2
5.B.2.3
5.B.2.4
5.B.2.5
5.B.2.6
5.B.2.7
5.B.2.8
5.B.2.9
5.B.2.10
5.B.2.11
5.B.2.12
5.B.2.13
5.B.2.14
5.B.2.15
5.B.2.16
5.B.2.17
Electrical Installation
Wiring 2-way light
Wiring ceiling lamp
Wiring bell lamp
Wiring master switch
Wiring 13A switch
09
351
10
352
100%
100%
100%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
97%
97%
97%
97%
100%
100%
100%
100%
Deleted
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
382
99%
02
344
1.00
03
345
1.00
04
346
1.00
05
347
1.00
06
348
1.00
07
349
1.00
08
350
1.00
09
351
1.00
10
352
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
5.B.4
5.B.4.2
5.B.4.3
5.B.4.4
Deleted
97% 1.00
97% 1.00
5.B.4.5
5.B.4.6
5.B.4.7
5.B.4.8
Ceiling paint
Waterbase paint timber door
Furniture paint
Pergola paint
96% 1.00
100% 1.00
Deleted
Deleted
5.B.5
5.B.5.1
5.B.5.2
5.B.5.3
5.B.5.4
5.B.5.5
5.B.5.6
Miscellaneous
Sliding door
Double sash door
Cement fibre ceiling
Door modification
Fix magic eye
Fix safety latch
0%
100%
100%
100%
97%
97%
NA
1.00
1.00
1.00
1.00
383
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Second Floor
01
02
03
04
05
06
07
08
Item
Description
%
343
344
345
346
347
348
349
350
5.B.5.7
5.B.5.8
5.B.5.9
5.B.5.10
5.B.5.11
5.B.5.12
5.B.5.13
5.B.5.14
5.B.5.15
5.B.5.16
10
352
97%
0%
0%
0%
97%
97%
100%
100%
0%
0%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.C.1 Demolition
5.C.1.1 Light fittings
5.C.1.2 Floor tiles
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.C.2 Waterproofing
5.C.2.1 Floor
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.C
09
351
BALCONY
384
02
344
1.00
03
345
1.00
04
346
1.00
05
347
1.00
06
348
1.00
07
349
1.00
08
350
1.00
09
351
1.00
10
352
1.00
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.C.4 Finishes
5.C.4.1 Floor tile
5.C.4.2 Skirting
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
97%
97%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Deleted
Deleted
94% 1.00
1.00
1.00
1.00
1.00
1.00 N/A
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.C.6
5.C.6.1
5.C.6.2
5.C.6.3
5.D
Miscellaneous
Clean Aluminum window
Repair handrail
Paint timber handrail
PASSAGE
100%
100%
1.00
1.00
1.00
1.00
385
Refurbishment of Guest Rooms (17 Rooms in Ground Floor and 34 Rooms in 1st & 2nd Floors)
At Ahungalla
Progress - Second Floor
01
02
03
04
05
06
07
08
Item
Description
%
343
344
345
346
347
348
349
350
5.E.1 Repair movement joint
90%
09
351
10
352
AMENDMENTS
3.A.1.10
3.A.3.11
3.A.3.1
3.A.3.2
3.A.3.3
3.A.5.4
3.A.5.5
3.A.6.1
3.B.1.5
3.B.2.20
3.B.3.1
3.C.4.1
3.C.3.1
3.C.3.2
3.D.1.1
3.D.1.2
100%
100%
99%
97%
97%
99%
99%
99%
100%
97%
99%
100%
97%
97%
100%
100%
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
386
11
353
12
354
13
355
14
356
15
357
16
358
17
359
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
0.75
17.00
17.00
16.75
16.75
1.00
1.00
0.99
0.99
387
11
353
1.00
1.00
1.00
1.00
1.00
12
354
1.00
1.00
1.00
1.00
1.00
13
355
1.00
1.00
1.00
1.00
1.00
14
356
1.00
1.00
1.00
1.00
1.00
15
357
1.00
1.00
1.00
1.00
1.00
16
358
1.00
1.00
1.00
1.00
1.00
17
359
0.75
0.75
0.75
0.75
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.80
1.00
1.00
1.00
0.80
1.00
1.00
1.00
0.80
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.75
16.75
16.75
16.75
17.00
0.99
0.99
0.99
0.99
1.00
1.00
0.50
0.50
0.75
17.00
16.50
16.50
16.15
1.00
0.97
0.97
0.95
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.50
0.50
1.00
1.00
17.00
16.50
17.00
16.50
16.50
17.00
17.00
1.00
0.97
1.00
0.97
0.97
1.00
1.00
388
11
353
12
354
13
355
14
356
15
357
16
358
17
359
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.90
0.50
0.50
16.90
16.50
16.50
0.99
0.97
0.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.75
1.00
16.75
17.00
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
0.75
16.50
17.00
16.75
0.97
1.00
0.99
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
389
11
353
12
354
13
355
14
356
15
357
16
358
17
359
Total
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
17.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
0.50
0.50
1.00
1.00
1.00
1.00
17.00
17.00
16.50
16.50
16.50
16.50
17.00
17.00
17.00
17.00
1.00
1.00
0.97
0.97
0.97
0.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
390
11
353
1.00
12
354
1.00
13
355
1.00
14
356
1.00
15
357
1.00
16
358
1.00
17
359
0.50
1.00
1.00
1.00
1.00
1.00
1.00
Total
16.50
0.97
0.75
16.75
0.99
0.97
0.97
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
16.50
16.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.25
1.00
16.25
17.00
0.96
1.00
NA
1.00
1.00
0.50
0.50
1.00
17.00
17.00
16.50
16.50
1.00
1.00
1.00
0.97
0.97
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
NA
1.00
1.00
1.00
1.00
391
11
353
12
354
13
355
14
356
15
357
16
358
17
359
Total
16.50
16.50
16.50
17.00
17.00
-
0.97
0.97
0.97
1.00
1.00
-
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
1.00
392
11
353
1.00
12
354
1.00
13
355
1.00
14
356
1.00
15
357
1.00
16
358
1.00
17
359
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
Total
17.00
1.00
1.00
17.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
0.50
16.50
16.50
0.97
0.97
1.00
1.00
1.00
1.00
16.00
0.94
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17.00
17.00
1.00
1.00
393
11
353
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
12
354
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
13
355
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
14
356
15
357
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
16
358
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
17
359
1.00
1.00
0.90
0.50
0.50
0.75
0.75
0.75
1.00
0.50
0.75
1.00
0.50
0.50
1.00
1.00
Total
0.90
0.90
17.00
17.00
16.90
16.50
16.50
16.75
16.75
16.75
17.00
16.50
16.75
17.00
16.50
16.50
17.00
17.00
1.00
1.00
0.99
0.97
0.97
0.99
0.99
0.99
1.00
0.97
0.99
1.00
0.97
0.97
1.00
1.00
394