CE 2052 Lecture 1
CE 2052 Lecture 1
Asoka Perera
Asoka Perera
Asoka Perera
Asoka Perera
Asoka Perera
Asoka Perera
Asoka Perera
10
Asoka Perera
11
Asoka Perera
12
Asoka Perera
Asoka Perera
14
Asoka Perera
15
Asoka Perera
Asoka Perera
17
Asoka Perera
Asoka Perera
Asoka Perera
20
Asoka Perera
Asoka Perera
Asoka Perera
24
Asoka Perera
25
Asoka Perera
26
Asoka Perera
Asoka Perera
Asoka Perera
29
Asoka Perera
30
To assist in periodic interim payments for work done onsite and project stages completed.
A civil engineering standard method of measurement is
adopted to itemise the project into its constituent parts.
Bills of Quantities (BQs) or Bills of Approximate
Quantities is prepared.
BQ item descriptions provide
a standard explanation of the nature and quantity
the type and quality of the
the specification document, describe installation with
reference to technical (national) standards Asoka Perera
31
Asoka Perera
Asoka Perera
Asoka Perera
34
Asoka Perera
36
Asoka Perera
37
Asoka Perera
38
Step 1:
Review the preliminary estimate
Step 2:
Ensure that key items have been described in a
standard format to reflect civil engineering standard methods
of measurement.
Step 3:
Develop from in-house sources, external price
books and construction texts, a range of work task gang-hour
efficiencies and unit rates for respective all-in labour, plant
and material costs; wherever possible, validate data by
industry supplier quotations and time-and-motion studies of
on-site production rates (generally, work efficiencies for
method-related tasks might be gleaned from experience or
from any available texts).
Asoka Perera
Asoka Perera
Asoka Perera
Asoka Perera
42
Preliminary items
Preamble items
Prime costs
Provisional sums
Contingency sums
Profitability mark up