This Cost and Design Template is strictly Fictitious and for illustra

construed as a real project. It only serves the purpose to demons


Design Template may look like. It is intentionally significant in sco
capture multiple scenarios that may go into a project in order to sh
scenarios may be defined.

Under no circumstance should anyone interpret this Cost and De


anything real or under consideration in the MISO transmission pla

New Transmission Proposal Cost & De

Open Transmission Project Name:


Qualified Transmission Developer's Name:
Submitted by:
Submitted on:

In-Service Date:

Total Project Capital Cost (in 2022 USD):

Substation Capital Cost Subtotal (in 2022


Transmission Line Capital Cost Subtotal (in 2022
Transmission Line
Capital Cost/Transmission Line Mile(in 2022

USD):
USD):
Miles:
USD):

Construction Work In Progresss (CWIP):


Available Funds Used During Construction (AFUDC):
Overheads:

New Transmission Proposal Cost & Design Template

Northern Indiana Congestion Relief

$0
$0
1.00
0
Yes (apply formula)
No (apply formula)
20% (apply formula)

n Template

MISO's Published In-Service Date:

MISO's Published Project Cost:

OPEN PROJECT TRANSMISSION LINE DETAILS


Transmission Line Design Details

Line Length

Termination
Points

Conductor

Structure

Shield
Wire

Design
Critera

New Line, Single Circuit (Miles)


New Line, Double Circuit (Miles)
Reconductor (Miles)
Voltage Conversion (Miles)
From Bus Name
From Bus Number (from powerflow model)
To Bus Name
To Bus Number (from powerflow model)
Type(ACSR, ACSS, ACCC, etc)
Size (kcmil) & Stranding
Conductor Code Name
Number of Conductors per Phase
Assumed Ruling Span (ft)
Nominal Operating Voltage (kV)
Ampacity, (Summer Ambient)
Summer Normal Rating (MVA)
Summer Emergency Rating (MVA)
Winter Normal Rating (MVA)
Winter Emergency Rating (MVA)
Conductor Configuration
Foundation Type
Structure Type
Structural Material
Dead Ends (Qty)
Tangents (Qty)
Storm Structures (Qty)
Running Angles (Qty)
Underbuild (Y/N)
Number
Type (Set 1)
Type (Set 2, if applicable)
Size (Set 1)
Size (Set 2, if applicable)
Arresters (if applicable)
Ambient Air Temperature(F)
Wind Speed (fps)
Electrical Line
Assumed Elevation (ft)
Loading
Characteristics
Wind Direction
Max Design Temperature (F)
NESC Load Case
Extreme Wind (mph)
Ice (in) and Wind (mph)
Structure Design
Construction Loading
Loads
Heavy Ice (in)
Unbalanced Structural Loads

Segment 1
Coal City - Reynolds

Segment 2
Greentown - Blue Creek

Segment 3

OPEN PROJECT SUBSTATION DESIGN DETAILS


Station Design Details
High Side

Location

Transformer

Breaker
Scheme

Wave Traps
Switches
Stand Alone
CTs
PTs
CCVTs
Capacitors
Reactors
Control Panels

SUBSTATION NAME
Bus Name
Bus Number (from powerflow model)
Voltage (kV)
Voltage
Rating (MVA)
Quantity
Voltage
Rating (MVA)
Quantity
Voltage
Rating (MVA)
Quantity
Quantity
Configuration
Ampacity
Interrupting Capacity Rating (kA)
Quantity
Ampacity
Quantity
Ampacity
Quantity
Ampacity
Quantity
Voltage (kV)
Quantity
Voltage (kV)
Quantity
Size (MVAR)
Quantity
Size (MVAR)
Quantity
Voltage (kV)
BIL Rating (kV Crest)

Required Substation Property/Fence Expansions


SCADA Requirements
Mobile Substation Requirements
Control Enclosure Requirements
Fiber Optic Requirements
Remote End Requirements
Metering Requirements
Contamination Requirements
Unusual Site Prep Requirements

Substation 1
Low Side
Blue Creek

Tertiary

Open Transmission Line Project Cost


Template

Project Cost
(Current Year $$$)

Section 1: Engineering & Surveying


Project Design Labor
Survey Labor
Other (to be specified)
Total

Total

Total

Total

Total

Section 2: ROW Estimation: land acquisition, regulatory, &


permitting
Rights-of-Way
Permitting & Regulatory
Legal Expenses
Other (to be specified)

Section 3: Construction Materials & Labor


Materials
Towers & Fixtures
Foundations
Overhead Conductors & Devices
Labor

Section 4: Contingency
Section 1: Design
Section 2: ROW
Section 3: Construction Materials & Labor
Other (to be specified)

Section 5: Other
CWIP (y/n)
AFUDC
Overheads

TOTAL FACILITY COST $

Open Transmission Line Project Cost


Template

Project Cost
(Current Year $$$)

Section 1: Engineering & Surveying


Project Design Labor
Survey Labor
Other (to be specified)
Total

Total

Total

Total

Total

Section 2: ROW Estimation: land acquisition, regulatory, &


permitting
Rights-of-Way
Permitting & Regulatory
Legal Expenses
Other (to be specified)

Section 3: Construction Materials & Labor


Materials
Towers & Fixtures
Foundations
Overhead Conductors & Devices
Labor

Section 4: Contingency
Section 1: Design
Section 2: ROW
Section 3: Construction Materials & Labor
Other (to be specified)

Section 5: Other
CWIP (y/n)
AFUDC
Overheads

TOTAL FACILITY COST $

Open Substation Project Cost Template

Project Cost
(Current Year $$$)

Section 1: Engineering & Surveying


Project Design Labor
Survey Labor
Other (to be specified)
Total

Total

Total

Total

Total

Section 2: ROW Estimation: land acquisition, regulatory, &


permitting
Land Acquisition
Permitting & Regulatory
Legal Expenses
Other (to be specified)

Section 3: Construction Materials & Labor


Materials
Structures
Transformers
Station Equipment
Labor

Section 4: Contingency
Section 1: Design
Section 2: ROW
Section 3: Construction Materials & Labor
Other (to be specified)

Section 5: Other
CWIP (y/n)
AFUDC
Overheads

TOTAL FACILITY COST $