RIICWM504A Prepare Civil Works Bill of Quantities: Release: 1
RIICWM504A Prepare Civil Works Bill of Quantities: Release: 1
RIICWM504A Prepare Civil Works Bill of Quantities: Release: 1
quantities
Release: 1
Modification History
Not applicable.
Unit Descriptor
This unit covers the preparation of civil works bills of quantities in Civil Construction. It
includes planning for the civil works bills of quantities process, identifying and calculating
the on-site labour, materials and on-site sub-contractor service requirements, the finalising of
the civil works bills of quantities process and supporting and reviewing the application of the
bill of quantities.
Civil construction
Licensing/Regulatory Information
Refer to Unit Descriptor.
Pre-Requisites
Not applicable.
Approved
Commonwealth of Australia, 2012
Page 2 of 11
SkillsDMC
PERFORMANCE CRITERIA
Approved
Commonwealth of Australia, 2012
Page 3 of 11
SkillsDMC
Approved
Commonwealth of Australia, 2012
Page 4 of 11
SkillsDMC
Required knowledge
Specific knowledge is required to achieve the Performance Criteria of this unit,
particularly its application in a variety of circumstances in which the unit may be used.
This includes knowledge of the following, as required to prepare a civil works bills of
quantities:
Approved
Commonwealth of Australia, 2012
Page 5 of 11
SkillsDMC
Approved
Commonwealth of Australia, 2012
Page 6 of 11
SkillsDMC
Evidence Guide
The evidence guide provides advice on assessment and must be read in conjunction
with the performance criteria, required skills and knowledge, range statement and the
Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment
and evidence required to
demonstrate competency in this
unit
Approved
Commonwealth of Australia, 2012
Page 7 of 11
SkillsDMC
Method of assessment
Approved
Commonwealth of Australia, 2012
Page 8 of 11
SkillsDMC
Approved
Commonwealth of Australia, 2012
Page 9 of 11
SkillsDMC
Range Statement
The range statement relates to the unit of competency as a whole. It allows for different
work environments and situations that may affect performance. Bold italicised
wording, if used in the performance criteria, is detailed below. Essential operating
conditions that may be present with training and assessment (depending on the work
situation, needs of the candidate, accessibility of the item, and local industry and
regional contexts) may also be included.
Relevant compliance
documentation
may include:
Confirm
may include:
land clearing
Approved
Commonwealth of Australia, 2012
geological data
geotechnical data
hydrological data
survey data
metrological data
project specifications
contractual requirements
client's requirements
project site geological data
project site hydrological data
project site engineering survey data
project site cultural and heritage constraints
existing project design and drawings
Australian or other relevant standards
Civil works
Page 10 of 11
SkillsDMC
may include:
bulk earthworks
surface drainage construction and maintenance
subsurface drainage construction and
maintenance
water storage dams construction and
maintenance
tailings dams construction and maintenance
topsoil management
rehabilitation works
road works preparation (including the sub
grade)
pavement construction and maintenance,
including:
asphalt placement
stabilisation
rigid pavement
underground services construction and
maintenance
applying trenchless technology
construction and maintenance of civil structures
tunnelling
dredging
Unit Sector(s)
Civil Works (Management and Supervision)
Competency field
Refer to Unit Sector(s).
Co-requisite units
Not applicable.
Approved
Commonwealth of Australia, 2012
Page 11 of 11
SkillsDMC