RAB Pager Panel Precast LAGUNDI
RAB Pager Panel Precast LAGUNDI
LUAS AREA
NO
: 189 M1
ITEM
VOL
SAT
A. Persiapan
1
Ls
Mobilisasi
Ls
Total A
B. Material Pondasi
1
Batuh Belah
33
M3
Semen
80
Zax
Pasir
15
M3
Ls
189
M1
Total B
C. Pekerjaan
1
11.25
M3
49
M3
10.5
M3
47.5
M3
189
M1
M3
Total C
Grend Total A + B + C
Dibulatkan
recast
HARGA
SATUAN
JUMLAH
2,000,000
2,000,000
2,000,000
200,000
6,600,000
70,000
5,600,000
120,000
1,800,000
14,000,000
3,000,000
3,000,000
290,000
54,810,000
40,000
450,000
40,000
1,960,000
45,000
472,500
45,000
2,137,500
450,000
85,050,000
175,000
1,050,000
148,930,000
164,930,000
165,000,000
Prepared by
Arip