Inspection & Test Plan For Level Gauge: Project: PP Pe Pilot Plant
Inspection & Test Plan For Level Gauge: Project: PP Pe Pilot Plant
INSPECTION&TESTPLANFORLEVELGAUGE
CONTRACTOR:
( )
LICENSOR:
Document No.:900-ITP-A4-IN-0011
Rev.: 1
Type: ITP
Page A
REV.
REV.
29
30
31
PAGE
PAGE
32
33
34
35
36
37
38
39
10
40
11
41
12
42
13
43
14
44
15
45
16
46
17
47
18
48
19
49
20
50
21
51
22
52
23
53
24
54
25
55
26
56
27
57
28
58
4
3
2
1
0
2013.04.27
2013.03.27
F.A.
F.A.
A.R.
A.R.
A.N.
A.N.
AFC
IFA
Revision
Date
PreparedBy
CheckedBy
ApprovedBy
Status
Document revision
CONTRACTOR:
( )
LICENSOR:
Rev.: 1
Type: ITP
Page B
()
1.
No.
01
02
03
04
05
06
07
R
R
R
R
R
H
R
W
S
R
R
W
H
R
M
M
M
M
M
M
M
X
X
X
X
X
X
Visual inspection
Dimensional inspection including flange connection
Mill test reports or material certificates
Non-destructive examination, when specified
Pressure test
Preparation for shipment
Documentation review prior to release
Note: Percent of witness for type "S" shall be depend on the quantity as follows: 3 to 20 3(all if total 2 and less), 20 to 40 5, 50 to 10010, 100 to 20015, 200 to 30020, 300 to 50025.
For another type, percent of witness inspection shall be 100%.
Remarks