EXTRA OVER ditto for cascaded drain in 3 nr steps, total drop 600mm
high [RM/Nr]
Precast concrete drain Grade 20 as specified, half round 225mm diameter, cast in 600mm long,
finished fair on exposed surfaces, laid to falls, bedded, jointed, and pointed in cement and sand
(1:3) mortar; 100mm thick in-situ concrete Grade 15 as described bed [RM/M]
[Take length of drain 100m]
A. Material
i.
ii.
@RM7.50/hr
RM 10.42
RM2510.42
RM
50.21
RM2560.63
iv.
RM2500.00
RM 522.00
RM 553.14
RM3113.77
RM
31.14
RM
0.00
2%
RM21.20
RM52.34
RM4.19
RM1.05
Rate for this item
RM 5.24
RM57.57
Extra Over precast concrete drain Grade 20 as specified, half round 225mm diameter, cast in
600mm long, finished fair on exposed surfaces, laid to falls, bedded, jointed, and pointed in
cement and sand (1:3) mortar; 100mm thick in-situ concrete Grade 15 as specified bed for
cascaded drain in 3 nr steps, total drop 600mm high [RM/Nr]
[Length of drain in cascade 1.80m]
A. Material
i.
ii.
iii.
RM 0.19
RM45.19
RM 0.90
RM46.09
iv.
RM45.00
RM 9.40
RM0.54
RM9.94
RM0.50
RM 10.44
RM 56.53
RM 0.00
C. Labour
Bedding, laying drains & plastering to drops
1.80m x 0.75gang hr/m @ [RM10.00/hr + 4(RM7.50/hr]
Allow for overhead 8%
RM8.84
RM2.21
RM 54.00
RM110.53
RM 11.05
RM121.58
Deduct
Cost of regular drains occupied by cascaded drain
1.80m @RM57.57/m
Extra over rate for this item
RM103.63
RM 17.95