BAGUIO TECHNOHUB DAILY REPORT

I. ALERT STATUS

GREEN

II. SAFETY HIGHLIGHTS/INCIDEN


No Safety Issues during the operation

III. EQUIPMENT MONITORING


All Equipment are in good condition/operation

IV. DAILY ACTIVITIES


>SEE ACTIVITIES
MAINTENANCE
Fabrication of Christmas lights anea
Painting of acoustic board ceiling at BPO-B
SECURITY
Inspection of Respective Areas
Monitoring of Perimeter Areas
Purchase Materials for Christmas lightings and PVC fittings
HOUSKEEPING/GROUNDSCAPING
Segregate Wastes
Cleaning of respective areas
Transfer/Planting of Poinsettia

V. TENANT CONCERN/S
Bellfrei Spa: Installation of tarpaulin

REPORT

RED

BAGUIO TECHNOHUB DAILY REPORT


Date: November 3, 2016

I. ALERT STATUS

GREEN

II. SAFETY HIGHLIGHTS/INCIDENT


No Safety issues during the operation

III. EQUIPMENT MONITORING


All Equipment are in good condition/operation

IV. DAILY ACTIVITIES


>SEE ACTIVITIES
MAINTENANCE
Fabrication of Christmas lights
Installation of Christmas lights infront of Starbucks
Rectification of leaks at Bldg. B handicap room
Painting of wall at BPO-A 4/F
SECURITY
Inspection of Respective Areas
Monitoring of Perimeter Areas

Monthly Inspection of Emergency Light ( 2 Emergency lights non-functioning at RET. C


Purchase Materials for Rectification of Leaks, Christmas lightings , PVC fittings
HOUSKEEPING/GROUNDSCAPING
Cleaning/Preparation of Inventory at Warehouse for Maintenance
Segregate Wastes at MRF
Installation of Christmas lights in grounds/grass
Transfer/Planting of Poinsettia

V. TENANT CONCERN/S
BPO-B: Leak below the lavoratory located at G/F Handicap Room

REPORT

RED

on-functioning at RET. C)
gs , PVC fittings

ce

om

1
2
3
4
5
6
7

BAGUIO TECHNOHUB DAILY REPORT

8
9
10

Date: November 4, 2016

11
12

I. ALERT STATUS

13
14

GREEN

15
16

II. SAFETY HIGHLIGHTS/INCIDENT

17
18

No Safety issues during the operation

19
20

III. EQUIPMENT MONITORING

21
22

All Equipment are in good condition/operation

23
24
25

IV. DAILY ACTIVITIES


>SEE ACTIVITIES

26
27

MAINTENANCE

28
29
30
31
32

Rectification of Fluorescent Lamp Bldg.B


Installation of Christmas lights at Starbucks
Painting of wall at BPO-A 4/F
Fabrication of Christmas lights

33
34
35

SECURITY

A
36
37
38
39

Inspection of Respective Areas


Monitoring of Perimeter Areas
Monthly Inspection of Emergency Light ( 1 Emergency lights non-functioning at
Purchase Materials for Painting

40
41

HOUSKEEPING/GROUNDSCAPING

42
43
44
45

Cleaning/Preparation of Inventory at Warehouse for Maintenance


Segregate Wastes at MRF
Cleaning of Stairway Bldg. B

46
47

V. TENANT CONCERN/S

48
49
50
51

BPO-B: Returning of Main Entrance Door Bldg. B


BPO-B: Rectification of Fluorescent lamp at Stair 1
BPO-B: Cleaning of Stairway Bldg. B

1
2
3
4
5
6
7

8
HNOHUB
DAILY REPORT

on

9
10
11
12
13
14
15
16
17
18
19
20
21

/operation 22

dg.B
arbucks

23
24
25
26
27
28
29
30
31
32
33
34
35

RED

36
37

38
ght ( 1 Emergency
lights non-functioning at Bldg. B)
39
40
41
42

43 for Maintenance
t Warehouse
44
45
46
47
48

Door Bldg.49B
50 1
lamp at Stair
51
B

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

G
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

1
2
3
4
5
6
7

BAGUIO TECHNOHUB DAILY REPORT

8
9
10

Date: November 5, 2016

11
12

I. ALERT STATUS

13
14

GREEN

15
16

II. SAFETY HIGHLIGHTS/INCIDENTS

17
18

No Safety issues during the operation

19
20

III. EQUIPMENT MONITORING

21
22

All Equipment are in good condition/operation

23
24
25

IV. DAILY ACTIVITIES


>SEE ACTIVITIES

26
27

MAINTENANCE

28
29
30
31

Installation of Christmas lights at Retail F, and Retail A 2/F


Fabrication of Christmas lights decorations
Painting of wall at Bldg. B

32
33

SECURITY

34
35

Inspection of Respective Areas

A
36
37
38

Monitoring of Perimeter Areas


Monthly Inspection of Emergency Light
Purchase Materials for Christmas Lighting

39
40

HOUSKEEPING/GROUNDSCAPING

41
42
43
44

Cleaning/Preparation of Inventory at Warehouse for Maintenance


Spray Garbage Wastes at MRF
Help Maintenance in Christmas lighting Installation

45
46

V. TENANT CONCERN/S

47
48

CVG: spraying of garbage wastes at MRF

1
2
3
4
5
6
7

8
HNOHUB
DAILY REPORT

on

9
10
11
12
13
14
15
16
17
18
19
20
21

/operation 22
23
24
25
26
27
28

etail F, and 29
Retail A 2/F
30
rations
31
32
33
34
35

RED

ght
ghting

D
36
37
38
39
40
41

42 for Maintenance
t Warehouse
43

44
ting Installation

t MRF

45
46
47
48

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

G
36
37
38
39
40
41
42
43
44
45
46
47
48

1
2
3
4
5
6
7

BAGUIO TECHNOHUB DAILY REPORT

8
9
10

Date: November 7, 2016

11
12

I. ALERT STATUS

13
14

GREEN

15
16

II. SAFETY HIGHLIGHTS/INCIDENTS

17
18

No Safety issues during the operation

19
20

III. EQUIPMENT MONITORING

21
22

All Equipment are in good condition/operation

23
24
25

IV. DAILY ACTIVITIES


>SEE ACTIVITIES

26
27

MAINTENANCE

28
29
30
31

Installation of Christmas lights at Retail A G/F, Retail C (FIC) & Grounds


Fabrication of Christmas lights decorations
Painting of Electrical Panel Cover

32
33

SECURITY

34
35

Inspection of Respective Areas

A
36

Monitoring of Perimeter Areas

37
38

HOUSKEEPING/GROUNDSCAPING

39
40
41

Cleaning/Preparation of Inventory at Warehouse for Maintenance


Watering of Plants

42
43

V. TENANT CONCERN/S

44
45

No tenant concern

1
2
3
4
5
6
7

8
HNOHUB
DAILY REPORT

on

9
10
11
12
13
14
15
16
17
18
19
20
21

/operation 22
23
24
25
26
27
28

etail A G/F, 29
Retail C (FIC) & Grounds
30
rations
31
32
33
34
35

RED

D
36
37
38
39

40 for Maintenance
t Warehouse
41
42
43
44
45

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

G
36
37
38
39
40
41
42
43
44
45

1
2
3
4
5
6
7

BAGUIO TECHNOHUB DAILY REPORT

8
9
10

Date: November 8, 2016

11
12

I. ALERT STATUS

13
14

GREEN

15
16

II. SAFETY HIGHLIGHTS/INCIDENTS

17
18

No Safety issues during the operation

19
20

III. EQUIPMENT MONITORING

21
22

All Equipment are in good condition/operation

23
24
25

IV. DAILY ACTIVITIES


>SEE ACTIVITIES

26
27

MAINTENANCE

28
29
30
31

Installation of Christmas lights for Canopies and Grounds


Rectification of Flusher at BPO-B
Fabrication of Christmas lights decorations

32
33

SECURITY

34
35

Inspection of Respective Areas

A
36
37

Help Maintenance in Christmas decoration


Monitoring of Perimeter Areas

38
39

HOUSKEEPING/GROUNDSCAPING

40
41
42

Cleaning/Preparation of Inventory at Warehouse for Maintenance


Help Maintenance in Christmas decoration

43
44

V. TENANT CONCERN/S

45
46

BPO B: Rectification of Flusher and Busted Bulbs

1
2
3
4
5
6
7

8
HNOHUB
DAILY REPORT

on

9
10
11
12
13
14
15
16
17
18
19
20
21

/operation 22
23
24
25
26
27
28

29 Grounds
anopies and

rations

30
31
32
33
34
35

RED

oration

D
36
37
38
39
40

41 for Maintenance
t Warehouse
42
oration
43
44
45

46
Busted Bulbs

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

G
36
37
38
39
40
41
42
43
44
45
46

>BACK
BEFORE

LOCATION

Production Area BPO-B 4/F

Near ATS-A

AFTER

>BACK
BEFORE

LOCATION

Production Area BPO-A 4/F

near Pedestrian Lane/Infront of BPI

Infront of Army Navy and Starbucks


(Nov.2 Night Shift)

Handicap Room G/F BPO B

AFTER

Handicap Room G/F BPO B

>BACK
BEFORE

LOCATION

Stair 1, Bldg. B

Main Entrance Door (BPO-B) Nov.3


Night Shift

Bldg. A 4/F

Starbucks

AFTER

Starbucks

>BACK
BEFORE

LOCATION

Retail F- Starbucks & Army Navy

Retail A drainage - Everything Nice (


Night Shift)

Bldg. A 4/F

AFTER

>BACK
BEFORE

LOCATION

For Retail A- EE rrom

Retail A -1st Floor

Bldg. A 4/F

AFTER

>BACK
BEFORE

LOCATION

BPO-B : Female CR 2/F

Retail A -1st Floor

Bldg. A 4/F

AFTER

You might also like