Project Lesson Learnt
Project Lesson Learnt
Stage
Manageme
nt
Activity
Recommendat
ion
Action Plan
Works
exceed
given timeframe
Inconsistent
produced.
Most of the job at the platform and OIE or Other Supervisor/ 3 rd party will be
onsite for inspection
For onshore job, we will request for inspection by email, 1 week before.
Recording Minutes
of Meeting (MOM).
No issue
Project Timeline.
Daily
Report
and
by
Impact
No issue
Progress
Cause
Communication
among PMT with
Client (MISC/PML).
Inspection
Verification
Client.
Page 1 of 5
Event
No issue
DPR
2.
3.
4.
Stage
Activity
Event
Cause
Impact
Recommendat
ion
Action Plan
Engineering design
and specification.
No issue
Rare occasion. if needed use 3rd party service, and well planned
Procurement
Resources
No issue
Equipment Rental.
Air
Compressor,
Generator
and
Welding Machine.
Engineeri
ng
Procurem
ent
Sub
Channel
RepairContract
Fraser
Tech
Page 2 of 5
Head
Bukit
Thermal
Additional
workRemachine Flange
surface
Miss
communication
between PMT and
BFTT
Extend duration of
repair activity
Follow
up
and
update constantly
with sub contractor
Constant
communication
among PMT and
Subcontractor
to
overcome
the
Stage
Activity
Event
Cause
Impact
Recommendat
ion
Constant
monitoring
and
review
in
Subcontractors
performance.
5.
Logistic
6.
Site
Survey
8.
Planning
Logistic
Management.
Dimensional
survey
No issue
Delay in
activities.
Page 3 of 5
upfront
Good
N/A
N/A
communication
,
material handling
& arrangement.
Request by client for upcoming major inspection. Normally will be done by
supervisor/inspector.
If needed for critical equipment, PMT will request a short offshore visit for
survey purpose only
Progress tracking.
Progress
Measurement.
Planning reporting.
Upfront
preparation
of
planning package
Delay
in
execution
Valve
unable
unit
work
problem.
Upfront
planning
with
respective
party.
Project Scheduling.
Action Plan
Passing
to isolate
Accurate feedback
for reporting.
N/A
N/A
Fast
problem
solving.
Decisive action on
area of concern.
Additional
workload
during
shutdown
N/A
N/A
Proper
planning
before every work
execution
Communication
between Onshore
and Offshore client
Stage
Activity
Event
Impact
POB constraint
Shortage
manpower
Recommendat
ion
Action Plan
representatives
HSE
Documentation.
Delay
submission.
on
No
dedicated
personnel.
Late submission.
Nominate PersonIn-Charge
for
accountability
Mercury Monitoring
Consumables
supply
Lack of information
Job
delay
and
mercury exposure
HSE Programs.
Achieving
Target.
UCUA
Safety
delivery.
Token
Pioneer HSE never give any token to any HX crew/ PMT during the entire
contract.
&
Organised
emergency
drill
(Fire
Drill/H2S
Drill).
HSE
HSE
Audit
Walkabout.
Cause
Raise
Safety
Awareness.
Dedicated support
from HSE dept.
Inform
contract
owner
for
any
Different contract
related
owner
maintenance
service that have
mercury
PHX have at least one of best UCUA submission in every SD campaign
offshore.
Project Supervisor/
Client SHO
N/A
N/A
Stage
Activity
Task
Assessment.
Event
Risk
1
0
Final Doc.
Page 5 of 5
Campaign
Program
Final
Documentation
Compilation.
or
Task
Assessment
session
Cause
Risk
Identify
hazard
prior engineering.
Design
None
No issue
To
eliminate
hazard at early
stage based on job
task.
Impact
Recommendat
ion
Campaign.
To
eliminate
hazard at early
stage.
Never conducted by Pioneer HSE for HX contract
Action Plan