NC Application Form FEB2016
NC Application Form FEB2016
Owner's Profile /
Owner's Name /
Father's / Husband's Name /
Profession / Occupation /
Residence /
Mobile /
Ofce /
Email Address /
National Tax / GST No. /
Mobile /
Ofce /
Email Address /
Address /
Load Extension /
Temporary Connection /
Maintenance /
Reinforcement /
Tapping Meter /
Type of Connection /
Single Phase /
Three Phase /
CTO /
Underground /
Overhead /
Details of Premises /
Type of Unit
References Required /
Reference # 1 /
Reference # 2 /
Name /
Name /
Address /
Address /
Contact Number /
Contact Number /
Company Name /
Company Name /
Designation /
Designation /
CNIC Number /
CNIC Number /
KE Consumer No. /
KE Consumer No. /
Signature /
Signature /
S. No.
Document Required
Residential
Commercial
Industrial
Agricultural
2
3
Copy of approved Building Plan along with Covering Letter (NC / Extension of
Load / Reinforcement cases)
8
NOC from concerned Industrial Association / Valid Trade License
Indemnity for Industrial Connection on Rs.100/- Stamp Paper attested by Notary Public
10
NOC of DHA in case of DHA Phase-VII Ext & DHA Phase-VIII / NOC of Society /
NOC of CBC.
11
NOC from other owners with valid copy of CNIC required if applicable on Rs.100/Stamp Paper attested by Notary Public
12
NTN Certicate
13
Undertaking for deviation from approved building plan (in case of deviation)
14
Copy of last paid bill for Extension of Load / Reinforcement / CMP/ Maintenance cases
15
16
List of units / ats / houses / shops with load details on letterhead or on Rs.100/Stamp Paper attested by Notary Public (NC and Extension of Load ) in multistorey
and scheme cases
17
Note:
Customers Declaration /
I/We fully agree to pay the charges as per tariff (which shall be enforced from time to time) and all services related charges including Security Deposit, System Development
charges and other payments (if any) as per approved terms and conditions.
I/We hereby agree to abide by all the rules & regulations of K-Electric and verify that all details and documents are authentic. In case of any deliberate misinformation,
K-Electric reserves the right to reject the application.
No. /
1
Check /
You will be intimated about your approved load via SMS or email
once it is approved in accordance with the assessed load.
Scenario No. 1
Requirements
Self Finance Undertaking / Agreement
Bank Guarantee (BG) or Pay Order (PO)
Estimate Amount (estimate is issued after submission and verification of BG or PO)
Security Deposit
*
* As per prescribed format provided by K-Electric
Submission Deadline
15 Days (from the date of issuance of BG Slip)
Scenario No. 2
No. /
10
You will be provided with the following documents along with the
intimation for execution:
Bill of materials
Approved drawings
List of approved manufacturers / suppliers for supply of materials
List of contact details of manufacturers / suppliers
List of approved pre-qualified contractors for scheme execution
Letter of agreement for conformance to current KE specifications
Letter of conformance to current KE specifications (for transformers)
Letter of conformance to current KE specifications (for other
materials)
11
12
13
14
15
16
17
18
Check /
Applicants Signature
No. /
Check /
Please make sure that all the contact details you provide are
genuine and in use. In case of providing fake email IDs or contact
numbers, you will not be able to receive any intimation which will
result in delaying your case.
10
11
12
Kindly make a copy of the checklist and submit the original along
with the application form.
Applicants Signature