HASIL PERHITUNGAN SENDIRI (HPS)

KEGIATAN

PENAMBAHAN GEDUNG SEKOLAH

PEKERJAAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

LOKASI

KECAMATAN KATEMAN

NO
I

URAIAN PEKERJAAN

ANALISA

VOLUME

HARGA
SATUAN (Rp.)

JUMLAH
(Rp)

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi

1.00 Ls

450,000.00

450,000.00

2 Pek. Pas. Bouwplank/ Pengukuran

1.00 Ls

500,000.00

500,000.00

3 Pek. Papan Nama Proyek

1.00 Ls

250,000.00

SUB JUMLAH
II

250,000.00

1,200,000.00

PEKERJAAN LANTAI
1 Pek. Cor Lantai Tebal = 10 cm 1 : 2 : 3

19

7.20 M3

959,801.50

SUB JUMLAH
III

6,910,570.80

6,910,570.80

PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3

19

0.28 M3

959,801.50

268,744.42

- Besi 8 mm

22

45.43 Kg

14,203.02

645,312.61

- Besi 6 mm

22

12.78 Kg

14,203.02

181,453.27

- Bekisting

25

5.60 M2

240,270.95

1,345,517.32

- Beton Campur 1 : 2 : 3

19

0.53 M3

959,801.50

506,775.19

- Besi 10 mm

22

5.42 Kg

14,203.02

77,016.74

- Besi 6 mm

22

22.17 Kg

14,203.02

314,897.02

- Bekisting

2 Pek. Cor Ring Balok 12/10 cm 1 : 2 : 3

25

9.68 M2

240,270.95

2,325,822.80

3 Pek. Pasangan Batako 5 x 15 x 30 cm

47

81.31 M2

103,070.28

8,380,912.04

4 Pek. Plasteran Pas. Batako

17

162.63 M2

32,352.15

SUB JUMLAH
IV

PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III

11

1.06 M3

3,827,997.90

4,055,380.98

2 Pek. Reng Kayu Klas III

12

128.39 M2

49,808.55

6,394,919.73

3 Pek. Atap Genteng Metal

41

128.39 M2

72,517.10

9,310,470.47

4 Pek. Perabung Genteng Metal

42

26.00 M1

81,179.40

2,110,664.40

5 Pek. Lysplank Papan Kls III

14

52.40 M1

38,675.87

2,026,615.59

2.25 M2

321,833.45

6 Pek. Ventilasi Singap Bawah Atap Kayu Kelas III

SUB JUMLAH
V

724,125.26

24,622,176.43

PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III

13

73.04 M2

63,494.10

4,637,609.06

2 Pek. Plafond Triplek 4 mm

29

73.04 M2

40,394.39

2,950,406.17

3 Pek. Peri-Peri Papan Kls III

15

75.48 M2

119,855.60

SUB JUMLAH
VI

5,261,274.86

19,307,726.28

9,046,700.69

16,634,715.92

PEKERJAAN PINTU /JENDELA


1 Pek. Pintu Panel 2 (Dua) Daun

HSB

1.00 Bh

2,300,000.00

2,300,000.00

0.46 M3

4,577,483.75

2,087,332.59

3 Pek. Engsel Pintu

33

6.00 Bh

16,821.50

100,929.00

4 Pek. Kunci Tanam

32

2.00 Bh

20,741.50

41,483.00

6.00 M2

321,833.45

1,931,000.70

2 Pek. Kunsen Pintu & Jendela Kayu Kls III

5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III


6 Pek. Jendela Kaca Mati 5 mm

HSB

5.00 Bh

300,000.00

1,500,000.00

7 Pek. Jendela Kaca Bingkai 5 mm

HSB

10.00 Bh

400,000.00

4,000,000.00

33

20.00 Bh

16,821.50

336,430.00

9 Pek. Grendel Jendela

HSB

20.00 Bh

8,981.50

179,630.00

10 Pek. Kait Angin Jendela

34

20.00 Bh

22,941.50

458,830.00

HSB

10.00 Bh

8,825.30

8 Pek. Engsel Jendela

11 Pek. Tarikan Jendela

SUB JUMLAH

88,253.00

13,023,888.29

NO
VII

URAIAN PEKERJAAN

ANALISA

VOLUME

HARGA
SATUAN (Rp.)

(Rp)

PEKERJAAN CAT
1 Pek. Teer/ Residu

35

63.56 M2

17,086.25

1,086,070.40

2 Pek. Cat Air Dinding

36

235.67 M2

22,444.50

5,289,387.58

3 Pek. Cat Minyak

37

88.21 M2

42,238.50

SUB JUMLAH
VIII

JUMLAH

3,725,858.09

10,101,316.06

PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan Akhir Proyek

1.00 Ls

500,000.00

500,000.00

500,000.00
Tembilahan,

2014

Diperiksa Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)

Dihitung Oleh,
CV. TAMA GRAHA CONSULINDO
(Perancana)

TONY WIRYA DINATA, ST


NIP. 19801024 200604 1 006

ASWIN GHANI LUBIS, ST


Direktur

Diketahui Oleh :
PENGGUNA ANGGARAN

Disetujui Oleh,
PEJABAT PEMBUAT KOMITMEN (PPK)

Drs. H. HELMI. D, M. Pd
NIP. 19661231 199703 1 027

NIP. 19610004 199103 1 002


NIP. 19610004 199103 1 002

RENCANA ANGGARAN BIAYA


KEGIATAN

PENAMBAHAN GEDUNG SEKOLAH

PEKERJAAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

LOKASI

KECAMATAN KATEMAN

NO
I

URAIAN PEKERJAAN

ANALISA

VOLUME

HARGA
SATUAN (Rp.)

JUMLAH
(Rp)

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi

1.00 Ls

500,000.00

500,000.00

2 Pek. Pas. Bouwplank/ Pengukuran

1.00 Ls

500,000.00

500,000.00

3 Pek. Papan Nama Proyek

1.00 Ls

250,000.00

SUB JUMLAH
II

PEKERJAAN PONDASI

Pek. Galian Tanah

Pek. Timbunan Kembali

Pek. Cerocok Kayu Bulat 10-12 x 6 M1

Pek. Cor Lantai Kerja 1 : 3 : 5

Pek. Cor Tapak Pondasi 1 : 2 : 3

5.63 M3

27,200.00

1.41 M3

13,040.00

18,337.50

5,358.00

7,233,300.00

1,350.00 M

153,000.00

20

0.70 M3

981,305.40

689,980.36

- Beton Campur 1 : 2 : 3

19

2.81 M3

961,639.60

2,704,611.38

- Besi 10 mm

22

536.09 Kg

15,287.68

8,195,632.02

- Bekisting

23

3.75 M2

120,831.38

453,117.68

- Beton Campur 1 : 2 : 3

19

0.95 M3

961,639.60

913,557.62

- Besi 10 mm

22

101.67 Kg

15,287.68

1,554,344.00

- Besi 6 mm

22

27.17 Kg

15,287.68

415,373.83

- Bekisting

25

4.75 M2

240,279.64

1,141,328.29

Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3

SUB JUMLAH
III

PEKERJAAN LANTAI

Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3

23,472,582.68

- Beton Campur 1 : 2 : 3

19

3.00 M3

961,639.60

2,884,918.80

- Besi 10 mm

22

185.11 Kg

15,287.68

2,829,848.11

- Besi 6 mm

22

77.79 Kg

15,287.68

1,189,155.95

- Bekisting

26

15.00 M2

248,630.08

3,729,451.20

0.47 M3

4,323,124.24

2,012,414.33
6,308,966.72

Pek. Gelegar Kayu 5/7 Kelas III

Pek. Lantai Papan Kls III 2/20 cm

10

56.00 M2

112,660.12

Pek. Papan Penutup Balok

10

12.00 M2

112,660.12

SUB JUMLAH
IV

250,000.00

1,250,000.00

1,351,921.44

20,306,676.55

PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3

19

0.42 M3

961,639.60

403,888.63

- Besi 10 mm

22

106.48 Kg

15,287.68

1,627,822.08

- Besi 6 mm

22

19.16 Kg

15,287.68

292,965.71

- Bekisting

25

4.20 M2

240,279.64

1,009,174.49

2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3


- Beton Campur 1 : 2 : 3

19

0.46 M3

961,639.60

438,507.66

- Besi 10 mm

22

93.91 Kg

15,287.68

1,435,648.64

- Besi 6 mm

22

19.15 Kg

15,287.68

292,830.08

- Bekisting

25

4.18 M2

240,279.64

1,004,368.90

47

79.31 M2

103,411.20

17

158.63 M2

32,370.96

3 Pek. Pasangan Batako 5 x 15 x 30 cm


4 Pek. Plasteran Pas. Batako

SUB JUMLAH
V

PEKERJAAN ATAP
11

0.94 M3

3,828,030.48

3,590,692.59

2 Pek. Reng Kayu Klas III

12

103.50 M2

49,704.81

5,144,447.84

3 Pek. Atap Genteng Metal

41

103.50 M2

70,500.92

7,296,845.22

4 Pek. Perabung Genteng Metal

42

9.00 M1

81,234.03

5 Pek. Lysplank Papan Kls III

14

41.00 M1

38,635.36

731,106.27
1,584,049.92

18,347,141.84

PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III

13

56.00 M2

63,425.82

3,551,845.92

2 Pek. Plafond Triplek 4 mm

29

56.00 M2

40,486.51

2,267,244.49

3 Pek. Peri-Peri Papan Kls III

15

74.00 M2

119,717.72

SUB JUMLAH
VII

5,134,850.00

1 Pek. Kuda Kuda Kayu Klas III

SUB JUMLAH
VI

8,201,811.14

19,841,867.33

8,859,111.28

14,678,201.69

PEKERJAAN PINTU /JENDELA


1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III

HSB

1.00 Bh

2,200,000.00

2,200,000.00

0.47 M3

4,338,628.75

2,020,065.55

33

6.00 Bh

16,824.80

100,948.80

32

2.00 Bh

20,744.80

41,489.60

6.00 M2

321,744.89

1,930,469.34

6 Pek. Jendela Kaca Mati 5 mm

HSB

5.00 Bh

300,000.00

1,500,000.00

7 Pek. Jendela Kaca Bingkai 5 mm

HSB

10.00 Bh

360,000.00

3,600,000.00

33

20.00 Bh

16,824.80

336,496.00

9 Pek. Grendel Jendela

HSB

20.00 Bh

8,984.80

179,696.00

10 Pek. Kait Angin Jendela

34

20.00 Bh

22,944.80

458,896.00

HSB

10.00 Bh

8,816.50

8 Pek. Engsel Jendela

11 Pek. Tarikan Jendela

SUB JUMLAH
VIII

PEKERJAAN CAT
1 Pek. Teer/ Residu

35

56.28 M2

17,144.00

964,864.32

2 Pek. Cat Air Dinding

36

214.63 M2

33,440.40

7,177,152.54

3 Pek. Cat Minyak

37

82.20 M2

42,367.20

3,482,583.84

SUB JUMLAH
IX

88,165.00

12,456,226.29

11,624,600.70

PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan Akhir Proyek

SUB JUMLAH

1.00 Ls

400,000.00

400,000.00

400,000.00

REKAPITULASI RENCANA ANGGARAN BIAYA


KEGIATAN

PENAMBAHAN GEDUNG SEKOLAH

PEKERJAAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

LOKASI

KECAMATAN KATEMAN

NO

JUMLAH

URAIAN PEKERJAAN

(Rp)

PEKERJAAN PENDAHULUAN

II

PEKERJAAN PONDASI

23,472,582.68

III

PEKERJAAN LANTAI

20,306,676.55

IV

PEKERJAAN DINDING

19,841,867.33

PEKERJAAN ATAP

18,347,141.84

VI

PEKERJAAN PLAFOND

14,678,201.69

VII

PEKERJAAN PINTU /JENDELA

12,456,226.29

VIII

PEKERJAAN CAT

11,624,600.70

IX

PEKERJAAN LAIN - LAIN

Terbilang :

1,250,000.00

400,000.00
JUMLAH HARGA

122,377,297.08

PPN 10 %

12,237,729.71

TOTAL JUMLAH

134,615,026.78

DIBULATKAN

134,615,000.00

Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.

DATA DATA YANG DIBUTUHKAN

Tanggal,

Desember 2014

KEGIATAN
Pekerjaan
Lokasi
Departemen / Instansi

TAHUN ANGGARAN 2014


PENAMBAHAN GEDUNG SEKOLAH
GEDUNG SEKOLAH SMPN 003 KATEMAN
KECAMATAN KATEMAN
Dinas Pendidikan Kabupaten Indragiri Hilir

Kontraktor Pelaksana

NAMA PERUSAHAAN
NAMA PEMILIK
JABATAN
ALAMAT

CV. .........................
............................
Direktur
Jl. ................................

Konsultan Pengawas

NAMA PERUSAHAAN
NAMA PEMILIK
JABATAN
ALAMAT

CV. KITA FOKUS CONSULTAN


FERY IRAWAN, A. Md
Direktur Cabang
Jl. Tanjung Emas - Tj. Harapan - Tembilahan

No. Surat Perjanjian/Kontrak


Tanggal
Nilai Kontrak

........b/PPK-PL/FSK/DD/VIII/2014
04 Agustus 2014 s/d 02 Desember 2014
Rp 134,615,000 (Seratus Tiga Puluh Empat Juta Enam Ratus

PPHP
Tanggal
NAMA PPHP

NOMOR : ........./PPHP/DISIDIK/XII/2014
12/13/2014
IDRIS ALKASIH
NIP. 19600322 198103 1 006
ENDANG FIRTANA
SARI HARTO DIRGANTORO, A. Ma
YANTO DERI
M. ISWAN, A. Md

PPTK
PPK
KUASA PENGGUNA ANGGARAN

TONY WIRYA DINATA, ST


Drs. SUHAIMI EKA
Drs. H. HELMI. D, M. Pd

NIP. 19801024 200604 1 006


NIP. 19610004 199103 1 002
NIP. 19661231 199703 1 027

PEMERIKSAAN KEMAJUAN PEKERJAA Nomor


Tanggal

....../BAPKP/PPK-PL/FSK/DD/XII/2014/.......
13 Desember 2014

SERAH TERIMA PEK PERTAMA

Nomor
Tanggal

....../BASTPP/PPK-PL/FSK/DD/XII/2014/.......
15 Desember 2014

PEMBAYARAN UTK KEMAJUAN PEK

Nomor
Tanggal

....../BAPUKP/PPK-PL/FSK/DD/XII/2014/.......
16 Desember 2014

ratus-an/puluh-an

terbilang dibulatkan
terbilang berkoma

apan - Tembilahan

at Juta Enam Ratus Lima Belas Ribu Rupiah.)

DINAS PENDIDIKAN KAB. INHIL


DINAS PENDIDIKAN KAB. INHIL
DINAS PENDIDIKAN KAB. INHIL
BAG. PEMBANGUNAN SETDA KAB INHIL
DINAS PEKERJAAN UMUM KAB. INHIL

0604 1 006
99103 1 002
9703 1 027

II/2014/.......

XII/2014/.......

/XII/2014/.......

ANGKA DAN HURUF


00
100
00/100
0
0
134

INPUT DATA

134,615,000 <= angka


2 <= jumlah desimal
b <="b" atau "saja"

TERBILANG
DIBULATKAN(Seratus Tiga Puluh Empat Juta Enam Ratus Lima
Belas Ribu Rupiah.)

TERBILANG
BERKOMA Seratus Tiga Puluh Empat Juta Enam Ratus Lima
Belas Ribu 00/100 Rupiah.

triliyun-an
milyar-an
juta-an seratus tiga puluh empat juta
ribu-an enam ratus lima belas ribu
ratus-an/puluh-an
terbilang dibulatkan seratus tiga puluh empat juta enam ratus lima belas ribu
terbilang berkoma seratus tiga puluh empat juta enam ratus lima belas ribu 00/100

615
0
0
0
134
615
0
0
0
1
6
0

134,615,000

0
0
34

0
1 satu
2 dua
3 tiga
4 empat
5 lima
6 enam

15
0
0
0
4
5
0
0
0
30
10
0

7 tujuh
8 delapan
9 sembilan
10 sepuluh
11 sebelas
12 dua belas
13 tiga belas
14 empat belas
15 lima belas
16 enam belas
17 tujuh belas
18 delapan belas
19 sembilan belas
20 dua puluh
30 tiga puluh
40 empat puluh
50 lima puluh
60 enam puluh
70 tujuh puluh
80 delapan puluh
90 sembilan puluh

OPS UPK

PENGEMBALIAN SPP

PENGEMBALIAN SPP

SURAT PERNYATAAN KUALITAS DAN KUANTITAS


Kami yang bertandatangan dibawah ini :
NAMA
: FERY IRAWAN, A. Md
JABATAN
: Direktur Cabang
CV. KITA FOKUS CONSULTAN
ALAMAT
: Jl. Tanjung Emas - Tj. Harapan - Tembilahan

Selaku Konsultan Pengawas pada :


1. Pekerjaan
2. Lokasi
3. Departemen / Instansi
4. Kontraktor Pelaksana

GEDUNG SEKOLAH SMPN 003 KATEMAN

:
:
:

KECAMATAN KATEMAN
Dinas Pendidikan Kabupaten Indragiri Hilir
CV. .........................

Dengan ini menyatakan bahwa :


1. Kualitas atau Mutu Pekerjaan yang dilaksanakan oleh CV. ......................... telah sesuai
dengan spesifikasi teknis yang dipersyaratkan dalam Kontrak.
2. Kualitas Pekerjaan telah mencapai Bobot 100% sesuai dengan yang diajukan dalam
Sertifikat Bulanan.

Selanjutnya apabila ternyata kualitas dan kuantitas tidak sesuai dengan ketentuan spesifikasi
Teknis yang telah dipersyaratkan dalam Kontrak atau tidak sesuai dengan ketentuan peraturan
perundang-undangan yang berlaku, maka kami bertanggung jawab sepenuhnya serta bersedia
menerima sanksi administrasi dan atau sanksi hukum.
Demikian Surat Pernyataan ini dibuat dengan sesungguhnya, untuk dapat dipergunakan
sebagaimana mestinya.

Tanggal,
Desember 2014
CV. KITA FOKUS CONSULTAN

FERY IRAWAN, A. Md
Direktur Cabang

SURAT PERNYATAAN KUALITAS DAN KUANTITAS


Kami yang bertandatangan dibawah ini :
NAMA
: ............................
JABATAN
: Direktur CV. .........................
ALAMAT
: Jl. ................................
Selaku Konsultan Pengawas pada :
1. Pekerjaan
2.
3.
4.
5.

Lokasi
Departemen / Instansi
Konsultan Pengawas
No. Surat Perjanjian

6. Nilai Kontrak

GEDUNG SEKOLAH SMPN 003 KATEMAN

:
:
:
:

KECAMATAN KATEMAN
Dinas Pendidikan Kabupaten Indragiri Hilir
CV. KITA FOKUS CONSULTAN
........b/PPK-PL/FSK/DD/VIII/2014
Tanggal : 04 Agustus 2014 s/d 02 Desember 2014
Rp
134,615,000
(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas
Ribu Rupiah.)

Dengan ini menyatakan bahwa :


1. Kualitas atau Mutu Pekerjaan yang dilaksanakan oleh kami CV. ......................... telah sesuai
dengan spesifikasi teknis yang dipersyaratkan dalam Kontrak.
2. Kualitas Pekerjaan telah mencapai Bobot 100% sesuai dengan yang diajukan dalam Sertifikat
Bulanan.

Selanjutnya apabila ternyata kualitas dan kuantitas tidak sesuai dengan ketentuan spesifikasi Teknis yang
telah dipersyaratkan dalam Kontrak atau tidak sesuai dengan ketentuan peraturan perundang-undangan
yang berlaku, maka kami bertanggung jawab sepenuhnya serta bersedia menerima sanksi administrasi
dan atau sanksi hukum.
Demikian Surat Pernyataan ini dibuat dengan sesungguhnya, untuk dapat dipergunakan sebagaimana
mestinya.

Tanggal,
Desember 2014
CV. .........................

............................
Direktur

BERITA ACARA PANITIA PENERIMA HASIL PEKERJAAN (PPHP)


KEGIATAN PENAMBAHAN GEDUNG SEKOLAH
TAHUN ANGGARAN 2014
NOMOR : ........./PPHP/DISIDIK/XII/2014
Pada hari ini Sabtu Tanggal Tiga Belas Bulan Desember Tahun Dua Ribu Empat Belas, Kami yang
bertandatangan dibawah ini :
NO

NAMA

INSTANSI

JABATAN

1.

IDRIS ALKASIH

DINAS PENDIDIKAN KAB. INHIL

Ketua

2.

ENDANG FIRTANA

DINAS PENDIDIKAN KAB. INHIL

Sekretaris

3.

SARI HARTO DIRGANTORO, A. Ma

DINAS PENDIDIKAN KAB. INHIL

Anggota

4.

YANTO DERI

BAG. PEMBANGUNAN SETDA KAB INHIL

Anggota

5.

M. ISWAN, A. Md

DINAS PEKERJAAN UMUM KAB. INHIL

Anggota

Selaku Panitia Pemeriksa Hasil Pekerjaan di Lingkungan Dinas Pendidikan Kab. Inhil TAHUN ANGGARAN 2014.
Berdasarkan Surat Keputusan Kepala Dinas Pendidikan Kab. INHIL Nomor : 656/DISDIK/V/2014 dan Kontrak
Nomor : ........b/PPK-PL/FSK/DD/VIII/2014 Tanggal : 04 Agustus 2014 s/d 02 Desember 2014, telah melakukan
Pemeriksaan / Penelitian pada :
1.
2.
3.
4.
5.

Kegiatan
Pekerjaan
Lokasi
Pelaksana
Nilai Kontrak

:
:
:
:
:

KEGIATAN PENAMBAHAN GEDUNG SEKOLAH


GEDUNG SEKOLAH SMPN 003 KATEMAN
KECAMATAN KATEMAN
CV. .........................
Rp
134,615,000
(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.)

JALAN PEMERIKSAAN :
Pemeriksaan dilalkukan melalui 3 (tiga) cara pendekatan antara lain :
1. Mengukur kembali setiap yang tercantum dalam penawaran.
2. Memperhatikan mutu/kualitas bahan yang digunakan.
Memperhatikan Teknis Pelaksanaan serta penjelasan dari pemeriksaan dan pengawasan.
Dengan melalui 3 (tiga) cara pendekatan tersebut, maka diperoleh hasil pemeriksaan :
NO
I

URAIAN PEKERJAAN

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting

VOLUME

KETERANGAN

1.00 Ls
1.00 Ls
1.00 Ls

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

5.63
1.41
1,350
0.70

M3
M3
M
M3

Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

2.81 M3
536.09 Kg
3.75 M2

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

0.95
101.67
27.17
4.75

Telah
Telah
Telah
Telah

M3
Kg
Kg
M2

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

III PEKERJAAN LANTAI


1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III
3 Pek. Lantai Papan Kls III 2/20 cm
4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III

3.00
185.11
77.79
15.00
0.47
56.00
12.00

M3
Kg
Kg
M2
M3
M2
M2

Telah
Telah
Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

0.42
106.48
19.16
4.20

M3
Kg
Kg
M2

Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

0.46
93.91
19.15
4.18
79.31
158.63

M3
Kg
Kg
M2
M2
M2

Telah
Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

0.94
103.50
103.50
9.00
41.00

M3
M2
M2
M1
M1

Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III

56.00 M2
56.00 M2
74.00 M2

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

VII PEKERJAAN PINTU /JENDELA


1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah

VIII PEKERJAAN CAT


1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

Bh
M3
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh

56.28 M2
214.63 M2
82.20 M2

1.00 Ls

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

Telah Dilaksanakan

Dari hasil Pemeriksaan / Penelitian dapat disimpulkan sebagai berikut :


Pekerjaan tersebut diatas menurut Panitia Pemeriksa Hasil Pekerjaan dapat diserah terimakan, dengan
kemajuan persentasi pekerjaan mencapai 100% (Seratus Persen), namun keputusan selanjutnya kami
serahkan kepada Kuasa Pengguna Anggaran Dinas Pendidikan Kabupaten Indragiri Hilir selaku Pejabat
Pembuat Komitmen, dengan ketentuan sebagai berikut :

Pasal 1
Masa Pemeliharaan adalah 6 (Enam) bulan terhitung sejak tanggal Serah Terima Pertama Pekerjaan.
Pasal 2
Penyedia barang/jasa wajib memelihara hasil pekerjaan selama masa pemeliharaan sehingga kondisi tetap
seperti saat penyerahan pertama pekerjaan.
Pasal 3
Apabila Penyedia barang/jasa tidak melaksanakan kewajiban pemeliharaan sebagaimana mestinya maka
pengguna barang/jasa berhak menggunakan uang retensi untuk membiayai perbaikan/pemeliharaan atau
mencairkan jaminan pemeliharaan dan jika dana yang tersedia tidak mencukupi menjadi tanggung jawab
penyedia barang/jasa (kontraktor).
Demikian Berita Acara Pemeriksaan Kegiatan ini dibuat dengan sebenarnya berdasarkan Pemeriksaan /
Penelitian yang seksama terhadap Proyek dimaksud, untuk dapat dipergunakan sebagai mestinya.
PANITIA PEMERIKSA HASIL PEKERJAAN YANG MELAKUKAN PEMERIKSAAN/PENELITIAN
PEKERJAAN GEDUNG SEKOLAH SMPN 003 KATEMAN
KECAMATAN KATEMAN

1.

IDRIS ALKASIH

1. ................................

2.

ENDANG FIRTANA

3.

SARI HARTO DIRGANTORO, A. Ma

4.

YANTO DERI

5.

M. ISWAN, A. Md

2. ................................

3. ................................

4. ................................

5. ................................

YANG MENDAMPINGI PANITIA PEMERIKSA HASIL PEKERJAAN

1.

TONY WIRYA DINATA, ST


PPTK

1. ................................

2.

FERY IRAWAN, A. Md
CV. KITA FOKUS CONSULTAN (PENGAWAS)

3.

............................
CV. ......................... (PELAKSANA)

2. ................................

3. ................................

Diketahui Oleh :
Pejabat Pembuat Komitmen
(PPK)

Drs. SUHAIMI EKA


NIP. 19610004 199103 1 002

(PPHP)

mpat Belas, Kami yang

JABATAN
Ketua
Sekretaris
Anggota
Anggota
Anggota

HUN ANGGARAN 2014.


DIK/V/2014 dan Kontrak
r 2014, telah melakukan

Ribu Rupiah.)

KETERANGAN
Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah
Telah
Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah
Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah
Telah

Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan
Dilaksanakan

Telah Dilaksanakan
Telah Dilaksanakan
Telah Dilaksanakan

Telah Dilaksanakan

rah terimakan, dengan


tusan selanjutnya kami
giri Hilir selaku Pejabat

ma Pekerjaan.

sehingga kondisi tetap

aimana mestinya maka


aikan/pemeliharaan atau
menjadi tanggung jawab

dasarkan Pemeriksaan /
ai mestinya.

AN/PENELITIAN

..........................

..........................

AN

..........................

KEGIATAN :
PENAMBAHAN GEDUNG SEKOLAH
TAHUN ANGGARAN 2014
PEKERJAAN :
GEDUNG SEKOLAH SMPN 003 KATEMAN

KECAMATAN KATEMAN

BERITA ACARA
PEMERIKSAAN KEMAJUAN PEKERJAAN
Nomor
:
Tanggal :
Lampiran :

....../BAPKP/PPK-PL/FSK/DD/XII/2014/.......
13 Desember 2014
1 (Satu) Berkas

Pada hari ini Jumat Tanggal Lima Bulan Desember Tahun Dua Ribu Empat Belas, Kami yang bertandatangan
dibawah ini :
1. Nama
Jabatan
Alamat

:
:
:

FERY IRAWAN, A. Md
Direktur Cabang CV. KITA FOKUS CONSULTAN
Jl. Tanjung Emas - Tj. Harapan - Tembilahan

2. Nama
Jabatan
Alamat

:
:
:

............................
Direktur CV. .........................
Jl. ................................

Dengan ini menyatakan bahwa :


A. Telah mengadakan pemeriksaan dan penelitian atas hasil pekerjaan untuk :
a. Pekerjaan
: GEDUNG SEKOLAH SMPN 003 KATEMAN
b. Lokasi
: KECAMATAN KATEMAN
c. Departemen / Instansi : Dinas Pendidikan Kabupaten Indragiri Hilir
d. Surat Perintah Kerja
: Nomor : ........b/PPK-PL/FSK/DD/VIII/2014
Tanggal : 04 Agustus 2014 s/d 02 Desember 2014
e. Nilai Kontrak
:
Rp
134,615,000
(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.)
B. Berdasarkan pemeriksaan, terbukti Kontraktor Pelaksana telah menyelesaikan pekerjaannya dengan Bobot
100% (Seratus Persen).
Demikian Berita Acara ini dibuat dan ditandatangani di Tembilahan pada hari dan tanggal tersebut diatas dalam
rangkap 6 (enam) untuk dapat dipergunakan seperlunya.

Disetujui Oleh,
PELAKSANA
CV. .........................

Diperiksa Oleh,
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

............................
Direktur

FERY IRAWAN, A. Md
Direktur Cabang

Diketahui / Disetujui Oleh,


PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

TONY WIRYA DINATA, ST

NIP. 19801024 200604 1 006

ERITA ACARA
N KEMAJUAN PEKERJAAN

PKP/PPK-PL/FSK/DD/XII/2014/.......

Belas, Kami yang bertandatangan

Lima Belas Ribu Rupiah.)

kan pekerjaannya dengan Bobot

dan tanggal tersebut diatas dalam

TAN PENGAWAS
OKUS CONSULTAN

KEGIATAN :
PENAMBAHAN GEDUNG SEKOLAH
TAHUN ANGGARAN 2014
PEKERJAAN :
GEDUNG SEKOLAH SMPN 003 KATEMAN

KECAMATAN KATEMAN

BERITA ACARA
SERAH TERIMA PERTAMA PEKERJAAN
Nomor
:
Tanggal :
Lampiran :

....../BASTPP/PPK-PL/FSK/DD/XII/2014/.......
15 Desember 2014
1 (Satu) Berkas

Pada hari ini


Senin Tanggal Delapan Bulan Desember Tahun Dua Ribu Empat Belas, Kami yang
bertandatangan dibawah ini :
1. Nama
Jabatan

:
:

IDRIS ALKASIH
Ketua Panitia Penerima Hasil Pekerjaan KEGIATAN PENAMBAHAN GEDUNG SEKOLAH di
KABUPATEN INDRAGIRI HILIR TAHUN ANGGARAN 2014.

Alamat

Jl. Veteran No. 09 Tembilahan, Kabupaten Indragiri Hilir.

2. Nama
Jabatan
Alamat

:
:
:

............................
Direktur CV. .........................
Jl. ................................

Berdasarkan Berita Acara Pemeriksaan Kemajuan Pekerjaan Nomor ....../BAPKP/PPK-PL/FSK/DD/XII/2014/.......


Tanggal
13 Desember 2014 , dengan ini menyatakan telah mengadakan Serah Terima
Pekerjaan untuk Pertama
kalinya sebagai
Berikut :
Pasal I
Pihak Kedua telah menyerahkan kepada Pihak Pertama :
a. Pekerjaan
: GEDUNG SEKOLAH SMPN 003 KATEMAN
b. Lokasi
: KECAMATAN KATEMAN
c. Departemen / Instansi : Dinas Pendidikan Kabupaten Indragiri Hilir
d. Surat Perintah Kerja
: Nomor : ........b/PPK-PL/FSK/DD/VIII/2014
Tanggal : 04 Agustus 2014 s/d 02 Desember 2014
e. Nilai Kontrak
:
Rp
134,615,000
(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.)
f. Bobot Pekerjaan
: 100.00%
Pasal II
Kerusakan dan penyempurnaan akan dilaksanakan sebagaimana mestinya dalam masa pemeliharaan yang
diterapkan selama 6 (enam) bulan kalender terhitung mulai tanggal Berita Acara Penyerahan Pertama Pekerjaan
ini sampai dengan selesai masa pemeliharaan, selanjutnya menjadi tanggung jawab PIHAK KEDUA.
Demikian Berita Acara ini dibuat dalam rangkap 6 (enam) untuk dapat dipergunakan seperlunya.
Disetujui Oleh,
KETUA PANITIA PENERIMA HASIL PEKERJAAN
(PPHP)

Diperiksa Oleh,
PELAKSANA
CV. .........................

IDRIS ALKASIH
NIP. 19600322 198103 1 006

............................
Direktur

Diketahui / Disetujui Oleh,


PEJABAT PEMBUAT KOMITMEN
(PPK)

Drs. SUHAIMI EKA


NIP. 19610004 199103 1 002

ERITA ACARA
MA PERTAMA PEKERJAAN

STPP/PPK-PL/FSK/DD/XII/2014/.......

Ribu Empat Belas, Kami yang

AMBAHAN GEDUNG SEKOLAH di

APKP/PPK-PL/FSK/DD/XII/2014/.......

erima

Pekerjaan untuk Pertama

Lima Belas Ribu Rupiah.)

dalam masa pemeliharaan yang


ra Penyerahan Pertama Pekerjaan
wab PIHAK KEDUA.

akan seperlunya.

KEGIATAN :
PENAMBAHAN GEDUNG SEKOLAH
TAHUN ANGGARAN 2014
PEKERJAAN :
GEDUNG SEKOLAH SMPN 003 KATEMAN

KECAMATAN KATEMAN

BERITA ACARA
PEMBAYARAN UNTUK KEMAJUAN PEKERJAAN
Nomor
:
Tanggal :
Lampiran :

....../BAPUKP/PPK-PL/FSK/DD/XII/2014/.......
16 Desember 2014
1 (Satu) Berkas

Pada hari ini Selasa Tanggal Sembilan Bulan Desember Tahun Dua Ribu Empat Belas, Kami yang
bertandatangan dibawah ini :
1. Nama
Jabatan

:
:

Drs. SUHAIMI EKA


Pejabat Pembuat Komitmen KEGIATAN PENAMBAHAN
KABUPATEN INDRAGIRI HILIR TAHUN ANGGARAN 2014.

GEDUNG

SEKOLAH

di

Alamat
: Jl. Veteran No. 09 Tembilahan, Kabupaten Indragiri Hilir.
Yang berwenang dalam bertindak untuk dan atas nama Pemerintah yang selanjutnya disebut PIHAK PERTAMA.

2. Nama
: ............................
Jabatan
: Direktur CV. .........................
Alamat
: Jl. ................................
Yang berwenang dalam bertindak untuk dan atas nama CV. ......................... yang selanjutnya disebut PIHAK KED

1. Telah mengadakan Penelitian atas Pekerjaan Pengawasan dan Kebenaran Laporan Kemajuan Pekerjaan pada
Minggu VII (Tujuh) seperti terlampir yang ternyata kemudian sesuai dengan kebenaran :
a.
b.
c.
d.

Pekerjaan
Lokasi
Departemen / Instansi
Surat Perintah Kerja

:
:
:
:

e.

Nilai Kontrak

GEDUNG SEKOLAH SMPN 003 KATEMAN


KECAMATAN KATEMAN
Dinas Pendidikan Kabupaten Indragiri Hilir
Nomor : ........b/PPK-PL/FSK/DD/VIII/2014
Tanggal : 04 Agustus 2014 s/d 02 Desember 2014
Rp
134,615,000
(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.)

Dan terbukti pula bahwa Kemajuan Pekerjaan telah mencapai prosentase sebesar : 100% (Seratus Persen)
Berdasarkan Surat Perintah Kerja dan menyerahkan jaminan pemeliharaan, maka kontraktor yang bersangkutan
dapat menerima Pembayaran sebesar 100% (Seratus Persen) dari Nilai Kontrak yaitu :
Sebesar Rp

134,615,000

100.00%

.................................................................

2. Pada Kontraktor yang bersangkutan telah dibayar :


a.
Pembayaran Angsuran s/d yang lalu
:
Rp
b.
Pengembalian uang muka s/d saat ini
:
Rp
+
Jumlah Potongan ............................................................................................................
Maka pada Angsuran ini dapat dibayarkan Sebesar ..............................................................
Terbilang :

(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah.)

Demikian Berita Acara ini dibuat dalam rangkap 6 (enam) untuk dapat dipergunakan seperlunya.

PIHAK PERTAMA
PEJABAT PEMBUAT KOMITMEN
(PPK)

PIHAK KEDUA
PELAKSANA
CV. .........................

Drs. SUHAIMI EKA


NIP. 19610004 199103 1 002

............................
Direktur

BERITA ACARA
UNTUK KEMAJUAN PEKERJAAN

/BAPUKP/PPK-PL/FSK/DD/XII/2014/.......

a Ribu Empat Belas, Kami yang

NAMBAHAN
2014.

GEDUNG

SEKOLAH

di

selanjutnya disebut PIHAK PERTAMA.

... yang selanjutnya disebut PIHAK KEDUA.

n Laporan Kemajuan Pekerjaan pada


ngan kebenaran :

2 Desember 2014

am Ratus Lima Belas Ribu Rupiah.)

sebesar : 100% (Seratus Persen)


maka kontraktor yang bersangkutan
ntrak yaitu :
Rp 134,615,000.00

Rp
-Rp 134,615,000

ima Belas Ribu Rupiah.)

unakan seperlunya.

PIHAK KEDUA
PELAKSANA
CV. .........................

............................

PEMERINTAH KABUPATEN INDRAGIRI HILIR

DINAS PENDIDIKAN
Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768) 21179 Tembilahan

KEGIATAN
PENAMBAHAN GEDUNG SEKOLAH
TAHUN ANGGARAN 2014

SERTIFIKAT BULANAN (MC)


BULAN

: NOPEMBER 2014

TANGGAL

: 20 Oktober s/d 30 Nopember 2014

PEKERJAAN
GEDUNG SEKOLAH SMPN 003 KATEMAN

KECAMATAN KATEMAN
NOMOR KONTRAK
TANGGAL
NILAI KONTRAK

: ........b/PPK-PL/FSK/DD/VIII/2014
: 04 Agustus 2014 s/d 02 Desember 2014
: Rp
134,615,000

PELAKSANA
CV. .........................
Jl. ................................

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

20 Oktober 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

I (PERTAMA)

BOBOT
%

26 Oktober 2014

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

5.16%
1.10%
16.59%

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

26 Oktober 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

536.09
3.75

0.00%
100.00%
100.00%

0.00%
6.70%
0.37%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

14.70%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

27 Oktober 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

II (DUA)

BOBOT
%

02 November 201

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

536.09
3.75

2.81

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

5.16%
1.10%
16.59%

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

02 November 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

20.20%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

03 November 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

III (TIGA)

BOBOT
%

09 November 201

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

5.16%
1.10%
16.59%

56.00
12.00

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

106.48
19.16
4.20

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

09 November 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

3.00
185.11
77.79
15.00
0.47

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

56.00
12.00

100.00%
100.00%

5.16%
1.10%

106.48
19.16
4.20

0.00%
100.00%
100.00%
100.00%

0.00%
1.33%
0.24%
0.82%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

39.19%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

10 November 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

IV (EMPAT)

BOBOT
%

MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

16 November 201

REALISASI VOLUME MINGGU

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

5.16%
1.10%
16.59%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

56.00
12.00

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

106.48
19.16
4.20

0.42

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

0.46
93.91
19.15

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

4.18
79.31
158.63

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

16 November 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

3.00
185.11
77.79
15.00
0.47

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

56.00
12.00

100.00%
100.00%

5.16%
1.10%

0.42
106.48
19.16
4.20

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

0.46
93.91
19.15

100.00%
100.00%
100.00%

0.36%
1.17%
0.24%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

100.00%
100.00%
100.00%

0.82%
6.70%
4.20%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

4.18
79.31
158.63

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

53.01%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

17 November 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

V (LIMA)

BOBOT
%

MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

23 November 201

REALISASI VOLUME MINGGU

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

5.16%
1.10%
16.59%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

56.00
12.00

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.42
106.48
19.16
4.20

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

0.46
93.91
19.15

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

4.18
79.31
158.63

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

0.94
103.50
103.50
9.00
41.00

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

23 November 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

3.00
185.11
77.79
15.00
0.47

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

56.00
12.00

100.00%
100.00%

5.16%
1.10%

0.42
106.48
19.16
4.20

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

0.46
93.91
19.15

100.00%
100.00%
100.00%

0.36%
1.17%
0.24%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

4.18
79.31
158.63

100.00%
100.00%
100.00%

0.82%
6.70%
4.20%

0.94
103.50
103.50
9.00
41.00

100.00%
100.00%
100.00%
100.00%
100.00%

2.93%
4.20%
5.96%
0.60%
1.29%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

68.00%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

24 November 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

VI (ENAM)

BOBOT
%

MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

30 November 201

REALISASI VOLUME MINGGU

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

5.16%
1.10%
16.59%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

56.00
12.00

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.42
106.48
19.16
4.20

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

0.46
93.91
19.15

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

4.18
79.31
158.63

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

0.94
103.50
103.50
9.00
41.00

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

56.00
56.00
74.00

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

1.00
0.47
6.00
2.00
-

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

400,000.00

0.33%

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

30 November 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

3.00
185.11
77.79
15.00
0.47

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

56.00
12.00

100.00%
100.00%

5.16%
1.10%

0.42
106.48
19.16
4.20

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

0.46
93.91
19.15

100.00%
100.00%
100.00%

0.36%
1.17%
0.24%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

4.18
79.31
158.63

100.00%
100.00%
100.00%

0.82%
6.70%
4.20%

0.94
103.50
103.50
9.00
41.00

100.00%
100.00%
100.00%
100.00%
100.00%

2.93%
4.20%
5.96%
0.60%
1.29%

56.00
56.00
74.00

100.00%
100.00%
100.00%

2.90%
1.85%
7.24%

1.00
0.47
6.00
2.00
-

100.00%
100.00%
100.00%
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.80%
1.65%
0.08%
0.03%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%

0.00%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

83.56%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

NO
1

URAIAN PEKERJAAN
2

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

LAPORAN MINGGUAN
MINGGU KE :
VOLUME
KONTRAK
3

01 Desember 2014

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

TANGGAL s/d TANGGAL

VII (TUJUH)

BOBOT
%

MINGGU
LALU

MINGGU INI

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

07 Desember 201

REALISASI VOLUME MINGGU

NO
1

URAIAN PEKERJAAN
2

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

6,308,966.72
1,351,921.44
20,306,676.55

BOBOT
%

5.16%
1.10%
16.59%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

56.00
12.00

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.42
106.48
19.16
4.20

0.46 M3
93.91 Kg
19.15 Kg

961,639.60
15,287.68
15,287.68

438,507.66
1,435,648.64
292,830.08

0.36%
1.17%
0.24%

0.46
93.91
19.15

NO

URAIAN PEKERJAAN

- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak
IX PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir Proyek

VOLUME
KONTRAK
3

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

BOBOT
%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

4.18 M2
240,279.64
79.31 M2
103,411.20
158.63 M2
32,370.96
Sub Total

1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

0.82%
6.70%
4.20%
16.21%

4.18
79.31
158.63

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

0.94
103.50
103.50
9.00
41.00

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

56.00
56.00
74.00

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

1.00
0.47
6.00
2.00
-

6.00
5.00
10.00
20.00
20.00
20.00
10.00

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

56.28
214.63
82.20

400,000.00

0.33%

1.00

1.00 Ls

400,000.00

NO
1

URAIAN PEKERJAAN
2

VOLUME
KONTRAK

KONTRAK ASLI
HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)

Sub Total
JUMLAH
PPN 10%
TOTAL
DIBULATKAN

BOBOT
%

400,000.00

0.33%

122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

100%

REALISASI VOLUME MINGGU


MINGGU
LALU

MINGGU INI

BO

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiks
KONTRAKTOR
CV. ..........

RIKI KARDO, ST
Inspector

(.................
Pelaksana

PEKERJAAN

KONSULTAN PENGAWAS

NG SEKOLAH SMPN 003 KATEMAN

CV. KITA FOKUS CONSULTAN

PORAN MINGGUAN

KONTRAK PELAKSANA

TANGGAL s/d TANGGAL

CV. .........................

07 Desember 2014

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

1.00
1.00
1.00

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

5.63
1.41
1,350.00
0.70

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

2.81
536.09
3.75

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

0.95
101.67
27.17
4.75

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

3.00
185.11
77.79
15.00
0.47

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

56.00
12.00

100.00%
100.00%

5.16%
1.10%

0.42
106.48
19.16
4.20

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

0.46
93.91
19.15

100.00%
100.00%
100.00%

0.36%
1.17%
0.24%

REALISASI VOLUME MINGGUAN


KUMULATIF
9

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

4.18
79.31
158.63

100.00%
100.00%
100.00%

0.82%
6.70%
4.20%

0.94
103.50
103.50
9.00
41.00

100.00%
100.00%
100.00%
100.00%
100.00%

2.93%
4.20%
5.96%
0.60%
1.29%

56.00
56.00
74.00

100.00%
100.00%
100.00%

2.90%
1.85%
7.24%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%

56.28
214.63
82.20

100.00%
100.00%
100.00%

0.79%
5.86%
2.85%

1.00

100.00%

0.33%

REALISASI VOLUME MINGGUAN


KUMULATIF

PROSENTASE
TERHADAP
PEKERJAAN (%)

BOBOT REALISASI
(%)

10

11

BOBOT REALISASI :
Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

100.00%

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

LAPORAN BULANAN
BULAN KE :

TANGGAL s/d TANGGAL

I (PERTAMA)

20 Oktober 2014

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

16 November 2014

REALISASI PEKERJAAN
BOBOT
%
6

S/D BULAN
REALISASI HARGA
INI
7

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

500,000.00
500,000.00
250,000.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

153,000.00
18,337.50
7,233,300.00
689,980.36

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

2,704,611.38
8,195,632.02
453,117.68

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

913,557.62
1,554,344.00
415,373.83
1,141,328.29

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

REALISASI PEKERJAAN
BOBOT
%

6,308,966.72
1,351,921.44
20,306,676.55

5.16%
1.10%
16.59%

S/D BULAN
REALISASI HARGA
INI
7

56.00
12.00

6,308,966.72
1,351,921.44

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.42
106.48
19.16
4.20

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.46 M3

961,639.60

438,507.66

0.36%

0.46

438,507.66

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

- Besi 10 mm
- Besi 6 mm
- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

REALISASI PEKERJAAN
BOBOT
%

S/D BULAN
REALISASI HARGA
INI
7

93.91
19.15
4.18
79.31
158.63

Kg
15,287.68
Kg
15,287.68
M2
240,279.64
M2
103,411.20
M2
32,370.96
Sub Total

1,435,648.64
292,830.08
1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

1.17%
0.24%
0.82%
6.70%
4.20%
16.21%

93.91
19.15
4.18
79.31
158.63

1,435,648.64
292,830.08
1,004,368.90
8,201,811.14
5,134,850.00

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

IX PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan Akhir Proyek

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
400,000.00
Sub Total

JUMLAH
PPN 10%
HARGA DI KONTRAK :
TOTAL
DIBULATKAN

400,000.00
400,000.00
###
12,237,729.71
###
###

REALISASI PEKERJAAN
BOBOT
%
6

0.33%
0.33%

100%

S/D BULAN
REALISASI HARGA
INI
7

HARGA
REALISASI :

64,871,126.56
6,487,112.66
71,358,239.22
71,358,000.00

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiksa Oleh :
KONTRAKTOR PELAKSAN
CV. .........................

RIKI KARDO, ST
Inspector

(................................
Pelaksana Lapangan

KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN
KONTRAK PELAKSANA
CV. .........................
PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%

5.16%
1.10%

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

100.00%

0.36%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%
100.00%
100.00%
100.00%

1.17%
0.24%
0.82%
6.70%
4.20%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

0.00%

0.00%

BOBOT
REALISASI :

53.01%

Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

PEMERINTAH KABUPATEN INDRAGIRI HILIR

PEKERJAAN

DINAS PENDIDIKAN

GEDUNG SEKOLAH SMPN 003 KATEMAN

Jl. Veteran No. 09 Telp. (0768) 21179 Fax. (0768)


21179 Tembilahan

LAPORAN BULANAN
BULAN KE :

TANGGAL s/d TANGGAL

II (DUA)

17 November 2014

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi
2 Pek. Pas. Bouwplank/ Pengukuran
3 Pek. Papan Nama Proyek

II PEKERJAAN PONDASI
1 Pek. Galian Tanah
2 Pek. Timbunan Kembali
3 Pek. Cerocok Kayu Bulat 10-12 x 6 M1
4 Pek. Cor Lantai Kerja 1 : 3 : 5
5 Pek. Cor Tapak Pondasi 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Bekisting
6 Pek. Cor Tiang Umpak 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
III PEKERJAAN LANTAI
1 Pek. Balok Lantai Beton 20/20 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Gelegar Kayu 5/7 Kelas III

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
500,000.00
1.00 Ls
500,000.00
1.00 Ls
250,000.00
Sub Total
5.63
1.41
1,350.00
0.70

07 Desember 2014

REALISASI PEKERJAAN
BOBOT
%
6

S/D BULAN
REALISASI HARGA
INI
7

500,000.00
500,000.00
250,000.00
1,250,000.00

0.41%
0.41%
0.20%
1.02%

1.00
1.00
1.00

500,000.00
500,000.00
250,000.00

M3
M3
M
M3

27,200.00
13,040.00
5,358.00
981,305.40

153,000.00
18,337.50
7,233,300.00
689,980.36

0.13%
0.01%
5.91%
0.56%

5.63
1.41
1,350.00
0.70

153,000.00
18,337.50
7,233,300.00
689,980.36

2.81 M3
536.09 Kg
3.75 M2

961,639.60
15,287.68
120,831.38

2,704,611.38
8,195,632.02
453,117.68

2.21%
6.70%
0.37%

2.81
536.09
3.75

2,704,611.38
8,195,632.02
453,117.68

0.95
101.67
27.17
4.75

M3
961,639.60
Kg
15,287.68
Kg
15,287.68
M2
240,279.64
Sub Total

913,557.62
1,554,344.00
415,373.83
1,141,328.29
23,472,582.68

0.75%
1.27%
0.34%
0.93%
19.18%

0.95
101.67
27.17
4.75

913,557.62
1,554,344.00
415,373.83
1,141,328.29

3.00
185.11
77.79
15.00
0.47

M3
Kg
Kg
M2
M3

2.36%
2.31%
0.97%
3.05%
1.64%

3.00
185.11
77.79
15.00
0.47

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

961,639.60
15,287.68
15,287.68
248,630.08
4,323,124.24

2,884,918.80
2,829,848.11
1,189,155.95
3,729,451.20
2,012,414.33

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

3 Pek. Lantai Papan Kls III 2/20 cm


4 Pek. Papan Penutup Balok
IV PEKERJAAN DINDING
1 Pek. Cor Tiang Kolom Praktis 10/10 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3
- Besi 10 mm
- Besi 6 mm
- Bekisting
2 Pek. Cor Ring Balok 10/12 cm 1 : 2 : 3
- Beton Campur 1 : 2 : 3

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

56.00 M2
112,660.12
12.00 M2
112,660.12
Sub Total

0.42
106.48
19.16
4.20

REALISASI PEKERJAAN
BOBOT
%

6,308,966.72
1,351,921.44
20,306,676.55

5.16%
1.10%
16.59%

S/D BULAN
REALISASI HARGA
INI
7

56.00
12.00

6,308,966.72
1,351,921.44

M3
Kg
Kg
M2

961,639.60
15,287.68
15,287.68
240,279.64

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.33%
1.33%
0.24%
0.82%

0.42
106.48
19.16
4.20

403,888.63
1,627,822.08
292,965.71
1,009,174.49

0.46 M3

961,639.60

438,507.66

0.36%

0.46

438,507.66

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

- Besi 10 mm
- Besi 6 mm
- Bekisting
3 Pek. Pasangan Batako 5 x 15 x 30 cm
4 Pek. Plasteran Pas. Batako
V PEKERJAAN ATAP
1 Pek. Kuda Kuda Kayu Klas III
2 Pek. Reng Kayu Klas III
3 Pek. Atap Genteng Metal
4 Pek. Perabung Genteng Metal
5 Pek. Lysplank Papan Kls III
VI PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls III
2 Pek. Plafond Triplek 4 mm
3 Pek. Peri-Peri Papan Kls III
VII PEKERJAAN PINTU /JENDELA
1 Pek. Pintu Panel 2 (Dua) Daun
2 Pek. Kunsen Pintu & Jendela Kayu Kls III
3 Pek. Engsel Pintu
4 Pek. Kunci Tanam
5 Pek. Pasang Ventilasi Jalusi Kayu Kelas III
6 Pek. Jendela Kaca Mati 5 mm
7 Pek. Jendela Kaca Bingkai 5 mm
8 Pek. Engsel Jendela
9 Pek. Grendel Jendela
10 Pek. Kait Angin Jendela
11 Pek. Tarikan Jendela
VIII PEKERJAAN CAT
1 Pek. Teer/ Residu
2 Pek. Cat Air Dinding
3 Pek. Cat Minyak

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

REALISASI PEKERJAAN
BOBOT
%

S/D BULAN
REALISASI HARGA
INI
7

93.91
19.15
4.18
79.31
158.63

Kg
15,287.68
Kg
15,287.68
M2
240,279.64
M2
103,411.20
M2
32,370.96
Sub Total

1,435,648.64
292,830.08
1,004,368.90
8,201,811.14
5,134,850.00
19,841,867.33

1.17%
0.24%
0.82%
6.70%
4.20%
16.21%

93.91
19.15
4.18
79.31
158.63

1,435,648.64
292,830.08
1,004,368.90
8,201,811.14
5,134,850.00

0.94
103.50
103.50
9.00
41.00

M3
3,828,030.48
M2
49,704.81
M2
70,500.92
M1
81,234.03
M1
38,635.36
Sub Total

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92
18,347,141.84

2.93%
4.20%
5.96%
0.60%
1.29%
14.99%

0.94
103.50
103.50
9.00
41.00

3,590,692.59
5,144,447.84
7,296,845.22
731,106.27
1,584,049.92

56.00 M2
63,425.82
56.00 M2
40,486.51
74.00 M2
119,717.72
Sub Total

3,551,845.92
2,267,244.49
8,859,111.28
14,678,201.69

2.90%
1.85%
7.24%
11.99%

56.00
56.00
74.00

3,551,845.92
2,267,244.49
8,859,111.28

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

Bh
2,200,000.00
M3
4,338,628.75
Bh
16,824.80
Bh
20,744.80
M2
321,744.89
Bh
300,000.00
Bh
360,000.00
Bh
16,824.80
Bh
8,984.80
Bh
22,944.80
Bh
8,816.50
Sub Total

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00
12,456,226.29

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%
10.18%

1.00
0.47
6.00
2.00
6.00
5.00
10.00
20.00
20.00
20.00
10.00

2,200,000.00
2,020,065.55
100,948.80
41,489.60
1,930,469.34
1,500,000.00
3,600,000.00
336,496.00
179,696.00
458,896.00
88,165.00

56.28 M2
17,144.00
214.63 M2
33,440.40
82.20 M2
42,367.20
Sub Total

964,864.32
7,177,152.54
3,482,583.84
11,624,600.70

0.79%
5.86%
2.85%
9.50%

56.28
214.63
82.20

964,864.32
7,177,152.54
3,482,583.84

KONTRAK ASLI
NO

URAIAN PEKERJAAN

VOLUME
KONTRAK

IX PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan Akhir Proyek

HARGA
JUMLAH HARGA
SATUAN (Rp)
(Rp)
4

1.00 Ls
400,000.00
Sub Total

JUMLAH
PPN 10%
HARGA DI KONTRAK :
TOTAL
DIBULATKAN

400,000.00
400,000.00
###
12,237,729.71
###
###

REALISASI PEKERJAAN
BOBOT
%
6

0.33%
0.33%

100%

S/D BULAN
REALISASI HARGA
INI
7

1.00

HARGA
REALISASI :

400,000.00
122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Diperiksa Oleh :
KONTRAKTOR PELAKSAN
CV. .........................

RIKI KARDO, ST
Inspector

(................................
Pelaksana Lapangan

KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN
KONTRAK PELAKSANA
CV. .........................
PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%
100.00%

0.41%
0.41%
0.20%

100.00%
100.00%
100.00%
100.00%

0.13%
0.01%
5.91%
0.56%

100.00%
100.00%
100.00%

2.21%
6.70%
0.37%

100.00%
100.00%
100.00%
100.00%

0.75%
1.27%
0.34%
0.93%

100.00%
100.00%
100.00%
100.00%
100.00%

2.36%
2.31%
0.97%
3.05%
1.64%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%

5.16%
1.10%

100.00%
100.00%
100.00%
100.00%

0.33%
1.33%
0.24%
0.82%

100.00%

0.36%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%
100.00%
100.00%
100.00%
100.00%

1.17%
0.24%
0.82%
6.70%
4.20%

100.00%
100.00%
100.00%
100.00%
100.00%

2.93%
4.20%
5.96%
0.60%
1.29%

100.00%
100.00%
100.00%

2.90%
1.85%
7.24%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

1.80%
1.65%
0.08%
0.03%
1.58%
1.23%
2.94%
0.27%
0.15%
0.37%
0.07%

100.00%
100.00%
100.00%

0.79%
5.86%
2.85%

PROSENTASE
TERHADAP
PEKERJAAN
(%)

BOBOT REALISASI
(%)

10

100.00%

0.33%

BOBOT
REALISASI :

100.00%

Diperiksa Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

(.................................)
Pelaksana Lapangan

REKAPITULASI BULANAN
KEGIATAN
PEKERJAAN
LOKASI
WAKTU PELAKSANAAN

:
:
:
:

PENAMBAHAN GEDUNG SEKOLAH


GEDUNG SEKOLAH SMPN 003 KATEMAN
KECAMATAN KATEMAN
20 Oktober s/d 16 November 2014

KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
SERTIFIKAT
TANGGAL

KONTRAK
NO
I
II
III
IV
V
VI
VII
VIII
IX

1
2

3
4

URAIAN PEKERJAAN

NILAI (Rp)

BOBOT

PENDAHULUAN
1,250,000.00
1.02%
PONDASI
23,472,582.68
19.18%
LANTAI
20,306,676.55
16.59%
DINDING
19,841,867.33
16.21%
ATAP
18,347,141.84
14.99%
PLAFOND
14,678,201.69
11.99%
PINTU /JENDELA
12,456,226.29
10.18%
CAT
11,624,600.70
9.50%
LAIN - LAIN
400,000.00
0.33%
JUMLAH HARGA
122,377,297.08
PPN 10 %
12,237,729.71
100.00%
TOTAL JUMLAH
134,615,026.78
DIBULATKAN
134,615,000.00
Nilai Bruto dari Sertifikat ini
Pengurangan :
a. Pengembalian Uang Muka
0.00%
x
b. Lain - lain
Nilai Pekerjaan yang disyahkan untuk dibayarkan pada sertifikat ini
Pembulatan

Diketahui / Disetujui Oleh :


PEJABAT PEMBUAT KOMITMEN
(PPK)

CV. .........................
CV. KITA FOKUS CONSULTAN
BULAN OKTOBER & NOPEMBER
16 Nopember 2014

PROSENTASE PEMBAYARAN (%)

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

Terbilang :

:
:
:
:

S/D BULAN
LALU
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

1.02%
19.18%
16.59%
16.21%
0.00%
0.00%
0.00%
0.00%
0.00%

S/D BULAN
INI
1.02%
19.18%
16.59%
16.21%
0.00%
0.00%
0.00%
0.00%
0.00%

53.01%

53.01%

BULAN INI

53.01%
134,615,000.00

(Tujuh Puluh Satu Juta Tiga Ratus Lima Puluh Delapan Ribu Rupiah)

Diketahui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Drs. SUHAIMI EKA


NIP. 19610004 199103 1 002

TONY WIRYA DINATA, ST


NIP. 19801024 200604 1 006

FERY IRAWAN, A. Md
Direktur Cabang

KAPITULASI BULANAN
:
:
:
:

CV. .........................
CV. KITA FOKUS CONSULTAN
BULAN OKTOBER & NOPEMBER 2014
16 Nopember 2014
NILAI PEKERJAAN YANG
DIBAYAR
(Rp)
1,250,000.00
23,472,582.68
20,306,676.55
19,841,867.33
64,871,126.56
6,487,112.66
71,358,239.22
71,358,000.00
71,358,000.00

71,358,000.00
71,358,000.00
Satu Juta Tiga Ratus Lima Puluh Delapan Ribu Rupiah)
Dibuat Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

............................
Direktur

REKAPITULASI BULANAN
KEGIATAN
PEKERJAAN
LOKASI
WAKTU PELAKSANAAN

:
:
:
:

PENAMBAHAN GEDUNG SEKOLAH


GEDUNG SEKOLAH SMPN 003 KATEMAN
KECAMATAN KATEMAN
17 Nopember s/d 7 Desember 2014

KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
SERTIFIKAT
TANGGAL

KONTRAK
NO
I
II
III
IV
V
VI
VII
VIII
IX

1
2

3
4

URAIAN PEKERJAAN

NILAI (Rp)

BOBOT

PENDAHULUAN
1,250,000.00
1.02%
PONDASI
23,472,582.68
19.18%
LANTAI
20,306,676.55
16.59%
DINDING
19,841,867.33
16.21%
ATAP
18,347,141.84
14.99%
PLAFOND
14,678,201.69
11.99%
PINTU /JENDELA
12,456,226.29
10.18%
CAT
11,624,600.70
9.50%
LAIN - LAIN
400,000.00
0.33%
JUMLAH HARGA
122,377,297.08
PPN 10 %
12,237,729.71
100.00%
TOTAL JUMLAH
134,615,026.78
DIBULATKAN
134,615,000.00
Nilai Bruto dari Sertifikat ini
Pengurangan :
a. Pengembalian Uang Muka
0.00%
x
b. Lain - lain
Nilai Pekerjaan yang disyahkan untuk dibayarkan pada sertifikat ini
Pembulatan

Diketahui / Disetujui Oleh :


PEJABAT PEMBUAT KOMITMEN
(PPK)

CV. .........................
CV. KITA FOKUS CONSULTAN
BULAN NOPEMBER & DESEMBE
7 Desember 2014

PROSENTASE PEMBAYARAN (%)

PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN

Terbilang :

:
:
:
:

S/D BULAN
LALU
1.02%
19.18%
16.59%
16.21%
0.00%
0.00%
0.00%
0.00%
0.00%

0.00%
0.00%
0.00%
0.00%
14.99%
11.99%
10.18%
9.50%
0.33%

S/D BULAN
INI
1.02%
19.18%
16.59%
16.21%
14.99%
11.99%
10.18%
9.50%
0.33%

46.99%

100.00%

BULAN INI

53.01%

100.00%
Rp 134,615,000

Rp
Rp

(Seratus Tiga Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah)

Diketahui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

Diperiksa Oleh :
KONSULTAN PENGAWAS
CV. KITA FOKUS CONSULTAN

Drs. SUHAIMI EKA


NIP. 19610004 199103 1 002

TONY WIRYA DINATA, ST


NIP. 19801024 200604 1 006

FERY IRAWAN, A. Md
Direktur Cabang

KAPITULASI BULANAN
:
:
:
:

CV. .........................
CV. KITA FOKUS CONSULTAN
BULAN NOPEMBER & DESEMBER 2014
7 Desember 2014
NILAI PEKERJAAN YANG
DIBAYAR
(Rp)

Rp

1,250,000.00
23,472,582.68
20,306,676.55
19,841,867.33
18,347,141.84
14,678,201.69
12,456,226.29
11,624,600.70
400,000.00
122,377,297.08
12,237,729.71
134,615,026.78
134,615,000.00
134,615,000.00

Rp
Rp

134,615,000.00
134,615,000.00

a Puluh Empat Juta Enam Ratus Lima Belas Ribu Rupiah)


Dibuat Oleh :
KONTRAKTOR PELAKSANA
CV. .........................

............................
Direktur