PROGRAM
KEGIATAN
PEKERJAAN
: PEMBANGUNAN BARU IPAL USAHA SKALA KECIL (USK) TAHU DESA AMBOYO INTI
LOKASI
SUMBER DANA
: DAK SANITASI
Uraian
Kode
3
Nilai
Harga
Jumlah
Satuan
Harga
(Rp)
(Rp)
Satuan
PEK. PERSIAPAN
A. 2.2.1.9
48.00
13,750.00
660,000.00
A. 2.2.1.4
32.00
M'
47,360.00
1,515,520.00
II
PEK. PONDASI
A.2.3.1.1
61.65
66,375.00
A.2.3.1.11
1.26
182,805.00
229,648.78
A.4.1.1.2
1.26
1,210,872.62
1,521,158.73
Sub Total
2,175,520.00
Sub Total
4,091,886.00
5,842,693.52
BANGUNAN IPAL
Cor Beton Camp mutu fc = 19,3 MPa (K 225)
A.4.1.1.7
28.13
1,390,609.63
39,119,239.64
Besi
A.4.1.1.17
2,009.70
Kg
20,721.75
41,644,569.08
Bekisting
A.4.1.1.22
159.91
217,080.00
34,713,262.80
A.4.4.2.4
173.99
57,644.16
10,029,507.40
125,506,578.92
IV PEK. SANITASI
1
4.00
M'
231,000.00
924,000.00
124.00
M'
115,500.00
14,322,000.00
T 4"
35.00
Bh
496,100.00
17,363,500.00
Sub Total
32,609,500.00
7.00
Unit
500,000.00
ijuk
1.00
Lsm
500,000.00
500,000.00
Sirtu (Filter)
8.25
m3
590,000.00
4,867,500.00
Sub Total
3,500,000.00
8,867,500.00
Jumlah Total
Dibulatkan
175,001,792.43
175,000,000.00
Dibuat Oleh :
Kabid Cipta Karya
Dinas Pekerjaan Umum dan Perumahan Kab. Landak
JAMELIUS, ST
Nip. 1971121881999031006
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.100
85,000.000
0.100
95,000.000
0.010
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
8,500.00
9,500.00
1,050.00
525.00
19,575.00
M3
Kg
M3
0.012
1,700,000.000
0.020
19,250.000
0.007
1,000,000.000
JUMLAH HARGA BAHAN
20,400.00
385.00
7,000.00
27,785.00
0.00
47,360.00
0.00
47,360.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kayu balok 5/7
2 Paku 2-3
3 Kayu papan 3/20
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
Uraian
Kode
Satuan
Koefesien
1
A
L.01
L.04
OH
OH
TENAGA
1 Pekerja
2 Mandor
BAHAN
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.100
85,000.000
0.050
105,000.000
JUMLAH TENAGA KERJA
8,500.00
5,250.00
13,750.00
0.00
0.00
13,750.00
0.00
13,750.00
10% x D
Uraian
Kode
Satuan
Koefesien
1
A
L.01
L.04
OH
OH
TENAGA
1 Pekerja
2 Mandor
BAHAN
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.750
85,000.000
0.025
105,000.000
JUMLAH TENAGA KERJA
63,750.00
2,625.00
66,375.00
0.00
0.00
66,375.00
0.00
66,375.00
10% x D
Uraian
Kode
Satuan
Koefesien
1
A
L.01
L.04
OH
OH
TENAGA
1 Pekerja
2 Mandor
0.500
85,000.000
0.050
105,000.000
JUMLAH TENAGA KERJA
42,500.00
5,250.00
47,750.00
BAHAN
JUMLAH HARGA BAHAN
0.00
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.00
47,750.00
0.00
47,750.00
Uraian
Kode
Satuan
Koefesien
1
A
L.01
L.04
OH
OH
TENAGA
1 Pekerja
2 Mandor
BAHAN
Tanah Datang
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.250
85,000.000
0.025
105,000.000
JUMLAH TENAGA KERJA
21,250.00
2,625.00
23,875.00
1.2
55,000.00
JUMLAH HARGA BAHAN
66,000.00
66,000.00
0.00
89,875.00
0.00
89,875.00
10% x D
Uraian
Kode
Satuan
Koefesien
1
A
L.01
L.04
OH
OH
TENAGA
1 Pekerja
2 Mandor
BAHAN
1 Pasir urug
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.300
85,000.000
0.001
105,000.000
JUMLAH TENAGA KERJA
25,500.00
105.00
25,605.00
1.200
131,000.000
JUMLAH HARGA BAHAN
157,200.00
157,200.00
0.00
182,805.00
0.00
182,805.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.500
85,000.000
0.750
95,000.000
0.075
105,000.000
0.075
105,000.000
JUMLAH TENAGA KERJA
127,500.00
71,250.00
7,875.00
7,875.00
214,500.00
M3
Kg
M3
1.200
292,000.000
136.000
1,859.000
0.544
131,000.000
JUMLAH HARGA BAHAN
350,400.00
252,824.00
71,264.00
674,488.00
0.00
888,988.00
0.00
888,988.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Batu belah
2 Semen Portlan
3 Pasir Pasang
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
A.4.1.1.2
Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
No.
1
A
1
2
3
4
B
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Semen Portland
2 Pasir Beton
Kg
Kg
1.650
85,000.000
0.275
95,000.000
0.028
105,000.000
0.083
105,000.000
JUMLAH TENAGA KERJA
276.000
828.000
1,859.000
93.571
140,250.00
26,125.00
2,940.00
8,715.00
178,030.00
513,084.00
77,477.14
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Kg
Liter
1,012.000
437.037
215.000
JUMLAH HARGA BAHAN
442,281.48
0.00
1,032,842.62
0.00
1,210,872.62
0.00
1,210,872.62
10% x D
A.4.1.1.7. Membuat 1 m beton mutu fc = 19,3 MPa (K 225), slump (12 2) cm, w/c = 0,58
No.
1
A
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.650
85,000.000
0.275
95,000.000
0.028
105,000.000
0.083
105,000.000
JUMLAH TENAGA KERJA
140,250.00
26,125.00
2,940.00
8,715.00
178,030.00
Kg
Kg
Kg
Liter
371.000
1,859.000
698.000
93.571
1,047.000
437.037
215.000
JUMLAH HARGA BAHAN
689,689.00
65,312.86
457,577.78
0.00
1,212,579.63
0.00
1,390,609.63
0.00
1,390,609.63
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
2
3
4
BAHAN
Semen Portland
Pasir Beton
Kerikil (Maks 30mm)
Air
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.070
85,000.000
0.070
95,000.000
0.007
105,000.000
0.004
105,000.000
JUMLAH TENAGA KERJA
JUMLAH TENAGA KERJA / Kg
5,950.00
6,650.00
735.00
420.00
13,755.00
1,375.50
Kg
Kg
10.500
18,205.000
0.150
15,400.000
JUMLAH HARGA BAHAN
JUMLAH HARGA BAHAN / Kg
191,152.50
2,310.00
193,462.50
19,346.25
0.00
207,217.50
0.00
207,217.50
20,721.75
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Besi beton (polos/ulir)
2 Kawat beton
PERALATAN
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan Per 1 Kg ( F/10 )
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.025
85,000.000
0.025
95,000.000
0.025
105,000.000
0.001
105,000.000
JUMLAH TENAGA KERJA
2,125.00
2,375.00
2,625.00
105.00
7,230.00
Kg
Kg
10.200
16,500.000
0.050
15,400.000
JUMLAH HARGA BAHAN
168,300.00
770.00
169,070.00
0.00
176,300.00
0.00
176,300.00
17,630.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Jaring kawat baja las
2 Kawat beton
PERALATAN
D
E
F
G
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Harga Satuan Pekerjaan Per 1 Kg ( F/10 )
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.520
85,000.000
0.260
95,000.000
0.026
105,000.000
0.026
105,000.000
JUMLAH TENAGA KERJA
44,200.00
24,700.00
2,730.00
2,730.00
74,360.00
M3
Kg
Liter
0.045
1,000,000.000
0.300
19,250.000
0.100
JUMLAH HARGA BAHAN
45,000.00
5,775.00
0.00
50,775.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kayu kelas III
2 Paku 5 10 cm
3 Minyak bekisting
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
0.00
125,135.00
0.00
125,135.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.660
85,000.000
0.330
95,000.000
0.033
105,000.000
0.033
105,000.000
JUMLAH TENAGA KERJA
56,100.00
31,350.00
3,465.00
3,465.00
94,380.00
M3
Kg
Liter
M3
Lembar
Btg
0.040
1,700,000.000
0.400
19,250.000
0.200
0.015
1,000,000.000
0.350
2.000
16,000.000
JUMLAH HARGA BAHAN
68,000.00
7,700.00
0.00
15,000.00
0.00
32,000.00
122,700.00
0.00
217,080.00
0.00
217,080.00
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
2
3
4
5
6
BAHAN
Kayu kelas II
Paku 5cm12cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia 8- 10cm panj 4 m
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.660
85,000.000
0.330
95,000.000
0.033
105,000.000
0.033
105,000.000
JUMLAH TENAGA KERJA
56,100.00
31,350.00
3,465.00
3,465.00
94,380.00
M3
Kg
Liter
M3
Lembar
Btg
0.040
1,700,000.000
0.400
19,250.000
0.200
0.018
1,000,000.000
0.350
2.000
16,000.000
JUMLAH HARGA BAHAN
68,000.00
7,700.00
0.00
18,000.00
0.00
32,000.00
125,700.00
0.00
220,080.00
0.00
220,080.00
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
2
3
4
5
6
BAHAN
Kayu kelas III
Paku 5cm12cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia 8- 10cm panj 4 m
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.660
85,000.000
0.330
95,000.000
0.033
105,000.000
0.033
105,000.000
JUMLAH TENAGA KERJA
56,100.00
31,350.00
3,465.00
3,465.00
94,380.00
M3
Kg
Liter
M3
Lembar
Btg
0.040
1,700,000.000
0.400
19,250.000
0.200
0.015
1,000,000.000
0.350
4.000
16,000.000
JUMLAH HARGA BAHAN
68,000.00
7,700.00
0.00
15,000.00
0.00
64,000.00
154,700.00
0.00
249,080.00
0.00
249,080.00
1
2
3
4
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1
2
3
4
5
6
BAHAN
Kayu kelas III
Paku 5cm12cm
Minyak bekisting
Balok kayu kelas II
Plywood tebal 9 mm
Dolken kayu dia 8- 10cm panj 4 m
PERALATAN
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
85,000.000
0.100
95,000.000
0.010
105,000.000
0.015
105,000.000
JUMLAH TENAGA KERJA
25,500.00
9,500.00
1,050.00
1,575.00
37,625.00
Bh
M3
Kg
12.500
1,400.000
0.039
131,000.000
12.130
1,859.000
JUMLAH HARGA BAHAN
17,500.00
5,082.80
22,549.67
45,132.47
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
BAHAN
1 Batako
2 Pasir
3 Semen
PERALATAN
D
E
F
0.00
82,757.47
0.00
82,757.47
10% x D
Memasang 1m2 Dinding Terawang (roster) ukuran (18x18) cm, campuran 1Pc : 4Ps (P.Dnd. 06)
No.
1
A
1
2
3
4
B
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.300
85,000.000
0.100
95,000.000
0.010
105,000.000
0.015
105,000.000
JUMLAH TENAGA KERJA
25,500.00
9,500.00
1,050.00
1,575.00
37,625.00
Bh
Kg
Kg
30.000
2,700.000
11.000
93.571
0.035
1,859.000
JUMLAH HARGA BAHAN
81,000.00
1,029.29
65.07
82,094.35
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
BAHAN
1 BatakoKerawang
2 Pasir
3 Semen
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
119,719.35
0.00
119,719.35
Uraian
Kode
Satuan
Koefesien
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.300
85,000.000
0.150
95,000.000
0.015
105,000.000
0.015
105,000.000
JUMLAH TENAGA KERJA
25,500.00
14,250.00
1,575.00
1,575.00
42,900.00
Kg
M3
6.240
1,859.000
0.024
131,000.000
JUMLAH HARGA BAHAN
11,600.16
3,144.00
14,744.16
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
BAHAN
1 Semen Portland
2 Pasir
PERALATAN
D
E
F
0.00
57,644.16
0.00
57,644.16
10% x D
1m3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8 (P.K. 06)
No.
1
A
1
2
3
4
B
Uraian
Kode
Satuan
Koefesien
L.01
L.03
L.03
L.04
OH
OH
OH
OH
0.300
85,000.000
0.150
95,000.000
0.015
105,000.000
0.015
105,000.000
JUMLAH TENAGA KERJA
25,500.00
14,250.00
1,575.00
1,575.00
42,900.00
M3
Kg
1.100
8,000,000.000
6.000
26,350.000
JUMLAH HARGA BAHAN
8,800,000.00
158,100.00
8,958,100.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Kayu Belian ( Ketam )
2 Paku Belian
PERALATAN
D
E
F
0.00
9,001,000.00
0.00
9,001,000.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
6.000
85,000.000
18.000
95,000.000
1.800
105,000.000
0.300
105,000.000
JUMLAH TENAGA KERJA
510,000.00
1,710,000.00
189,000.00
31,500.00
2,440,500.00
M3
Kg
Kg
1.100
3,200,000.000
1.250
19,250.000
1.000
20,400.000
JUMLAH HARGA BAHAN
3,520,000.00
24,062.50
20,400.00
3,564,462.50
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Balok kayu
2 Paku 10 cm
3 Lem kayu
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
6,004,962.50
0.00
6,004,962.50
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu klas I
No.
1
A
1
2
3
4
B
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
85,000.000
95,000.000
0.240
105,000.000
0.040
105,000.000
JUMLAH TENAGA KERJA
68,000.00
228,000.00
25,200.00
4,200.00
325,400.00
M3
Kg
0.024
3,600,000.000
0.300
20,400.000
JUMLAH HARGA BAHAN
86,400.00
6,120.00
92,520.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Papan kayu
3 Lem kayu
0.800
2.400
PERALATAN
D
E
F
0.00
417,920.00
0.00
417,920.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
1.000
85,000.000
1.500
95,000.000
0.150
105,000.000
0.160
105,000.000
JUMLAH TENAGA KERJA
85,000.00
142,500.00
15,750.00
16,800.00
260,050.00
Unit
Kg
M3
1.000
197,450.000
6.000
1,859.000
0.010
131,000.000
JUMLAH HARGA BAHAN
197,450.00
11,154.00
1,310.00
209,914.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Closet jongkok
2 Semen Portland
3 Pasir pasang
PERALATAN
D
E
F
0.00
469,964.00
0.00
469,964.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.036
85,000.000
0.060
95,000.000
0.006
105,000.000
0.002
105,000.000
JUMLAH TENAGA KERJA
3,060.00
5,700.00
630.00
210.00
9,600.00
M
Ls
1.200
23,100.000
1.000
8,085.000
JUMLAH HARGA BAHAN
27,720.00
8,085.00
35,805.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Pipa PVC 3/4
2 Perlengkapan (35%xpipa)
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
45,405.00
0.00
45,405.00
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.081
85,000.000
0.135
95,000.000
0.014
105,000.000
0.004
105,000.000
JUMLAH TENAGA KERJA
6,885.00
12,825.00
1,417.50
420.00
21,547.50
M
Ls
1.200
22,000.000
1.000
7,700.000
JUMLAH HARGA BAHAN
26,400.00
7,700.00
34,100.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Pipa PVC 3
2 Perlengkapan (35%xpipa)
PERALATAN
D
E
F
0.00
55,647.50
0.00
55,647.50
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.081
85,000.000
0.135
95,000.000
0.014
105,000.000
0.004
105,000.000
JUMLAH TENAGA KERJA
6,885.00
12,825.00
1,417.50
420.00
21,547.50
M
Ls
1.200
28,875.000
1.000
10,106.250
JUMLAH HARGA BAHAN
34,650.00
10,106.25
44,756.25
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Pipa PVC 4
2 Perlengkapan (35%xpipa)
PERALATAN
D
E
F
0.00
66,303.75
0.00
66,303.75
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.010
85,000.000
0.400
95,000.000
0.040
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
850.00
38,000.00
4,200.00
525.00
43,575.00
Bh
Bh
1.000
20,900.000
0.025
3,000.000
JUMLAH HARGA BAHAN
20,900.00
75.00
20,975.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Kran air
2 Sealtape
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
64,550.00
0.00
64,550.00
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.010
85,000.000
0.500
95,000.000
0.050
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
850.00
47,500.00
5,250.00
525.00
54,125.00
Buah
1.000
199,100.000
JUMLAH HARGA BAHAN
199,100.00
199,100.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kunci tanam biasa
PERALATAN
D
E
F
0.00
253,225.00
0.00
253,225.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.015
85,000.000
0.150
95,000.000
0.015
105,000.000
0.008
105,000.000
JUMLAH TENAGA KERJA
1,275.00
14,250.00
1,575.00
840.00
17,940.00
Buah
1.000
13,200.000
JUMLAH HARGA BAHAN
13,200.00
13,200.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Engsel pintu
PERALATAN
D
E
F
0.00
31,140.00
0.00
31,140.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.020
85,000.000
0.200
95,000.000
0.020
105,000.000
0.0010
105,000.000
JUMLAH TENAGA KERJA
1,700.00
19,000.00
2,100.00
105.00
22,905.00
Buah
1.000
7,590.000
JUMLAH HARGA BAHAN
7,590.00
7,590.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kunci slot
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
30,495.00
0.00
30,495.00
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.015
85,000.000
0.150
95,000.000
0.015
105,000.000
0.008
105,000.000
JUMLAH TENAGA KERJA
1,275.00
14,250.00
1,575.00
840.00
17,940.00
M2
Kg
1.100
178,200.000
0.050
7,590.000
JUMLAH HARGA BAHAN
196,020.00
379.50
196,399.50
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kaca tebal 5mm
2 Sealant
PERALATAN
D
E
F
0.00
214,339.50
0.00
214,339.50
10% x D
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
1
2
3
4
BAHAN
Ubin keramik
Semen Portlan
Pasir pasang
Semen warna
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.700
85,000.000
0.350
95,000.000
0.035
105,000.000
0.035
105,000.000
JUMLAH TENAGA KERJA
59,500.00
33,250.00
3,675.00
3,675.00
100,100.00
M2
Kg
M3
Kg
1.100
65,450.000
10.000
1,859.000
0.045
131,000.000
1.500
11,550.000
JUMLAH HARGA BAHAN
71,995.00
18,590.00
5,895.00
17,325.00
113,805.00
PERALATAN
D
E
F
0.00
213,905.00
0.00
213,905.00
10% x D
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
1
2
3
4
BAHAN
Porslen
Semen Portlan
Pasir pasang
Semen warna
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.700
85,000.000
0.350
95,000.000
0.035
105,000.000
0.035
105,000.000
JUMLAH TENAGA KERJA
59,500.00
33,250.00
3,675.00
3,675.00
100,100.00
M2
Kg
M3
Kg
1.100
73,150.000
10.400
1,859.000
0.045
131,000.000
1.620
11,550.000
JUMLAH HARGA BAHAN
80,465.00
19,333.60
5,895.00
18,711.00
124,404.60
PERALATAN
JUMLAH HARGA ALAT
D
E
F
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
224,504.60
0.00
224,504.60
TENAGA
Pekerja
Tukang Semen
Kepala Tukang
Mandor
1
2
3
4
BAHAN
Porslen
Semen Portlan
Pasir pasang
Semen warna
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.900
85,000.000
0.450
95,000.000
0.045
105,000.000
0.045
105,000.000
JUMLAH TENAGA KERJA
76,500.00
42,750.00
4,725.00
4,725.00
128,700.00
M2
Kg
M3
Kg
1.100
89,100.000
9.300
1,859.000
0.018
131,000.000
1.940
11,550.000
JUMLAH HARGA BAHAN
98,010.00
17,288.70
2,358.00
22,407.00
140,063.70
PERALATAN
D
E
F
0.00
268,763.70
0.00
268,763.70
10% x D
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
1
2
3
4
5
6
7
BAHAN
Cat menie
Dempul
Cat dasar
Cat penutup
Kuas
Pengencer
Ampelas
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.07
85,000.000
0.009
95,000.000
0.006
105,000.000
0.0003
105,000.000
JUMLAH TENAGA KERJA
5,950.00
855.00
630.00
31.50
7,466.50
Kg
Kg
Kg
Kg
Buah
Kg
Lembar
0.200
0.150
38,500.000
0.170
27,500.000
0.260
60,500.000
0.010
0.030
0.200
JUMLAH HARGA BAHAN
0.00
5,775.00
4,675.00
15,730.00
0.00
0.00
0.00
26,180.00
PERALATAN
D
E
F
0.00
33,646.50
0.00
33,646.50
10% x D
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No.
1
A
1
2
3
4
B
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.020
85,000.000
0.063
95,000.000
0.0063
105,000.000
0.003
105,000.000
JUMLAH TENAGA KERJA
1,700.00
5,985.00
661.50
315.00
8,661.50
Kg
Kg
Kg
0.100
56,100.000
0.100
27,500.000
0.260
30,250.000
JUMLAH HARGA BAHAN
5,610.00
2,750.00
7,865.00
16,225.00
TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
1 Plamuur
2 Cat dasar
3 Cat penutup
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
10% x D
0.00
24,886.50
0.00
24,886.50
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.200
85,000.000
0.100
95,000.000
0.010
105,000.000
0.001
105,000.000
JUMLAH TENAGA KERJA
17,000.00
9,500.00
1,050.00
105.00
27,655.00
Lembar
Kg
1.020
89,100.000
0.200
19,250.000
JUMLAH HARGA BAHAN
90,882.00
3,850.00
94,732.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Genteng metal
2 Paku biasa "-1
PERALATAN
D
E
F
0.00
122,387.00
0.00
122,387.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.250
85,000.000
0.150
95,000.000
0.015
105,000.000
0.013
105,000.000
JUMLAH TENAGA KERJA
21,250.00
14,250.00
1,575.00
1,365.00
38,440.00
Lembar
Kg
1.100
52,800.000
0.050
19,250.000
JUMLAH HARGA BAHAN
58,080.00
962.50
59,042.50
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Nok genteng metal
2 Paku biasa "-1
PERALATAN
D
E
F
0.00
97,482.50
0.00
97,482.50
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.100
85,000.000
0.050
95,000.000
0.005
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
8,500.00
4,750.00
525.00
525.00
14,300.00
Lembar
Kg
0.364
74,800.000
0.110
19,250.000
JUMLAH HARGA BAHAN
27,227.20
2,117.50
29,344.70
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 GRC board
2 Paku GRC
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
43,644.70
0.00
43,644.70
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No.
1
A
1
2
3
4
B
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.200
85,000.000
0.300
95,000.000
0.030
105,000.000
0.010
105,000.000
JUMLAH TENAGA KERJA
17,000.00
28,500.00
3,150.00
1,050.00
49,700.00
M3
Kg
0.0163
1,700,000.000
0.250
19,250.000
JUMLAH HARGA BAHAN
27,710.00
4,812.50
32,522.50
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kaso-kaso 5 x 7cm
2 Paku 7 dan 10 cm
PERALATAN
D
E
F
0.00
82,222.50
0.00
82,222.50
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.010
85,000.000
0.100
95,000.000
0.010
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
850.00
9,500.00
1,050.00
525.00
11,925.00
Unit
1.000
16,720.000
JUMLAH HARGA BAHAN
16,720.00
16,720.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
1 Floor drain
PERALATAN
D
E
F
0.00
28,645.00
0.00
28,645.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
4.000
85,000.000
12.000
95,000.000
1.200
105,000.000
0.200
105,000.000
JUMLAH TENAGA KERJA
340,000.00
1,140,000.00
126,000.00
21,000.00
1,627,000.00
m3
Kg
Kg
1.100
1,700,000.000
15.000
10,670.000
5.600
19,250.000
JUMLAH HARGA BAHAN
1,870,000.00
160,050.00
107,800.00
2,137,850.00
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
1 Balok kayu
2 Besi strip 5mm
3 Paku 12 cm
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
3,764,850.00
0.00
3,764,850.00
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
6.700
85,000.000
20.100
95,000.000
2.010
105,000.000
0.335
105,000.000
JUMLAH TENAGA KERJA
569,500.00
1,909,500.00
211,050.00
35,175.00
2,725,225.00
m3
Kg
Kg
1.100
1,700,000.000
15.000
10,670.000
3.000
19,250.000
JUMLAH HARGA BAHAN
1,870,000.00
160,050.00
57,750.00
2,087,800.00
TENAGA
Pekerja
Tukang kayu
Kepala tukang
Mandor
BAHAN
1 Balok kayu
2 Besi strip 5mm
3 Paku 12 cm
PERALATAN
D
E
F
0.00
4,813,025.00
0.00
4,813,025.00
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.100
85,000.000
0.100
95,000.000
0.010
105,000.000
0.005
105,000.000
JUMLAH TENAGA KERJA
8,500.00
9,500.00
1,050.00
525.00
19,575.00
M3
M3
Kg
0.014
1,700,000.000
0.036
1,700,000.000
0.250
19,250.000
JUMLAH HARGA BAHAN
23,800.00
61,200.00
4,812.50
89,812.50
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kaso-kaso 5 x 7cm
2 Reng 2 x 3 cm
3 Paku 5 dan 10 cm
PERALATAN
D
E
F
0.00
109,387.50
0.00
109,387.50
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
10.000
85,000.000
12.000
95,000.000
3.600
105,000.000
0.600
105,000.000
JUMLAH TENAGA KERJA
850,000.00
1,140,000.00
378,000.00
63,000.00
2,431,000.00
M3
Kg
1.1000
1,700,000.000
0.100
19,250.000
JUMLAH HARGA BAHAN
1,870,000.00
1,925.00
1,871,925.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Kayu Klas II
2 Paku 5 dan 10 cm
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
10% x D
0.00
4,302,925.00
0.00
4,302,925.00
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.800
85,000.000
0.400
95,000.000
0.040
105,000.000
0.040
105,000.000
JUMLAH TENAGA KERJA
68,000.00
38,000.00
4,200.00
4,200.00
114,400.00
Zak
M3
Kg
Kg
Lbr
0.234
92,950.000
0.023
131,000.000
1.500
35,750.000
0.150
19,250.000
0.364
70,400.000
JUMLAH HARGA BAHAN
21,750.30
3,013.00
53,625.00
2,887.50
25,625.60
106,901.40
1
2
3
4
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
1
2
3
4
5
BAHAN
Semen Portland
Pasir
Kawat Simpai
Paku
Triplek
PERALATAN
D
E
F
0.00
221,301.40
0.00
221,301.40
10% x D
Uraian
Kode
Satuan
Koefesien
L.01
L.02
L.03
L.04
OH
OH
OH
OH
0.100
85,000.000
0.100
95,000.000
0.010
105,000.000
0.050
105,000.000
JUMLAH TENAGA KERJA
8,500.00
9,500.00
1,050.00
5,250.00
24,300.00
M3
Kg
0.009
3,600,000.000
0.060
19,250.000
JUMLAH HARGA BAHAN
31,680.00
1,155.00
32,835.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
1 Papan Kayu Kelas I (Ketam)
2 Paku
PERALATAN
Jumlah (A+B+C)
Overhead & Profit (Contoh 15 %)
Harga Satuan Pekerjaan (D+E)
Acuan : ABK Bangunan Gedung dan Perumahan - 6.53
10% x D
0.00
57,135.00
0.00
57,135.00
HARGA
NO
A.
1
2
3
4
TENAGA KERJA
UPAH
Mandor Lapangan
Kepala Tukang
Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang
Pekerja / Buruh Lapangan Tak terlatih
NO
MATERIAL
B. BAHAN PENGISI
1 Batu pecah 10/15 cm
2 Batu pecah 1/2 cm
3 Pasir
4 Semen PC
5 Semen PC
6 Tanah Biasa ( CBR > 6%)
7 Tanah Pilihan ( CBR > 10%)
8 Bataco 15 x 30 x 7 cm
9 Terawang ( roster ) 18 x 18 cm
10 Keramik Uk. 20cm x 20cm ( BerTekstur)
11 Keramik 30 x 30 cm (Polos)
12 Keramik dinding 20 x 25 cm
SATUA
KODE
N
HARGA DI
LOKASI
SATUAN
KODE
Org/hari
Org/hari
Org/hari
Org/hari
M03
M04
M02
M10
M.12
M.08
M.17
M.20
M.20.a
M.22
M.23
M.04
M.55
M.58
-
292,000.00
590,000.00
131,000.00
84,500.00
1,690.00
55,000.00
62,000.00
1,400.00
2,700.00
66,500.00
59,500.00
81,000.00
105,000.00
105,000.00
95,000.00
85,000.00
105,000.00
105,000.00
95,000.00
85,000.00
HARGA
HARGA
ONGKOS
TANPA
TERMASUK
ANGKUT
PER UNIT KEUNTUNGANKEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp)
(Rp)
(Rp)
(Rp)
PAJAK
PPN
10%
(Rp)
M
M
M
Zak
Kg
M
M
Bh
Bh
Kotak
Kotak
Kotak
HARGA
TANPA
TERMASUK
KEUNTUNGANKEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp)
(Rp)
(Rp)
8,450.00
169.00
6,650.00
5,950.00
8,100.00
292,000.00
590,000.00
131,000.00
92,950.00
1,859.00
55,000.00
62,000.00
1,400.00
2,700.00
73,150.00
65,450.00
89,100.00
8,000,000.00
3,200,000.00
1,700,000.00
3,600,000.00
1,000,000.00
13,000.00
16,000.00
20,000.00
C.
1
2
3
4
5
6
7
8
BAHAN KAYU
Ky. Belian ketam
Ky. klas I ( ketam )
Ky. klas II ( tidak ketam )
Papan kayu klas I ketam
Kayu Mall /perancah Kayu Klas III
Kayu cerucuk /dolken 5-7 cm Pj. 4 M
Kayu cerucuk /dolken 8-10 cm Pj. 4 M
Alas kayu hutan
M
M
M
M
M
Btg
Btg
Btg
M. 37
M.42
M.51
M.46
M.40
M.39
M.48
8,000,000.00
3,200,000.00
1,700,000.00
3,600,000.00
1,000,000.00
13,000.00
16,000.00
20,000.00
D.
1
2
3
4
5
6
7
8
BAHAN CAT
Cat kilat
Cat dasar
Cat tembok
Plamur
Dempul
Meni
Oker
Lem Kayu
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M.145
M.143
M.138
M.147
-
55,000.00
25,000.00
27,500.00
51,000.00
35,000.00
33,000.00
10,500.00
18,550.00
5,500.00
2,500.00
2,750.00
5,100.00
3,500.00
3,300.00
1,050.00
1,855.00
60,500.00
27,500.00
30,250.00
56,100.00
38,500.00
36,300.00
11,550.00
20,400.00
Kg
Kg
Kg
Btg
Kg
Kg
M.69
-
16,550.00
15,000.00
14,000.00
9,000.00
9,700.00
32,500.00
1,655.00
1,500.00
1,400.00
900.00
970.00
3,250.00
18,205.00
16,500.00
15,400.00
9,900.00
10,670.00
35,750.00
F.
1
2
3
4
5
6
7
8
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
225,000.00
250,000.00
12,000.00
6,900.00
180,000.00
181,000.00
17,500.00
23,960.00
22,500.00
25,000.00
1,200.00
690.00
18,000.00
18,100.00
1,750.00
2,396.00
247,500.00
275,000.00
13,200.00
7,590.00
198,000.00
199,100.00
19,250.00
26,350.00
BAHAN PENGANTUNG
Pintu Plastik untuk WC
Handle Pintu minimalis
Engsel pintu
Slot pintu
Kunci tanam 2 slag (setaraf Belluci)
Kunci tanam 1 slag
Paku campuran 1" - 5 "
Paku Belian
NO
MATERIAL
SATUA
KODE
N
HARGA DI
LOKASI
PAJAK
PPN
10%
(Rp)
HARGA
HARGA
ONGKOS
TANPA
TERMASUK
ANGKUT
PER UNIT KEUNTUNGANKEUNTUNGAN KEUNTUNGAN
(OVERHEAD) (OVERHEAD) (OVERHEAD)
(Rp)
(Rp)
(Rp)
(Rp)
H.
1
2
BAHAN KACA
Kaca Polos, t = 5 mm
Kaca Es
M
M
162,000.00
182,000.00
16,200.00
18,200.00
178,200.00
200,200.00
I.
1
BAHAN TRIPLEK
Triplek t = 3 mm
Lbr
64,000.00
6,400.00
70,400.00
Bh
Bh
Btg
Btg
Btg
M'
M'
M'
M'
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Bh
Bh
Unit
Unit
Bh
Bh
179,500.00
19,000.00
68,000.00
84,000.00
136,000.00
50,000.00
80,000.00
105,000.00
210,000.00
210,000.00
155,000.00
78,000.00
4,500.00
1,115,000.00
451,000.00
283,000.00
6,200.00
698,000.00
15,200.00
2,100,000.00
550,000.00
400,000.00
25,000.00
35,000.00
17,950.00
1,900.00
6,800.00
8,400.00
13,600.00
5,000.00
8,000.00
10,500.00
21,000.00
21,000.00
15,500.00
7,800.00
450.00
111,500.00
45,100.00
28,300.00
620.00
69,800.00
1,520.00
210,000.00
55,000.00
40,000.00
2,500.00
3,500.00
197,450.00
20,900.00
74,800.00
92,400.00
149,600.00
55,000.00
88,000.00
115,500.00
231,000.00
231,000.00
170,500.00
85,800.00
4,950.00
1,226,500.00
496,100.00
311,300.00
6,820.00
767,800.00
16,720.00
2,310,000.00
605,000.00
440,000.00
27,500.00
38,500.00
Ltr
M.183
32,000.00
3,200.00
35,200.00
81,000.00
48,000.00
68,000.00
8,100.00
4,800.00
6,800.00
89,100.00
52,800.00
74,800.00
42,000.00
3,916.67
6,700.00
15,000.00
4,500,000.00
800,000.00
4,200.00
391.67
670.00
1,500.00
450,000.00
80,000.00
46,200.00
4,300.00
7,370.00
16,500.00
4,950,000.00
880,000.00
J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
19
20
BAHAN SANITASI
Kloset jongkok (setaraf INA)
Kran air uk 1/2"
Pipa paralon dia 1/2" A/W
Pipa paralon dia 3/4" A/W
Pipa paralon dia 1" A/W
Pipa PVC dia 2" SNI
Pipa PVC dia 3" SNI
Pipa PVC dia 4" SNI
Pipa PVC dia 6" SNI
L Bow 6"
L Bow 4"
L Bow 3"
L Bow 3/4"
T 6"
T 4"
T 3"
T 3/4"
Reducer 6" x 4"
floor drain
Tangki Fiberglas kapasitas 2 kubik
Bak Air Fiberglas 220 Liter (Kamar Mandi)
Bak Air Fiberglas 100 Liter (WC)
Gayung
Sikat Wc
K.
1
L.
1
2
3
BAHAN ATAP
Atap Genteng Metal
Nok Colour
GRC Board
M.
1
2
3
4
5
6
Lembar
M'
Lembar
Buah
Buah
Buah
Buah
Unit
Unit
No
Uraian Pekerjaan
1
2
3
Pembersihan Lokasi
Pengukuran & Pemasangan Bowplank
Galian Tanah
Bangunan Ipal
Bak Inlet
4
5
Quantitas
1.00
1.00
12.00
24.00
4.00
8.00
1.00
1.00
Sub. Jumlah
8.90
1.10
2.50
1.10
120.67
35.33
70.67
241.33
141.33
152.00
7.67
17.67
68.00
17.67
36.00
106.00
Sub. Jumlah
2.50
8.90
8.90
2.70
2.70
2.50
4.50
2.30
2.50
10.05
2.70
0.70
Berat / m'
48.00
32.00
m2
m'
60.08
1.57
61.65
m3
m3
m3
m3
186.37
194.28
388.56
402.69
235.83
234.84
21.32
25.11
105.06
109.73
60.07
45.86
2009.70
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
1.50
Kg
Kg
Kg
1.11
0.14
m3
m3
1.26
m3
0.05
0.05
1.11
0.14
1.26
m3
m3
m3
2.50
2.50
1.00
1.00
44.50
77.00
4.40
2.00
22.11
9.90
m2
m2
m2
m2
m2
m2
2.70
1.30
0.618
0.618
0.618
0.618
0.618
0.618
0.618
0.618
0.618
0.618
0.618
0.618
1.00
1.00
8.90
2.50
2.50
1.15
0.05
0.05
Jumlah
Lantai Kerja
Ipal.1
Ipal
Outlet
Satuan
Pasir Alas
Ipal.1
Ipal
Outlet
Volume
Bekisting
Ipal.1 (2 kali Pakai)
- Dinding Memanjang ipal
- Dinding Melintang ipal (Sekat)
- Dinding Melintang inlet & outlet
- Dinding Memanjang inlet & outlet
- Plat Lantai atas
- Plat Lantai Filter
1.00
1.00
Sub. Jumlah
8.90
2.50
2.00
14.00
2.00
2.00
1.00
3.00
8.90
2.20
2.20
1.00
10.05
1.50
2.50
1.15
2.20
2.20
Sub. Jumlah
9
- lantai ipal
- lantai Outlet
Dinding Memanjang Ipal
Dinding Sekat Ipal
Dinding Outlet
Balok Filter
Plat Pori
Plat Lantai Atas
10
m2
1.00
1.00
2.00
8.00
1.00
2.00
6.00
3.00
1.00
Sub. Jumlah
10.05
1.15
8.90
2.20
2.50
1.00
2.20
2.20
10.05
2.60
2.60
0.20
0.15
0.15
0.20
0.25
2.20
2.60
3.00
5.00
1.00
1.00
2.00
14.00
1.00
1.50
0.80
1.00
1.30
8.90
2.20
10.05
2.20
2.20
2.20
4.20
2.50
2.50
2.60
0.20
0.15
2.50
2.50
1.00
1.30
0.25
0.10 man holl
0.15
0.900
5.23
0.45
8.90
6.60
0.38
0.52
0.83
1.45
3.78
28.13
m3
m3
m3
m3
m3
9.90
8.80
2.20
5.46
44.50
77.00
26.13
m2
m2
m2
m2
m2
m2
m2
173.99
m2
4.00
m'
4.00
m'
15.00
15.00
15.00
45.00
15.00
15.00
4.00
124.00
0.00
35.00
7.00
m'
m'
m'
m'
m'
m'
m'
m'
Bh
Bh
Bh
m3
m3
m3
m3
Plesteran
Ipal.I
- lantai ipal
- lantai Outlet
Dinding Memanjang Ipal
Dinding Sekat Ipal
Plat Lantai Atas
Sub. Jumlah
11
12
4.00
Sub. Jumlah
13
14
15
159.91
Beton K.225
Ipal. 1
5
5
5
15
5
5
1
Sub. Jumlah
0
35
7
3
3
3
3
3
3
4