Risk Register For Project EPM Assignment-2
Risk Register For Project EPM Assignment-2
Risk Description
ownership
ID
Design
Current Status
D = Done
A=
Active
M=Monitor
Probability
Very high : 0.9
Very low :
0.1
Impact
very
high: 0.8
very low : 0.05
Planning Team
0.7
0.8
0.56
Client
0.3
0.7
0.21
Contractor/Vendor
0.2
0.7
0.14
Planning Team
0.9
0.6
0.54
Internal design team meetings identifying potential problems well in advance to ensure ability for
solutions and production of timely information.
Delay in placing orders by Vendor/Contractor for any stats diversions which causes
prolonged installation period and phasing issues
Project Manager
0.9
0.8
0.72
Project Manager/Project
Coordinator
0.7
0.4
0.28
Project Team
0.9
0.75
0.675
Detailed meetings between Project and implementation time to check and resolve any delays.
Contractor
0.6
0.7
0.42
Planning Team
0.8
0.7
0.56
Programme
10
Government
0.7
0.8
0.56
11
Project Manager/Director
0.5
0.5
0.25
System to be established such that financial and cost management risk of unliabilitised costs is minimal and forecasts are accurate
12
Government Responsibilty M
0.2
0.1
0.02
0.4
0.7
0.7
0.5
0.28
0.35
13
14
M
M
15
Project Manager/Contractor
0.4
0.2
0.08
Safety Procedures must be locked before awarding the project. Then Project
manager should monitor that all the required health and safety hazards are
meet and fullfilled.
16
Accident or injury to general public - either pedestrian or through road traffic accident
Project Manager/Contractor
0.5
0.3
0.15
On-Site personnel must ensure their own safety, along with passer by and
citizens to protect them from any on-site destructutions etc.
Liquidation / insolvency
17
Contractor
Project Director
0.6
0.7
0.42
Contactor selection process will identify suitable companies and check financial
standing with having experience in relevant field and work.
18
Supply Chain
Contractor
0.4
0.6
0.24
Contactor to ensure supply chain protection and contingency plan when placing
single supplier orders.
19
Suspension of Works during heavy rainfall or cold periods; inadequate protection to fnished
Government (Metrological dept.) M
works, flooded excavations etc
0.5
0.4
0.2
20
0.6
0.3
0.18
21
Noise
Contractor
0.3
0.2
0.06
Stated levels to be agreed with Contractor to take necessary steps to ensure these levels are
adhered to by using silenced equipment etc. Contractor to work within agreed working day/week
Adverse weather-Environmental
Quality Failure
22
0.7
0.8
0.56
Sources of materials checked and from reputable companies. Advance ordering in bulk to ensure
consistency and availablity. Site checks to be undertaken at Suppliers Depot.
23
0.6
0.5
0.3
Selection of contractors will review quality and workmanship control Full time supervision on site to
check quality. Test Panels will be completed in advance of progressing large areas.
Delay to Works
24
0.4
0.2
0.08
Project Manager will timely inform the concern government office for alternate
road plans
25
Interface with adjoining contracts causes delays to completion/start of work phases eg Civil
work completion will initate Camera installations
Contractor/Vendor
0.5
0.5
0.25
26
Contractor/Projec Manager
0.8
0.5
0.4
Tight supervision, programme monitoring and seeking recovery plan from Contractor at early stage
rather than later in Contract. Provision for LD's in Contract
27
Contractor/Projec Manager
0.7
0.3
0.21
Sources of materials checked and from reputable companies. Advance ordering in bulk to ensure
consistency and availablity.
28
Implementation Team
0.6
0.8
0.48
29
Planning Team
0.2
0.6
0.12
Unforeseen risks
30
Project Manager
0.2
0.1
0.02
Radar surveys carried out to check the space locations and installed cities. All Services must be
included.
31
Project Manager
0.5
0.7
0.35
Orders placed in time and firm commitment on lead in times. Detailed interface between CCTV
programme and stats agreed at start of CCTV contract.
32
Statutory Undertakers repairs and planned maintenance works interfere with installation
programme.
0.6
0.8
0.48
All State departments must have the detailed logs. Maintenance team and implentation time must
be address to cover up the issues.
33
Contractor
0.5
0.6
0.3
In case of road side or hanging camera installation, these are common to be seen.
34
Implementation team
0.7
0.5
0.35
Sufficient allowance in programme, phasing and planning to be allowed for timeline of the project.
Enable contractor to define at an early stage what will be required. Close cordination is required
between Contractor and Vendor.
Contingency and timescales to allow for minimal additional works. Stage Audit to be undertaken in
advance of issuing parctical completion
35
Contractor
0.8
0.7
0.56
36
0.3
0.7
0.21
37
Project Manager
0.5
0.7
0.35
38
Project Manager
0.7
0.7
0.49
39
Planning Permission e.g ROW expires in 2020 and Project has not been
started.
Project Team
0.6
0.7
0.42
Project Manager should handle the project to start as early as possible and
renew license or get extension incase of delay.
40
0.9
0.7
0.63
Note:
1
This Risk Register has been compiled over a period of years and aims to represent all known and perceived project risks.
The Risks Identified are not final and additional risks are likely to materialise as the project develops, along with some risks being closed out.
The Contractor should aim to complete, add to and quantify all known and those perceived risks within the Risk Tab.
Any additional methodology / matrix or criteria for evaluating the cost or impact of any risk should be appended to this workbook.
This is higher because, any delay will result in delay of the project.
Cater off any risks involved and apply extension on time to get early extension
approval.