Rigging Up Checklist: Rig Model
Rigging Up Checklist: Rig Model
Rigging Up Checklist: Rig Model
Rig Model:
S.No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Location
Description of Activity
Observation
Inspect bull line spelter and pin condition
visually
Check lock spring of pins
Check Draw works anchors, Whether all clits
are tightened or not ( Branham Mast) and Box
type anchor bolts are fastened or not.
Check bull line pullies & movement.
Check Cylindrical Roller movements
Check Mast Pulley anchoring bolts ( Both
horizontal and Vertical Pulley)
Check Rig foundation for any crack and
damage
Inspect D/ Works linkage , pins and Equalizer
centre pin
Check mast leveling bolts whether properly
tight or not.
Check dead man anchor foundation bolt.
Check Weight indicator
Check E.C brake and Friction brake
Check water flow to D/Works
Check air pressure and Guages
Check proper reeving of floor bull line( Skytop
Mast)
Check whether casing line is over floating
sheave of strong back column or not.
During lowering, check slippage of line pulley
in strong back column.
Check whether casing line is over floating
sheave of A frame or not
Check whether casing line is properly reeved on
crown block or not
Check whether diving board is properly tied
back or not.
Check crown railings.
Remarks
22
23
24
25
26
27
28
29
30
31
32
33
34
35
Name
Name
Designation
Designation
Signature
Signature