Supplier / In-Plant Quality Problem Analysis and Countermeasure Sheet (5-Rule)
Supplier / In-Plant Quality Problem Analysis and Countermeasure Sheet (5-Rule)
VENDOR / DEPTT :
PROBLEM
UNEVEN CHAMFER
ACTUAL CONTENTS
PLACE OF
OCCURRENCE
MODEL:
REJ. QTY.:
PART NAME :
PART NO. :
MAN
SAFETY /
PERFORMANCE/
ASPEE ENGG
OTHERS:
FIT FUNCTION
SKILL
PREPARED BY
CHECKED BY
DATE:
ASHOK KUMAR
G N CHATURVEDI
22.11.2016
RANK
LOT
PROBLEM NO.
DOC NO.:
REV NO.:
AWARENESS
PDI
CLG
CNC
IN PROCESS INSPECTION
UNEVEN CHAMFER
RAW MATERIAL
MATERIAL
ROOT CAUSE
METHOD
COUNTERMEASURE DETAIL
RESP.
IMPL. DATE
NAVEEN
23.11.2016
PRAMOD
23.11.2016
NEERAJ
23.11.2016
ASHOK
23.11.2016
CORRECTIVE ACTION
(SKETCH/DATA/DETAIL)
PREVENTIVE ACTION
WHY-WHY ANALYSIS :
UNEVEN CHAMFER
PROBLE
II
ONE SIDE NO
CHAMFER ON
OD
WRONG
ORIENTAION IN
CNC RUN OUT IN
THE ITEM
IMPROPER VISUAL
INSPECTION AT PDI
NG PCS
REMAINED IN
THE LOT
III
1 MONTH
NEW
TRAINING NOT
Aspee would
OPERATOR
PROVIDED
SYSTEM GAP check the 100%
DEPLOYED AS
BEFORE HAND
visual
STOPGAP
inspection for
the uneven
chamfer &
other visual
SLIPPED TO
defects
CUSTOMER
II MONTH
III MONTH
IV MONTH
V MONTH
VI MONTH
REMARKS