Checklist For Quality Management
Checklist For Quality Management
PRE-DEIGN PHASE
1.0 The PM should set and
qualify the goals and
objectives of the Quality
Management Program
2.0 The PM may review the
Scope of Work of the
design professionals.
DESIGN PHASE
PROCUREMENT
PHASE
CONSTRUCTION
PHASE
1.0 Pre-Construction
Conference
2.0 Construction Planning and
Scheduling
3.0 Inspection and Testing
10.0Value Engineering
12.0Construction Testing
Requirements
13.0Quality Management
Specifications
14.0Implementation of QC/QA
Requirements During
Construction
15.0Public Relations/User
Review
16.0Project Funding
17.0Project Review Meetings
18.0Reports
POST CONSTRUCTION
PHASE
1.0 After the project is
completed, the PM/CM may
review and discuss the
Overall Quality
Management of the project
with the owner.
2.0 The PM/CM prepares a
Final Report for the overall
project with
Recommendations to the
Owner.