NTP

-05

-04

-03

-02

-01

01

BACK FEED
POWER
REQUIRED FROM
OWNER

START
CONSTRUCTION
(U/G's and Foundations)

BREAK GROUND

02

04

03

05

06

07

08

09

10

11

12

13

14

15

HEAVY HAULER SET


TRANSFORMER

BLOCK 1 &
COMMON

ST TRANSFORMER FOUNDATION
& WALLS

ST AREA U/G PIPE

DUCTBANK

ST MAT

PILE

TRNSFMR ERECTION

16

17

ISO PHASE
BUS DUCT/
GENERATOR
BREAKER
ERECTION

18

FATOFF /
CONSTRUCTION COMPLETE BLOCK 1
READY FOR STEAM BLOWS

HRSG HYDROS
COMPLETE
UNIT 1

GAS REQUIRED
FROM OWNER

BACK ENERGIZE

19

20

21

22

23

24

PROVISIONAL
ACCEPTANCE

25

26

27

28

GTB

APB
APC
APD
APH
API
CAA
CAB
COA
ECA
ECB
FOB
FWA
FWC
FWF
FPA
GTB
GTL
HRA
HRC
SGA
SGG
SGF
SGJ
STG
TGA
TGC
TGD
WSC
WSE
WTD

INSULATE PIPING
ST AREA
STEEL
ERECTION

PROCURE / FAB / DELIVER STEEL

GRATING/STARIS/
RAIL. ACCESS

ERECT/COMPLETE/HYDRO PIPING (ECB, FWC, FWF, SGG, SGF, SGJ, TGA, TGC, TGD) & INSTALL TRAY /
CABLE

SET &
COMMISSION
CRANE

S/T SOLE
PLATES

HEAVY
COMPONENTS
& GEN LIFT

LUBE OIL
FLUSH &
RESTORE/ON
GEAR

STEAM TURBINE ERECTION

FAB & DELIVER STEAM TURBINE (14 MONTHS)


PROCURE / FAB / DELIVER CONDENSER

ASSEMBLE CONDENSER

SHIP
TO
SITE

PROCURE / FAB P91 PIPING

TO ST AREA
PIPE

ERECT MAIN EAST/WEST PIPE


RACK
COFFER DAM AT INTAKE

HRSG MAIN PIPE RACK ERECT PIPING (FWA, FWC, SGG, SGF, SGJ,) / TRAY /
CABLE PULLING

INTAKE STRUCTURE FDN

SET EQUIP

CENTRAL CONTROL BLDG ERECTION

ECA, ECB,
FWA, AND
FWC FLUSH

EQPT INSTALLATION

INTERIORS

TRAY

INSULATE

REMOVE DAM /
FLOOD PUMP PIT

PROCURE / FAB / DELIVER BUILDING MATERIAL


CENTRAL CONTROL BLDG
FDN

PANEL/
TERMINTE

30

31

32

33

34

SYSTEM CODE KEY / LEGEND

F/P
62.0805

CURE/REMOVE
FORMS

ST PEDESTAL

29

AUX POWER / DCS SYTEMS

WATER / AIR SYSTEMS

PROCURE / FAB / DELIVER ELECTRICAL EQUIPMENT

AC POWER SUPPLY (120V/208V)


AC POWER SUPPLY (480V)
AC POWER SUPPLY 4.16 KV
DC POWER
ESSENTIAL SERVICE
STATION AIR
INSTRUMENT AIR
DCS
AUXILIARY COOLING WATER
CLOSED CYCLE COOLING WATER
FUEL OIL STORAGE & SUPPLY
BOILER FEEDWATER
CONDENSATE
WATER CYCLE MAKEUP & STORAGE
FIRE PROTECTION
GENERATOR STEPUP TRANSFORMER
GENERATOR TRANSFORMER
CONDENSATE
CIRCULATING WATER
HRSG
MAIN STEAM
BOILER VENTS AND DRAINS
INTERMEDIATE & LOW PRESSURE STEAM
SITE FIRE PROTECTION
STEAM TURBINE
STEAM TURBINE SEALS & DRAINS
STEAM TURBINE LUBRICATING OIL
SERVICE WATER
FIRE PROTECTION-WTR SPLY
CYCLE MAKEUP TREATMENT

(SYSTEM CODES REPRESENT COMMISSIONING OF THAT SYSTEM)


FATOFF
SP

PROCURE / FAB / DELIVER STEPUP/AUX TRANSFORMERS

FIRST ATTEMPT TO OBTAIN FIRST FIRE


SOLE PLATES

HVY HAUL
SET XFRMR
INITIAL
DELIVERY HRSG
UNIT 1

CHEM
CLEAN /
RESTORE

PROCURE / FAB / DELIVER HRSG


CT / HRSG PILING/PIERS

SITE PREP

DUCT
BANK

HRSG AREA
U/G PIPE

HRSG FOUNDATION

DUCT
BANK

HRSG PIPING & INTERNALS

HRSG HEAVY ERECTION


ERECT
FINGER PIPE
RACK

CT AREA
U/G PIPE

CT FOUNDATION

Hydro

COMPLETE
ERECTION

STEAM BLOW
& RESTORE
PLANT OPTIMIZATION

SU & PERFORMANCE TEST

Reliability Run

SGA

INSULATE PIPING

HRSG FINGER PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI,
SGJ, SGL) / TRAY / CABLE PULLING

SP

FWA
SGA
INIT
OPER

CT CHECK OUT

STATION AUX XFMR FDN

INSULATE

CT ERECTION

FATOFF

FAB & DELIVER COMBUSTION TURBINE (15 MONTHS)


CT AREA
SLAB

FOB
& Flush

FGA

GEN BLDG / CTG AREA STEEL / BLDG


PROCURE / FAB / MOBILIZE INSULATION 62.1401 F&E

HEAT TRACE / INSULATE BOP

HEAVY HAUL SET XFMR

ST MAT

TRNSFMR ERECTION

IPB/GB

F/P
62.0805

GTL

CURE/REMOVE
FORMS

ST PEDESTAL

INSULATE PIPING

BLOCK 2

ST AREA
STEEL
ERECTION

GRATING/STARIS/RAIL.
ACCESS

ERECT/COMPLETE/HYDRO PIPING (ECB, FWC, FWF, SGG, SGI, SGJ, SGL, TGA, TGC, TGD,
TGE, TEF) & INSTALL TRAY / CABLE

HEAVY
COMPONENTS
& GEN LIFT

8:24:07 AM

S/T SOLE
PLATES

STEAM TURBINE ERECTION

LUBE OIL
FLUSH &
RESTORE/ON
GEAR
CT CHECK OUT

PILE

GSU TRANSFORMER FDN

ST AREA U/G PIPE

DUCTBANK

ASSEMBLE CONDENSER

ERECT MAIN EAST/WEST PIPE


RACK

HRSG MAIN PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI, SGJ,
SGL) / TRAY / CABLE PULLING

TRNSFMR ERECTION
INITIAL
DELIVERY HRSG
UNIT 2
CT / HRSG PILING/PIERS

DUCT
BANK

HRSG
FOUNDATION

HRSG AREA
U/G PIPE

HRSG HEAVY ERECTION

IPB/GB

F/P
62.0805

HRSG PIPING & INTERNALS


ERECT
FINGER PIPE
RACK

INSULATE

STEAM BLOW
& RESTORE
PLANT OPTIMIZATION

SU & PERFORMANCE TEST

Reliability Run

GTB

Hydro

HRSG FINGER PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI,
SGJ, SGL) / TRAY / CABLE PULLING

COMPLETE
ERECTION

SGA

INSULATE PIPING
INSULATE
FATOFF

SKIKDA~2.VSD

DUCT
BANK

CT AREA
U/G PIPE

CT FOUNDATION

CT ERECTION

SP

FAB & DELIVER COMBUSTION TURBINE (15 MONTHS)


CT AREA
SLAB

FILE NAME:

GEN BLDG / CTG AREA STEEL / BLDG

DRAWING NUMBER

ENGINEER
1

21-JAN-2002

NO.

DATE

PRELIMINARY LEVEL 1 SCHEDULE


REVISIONS & RECORD OF ISSUE

JAH

SW

MAM

DWN

CHK

APP

CHECKED
FLM

DRAWN

DATE

SKIKDA
2 - 1 ON 1 COMBINED CYCLE PROJECT

CODE

AREA

J.HARKIN

10-JAN-2003

PRELIMINARY
LEVEL 1 SCHEDULE

PAGE 1 OF 1

35