Block 1 & Common: System Code Key / Legend
Block 1 & Common: System Code Key / Legend
-05
-04
-03
-02
-01
01
BACK FEED
POWER
REQUIRED FROM
OWNER
START
CONSTRUCTION
(U/G's and Foundations)
BREAK GROUND
02
04
03
05
06
07
08
09
10
11
12
13
14
15
BLOCK 1 &
COMMON
ST TRANSFORMER FOUNDATION
& WALLS
DUCTBANK
ST MAT
PILE
TRNSFMR ERECTION
16
17
ISO PHASE
BUS DUCT/
GENERATOR
BREAKER
ERECTION
18
FATOFF /
CONSTRUCTION COMPLETE BLOCK 1
READY FOR STEAM BLOWS
HRSG HYDROS
COMPLETE
UNIT 1
GAS REQUIRED
FROM OWNER
BACK ENERGIZE
19
20
21
22
23
24
PROVISIONAL
ACCEPTANCE
25
26
27
28
GTB
APB
APC
APD
APH
API
CAA
CAB
COA
ECA
ECB
FOB
FWA
FWC
FWF
FPA
GTB
GTL
HRA
HRC
SGA
SGG
SGF
SGJ
STG
TGA
TGC
TGD
WSC
WSE
WTD
INSULATE PIPING
ST AREA
STEEL
ERECTION
GRATING/STARIS/
RAIL. ACCESS
ERECT/COMPLETE/HYDRO PIPING (ECB, FWC, FWF, SGG, SGF, SGJ, TGA, TGC, TGD) & INSTALL TRAY /
CABLE
SET &
COMMISSION
CRANE
S/T SOLE
PLATES
HEAVY
COMPONENTS
& GEN LIFT
LUBE OIL
FLUSH &
RESTORE/ON
GEAR
ASSEMBLE CONDENSER
SHIP
TO
SITE
TO ST AREA
PIPE
HRSG MAIN PIPE RACK ERECT PIPING (FWA, FWC, SGG, SGF, SGJ,) / TRAY /
CABLE PULLING
SET EQUIP
ECA, ECB,
FWA, AND
FWC FLUSH
EQPT INSTALLATION
INTERIORS
TRAY
INSULATE
REMOVE DAM /
FLOOD PUMP PIT
PANEL/
TERMINTE
30
31
32
33
34
F/P
62.0805
CURE/REMOVE
FORMS
ST PEDESTAL
29
HVY HAUL
SET XFRMR
INITIAL
DELIVERY HRSG
UNIT 1
CHEM
CLEAN /
RESTORE
SITE PREP
DUCT
BANK
HRSG AREA
U/G PIPE
HRSG FOUNDATION
DUCT
BANK
CT AREA
U/G PIPE
CT FOUNDATION
Hydro
COMPLETE
ERECTION
STEAM BLOW
& RESTORE
PLANT OPTIMIZATION
Reliability Run
SGA
INSULATE PIPING
HRSG FINGER PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI,
SGJ, SGL) / TRAY / CABLE PULLING
SP
FWA
SGA
INIT
OPER
CT CHECK OUT
INSULATE
CT ERECTION
FATOFF
FOB
& Flush
FGA
ST MAT
TRNSFMR ERECTION
IPB/GB
F/P
62.0805
GTL
CURE/REMOVE
FORMS
ST PEDESTAL
INSULATE PIPING
BLOCK 2
ST AREA
STEEL
ERECTION
GRATING/STARIS/RAIL.
ACCESS
ERECT/COMPLETE/HYDRO PIPING (ECB, FWC, FWF, SGG, SGI, SGJ, SGL, TGA, TGC, TGD,
TGE, TEF) & INSTALL TRAY / CABLE
HEAVY
COMPONENTS
& GEN LIFT
8:24:07 AM
S/T SOLE
PLATES
LUBE OIL
FLUSH &
RESTORE/ON
GEAR
CT CHECK OUT
PILE
DUCTBANK
ASSEMBLE CONDENSER
HRSG MAIN PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI, SGJ,
SGL) / TRAY / CABLE PULLING
TRNSFMR ERECTION
INITIAL
DELIVERY HRSG
UNIT 2
CT / HRSG PILING/PIERS
DUCT
BANK
HRSG
FOUNDATION
HRSG AREA
U/G PIPE
IPB/GB
F/P
62.0805
INSULATE
STEAM BLOW
& RESTORE
PLANT OPTIMIZATION
Reliability Run
GTB
Hydro
HRSG FINGER PIPE RACK ERECT PIPING (FWA, FWC, SGF, SGG, SGI,
SGJ, SGL) / TRAY / CABLE PULLING
COMPLETE
ERECTION
SGA
INSULATE PIPING
INSULATE
FATOFF
SKIKDA~2.VSD
DUCT
BANK
CT AREA
U/G PIPE
CT FOUNDATION
CT ERECTION
SP
FILE NAME:
DRAWING NUMBER
ENGINEER
1
21-JAN-2002
NO.
DATE
JAH
SW
MAM
DWN
CHK
APP
CHECKED
FLM
DRAWN
DATE
SKIKDA
2 - 1 ON 1 COMBINED CYCLE PROJECT
CODE
AREA
J.HARKIN
10-JAN-2003
PRELIMINARY
LEVEL 1 SCHEDULE
PAGE 1 OF 1
35