Combined Cycle Generating Facility

Tuas
Singapore
Client
Tuas Power Ltd.

Schedule
Notice-to-Proceed: 05/1999
Commercial Operation:
Block I: 07/2001
Block II: 10/2001

Black & Veatch Role


EPC

Technology

Combined Cycle
MHI 701F
Natural Gas
Total Output: 720 MW

Significant Aspects

Water Treatment
Joint Venture with Mitsubishi
Heavy Industries
Use of P91 Piping

Black & Veatch Contact


Sheldon Wood
Phone: (913) 458-2000
Fax: (913) 458-2934

combined\-tuas

Combined Cycle Generating Facility


Tuas
Singapore

Tuas Power Ltd. contracted Black &


Veatch in a joint venture with
Mitsubishi Heavy Industries (MHI)
and Mitsubishi Corporation to provide
engineer, procure, construct (EPC)
services on a new 1 x 1 F Class
combined cycle facility. There are
four (4) MHI 701F combustion
turbines involved with the new Tuas
project located in Singapore. The
facility functions on natural gas with
backup oil firing capability, reaching a
nominal capacity output of 720 MW.
Included in the Tuas design is a water
treatment system. Block I went into
commercial operation in July 2001
with Block II three months later.