Professional Documents
Culture Documents
Rainwater Harvesting: Technical Writing Skills
Rainwater Harvesting: Technical Writing Skills
Assignment No.1
RAINWATER HARVESTING
This shall give the development plan of the area under consideration for the programme
and will help the governing body identify the areas and buildings suitable for the
implementation of the program. The government letters and notices shall be sent out to
the residents of the identified buildings only.
ii. Brihanmumbai Municipal Corporation Office:
This will give us information regarding the total population of the identified area, their
water requirements and the overall general details such as electricity consumption and
class of citizens residing in that area.
iii. Indian Meteorological Department/ Central Groundwater Board:
This will give us information about the underground water availability and the total
annual precipitation in the identified area. This will make it easy to plan the scale of the
rain water harvesting projects.
iv. Geological Survey of India;
This will give us the details related to the soil profile of the region if required at all.
Please turn over for the outline of the proposed Govt. Resolutions/ Public Notices.
NEER
Govt. Aided Public Rainwater Harvesting
A venture by BMC for the people, of the people and by the people because
RAINWATER HARVESTING
Submitted by:
141011014: Neeta Arote
141011019: Kalyani Gajewar
141011028: Sanika Baste
141011029: Apeksha Khandelwal
141011032: Smita Gaikwad
Group III
Batch C
T.Y.B.Tech Civil