Professional Documents
Culture Documents
Tasks
Tasks
Tasks
Abu Bakar
Planning, Scheduling and Time Management of Six Lanes Road Construction Work at V.O.C Port Trust
using Primavera P6 Software
3
4
Evaluating Project Management Software Packages Using a Scoring ModelA Comparison between MS
Project and Primavera
Cost and time control of construction projects: inhibiting factors and mitigating measures in practice
Case Study on Scheduling Software for Prime Contractors Efficient Management of Projects
Ubaid
Project Monitoring and Control using Primavera
Study of Cost Control Techniques Used in Construction Industry and Their Impact to Minimize Cost
Overrun
Project risk management practice s and their association With reported project success
6
7
The controlling influences on efective risk identifcation and assessment for construction design
management
Transforming project risk management into project uncertainty management
Saad
Planning, Scheduling and Tracking of a residential Project using Primavera Software
Using Primavera Software in Resource Allocation and Project Evaluation of Construction Projects
Planning scheduling, tracking and application administration using primavera web logic p6
Construction Project Scheduling with Time, Cost, and Material Restrictions Using Fuzzy Mathematical
Models and Critical Path Method
Authors
P. Esakki Thangam,
R. Magdalene
Benila
P Raghunath
Reddy1, B.Harish
Naik
Hani Gharaibeh
Yakubu Adisa
Olawale, MCIOB
and Ming Sun
Prof. P.K Gunjal*,
Rajiv Kumar
Goswami, Punit M
Bedmutha
Boskee Sharma,
Mr. K.N. Labh
B. S. K. Reddy, sk.
Nagaraju, md.
Salman
Mike Bell, Tulio
Sulbaran, PhD.,
Kimberly Williams,
Michael Blain
Authors
Andrew Fernans
Tom, Sachin Paul
A.G.D.Premalal,
R.K.P.C.B. Mudalige
and S.N.Malkanthi
Yong-Cheol Yang;
Chan-Jung Park; JuHyung Kim3; and
Jae-Jun Kim
V. Ahuja and V.
Thiruvengadam
Robert James
Voetsch, Denis F.
Cioffi, Frank T.
Anbari
Robert J. Chapman
Stephen Ward,
Chris Chapman
Zarina Alias, E.M.A.
Zawawi, Khalid
Yusof, Aris, NM
Authors
Unmesh. Y. Polekar,
Rohit. R. Salgude
Satinder Chopra 1,
Arvind Dewangan
Hamed
Ziaidoostan1,
Hamidreza
Ghaneh2, Matin
Amanin3,
Mohamadmahi
Gholipoor4
Mohammed
ZakiHaider ,
Rajendra., Vijay.K
Daniel CastroLacouture,
A.M.ASCE1; Grsel
A. Ser; Julian
Gonzalez-Joaqui;
and J. K. Yates
Kunal B. Badgujar,
B.A.Konnur,
Amarsinh B.
Landage
Shaik mohammad
masood,
devanand.r, harsha
h.n
An Analysis on Resource Planning, Cost Estimation and Tracking of Project by Earned Value
Management
Hasan
Planning and Scheduling of High Rise Building Using Primavera
3
4
Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera
Authors
T. Subramani1, A.
Sarkunam2, J.
Jayalakshmi3
Rhuta Joshi1, Prof.
V. Z. Patil
Shweta Rai
Ms.deepika k, mrs.
Suchithra
George Otim1,
Fiona Nakacwa2,
Michael Kyakula3
Raiyan Abdul
Rashid Mansoori
RAJ SARAN, NEEL
FONDEKAR, YASH
MATALIA
T. Subramani, D. S.
Stephan Jabasingh,
J. Jayalakshmi