Civil Quote for Holding Tank Work

Item

1.0

Description

Civil Works : Section (A)


Site Preparation Clear Debris; remove from site as per existing conditions.
(Approx. 12Sq.m)

Qty.

Unit

Rate

Ls

1,000.00

36

115.00

1,200.00

3.0

a) Ground Leveling and excavation up to 2.9m


Depth and Compaction Works with
Heavy Duty Roller (Approx36 Sq.m )
Plain concrete grade C-25/20, (300kg/m of cement content) in SRC for
100mm thick concrete, 1000 gauge polythene sheet over compacted soil to
95% MDD.(Approxm15 Sq.m)

4.0

Filling by minimum 100mm thick road base material (98% aggregate)


compacted to 95% MDD (Approx. 18 Sq.m )

320.00

5.0

Back filling by excavated suitable materials to 95% proctor density..


(Approx. 5 Sq.m)

m2

200.00

1,800.00

2,000.00

RCC footing for Four Column and Tiebeam Approx (4 Cubic mtr)
6.0

Supply & Laying RCC floor slab &compaction (Approx 15


sq.m)

7.0

2,000.00

8.0

Supply & Laying RCC Column (Approx 3m3)


Man Hole(600x600mm)
BLOCKWORKS : 200mm thickness solid block in 1:3 cement and sand
mortar (approx 37sq.m)

2,000.00

9.0
10.0
11

Bituminous Asphalt on side of footing, side of column and side of block


work(Approx 37sq.m)

500.00

1
35

200.00

12

25.00

Sub Total - 2 - AED

Amount

1,000.00
4,140.00

3,600.00

960.00
1,000.00
7,200.00
8,000.00
8,000.00
6,000.00
500.00
7,000.00
300.00

40,000.00