INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST INFORMATION

CENTRE
ELEMENTAL COST ANALYSIS - FORM 1

8 - Residential Building
A-2-1

JOB TITLE :

CLIENT :

LOCATION :

TENDER DATE :
INFORMATION TOTAL PROJECT
Project and Contract Information

Project Details and Site Condition :

Market Conditions :
Contract particulars :

Contract :

COMPETITIVE

Competitiv

Type of Contract :

Cost Fluctuation:

Yes

RM

0
Basis of Tender :
Bills of Quantities

No
Open / Selected
Competition

Government

Bills of Appr. Quant.

Negotiated

Private

Schedule of rates /
Spec. & Drawings

Serials

Provisional Sums

RM

0.00

Prime Cost Sums

RM

0.00

Contract Period Stipulated by Client:

Preliminaries

RM

0.00

Contract Period Offered by Builders:

Contigencies

RM

0.00

Numbers of Tenders Issued :

Contract Sum

RM

0.00

Numbers of Tenders Received :

ANALYSIS OF SINGLE BUILDING


Design/Shape Information
Accomodation and Design Features:

Areas :

Functional unit:

Lower Ground Floor


Ground floor
Upper Floors

- m
m
m

Gross Floor Area

0 m

0 m

External Wall Area

(a)

=
0

Gross Floor Area

(b)
=

Usable Area
Circulation Area
Ancillary Area
Internal Division
Gross Floor Area

Design
Percentage of Gros

#DIV/0!

m
m
m
m
0 m

Storey Heights:

Floor Spaces NOT Enclosed:

At Ground Floor

Roof Area :
(Structural and Plant Rooms)

Above Ground Floor

(c)

Average below Ground Floor

- m

(d)

(e)

Brief Cost Information


Contract sum

RM

Provisional Sums

RM

Prime Cost Sums

RM

Preliminaries

RM

Contigencies

RM

Contract Sum less Contingencies

Functional Unit Costs


excluding external works :

0.00

0.00

RM

being

#DIV/0!

of remainder

being

#DIV/0!

Contract Sum

0.00

RM

8 - Residential Buildings
A-2-1

Competitive Tender List


RM

Int (JV)/L

Design / Shapes
Percentage of Gross Floor Area
Below Ground Floor

Single-Storey
Construction

Two-storey
Construction

3-storey
Construction

-storey
Construction

#DIV/0!

per m2

INSTITUTION OF SURVEYORS MALAYSIA BUILDING COST


INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 2

8 - Residential Buildings
A-2-1
SUMMARY OF ELEMENT COSTS

GROSS FLOOR AREA:

Total Cost
of Element
RM

1. Substructure
1A
Piling
1B
Work Below Lowest Floor
Finish
Group Element Total :

2 Superstructure
2A
Frame
2B
Upper Floor
2C
Roof
2D
Stairs
2E
External Walls
2F
Windows & External Doors
2G
Internal Walls & Partitions
2H
Internal Doors
Group Element Total :

TENDER DATE :
Cost per m2
GFA
RM

Element
Unit
Quantity

#DIV/0!
#DIV/0!

4. Fittings and Furnishing

m
m

#DIV/0!
#DIV/0!

m
m
m

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!

m
m
m
m

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

m
m
m

#DIV/0!
#DIV/0!
#DIV/0!

P.C.Sums Allowed

#DIV/0!
#DIV/0!

Nos
-

#DIV/0!

Tm

#DIV/0!
-

#DIV/0!

Fire Protection Installation


Lift & Conveyor Installation

#DIV/0!
#DIV/0!

5H
5J

Communication Installation
Special Installation

#DIV/0!
#DIV/0!

5K

Builder's Profit & Attendance


on Services

#DIV/0!

5L

Builder's Work in Connection


With Services

#DIV/0!

Sub-total excluding External Works,


Preliminaries and Contingencies

#DIV/0!

#DIV/0!

6. External Works
6A
Site Work
6B
Drainage
6C
External Services
6D
Ancillary Buildings
6E
Recreational Facilities
Group Element Total :

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
-

Preliminaries
TOTAL (less Contigencies)

#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

5F
5G

Group Element Total :

#DIV/0!
#DIV/0!

#DIV/0!

5. Services
5A
Sanitary Appliances
5B
Plumbing Installation
5C
Refuse Disposal
5D
Air-conditioning & Ventilation
System
5E
Electrical Installation

#DIV/0!
#DIV/0!

Reinforced
Concrete
m3

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
-

Preliminaries Shown Separately


Element
Element
unit rate
Ratio per
RM
m2 GFA

#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

3. Finishes
3A
Internal Wall Finishes
3B
Internal Floor Finishes
3C
Internal Ceiling Finishes
3D
External Finishes
Group Element Total :

#DIV/0!

#DIV/0!

(RM)

8 - Residential Buildings
A-2-1

TENDER DATE :

ely
Reinforcement
kg

P.C.Sums Allowed

(RM)

Formwork
m2

Tendered Sums
(RM)

INSTITUTION OF SURVEYOR MALAYSIA


BUILDING COST INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - Form 3

8 - Residential Buildings
A-2-1
BRIEF SPECIFICATION

GROSS FLOOR AREA : m


ELEMENT
1
Substructure
1A
1B

Piling
Work Below Lowest Floor Finish

Superstructure

2A

Frame

2B

Upper Floors

2C

Roof

2D

Stairs

2E
2F

External Walls
Windows & External Doors

2G
2H

Internal Walls & Partition


Internal Doors

Finishes

3A

Internal Wall finishes

3B
3C

Internal Floor Finishes


Internal Ceiling Finishes

3D

External Finishes

Fittings and Furnishings

5
5A

Services
Sanitary Appliances

5B
5C
5D

Plumbing Installation
Refuse disposal
Air-Conditioning & Ventilation System

5E
5F
5G
5H
5J
5K

Electrical Installation
Fire Protection Installation
Lift & Conveyor Installation
Communication Installation
Special Installation
Builders's Profit & Attendance on Services

5L

Builders's Work in Connection With Services

External Works

6A

Site Works

6B
6C
6D
6E

Drainage
External Services
Ancillary Building
Recreational Facilities

TENDER DATE :
SPECIFICATION

8 - Residential Buildings