ABB
Contents
Application
Characteristics
Standards and quality
Modular design concept
Equipment options
Generator circuit-breaker
Disconnector
Earthing switch
Starting switch
Short-circuiting connection
Current transformer
Voltage transformer
3
3
3
4
5
5
8
9
9
9
10
10
Surge arrester
Surge capacitor
Terminals
Phase enclosure
Control and supervision
Tests
Transport to site
Site erection and commissioning
Maintenance and overhaul
Dimensions
Technical data
10
10
11
11
11
12
12
12
12
13
14
Application
The Generator Circuit-Breaker System type HECS and
HEC 7/8 has been developed as a system suitable for
application in all types of power plants.
The HECS and HEC 7/8 Generator Circuit-Breaker
Characteristics
3-phase system with a SF6 circuit-breaker and disconnector in series with the circuit-breaker, in single-phase enclosures, supplied fully assembled on a
common frame, with operating mechanisms, supervisory and control equipment.
Additional components as earthing switches, starting switch (for starting of gas-turbines), current- and
voltage transformers, surge capacitors, surge arrester,
all integrated and mounted in the phase enclosures,
can be provided. Additionally the earthing switch
on the breaker side of the HECS Generator CircuitBreaker System (if equipped with an optional short-
ABB
ABB High Voltage Products is continuously endeavoured to improve its quality-assurance-system; this has
been recently new assessed by The Swiss Association
for Quality and Management Systems with the SQScertificate ISO 9001 / ISO 14001.
As required by the plant layout, individual components can be deleted from the standard execution.
The standard execution can be extended by the following optional items:
For HECS: Short-circuiting connection - either in
connection with generator side earthing switch, or
to be manually mounted (for power plant protection
setting)
ABB
Equipment options
Generator circuit-breaker
Surge capacitor
Current transformers
Earthing switch
Voltage transformers
Surge arrester
10
Generator circuit-breaker
Interrupting chamber
Within the interrupting chamber SF6-gas is used for
both arc extinguishing and internal insulation. The
external insulation is air.
For the interruption a combination of the self-extinguishing and the puffer principle is used, a design
optimised to achieve a significant reduction in operating energy.
This self-pressurising principle allows high breaking
capacities as well as almost overvoltage-free interruption of small (inductive) currents.
Separate contact systems for breaking and for continuous current carrying are used. This avoids wear / erosion of the continuous current contacts and ensures
trouble-free current carrying even after a large number
of operations.
ABB
a Circuit-breaker CLOSED
b Initiation of opening movement, (transfer of current from the
main contacts to the arcing contacts)
2
3
4
a
9
c Separation of arcing contacts with interruption of small currents supported by puffer action
5
2
d Separation of arcing contacts with interruption of large currents supported by the thermal effect of the current arc
itself to build up the pressure in the heating volume
e Circuit-breaker OPEN
d
7
1 Terminals
2 Cylindrical coil
7 Puffer
8 Heating volume
9 Gas compartment
High pressure
Low pressure
ABB
For the opening operation, the piston head side is isolated from the high pressure and simultaneously connected to the low pressure oil volume.
The charging state of the spring disk assembly is controlled by switching elements, actuating the pump
motor to immediately maintain the oil pressure. For
emergency use or maintenance, charging of the spring
disk assembly and tripping is possible locally. The
fully integrated construction has no hydraulic pipe
connections of any kind.
A non-return valve between pump and high-pressure oil volume prevents pressure loss in the event
of a pump outage. The hydraulic system is hermetically sealed against atmosphere (no corrosion). The
mechanically operated position indicator provides reliable indication of the circuit-breaker position.
The drive operates all three breaker poles simultaneously by mechanical linkages, thus keeping the
switching time difference between the poles to a minimum.
5
SF6-gas density indication and filling connection
900
850
900
p [kPa]
750
700
650
600
550
500
450
p [kPa]
850
800
800
750
700
650
600
550
500
1 Pressure connection
2 SF6-gas volume of the
circuit-breaker
3 Metallic bellows
450
400
-40 -30 -20 -10
400
-40 -30 -20 -10
10 20 30
10 20 30
40 50 60 70
t [C]
40 50 60 70
80 90 100
80 90 100
ABB
Disconnector
The switchgear concept provides a disconnector fitted
in series with the circuit-breaker. It is placed on the
out-going side of circuit-breaker and within the same
enclosure.
The disconnector is a tubular telescopic unit, with the
moving contact on the terminal side and fixed contact
tube on the circuit-breaker side. This layout provides
easy access and simplifies maintenance.
View through the inspection window of HECS to assure that the disconnect switch is in the open position.
The sticker shows the different operation modes of the key locking
scheme of the individual motor operating mechanisms, which all of
them operate in the same way.
ABB
Earthing switch
The earthing switch can be provided on either one or both
sides of the system. The switch and its connections are
designed for protective earthing purposes, i.e. it is rated for
the full fault current but has no current making or continuous carrying capacity.
Design is of a blade type with the hinge point connected
to the enclosure and the fixed contact to the current path.
The earthing connection is made via the system enclosure,
which is earthed at one end to the busbar enclosure. The
moving contact is motor driven.
Starting switch
The starting switch can be provided on the generator side
of the system. The starting switch and its connections have
been designed for the voltage, current and current-duration
occurring during the SFC (Static Frequency Converter) startup period of the gas turboset. The design is of a blade type
with the fixed contacts at the current path and the hinge
point isolated from the enclosure. High voltage cables can
be connected to this. The moving contact is motor driven.
Short-circuiting connection
For the HEC 7/8 there is either a manual short circuiting
connection or an electrical operated short-circuiting switch
available.
The manual short-circuiting connection can be provided
for the use between the circuit-breaker and the disconnector of the system. This arrangement has been designed for
installations where the short-circuiting facility is only rarely
used. The short-circuiting connection is built for the voltage, current and current duration occurring during the testing and adjustment of the power plant protection system.
The cover of each of the phase enclosures has to be
removed to allow the fitting of the short-circuiting busbar.
ABB
For the HECS there is also a manual short circuiting connection available which needs to be connected between
the circuit breaker and the disconnector. The cover of
each of the phase enclosures has to be removed to allow
the fitting of the short-circuiting busbar.
Current transformer
A ring core current transformer can be provided
on either one or both sides of the breaker system.
Depending on the class up to three cores per current
transformer can be accommodated, depending on
output and class required. The secondary windings
are permanently wired back to terminal blocks in the
control cubicle.
Voltage transformer
Surge arrester
A surge arrester can be fitted on the transformer side, to
provide protection for transformer and generator against
overvoltages. Standard is an ABB metal-oxide surge arrester of the POLIM range with silicon housing. Metal-oxide
resistors have a highly non-linear resistance characteristic.
At service voltage a predominantly capacitive current
of < 1mA flows. Any voltage increase leads to a rapid
increase of the current, thereby limiting any further rise
in the voltage. When the voltage decreases, the condition
reverts to its essential non-conducting state. Metal-oxide
surge arresters are characterised by the residual voltage,
i.e. the voltage during the passage of an impulse current.
The voltage transformers are fitted on the side panel of the phase
enclosure.
The surge arrester is fitted on the side panel of the phase enclosure.
Surge capacitor
Surge capacitors are fitted on both sides of the breaker
system, to provide additional protection against overvoltages and to support arc extinction in the circuitbreaker by TRV limitation.
The surge capacitors are fitted outside the phase
enclosure with only the porcelain bushings protruding
into the phase enclosure.
Surge capacitor are installed in such a manner that only their porcelain bushings protrude into the phase enclosure.
10
ABB
Terminals
The current path of the system is connected to the
busbar current path by bolted flexible, laminated or
stranded connectors.
In order to avoid detrimental tensile stresses to the
terminals, resulting from electro-dynamic forces of a
short-circuit current, the flexible connectors must be
supported at the midpoint by a ring having the same
diameter as the terminals. These rings reduce the con-
Phase enclosure
The phase enclosures are designed to carry the induced
reverse current, flowing through the isolated phase busbar enclosures. Thus the external magnetic field and its
influence to the equipment is minimised. As standard, the
phase enclosure is welded onto the busbar enclosure,
ensuring continuity of the phase enclosure characteristics.
On the other hand, the phase enclosures effectively eliminate any possibilty of accidental contact with live components. In order to avoid pollution due to ingress of dust
and/or moisture, the phase enclosures are made airtight to
withstand also a small internal overpressure. Windows are
provided in the phase enclosures near to the disconnector, earthing switches and starting switch, to allow visually
checking of the position of each of them.
Phase enclosures and control cubicle of GCB system type HEC 7/8
ABB
11
Tests
Type tests
Routine tests
The performance of the generator circuit-breaker system was fully tested by the High Power Laboratory of
KEMA/Netherlands in accordance to the standard IEEE
C37.013 with regard to the interrupting capability.
Transport to site
The entire system is fully assembled and tested together with all its ancillary equipment in the factory.
12
The contact erosion can be measured without opening the interrupting chamber with the DRM-methode
(Dynamic Resistance Measurement), which has been
specifically developed for generator circuit-breakers by
ABB High Voltage Products. This allows to optimise
the service intervals also for frequent switching of
higher service currents. The DRM-Measurement system
can be ordered separately.
ABB
Dimensions
Type HECS
ABB
13
Technical data
Generator circuit-breaker system type
General:
Rated maximum voltage
Rated frequency
HECS-80
HECS-100
HECS-130
kV
Hz
23
50/60
25.3
50/60
25.3
50/60
10500
13000
18000
13000
18000
10000
12000
17000
12000
17000
S
M
L
XL*
A rms
A rms
A rms
A rms
8500
10500
S
M
L
XL*
A rms
A rms
A rms
A rms
8000
10000
kV rms
kV rms
60
70
60
70
60
70
kV peak
kV peak
125
145
125
145
125
145
kA peak
kA, 3 s
kA peak
kA rms
220
80
220
80
360
130
360
130
67
280
100
280
100
CO-30min-CO
67
ms
67
Disconnector:
Rated peak withstand current
Rated short-time withstand current
Operating time
kA peak
kA, 3 s
s
220
80
2
280
100
2
360
130
2
Earthing Switch:
Rated peak withstand current
Rated short-time withstand current
Operating time
kA peak
kA, 1 s
s
220
80
2
280
100
2
360
130
2
The above data are not limiting values. Additional data on request. We reserve the right to alter data and technical details without notice.
14
ABB
HEC 7
HEC 8
kV rms
Hz
kA
30
50/60
24/22
30
50/60
28/26
kV rms
kV rms
80
88
80
88
kV peak
kV peak
150
165
150
165
kA peak
kA, 1 s
kA peak
kA rms
ms
600
600
220
220
440
440
160*)
160*)
CO-30min-CO
56
56
Disconnector:
Rated peak withstand current
Rated short-time withstand current
Operating time
kA peak
kA, 1 s
s
600
220
2
600
220
2
Earthing Switch:
Rated peak withstand current
Rated short-time withstand current
Operating time
kA peak
kA, 1 s
s
440
160
2
440
160
2
ABB