NSRP COMPLEX PROJECT

Title: ITP for Piping Installation

QCR: 6000-004

Rev. 8

DAILY WELDING VISUAL INSPECTION REPORT


Service Class:WO-Continually Oil Contaminated Waste Water

Record No/NFI: L691-WO-VT-C-0296 / NFI-L691-PIP-3066

Area : AC00
Drawing / Line No.

No.

Loc (F/S) : F

AC22-WO-020-0206-01 Sheet1/1 Rev.0a


020-0206-A1AP-NI

Spool No.

2"-WO-

01

Joint
No.

001

Mat. Spec
No.1

Heat
No.1

A106-B

Mat.
Spec
No.2

Heat
No.2

A234-WPB

Size

Date of Inspection :

8/Jun/2016

Welder No.

Sch/
Thk

WPS
No.

Weld Type

S-XS/5.54

NSRP-LLM-WPS-001
(GTAW)

BW

Completed Date

Fitup

Welding

3091

26/May/16

26/May/16

Legend: Welding Type: BW (Butt), FW (Fillet), SW (Socket Weld), TH (Threaded), FJ (Flange Joint), CW (Branch Welding), RP (Reinforcing Pad Joint), OL ( O- Let Joint )
Loc. ( (Location): S: Shop Welding, F: Field Welding
Acceptace criteria: Fit-up ASME B31.3 Para. 328.4.3, Visual ASME B31.3 Table 341.3.2; Above Joints are acceptable
COMPANY
NAME OF INSPECTOR

SUBCONTRACTOR

CONTRACTOR

EMPLOYER

Nguyen Dinh Tam

SIGNATURE

DATE

Subcontractor Doc. No.: L04-Q-001