Fire Services for Rooms

Wet Riser (Landing Valve Location)

Hose Reel

BOMBA Lift Lobby

BoH Corridor

Exit Staircase

FoH Platform
FoH Concourse
Besides Escalator

900 m2 / 60 m max separation

800 m2 / HR hose 30 m length

1500 L/min (3 nos. LV simultaneously operating)

120 L/min (4 nos. HR


simultaneously operating)

4 to 7 bar outlet pressure

Minimum 2 bar pressure at inlet to


HR

Sprinkler
Escalator Sprinkler Protection (ESPS)
at Escalator End at Concourse / Plantroom
Surau
Toilet
First Aid Room
Cleaner's Room
Cleaner's Closet
Cleaning Chemical Room
Station Store Room
Staff Room
Chiller Plant
Maintenance Office
ECS Plant Room
BoH Corridor
CSO
SCR - Security & Station (Pre-Action)
Fire Pump Room
CW Pump Room
FoH Platform
FoH Concourse
Sewage Ejector Room
Sump Pump Room
Retail Areas
Escape Staircase
Escalator Void Area
BoH Corridor
Resistor Bank
Pump Sizing (Flow and Head) & Tank Sizing according to
MS1910

Drainage Services for Rooms


Rooms
ECS Plant Room
Chiller Plant Room
Sprinkler Tank and Pump Room
Cold Water Tank and Pump Room
Escalator and Lift Pit
Hose Reel
Public Area
Seepage D-Wall

Quantity
1 no. 100 mm FD
2 nos. 100 mm FD
1 no. 200 mm overflow FD
1 no. 200 mm overflow FD
1 no. 100 mm FT
1 no. 100 mm FD
1 no. 100 mm FD
1 no. 100 mm FD

Sanitary Services
Rooms
Toilets
First Aid Room
Surau
Cleaner's Store

Quantity
FT, WC, UR, BN
FT
BN, FT
FT

Maximum Distance for FD / Catch Pits

25 m maximum gap until sump pit

Fireman Intercom

Fire Alarm Panel (Selected)

Smoke Detector

Heat Detector

Exit Stairs

Escalator Control Panel (Top Landing)

ECS Plant Room

ECS Plant Room (Rare)

BOMBA Lift Lobby


TVS MCC Room
Chiller Plant Room

Lift Control Panel (Top Landing)


ESPS Control Panel
Pre-Action SPR Control Panel

TVS MCC Room


ECS MCC Room
TSS Room

TVS MCC Room


ECS MCC Room
TSS Room

Fire Pump Room

FM 200 Control Panel

33 kV Room

33 kV Room

Lift Lobby
FCR
Staircase Pressurisation Fan Room
Breeching Inlet

Supervisory Valve for TNL Wet Riser


Link to Ancillary Buildings' MFAP
Main Fire Alarm Panel (SCR)
Station LHD Control Panel
Tunnel LHD Control Panel

PER Room
LV Switchroom
TER Room
SER Room
UPS Room
CTER
Security Control Room (Pre-Action)
Station Control Room (Pre-Action)
PSD Room
DB Room
Cleaner's Closet
Electrical Risers
Platform & Concourse FoH
(Double Layer)
Lift Lobby - Bomba
Electrical Room
Gas Room
Escalator Void
Exit Staircase
Top of Lift Shaft
Entrance
FCR

PER Room
LV Switchroom
TER Room
SER Room
UPS Room
CTER
Security Control Room (Pre-Action)
Station Control Room (Pre-Action)
PSD Room
TVF Room
TSF Room
TEF Room

Project Name :
Project No. :
Service :
Subject :

KVMRT_SSP_Line 2
Cold Water System
Cold Water Tank & Pump Sizing Calculation - TITIWANGSA Station

Loading Units for Cold Water Demand

CWS Fi
Level
Ground Level

Transfer Level

Concourse Level
Platform Level

Location

FV WC

Cooling Tower
Landscape
Refuse Storage
Make up water pump room
Chiller Plant Room
Domestic Water Tank Room
Male Surau & Ablution
Public Male Toilet
Disabled Toilet
Public Female Toilet
Female Surau & Ablution
First Aid Room
Cleaner's closet
Staff Toilet
Fire Pump Room
ECS Plant Room
ECS Plant Room
Ejector Room
Sump Pump Room 1
Sump Pump Room 2
Cleaner's Store
0

Loading Units for Rain Water Demand

CWS Fi
Level

Location

Ground Level

Landscape

Concourse Level

Public Male Toilet


Disabled Toilet
Public Female Toilet
Staff Toilet

FV WC

2
1
4
1
8

NOTE:
1
2
3
4
5

Design complies to BS 6700 - 2006


Based on BS 6700:2006, flush valve flow rate per toilet is 0.15 L/s
Please note that the MS 1402 Table 1 - WB & Sink data has not been used. These two fixtures from M
certain diameter of branch, which is not applicable to this project (dia 20mm)
Based on BS 6700, flow for urinal cistern is low hence disregarded
Based on 6700:2000
Wash hand basin
0.15 L/s

A) Cold Water Demand


Sanitary Fitment
Nos.
Water Demand (l/day)

B.N.
10
90

Landscape
0
500

Total Daily Demand (l)

900

W.C.
8
180
1440

Urinal
3
180
540

B) Rainwater Demand
Sanitary Fitment
Nos.
Water Demand (l/day)
Total Daily Demand (l)

Total Daily Cold Water Demand (l)


Total Daily Rain Water Demand (l)

Minimum Cold Water storage


Description

Litres per
unit

2 days Cold Water Storage


1 day ECS Make Up Tank (onethird)
3 days Rain Water Tank
Tank Size

Act Required Storage


Tank Size

100,004
length

Dimensions

7,500

Water
Fill time
in Connection Size

hours

Act storage
2

C) Pump Flowrate Estimation


Total Pump Flow Rate

100,004

Number of
compartmen
t
2

Daily Consumption
Potable demand
Cooling Make Up Water Demand
Fire Sprinkler Storage only
Fire Wet Riser Storage only
Fire hose reel Storage only
Total Water Demand (Daily)

=
=
=
=
=
=

Note:
1. The above estimation is required by C&S team for consultation to SYABAS to obtain the following in
a. Material of Main Incoming Piping
b . Pressure of main incoming TBC by SYABS whether the direct feed is feasible to Cooling Tower Ma
2. Water Demand as per SPAN 2010

Calculation No. : 1.1


Revision No.: 0
Date: 21/12/2015

CWS Fittings
FV Urinal

Tap for Wash


Basin

2
1
4

LU
Bib Taps

1
1
2
1
3
3
1
5
3

1
2

10

1
1
1
1
1
1
1
1
1
29

WB=3

BT=3

0
0
0
0

0
0
3
3
6
3
9
9
3
15
9
0
3
3
3
3
3
3
3
3
3

0
6
3
12
0
3
0
6
0
0
0
0
0
0
0

DU FLOW L/s (Base on Figure D.1)


TOTAL DISCHARGE FLOW L/s
with 15% FOS

Total LU
0
0
3
3
6
3
9
15
6
27
9
3
3
9
3
3
3
3
3
3
3
117
1.50
1.50
1.73

CWS Fittings
FV Urinal

Tap for Wash


Basin

LU
Bib Taps

WB=3

BT=3

0
0
0
0
0

12
0
0
0
0

1
3

4
DU FLOW L/s (Base on Figure D.1)

Total LU
12
0
0
0
0
12
0.40

URINAL AND WC FLUSH VALVE MAXIMUM


SIMULTANEOUS USAGE (nos.)

2.00

FLUSH VALVE DISCHARGE FLOW L/s


TOTAL DISCHARGE FLOW L/s
with 15% FOS

3.00
3.40
3.91

used. These two fixtures from MS specifically refer to the discharge of a

Bib taps
29
90

2610

Landscape
4
500
2000

Bib taps
0
90
0

=
=

3510
3980

Units

Litres
Litres

Sub Total
7020
68000
11940
18960
plus 10% for freeboard

width

Height
7,000

Capacity (m3)
4,000

210

Flow rate
required per Total flow
section, L/s rate required Pipe Size
6.94

13.89

100.00

15.00 Litres/second

(m3)
100.00
68
188.2
90
9.1
100.00

*With 15% allowance


Effective demand
Storage only
for emergency use
Storage only
for emergency use
Storage only
for emergency use

YABAS to obtain the following information:-

is feasible to Cooling Tower Make Up Tank.

You might also like