FPS, DR, SN, CWP Provisions
FPS, DR, SN, CWP Provisions
FPS, DR, SN, CWP Provisions
Hose Reel
BoH Corridor
Exit Staircase
FoH Platform
FoH Concourse
Besides Escalator
Sprinkler
Escalator Sprinkler Protection (ESPS)
at Escalator End at Concourse / Plantroom
Surau
Toilet
First Aid Room
Cleaner's Room
Cleaner's Closet
Cleaning Chemical Room
Station Store Room
Staff Room
Chiller Plant
Maintenance Office
ECS Plant Room
BoH Corridor
CSO
SCR - Security & Station (Pre-Action)
Fire Pump Room
CW Pump Room
FoH Platform
FoH Concourse
Sewage Ejector Room
Sump Pump Room
Retail Areas
Escape Staircase
Escalator Void Area
BoH Corridor
Resistor Bank
Pump Sizing (Flow and Head) & Tank Sizing according to
MS1910
Quantity
1 no. 100 mm FD
2 nos. 100 mm FD
1 no. 200 mm overflow FD
1 no. 200 mm overflow FD
1 no. 100 mm FT
1 no. 100 mm FD
1 no. 100 mm FD
1 no. 100 mm FD
Sanitary Services
Rooms
Toilets
First Aid Room
Surau
Cleaner's Store
Quantity
FT, WC, UR, BN
FT
BN, FT
FT
Fireman Intercom
Smoke Detector
Heat Detector
Exit Stairs
33 kV Room
33 kV Room
Lift Lobby
FCR
Staircase Pressurisation Fan Room
Breeching Inlet
PER Room
LV Switchroom
TER Room
SER Room
UPS Room
CTER
Security Control Room (Pre-Action)
Station Control Room (Pre-Action)
PSD Room
DB Room
Cleaner's Closet
Electrical Risers
Platform & Concourse FoH
(Double Layer)
Lift Lobby - Bomba
Electrical Room
Gas Room
Escalator Void
Exit Staircase
Top of Lift Shaft
Entrance
FCR
PER Room
LV Switchroom
TER Room
SER Room
UPS Room
CTER
Security Control Room (Pre-Action)
Station Control Room (Pre-Action)
PSD Room
TVF Room
TSF Room
TEF Room
Project Name :
Project No. :
Service :
Subject :
KVMRT_SSP_Line 2
Cold Water System
Cold Water Tank & Pump Sizing Calculation - TITIWANGSA Station
CWS Fi
Level
Ground Level
Transfer Level
Concourse Level
Platform Level
Location
FV WC
Cooling Tower
Landscape
Refuse Storage
Make up water pump room
Chiller Plant Room
Domestic Water Tank Room
Male Surau & Ablution
Public Male Toilet
Disabled Toilet
Public Female Toilet
Female Surau & Ablution
First Aid Room
Cleaner's closet
Staff Toilet
Fire Pump Room
ECS Plant Room
ECS Plant Room
Ejector Room
Sump Pump Room 1
Sump Pump Room 2
Cleaner's Store
0
CWS Fi
Level
Location
Ground Level
Landscape
Concourse Level
FV WC
2
1
4
1
8
NOTE:
1
2
3
4
5
B.N.
10
90
Landscape
0
500
900
W.C.
8
180
1440
Urinal
3
180
540
B) Rainwater Demand
Sanitary Fitment
Nos.
Water Demand (l/day)
Total Daily Demand (l)
Litres per
unit
100,004
length
Dimensions
7,500
Water
Fill time
in Connection Size
hours
Act storage
2
100,004
Number of
compartmen
t
2
Daily Consumption
Potable demand
Cooling Make Up Water Demand
Fire Sprinkler Storage only
Fire Wet Riser Storage only
Fire hose reel Storage only
Total Water Demand (Daily)
=
=
=
=
=
=
Note:
1. The above estimation is required by C&S team for consultation to SYABAS to obtain the following in
a. Material of Main Incoming Piping
b . Pressure of main incoming TBC by SYABS whether the direct feed is feasible to Cooling Tower Ma
2. Water Demand as per SPAN 2010
CWS Fittings
FV Urinal
2
1
4
LU
Bib Taps
1
1
2
1
3
3
1
5
3
1
2
10
1
1
1
1
1
1
1
1
1
29
WB=3
BT=3
0
0
0
0
0
0
3
3
6
3
9
9
3
15
9
0
3
3
3
3
3
3
3
3
3
0
6
3
12
0
3
0
6
0
0
0
0
0
0
0
Total LU
0
0
3
3
6
3
9
15
6
27
9
3
3
9
3
3
3
3
3
3
3
117
1.50
1.50
1.73
CWS Fittings
FV Urinal
LU
Bib Taps
WB=3
BT=3
0
0
0
0
0
12
0
0
0
0
1
3
4
DU FLOW L/s (Base on Figure D.1)
Total LU
12
0
0
0
0
12
0.40
2.00
3.00
3.40
3.91
Bib taps
29
90
2610
Landscape
4
500
2000
Bib taps
0
90
0
=
=
3510
3980
Units
Litres
Litres
Sub Total
7020
68000
11940
18960
plus 10% for freeboard
width
Height
7,000
Capacity (m3)
4,000
210
Flow rate
required per Total flow
section, L/s rate required Pipe Size
6.94
13.89
100.00
15.00 Litres/second
(m3)
100.00
68
188.2
90
9.1
100.00