ThyssenKrupp Industries India

SPECIFICATIONS FOR DS/FF/SEWAGE/DW/AUXILIARY SYSTEMS


PROJECT: COKE HANDLING SYSTEM PACKAGE
(INTEGRATED REFINERY EXPANSION PROJECT), Kerala

CLIENT

: BHARAT PETROLEUM CORPORATION LIMITED, KOCHI

CONSULTANT

: ENGINEERS INDIA LIMITED, NEW DELHI

SPEC NO. : 7303-B00-01005


REVISION : 0
DATE

: 22.02.2014

W.O. NO.

: 3M0043

3.0 MATERIAL CHARACTERISTICS:


Following design parameters shall be considered for design the coal handling plant & equipment &
accessories:
a) Material handled

: Petroleum Coke

b) Maximum lump size

: 100 mm (Crushed coke)

c) Moisture, wt %

: 8 15

d) Angle of repose

: 35 deg.

e) Bulk Density

: 0.72 T /Cu. m for Volume Calculation


: 1.04 T /Cu. m for Load Calculation

f) Material temperature

: Ambient to Max. 60 Deg. C

g) Abrasiveness

: Moderate

h) Flowability

: Sluggish

4.0 INPUTS / ATTACHMENTS TO THIS SPECIFICATION:


The following drawings are attached with this specification, which may please be referred, while preparation of
offer:
1. PLANT LAYOUT
2. COKE FLOW DIAGRAM
3. SPECIFICATION REQUIREMENT
4. TECHNICAL SPECIFICATION PAINTING SYSTEM
5. CONSOLIDATED VENDOR LIST
6. STANDARD SPEC. FOR HOSE
7. STAND POST TYPE FIRE HYDRANT
8. STAND POST TYPE WATER CUM FOAM MONITOR
9. DATA SHEET FOR SPRAY NOZZLES
10. SPEC. FOR INDUSTRIAL TYPE CONTROL STATION
11. SPEC. FOR LT MOTOR
12. SPEC. FOR MEDIUM & HOLTAGE CABLES & ACCESS.
13. SPEC. FOR COMMUNICATION & FIRE ALARM CABLES
14. SPEC. FOR ELECTRICAL MOTOR OPERATED VALVES
15. SPEC. FOR LOCAL CONTROL PANEL & ACCESSORIES
16. INSTRUCMENTS FOR COKE HANDLING SYSTEM
17. SPECIFICATION FOR CABLES (POWER)
18. SPECIFICATION FOR CABLES
(COMMUNICATION & FIRE ALARM CABLES)
19. MANDATORY SPARES (LIST)
20. HYDRANT ASSEMBLY DRAWING
21. SAFETY PRACTICES (TO BE FOLLOWED AT SITE)
22. SCOPE DRAWING FOR COKE HANDLING PACKAGE
23. PIPING SCOPE DRAWING

: Drawing No. 3M0045 C00 000 01


: Drawing No. 3M0045 C00 000 02
: PDF File (13 Pages)
:: Document No. A307-ID-28-41-VL-02
: Document No. 6-66-0018 REV. 3
: Document No. A307-0IY-16-47-DS-18
: Document No. A307-0IY-16-47-DS-20
: Document No A307-0IY-16-47-DS-22
: Document No. 6-51-0014-REV. 4
: Document No. 6-51-0032-REV. 4
: Document No. 6-51-0051-REV. 6
: Document No. 6-51-0052-REV. 6
: Document No. 6-51-0091-REV. 3
: Document No. 6-51-0072-REV. 3
: Document No. A307-0ID-16-51-SP-1001
: Document No. 6-51-0051 Rev 6
: Document No. 6-51-0052 Rev 5
: PDF File (13 Pages)
: Drawing No. A307-0IY-16-47-4921
: OISD-GDN-192
: A307-0ID-16-47-0416_Rev 2
:A307-OID-16-43-7000_Rev A

Bidder to highlight in his offer clearly Specific Deviations & Assumptions, if any.
Otherwise, it will be deemed that, bidder has followed and considered all the requirements of the specification
and the same will be binding as per approval from BPCL/EIL, without any commercial implication to TKII.

PREPARED BY: CHETAN

APPROVED.BY: D. MITRA.