Professional Documents
Culture Documents
Fire Fighting 2015
Fire Fighting 2015
Prepared BY
Supervised By
Eng. Mahmud Abdelaty
Senior Electromechanical Engineer
Engmah111@gmail.com
July, 2015
Types of sprinklers
Zone station
Sprinkler system design (no. of sprinkler, location, net work)
Special sprinkler systems :( dry, pre action, deluge)
Note that:
All tables which
needed, putted on the
final pages
5- fire fittings
e.hosam2000@gmail.com
Page 2
1- Fire science :
1-1 Fire safety
:
fire rated wall
- fire , smoke,
temperature
: 30 min, 60min, 120min
escape staircase
*
inputs
controller
sensors
output
- types of sensors:
- smoke, heat , multi
detector
: FACP
Fire Alarm Control
Panel
Together, they
produce the CHEMICAL
REACTION that is fire
Take away any of these
things and the fire will be
extinguished
NFPA:
National Fire Protection Association
e.hosam2000@gmail.com
Page 3
glass bulb
sprinkler body
mercury
fusible link
" "
Deflector :
e.hosam2000@gmail.com
Page 4
Secondly:
According to direction of flow
1- Pendent
-direction of flow
down word
- fall ceiling is found
"
"
2- Upright
-direction of flow is up
word
- fall ceiling not found
" "
- fall ceiling is found:
When ceiling void >= 90 cm
"
" 90 =>
e.hosam2000@gmail.com
pendent, upright
3- side wall
side wall
Page 5
ZCS
Main line
ZCS
Discharge line
cross main
ZCS
Suction line
branches
ZCS
Riser
FF
tank
Pump
. *
* Zone
e.hosam2000@gmail.com
Page 6
2) tamper switch:
OS&Y gate valve
Tamper switch
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
3) Flow switch:
fire switch
" " switch
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 7
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 8
Beam
ZCS
External additional flushing connection
e.hosam2000@gmail.com
Page 9
e.hosam2000@gmail.com
2- Ordinary hazard
3- extra hazard
Page 10
A) (length \ 4.6) =
B) (width \ 4.6) =
C) x, 2x ; y, 2y :
e.hosam2000@gmail.com
Page 11
:
( ) m 5 * m 10 :
10
=3
( )3
width :D
=2
)2(
Page 12
e.hosam2000@gmail.com
C) x, 2x ; y, 2y :
sprinkler :
2X X - :
Y
2X
2X
2Y
10 = X *
X = 1.6 m 6X = 10
5 = Y *
Y = 1.25m 4Y = 5
:
e.hosam2000@gmail.com
Page 13
:
-:
Page 14
e.hosam2000@gmail.com
1- Rooting:
( simple, symmetrical)
2- Sizing:
We get the sizing from pipe schedules which depend on (hazard, no.
of sprinkler)
Locke @ table (22.5.2.2.1 light hazard pipe schedule) , (22.5.3.4 ordinary hazard
pipe schedule) , (A.22.5.4 extra hazard pipe schedule) page 66 in this file.
:
22.5.2.2.1 Light hazard pipe schedule
Pipe sizing
1
1.25
No. of sprinkler
1, 2
3, 4
e.hosam2000@gmail.com
Page 15
e.hosam2000@gmail.com
Page 16
4.25 =
3.75 =
:
Secondly lock @ table 8.9.2.2.1 page 67 for extended coverage side wall sprinkler
Where:
S
" "3.75 =
,,,,,,,,,,,,,,,,,,,,,,,
8.5 S 8.5 ( .
)
e.hosam2000@gmail.com
Page 17
- Zone station valve is normally open. - Zone station valve is normally open
but after it we put clapper arm to
- Normal condition: 0: 74 C; 1 bar.
prevent the water from crossing.
- Single acting system
(
)
fire -
compressed air
clapper arm
e.hosam2000@gmail.com
Page 18
4- Deluge system
- Zone station valve is normally closed. - Zone station valve is normally closed.
SPK
. zone valve
SPK
( )
- Single acting system
SPK Nozzle
Page 19
e.hosam2000@gmail.com
1- Class I
- it called civil defense
cabinet
- D = 2.5 inch
- design condition:
* 250 GPM
* Mini. Pressure 6.9 bar
* Max. pressure 12.1 bar
note that:
- When P>12.1 bar;
pressure reducing valve
must used PRV.
e.hosam2000@gmail.com
2- Class II
- normal users
3- Class III
- fire hose station
-
Page 20
2- Guide location:
- Escape stair case
- Escape corridor
- @ car park in main inlet, main exit
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
-: - Poly line: reel
- List properties L I enter:
e.hosam2000@gmail.com
Page 21
hydrant . 50 hydrant 2
e.hosam2000@gmail.com
Page 22
ZCS
Main line
ZCS
Discharge line
cross main
ZCS
Suction line
branches
ZCS
FF
tank
N
Pump
Check valve
Siamese connection
" : . "
- Siamese connection:* supply the system with water.
* connected on the pump discharge.
* check valve must be used with it;
.
e.hosam2000@gmail.com
Page 23
e.hosam2000@gmail.com
Page 24
Deluge system
e.hosam2000@gmail.com
Page 25
- Pump flow
in GPM calculated
Light
30: 60 min
ordinary
60: 90 min
extra
90: 120 min
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 26
- Puddle flinch: -
puddle flinch -
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Connection on tank
1234567-
e.hosam2000@gmail.com
diameter
height
Fire fighting
Fire fighting
plumbing
plumbing
plumbing
plumbing
plumbing
25: 30 cm
cm "10 :5" +
Inside depression
Fire fighting storage hff = vff \ Atank
over flow
Page 27
Vent pipe:
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
- To avoid cavitations:
1- anti vortex plate 2D where D is suction pipe diameter.
2- The distance between anti vortex plate & depression = 6 inch=
150mm= 15cm.
- Trench drain:
:
- Drainer pipe
- Over flow line
- Pump room water
plumbing
e.hosam2000@gmail.com
Page 28
e.hosam2000@gmail.com
Page 29
3- Jockey pump
NFPA pressure main pump
e.hosam2000@gmail.com
Page 30
:
1- cabinet system only
a) Class II
3- combined system
b) Class I,III
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
4-2-1 cabinet system only:
a) Class II;
100 GPM; 4.5 bar: 6.9 bar
- flow calculation:
100 GPM class II -
- Head calculation:
Hp = Hst + Hres + Hf
Where:
- Hp
pump head
- Hst
static head
bar 10
- Hres
e.hosam2000@gmail.com
Page 31
- Hf
friction head
hazen-williams formula -
Pl = hf= (4.52 * . ) \ (. * . )
Where:
-Q
-C
friction loss coefficient = 120; from table 22.4.4.7 hazen-williams C values page 67
-D
,,,,,,,,,,,,,,
Ex:
4, 100 GPM
FF
tank
Pump
2.5
2.5
2.5
25 ft
25 ft
25 ft
25 ft
100 GPM
100 GPM
100 GPM
100 GPM
e.hosam2000@gmail.com
Page 32
5
4
4, 100 GPM
FF
tank
Pump
2.5
2.5
2.5
25 ft
25 ft
25 ft
25 ft
100 GPM
100 GPM
100 GPM
100 GPM
: sr
1
2
3
4
5
section
1-2
2-3
3-4
4-5
GPM D
hf
Lpipe
100
2
100 2.5
100
4
100
1
Where:
Pl = hf= (4.52 * . ) \ (. * . )
Leq
From
Ltotal
Hf
Lpipe + Leq
hf * Ltotal
Table 6.4.3.1
page 68
Hf 1.1 Hf head Hp
e.hosam2000@gmail.com
Page 33
b) Class I ,III;
2.5 , 1 , 2.5
250 GPM; 6.9 bar: 12.1 bar
- flow calculation:
500 GPM = 2 Flow class III,I 250 GPM GPM 1250 Pump Flow .
250 GPM
250 GPM
FF
tank
Pump
e.hosam2000@gmail.com
1250 GPM
1250GPM
1000 GPM
750 GPM
500 GPM
Page 34
- Head calculation:
Hp = Hst + Hres + Hf
Where:
- Hp
pump head
- Hst
static head
bar 10
- Hres
- Hf
Pl = hf= (4.52 * . ) \ (. * . )
Where:
-Q
-C
friction loss coefficient = 120; from table 22.4.4.7 hazen-williams C values page 67
-D
,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 35
Ex:
2.5
250 GPM
250 GPM
4, 500 GPM
250 GPM
FF
tank
Pump
250 GPM
250 GPM
25 ft
25 ft
25 ft
25 ft
1250 GPM
1000 GPM
750 GPM
500 GPM
Ex:
2.5
3
1
250 GPM
250 GPM
4, 500 GPM
250 GPM
FF
tank
Pump
250 GPM
25 ft
25 ft
25 ft
25 ft
1250 GPM
e.hosam2000@gmail.com
250 GPM
1000 GPM
750 GPM
500 GPM
Page 36
: sr
1
2
3
4
5
6
7
section
1-2
2-3
3-4
4-5
5-6
6-7
GPM D
hf
Lpipe
1250 6
1000 6
750
5
500
4
250
4
250 2.5
Where:
Leq
From
Ltotal
Hf
Lpipe + Leq
hf * Ltotal
Table 6.4.3.1
page 68
Hf 1.1 Hf head Hp
e.hosam2000@gmail.com
Page 37
Steps:
1- Most demand area:
" " NFPA demand
Hazard
Light Hazard
Ordinary Hazard
Extra Hazard
,,,,,,,,,,,,,,,,,,,
2- Sprinkler density:
NFPA demand
Hazard
Light Hazard
Ordinary Hazard
Extra Hazard
0.1
0.15: 0.2
0.3 : 0.4
,,,,,,,,,,,,,,,,,,,
Q = K
5.65 = KSP FM UL Factory
mutual
e.hosam2000@gmail.com
Page 38
Ex:
Required:
- make a complete design for the fire fighting pump which
serves a building; the most demand area is as shown.
Note that; the hazard is ordinary hazard.
NFPA
e.hosam2000@gmail.com
Page 39
Where:
Sp1 , qsp1 , psp1 : -
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
: X -
Pl1
losses
139
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
1 = 1 *
Where:
Area ( )
200
130
100
4.6
4.6
3.7
0.15 =
e.hosam2000@gmail.com
Page 40
1 = K
Where
1 = 11.9
Note that:
- The minimum residual pressure for any sprinkler is 7 psi = 0.5 bar.
5- Calculate the friction losses per unit of pipe from the most
remote sprinkler to the adjacent sprinkler by using hazenwilliam formula.
4.52 Q 1.85
C 1.85 D 4.87
Where:
e.hosam2000@gmail.com
. ..
= .
Page 41
pl1
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
7- Calculate the residual pressure on adjacent sp2
= 1 + 1 = 13.5 psi
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
8- Calculate the discharge @ this adjacent remote sprinkler
2 = k
2
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
9- Calculate the discharge in this pipe section
2 = 1 + 2
2 = 40.2 GPM
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
10-
3 9 8 7 6 5
:
2 \\ 3 = ( 2 +2 ) \\ 3 \\ 3
11-
4 9 8 7 6 5
:
3 \\ 4 = ( 3 +3 ) \\ 4 \\ 4
e.hosam2000@gmail.com
Page 42
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
demand area branch -
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Note that:
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
4 =
12-
4.52 Q 4 1.85
C 1.85 D 4.87
)* total length
(Pipe length + eq. length)
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
SPK X - 13
= 4 + 4
= 4 = 3 + 4
14- Calculate K factor for the pipe
K=
=
e.hosam2000@gmail.com
Page 43
4.52 Q 4 1.85
5 =
15-
C 1.85 D 4.87
spk
)* total length
(Pipe length + eq. length)
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
16-
py = px + pl5
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
17-
5 =
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
18-
6 = 5 + 4
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
4.52 Q 6 1.85
6 =
19-
C 1.85 D 4.87
)* total length
(Pipe length + eq. length)
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
20-
pz = py + 6
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
21-
7 =
e.hosam2000@gmail.com
Page 44
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
22-
8 = 7 + 6
e.hosam2000@gmail.com
:
Pump flow ##
Page 45
- Head calculation:
Hp = Hst + Hres + Hf
Where:
- Hp
pump head
- Hst
static head
bar 10
- Hres
- Hf
Hf
demand area - 1
" diameter flow " section - 2
= 4 in
: sr
1
2
section
GPM
hf
Lpipe
Leq
Ltotal
Where:
Pl = hf= (4.52 * Q^1.85) \ (C^1.85 * D^4.86)
Hf
From
Lpipe + Leq
hf * Ltotal
Table 6.4.3.1
page 68
Hf 1.1 Hf head Hp
e.hosam2000@gmail.com
Page 46
Steps:
A) Calculate the flow for cabinet system only.
B) Add for this flow :
1- Light hazard
2- Ordinary hazard
3- Extra hazard
GPM 150 -
GPM 500 -
C) Head calculation:
- calculate head for cabinet
- calculate head for sprinkler
*** take the larger
e.hosam2000@gmail.com
Page 47
Hp =
Horse power
e.hosam2000@gmail.com
3960
0 .65
Page 48
Pump
(1)
(8)
e.hosam2000@gmail.com
(7)
(3)
(2) (9)
(4)
(1)
Page 49
2- Construction
Design drawing
BOQ pumps, pipes
, spk, co2 or fm200 system,
cabinet
Specs specification
Cost estimation
Requesting order
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
5-2 Fittings:
123-
threaded fittings
weld fittings
grooved fittings
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 50
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
5-2-3-2 coupling
:
a) rigid
coupling
b) flexible
" "
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
5-2-3-3 mechanical Tee
:
e.hosam2000@gmail.com
Page 51
e.hosam2000@gmail.com
Page 52
Ex:
fittings
e.hosam2000@gmail.com
Page 53
:
1- grooved Tee 4 * 2.5 * 4
2- two(2) rigid coupling 4
3- one(1) rigid coupling 2.5
4- grooved elbow 2.5
5- two(2) rigid coupling (RC) 2.5
reducer
1- grooved Tee 4 * 3 * 4
2- reducer 4 * 2.5
3- one(1) rigid coupling 2.5
4- one(1) rigid coupling 4
5- one(1) rigid coupling 3
6- grooved elbow 3
7- two(2) rigid coupling (RC) 3
Note that:
mechanical Tee
NFPA main mechanical Tee
e.hosam2000@gmail.com
Page 54
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
RN: riser nipple 10 = ~
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 55
e.hosam2000@gmail.com
Page 56
Ex:
mechanical Tee
fittings
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Note that:
* Pipe schedule:
4 sch 40 40 "4
**
Schedule
pipe thickness
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
** groove
a) roll groove
b) cut groove
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
*** Diameters:
Pipe diameter
e.hosam2000@gmail.com
thickness
stress
Page 57
Fittings:
1- Threaded
2- Weld
3- Grooved (roll groove or cut groove)
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Sch10 " 5 D -
e.hosam2000@gmail.com
Page 58
2-2 Fire extinguishers fire ext.
2-2-1 Type of fire ext. Class of fire
2-2-2 Location of fire ext.
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
2-2-1 Type of fire ext. Class of fire
Class A
Class B
Class C
Class D
Class K
Surface fire
:
Wood paper
clothes
Fire in
combustible
material in
liquid
material
Fire in
energized elect
Equipment
Fire in
combustible
material in
solid state
Fire in cooking
media
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
2-2-2 Location of fire ext.
* Travel distance
30 m
** Guide location:
- escape stair case
- escape corridor
e.hosam2000@gmail.com
Page 59
Electro static
" "
,,,,,,,,,,,,,,,,,,,,,,,,,,,
** Type of fire ext. according to its shape:
Portable
" "
wheeled
automatic matic
Matic
Sprinkle
r
e.hosam2000@gmail.com
Page 60
Pull
Aim
Squeeze
Sweep
Aim
e.hosam2000@gmail.com
Page 61
,,,,,,,,,,,,,,,,,,,,,,,,,,,,
3- design:
a) Weight of required gas. not volume
b) Sequence of operation.
..
A) Weight of required gas. not volume
It depends on:
- Volume of space
- Temperature of space
- Type of fire
e.hosam2000@gmail.com
Page 62
Steps:
1- Calculate the volume of the space.
Volume = length * width * height
W=v*f
2-
Where:
W
volume of space
flooding factor
( 3 or 3 )
or 3 )
It passed on:
- Type of gas
- Type of fire
- Type of gas
By
table 1
, concentration factor
- Type of fire
C
By
table 2
F = 0.0341
Temp. Of space 70 , 22
e.hosam2000@gmail.com
Page 63
Table 1:
Table 2:
e.hosam2000@gmail.com
Page 64
b) Sequence of operation:
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
* Standard weight for 2 is 45 kg
** For Fm200 no standard
e.hosam2000@gmail.com
Page 65
weight
Plumbing Works Calculations
e.hosam2000@gmail.com
Page 66
e.hosam2000@gmail.com
Page 67
e.hosam2000@gmail.com
Page 68
e.hosam2000@gmail.com
Page 69
e.hosam2000@gmail.com
Page 70
Processing
outputs
1-Input:
1-1 automatic :
1-1-a) smoke detector (SD)
1-1-b) heat detector (HD)
1-1-c) gas detector (GD)
1-1-d) carbon monoxide detector (CD)
1-1-e) duct smoke detector (DS)
1-1-f) beam detector (S,R)
1-2 Manual:
- Manual pull station, break glass, call point
2-Data processing:
- FACP (fire alarm control panel)
3-Out put :
3-1 Bell
3-2 serine
3-3 horn
3-4 strobes light
3-5 flusher
e.hosam2000@gmail.com
Page 71
1-Input:
1-1 automatic :
average area
7.5 .,,,,,,,,,,,,,,,,,,,,,
detector ,,,,,,,,,,,,,,,,,,,
Page 72
e.hosam2000@gmail.com
2- Rate of rise:
,,,,,,,,,,,,,,,,,,,,,,,,,
5,,,,,,,,,,,,,,,,,,,,,,,,,
Page 73
e.hosam2000@gmail.com
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
1-1-f) beam detector (S,R)
receiver receiver transmitter sender . sender
100 50 R T .
. 7 T,R T,R -
IR
7m
e.hosam2000@gmail.com
7m
IR
Page 74
flame detector **
) (
,,,,,,,,,,,,,,,,,,,,,,,
1-2 Manual:
- Manual pull station, break glass, call point
. 1.20 . 40 =
,,,,,,,,,,,,,,,,,,,,,,,
** wet area, stair, outdoors; not have alarm
,,,,,,,,,,,,,,,,,,,,,,,
e.hosam2000@gmail.com
Page 75
e.hosam2000@gmail.com
Page 76
2- Output:
3-1 Bell:
,,,,,,,,,,,,,,,,,,,,,,,
3-2 serine
90 db
60 db -
,,,,,,,,,,,,,,,,,,,,,,,
3-3 horn
120 db : outdoors
,,,,,,,,,,,,,,,,,,,,,,,
3-4 strobes light:
3-6 flusher :
2.20
manual input
,,,,,,,,,,,,,,,,,,,,,,,
3- Data processing:
- FACP (fire alarm control panel)
- Monitor:
- PCB: electronic devices
fire alarm - Battery
e.hosam2000@gmail.com
Page 77
controller :
- Conventional type:
50
Page 78
e.hosam2000@gmail.com
- addressable type :
monitor address address
micro processor
e.hosam2000@gmail.com
Page 79
:
branch : loop element 100 : loop ) 24 20 16 12 8 4 2 1 ( loops element : riser diagram fault isolator element 15 riser diagram *
. element riser diagram element
S: smoke detector
H: heat detector
FS: flow switch
TS: tamper switch "
G: generator
TR,RC: Beam detector
L: elevator
DS: duct smoke detector
Note that:
- Fire alarm system
DC 24 Volt
e.hosam2000@gmail.com
Page 80
***Shop drawing***
Fire fighting drawings
1- Design drawing
2- Shop drawing
- level
- dimensions
- supports
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
1- Design drawing
* Steps:
: -1
* Delete for any not required data
color 8 **
one block ***
**** Closed layer
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
: - 2
* Main fire fighting network from FF tank & FF pump room
. Fire
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
LI
Enter
: one block ***
enter block
e.hosam2000@gmail.com
Page 81
- 11
- 12
- 13
move
Spk
- 14
- 15
div
- 16
main
Page 82
e.hosam2000@gmail.com
2- Shop drawing
double single line - 1
Dimensions - 2
"Pipe Levels - 3
*
** Level depend on:
- F.C.H+ 75mm
- Main pipe = F.C.H+ 100mm
- Branch pipe =main + 100mm
Support -4
:Material takes off -5
Lock @:
- Shop drawing LC 306
- Shop drawing, Fire Fitting, fitting, 01
e.hosam2000@gmail.com
Page 83