Bermuda Project - Works sum

Sl. No
1
1.1

2
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
4.3
4.4
4.5
4.6
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8

1
2
2.1
2.2
2.3
2.4
2.5
3
3.1
3.2
3.3

3.4
4
4.1
4.3
4.4
4.5
4.6
4.7
4.8

1
2
2.1
2.2
2.3
2.4
2.5
3
3.1
3.2
3.3
3.4
4
4.1
4.3
4.4
4.5
4.6
4.7
4.8

1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2
2.3
2.4
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7

1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2

Bermuda Project - Works summar


Description
Payment approval from consulatnts till end of Spetember 2016(without 10% retention)
Total work progress completed till end of September 2016
Work progress
Zone-4 (Total 49 villas - 19 D type & 30 E type)
All MEP works above falase ceiling are competed
Electrical
Light fittings, Sanitary mixtures & fixture installation completed, under inspection
DB, SMDB & Energy meter installation completed
Switch socket installation completed
Isolators installation is pending
All villas cabling works from Energy meter to DB are completed
HVAC
Indoor installations completed
PI & GI Ducting works, exhaust fan installations completed
E-type - 30 villas Outdoor installation completed, copper piping works completed
Copper pipe pressure test is completed
D-type outdoor installation is in progress
Grilles and diffuser installation is in progress
PLUMBING
All villas High level and low level piping completed
Sanitary ware & sanitary mixture (except bath tub mixture) installaton is completed
Waiting for pump material, pumps installation is pending
All internal water supply piping works are completed
Water tanks shifted to roof, roof piping not completed
Bath tub mixture material delivery is pending since long time
External drainage piping and manhole works are completed
Drainage line connected to external infra drainage lines
Zone-1 (Total 44 villas )
All MEP works above falase ceiling are competed
Electrical
Light wiring, isolator wiring, TV & Telephone wiring works are completed
DB, SMDB & Energy meter installation completed
All villas cabling works from Energy meter to DB are completed
Isolators installation is pending
Light fittings installation not completed
HVAC
Indoor installations completed
PI & GI Ducting works, exhaust fan installations completed
Outdoor installation is pending

Shaft copper pipingis completed, roof copper piping works are pending
PLUMBING
All villas High level and low level piping completed
Pumps installation not completed
Water tanks works are pending
Bath tub mixture material delivery is pending since long time
External drainage piping and manhole works are completed
Drainage line connected to external infra drainage line works are in progress
All internal water supply piping works are completed

Zone-2 (Total 24 villas - B type - 15 villas & C type - 9 villas)


B type 15 villas above false ceiling MEP activities are completed
Electrical
Light wiring, isolator wiring, TV & Telephone wiring works are completed
DB, SMDB & Energy meter installation completed
All villas cabling works from Energy meter to DB are completed
Isolators installation is pending
Light fittings installation not completed
HVAC
Indoor installations completed
B type - 15 villas PI, GI duct works completed, C type - 9 villas in progress
Outdoor installation is pending in all villas
Shaft copper pipingis completed, roof copper piping works are pending
PLUMBING
All villas High level and low level piping completed
Pumps installation not completed
Water tanks works are pending
Bath tub mixture material delivery is pending since long time
External drainage piping and manhole works are completed
Drainage line connected to external infra drainage line works are in progress
All internal water supply piping works are completed
Zone-3 (Total 32 villas)
Electrical
Light wiring, isolator wiring, TV & Telephone wiring works are completed
DB, SMDB & Energy meter installation completed
All villas cabling works from Energy meter to DB are completed
Isolators installation is pending
Light fittings installation not completed
HVAC
Indoor installations completed
PI, GI duct & Ehaust fan installation is in progress
Outdoor installation is pending in all villas
Shaft copper pipingis completed, roof copper piping works are pending
PLUMBING
Low level piping works are completed, high level piping works are pending in 10 villas
Pumps installation not completed
Water tanks works are pending
Bath tub mixture material delivery is pending since long time
External drainage piping and manhole works are in progress
Drainage line connected to external infra drainage line works are in progress
All internal water supply piping works are completed

Infrastructure works
Electrical & Telephone works
90% Electrical cable laying works are completed
Waiting for RMU and Transformer
Sub-station works are pending
Peeder pillar installationand termination works are in progress
Zone-4, Zone-1 & Zone-2 Etisalat manhole and piping works are completed
Drainage & water suppy works
Zone-4, Zone-1 & Zone-2 villa drainge connection to extranal drainage lines works are completed,
works are in progress

Zone-4, Zone-3 & Zone-2 main water line and tap off works are completed, Zone-1 works are in pro

ry
Remarks
15,966,409.98
59.13%