Bermuda Project - Works Summary: Sl. No 1 1.1
Bermuda Project - Works Summary: Sl. No 1 1.1
Sl. No
1
1.1
2
3
3.1
3.2
3.3
3.4
3.5
4
4.1
4.2
4.3
4.4
4.5
4.6
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
1
2
2.1
2.2
2.3
2.4
2.5
3
3.1
3.2
3.3
3.4
4
4.1
4.3
4.4
4.5
4.6
4.7
4.8
1
2
2.1
2.2
2.3
2.4
2.5
3
3.1
3.2
3.3
3.4
4
4.1
4.3
4.4
4.5
4.6
4.7
4.8
1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2
2.3
2.4
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
1
1.1
1.2
1.3
1.4
1.5
2
2.1
2.2
Shaft copper pipingis completed, roof copper piping works are pending
PLUMBING
All villas High level and low level piping completed
Pumps installation not completed
Water tanks works are pending
Bath tub mixture material delivery is pending since long time
External drainage piping and manhole works are completed
Drainage line connected to external infra drainage line works are in progress
All internal water supply piping works are completed
Infrastructure works
Electrical & Telephone works
90% Electrical cable laying works are completed
Waiting for RMU and Transformer
Sub-station works are pending
Peeder pillar installationand termination works are in progress
Zone-4, Zone-1 & Zone-2 Etisalat manhole and piping works are completed
Drainage & water suppy works
Zone-4, Zone-1 & Zone-2 villa drainge connection to extranal drainage lines works are completed,
works are in progress
Zone-4, Zone-3 & Zone-2 main water line and tap off works are completed, Zone-1 works are in pro
ry
Remarks
15,966,409.98
59.13%