Professional Documents
Culture Documents
Summary of Utilities
Summary of Utilities
Summary of Utilities
Project
Location
Project Code
:
:
:
MONTH
1 mos. Advance
2 mos. Deposit
August 2015
September 2015
October 2015
November 2015
December 2015
January 2016
February 2016
March 2016
April 2016
May 2016
June 2016
July 2016
August 2016
September 2016
TOTAL :
Female
Male
UTILITIES
Electric
Female
15,000.00
30,000.00
15,000.00 P
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
15,000.00
0.00
255,000.00 P
0.00
Water
Male
Female
361.78
584.09 P
347.30
530.38
932.17
107.21
1,764.72
1,599.03
1,290.82
1,006.38
1,196.19
9,720.07
GRAND TOTAL : P
Prepared by:
Noted by:
Male
0.00
135.00
135.00
133.00
120.04
119.83
277.24
181.12
314.88
149.73
1,565.84
266,285.91
Approved by:
MA. ANDREA G. SALDAJENO CESAR C. CARAVEO III / ELIZARDO TOLENTINOMAXIMILLIAN G. QUINTOS/IBRAHIM M. NUO
HR/Admin Officer
Project-in-Charge / Area Manager
SVP / President
1 mos. Advance
1 mos. Deposit
August 2015
September 2015
October 2015
November 2015
December 2015
January 2016
February 2016
March 2016
April 2016
May 2016
June 2016
July 2016
August 2016
September 2016
October 2016
16000
16000
16,835.48
17,227.43
18,915.81
20,104.86
20,386.01
18,148.12
19,768.44
17,222.13
21,724.32
22,065.39
16,000.00
16,000.00
16,000.00
16,000.00
16,000.00