Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 12

PORT OF

FUJAIRAH OIL TANK


UPDATED WO
Sl.No

Date

Work Order
No

Berth

01.07.15

16292

Misc

27.07.15

16457

MM1

29.07.15

16462

14.08.15

16478

30.08.15

16493

30.08.15

16494

MM1

31.08.15

16496

Misc

09.09.15

16561

22.09.15

16581

Lights

10

27.09.15

16597

11

27.09.15

16600

MM1

12

29.09.15

16604

Misc

13

06.10.15

16620

MM1

14

07.10.15

16623

15

22.10.15

16639

CCR

16

25.10.15

16643

CCR

17

26.10.15

16645

MM1

18

26.10.15

16648

Misc

19

26.10.15

16649

20

29.10.15

16701

MM1

21

09.11.15

16707

CCR

22

14.11.15

16657

MM1

16.11.15

16658

24

17.11.15

16661

CCR

25

26.11.15

16665

26

04.12.15

16668

27

13.12.15

16671

MM2

28

19.12.15

16672

29

21.12.15

16673

Misc

23

30

21.12.15

16674

31
32

27.12.15
31.12.15

16678
16680

MM1
8

33

11.01.16

16683

MNR

34

14.01.16

16685

MM2

35

14.01.16

16687

36
37

17.01.16
19.01.16

16688
16690

MM1
MM2

38

20.01.16

16691

CCR

39

24.01.16

16693

40

25.01.16

16695

CCR

41

25.01.16

16696

42
43

27.01.16
27.01.16

16697
16698

CCR
Misc

44

28.01.16

16699

45

28.01.16

16700

MM1

46

28.12.15

16716

CCR

47

28.12.15

16717

CCR

48

11.01.16

16718

49

25.01.16

16723

Safety

50

30.01.16

16725

MM1

51

31.01.16

16726

Misc

52

01.02.16

16727

Misc

53

01.02.16

16728

54
55
56
57
58

03.02.16

16729

CCR

04.02.16
04.02.16

16730
16732

3
2

05.02.16

16733

MM1

05.02.16

16734

MM1

total WO in this list


Closed
work in progress
open

58
22
31
5

PORT OF FUJAIRAH
FUJAIRAH OIL TANKER TERMINAL 1 & 2
UPDATED WORK ORDERS
Description

Status

Dept

Kindly arrange Contractor for MLA Panel shelters, Control room


window sunshades, SS-22 Generator shelters, OTB-6W New
Inprogress
shelters, OT-2 FFA shelters repairs to be done

NAWAS

Kindly provide Civil/Pipe Barricades at MM1 Pipe rack which is


very near Enoc Nitrogen Plant

Open

NAWAS

MLA 76 Right/Left Hydrauilc slew cylinder is leaking

Inprogress

MARIO

MLA-43 Apex swivel joint No :02 Left side seal is leaking

closed

MARIO

Kindly replace all suction and discharge Sprial hose of


docklines at OTB-02 & 03M with carbon steel pipes

closed

MADAN

Kindly make arrangement/Header to draining of White header


at MM1 to be connected with Oil Pit for emptiness of dockline
header

Inprogress

MADAN

SAFT User Room 1. Toilet Exhaust Fan 2. Window door lock to


be changed with new one

Inprogress

NAWAS

During MLA Connection/Disconnection time, The MLA Panel


was cutoff at OTB-05M Jetty side. Kindly check and rectify

closed

MARIO

Kindly replace and rectify the lights deficiencies at OT-2 Berths Inprogress

MARIO

OTB-3E Main AIR valve is not able to open/close

closed

MARIO

PLR 1/2 Inch safety pin ball valve is passing at PLR-11 MM1

Inprogress

MARIO

Kindly install one no pressure gauge at near wing berth


White/Black MLA of Berth 8 & 9 for monitoring pressure
readings

Inprogress

MADAN

Kindly install 2 inch common header for venting of dockline


pressure & connected with oil pit

Inprogress

MADAN

QRH Display Screen monitor is not working

Inprogress

MARIO

CCR Parking Shed has to be Shifted at Berth 8,9 & MM2

Inprogress

NAWAS

Kindly check CCR First floor water system. Due to extension of


CCR, The water pressure is not build up from fresh water tank
pump which islocated at CCR

closed

NAWAS

Kindly provide SS Tubing arrangement of slot 57 to 62 MOV for


integrity checks

Inprogress

MADAN

Inprogress

NAWAS

closed

MARIO

Kindly replace the following pressure gauages 1.Black


stripping Pump-01 & 02 Discharge pressure gauge and DL-24
Pressure gauge at MM1

closed

MARIO

FOTT CCR Training room lights has to be divided in two


buttons, Control cover is required for central AC in 1 st floor

Inprogress

NAWAS

DL-36 Stripping suction valve indication has to be rectified

Inprogress

MARIO

QRH-3/7 & QRH 4/3 Rope guard is bend as informed by Marine

Inprogress

MARIO

closed

NAWAS

closed

MARIO

OTB-04 White stripping Pump shaft seal is leaking

Inprogress

MARIO

PLR-56 Door is leaking, DL-33 MOV B0833& MOV MB 23-1


Selector switch is not holding

Inprogress

MARIO

MOV-MB16-2 is closing automatically while cargo operation

closed

MARIO

Kindly do restencling of all FOTT equipments


( MLA,QRH's,FMT's etc ) which was ereasd

closed

MARIO

Electrical panel, entrance door and Kitechen wooden door


replacement works
MOV-B4W-20 Valve is slightly passing

Kindly check CCR First floor water system. Due to extension of


CCR, The water pressure is not build up from fresh water tank
pump which islocated at CCR
Berth-07 White Header DBB Valve is not closing

OTB-02 Control room Kitchen drain line ,water line is leaking


inside wall

Inprogress

NAWAS

closed
Inprogress

MARIO
ALBANNA

Inprogress

MARIO

New ITT Header requirement- TG, Air eliminator,Sounding


Points and Platform

Inprogress

MADAN

OTB-02 White stripping Pump is not taking proper suction and


Discharge NRV is passing

closed

MARIO

MOV-MB-23-2 Power got tripped while remote


Kindly install Ball Valve of each header at MM2

closed
Inprogress

MARIO
MADAN

CAMERA Deficiencies

Inprogress

ASIF

MOV-B6B-18 Opened Automatically without Local/Remote


Mode

closed

MARIO

KARCHER PRESSURE WASHER is not build up pressure

Inprogress

MARIO

MOV MB-19-2 Top MOV is not holding


Berth 8 & 9 MLA Drainage going to Oil Pit is block
Kindly replace Flourescent lamp of emergency lights and 12
Meter pole lights

OTB-04 QRH Monitoring system is showing time-out and not


able to laod QRH Load
CCTV-PC Monitoring system is not working
OTB PICK UP 12458 AC is not working

closed

MARIO

closed
Inprogress

ASIF
NAWAS

BERTH 08 & 09 Stenchiling of QRH SWL and Hook No

Inprogress

MARIO

Painting of MM1 Docklines near PLR

Inprogress

MARIO

Trucking and wiring toward wall @ FOTT office building

closed

NAWAS

Trucking and wiring of network cable toward wall @ FOTT


office building

closed

NAWAS

Black stripping Pump Strainer heat tracing cable is not getting


heat

closed

MARIO

Safety sign board letter changes

Inprogress

NAWAS

MOV-MB-15-2 Valve shaft is slightly bend


Kindly check and rectify of berths Monorail Chain Hoist Which
is not working

closed

MARIO

Inprogress

MARIO

Open

NAWAS

closed

MARIO

2 TON Split AC to be relocated in adjacent room on staurday


6th Feb 2016
LHF-5-2 Foam Valve is rusty and corroded

Furniture to be dismantled located from Following FOTT 1. Old


TM 2. Asst terminal to CCR

Inprogress

NAWAS

MLA -35 Product Valve side Hudraulic oil is leaking


MLA-24 Temperaure Gauge is not working

Open
Open

MARIO
MARIO

MM1 Black stripping Pump-02 Gear Box problem , Pump is not


rotating

Open

MARIO

Black stripping Pump-1 Discharge PG, White Pump-02


Discharge PG is not working

Inprogress

MARIO

NAL 1 & 2
RS
Status

50% completed and Job in progress


contractor will start working after
issueing LOP
Right side Job completed and waiting
for left side spare (LPO. 416041)
leaking only in MOGAS - still monitoring
by FOTT
this work is included with OT-1 stripping
pump installation - pumps already
arrived, still contractor not finallized
(negotiation in progress)
already awarded to M/S Albanna Eng. /
procurement completed work will be
done after completing scrubber line
modification
50% completed and Job in progress
completed
in progress
no need to replace this valve, because
this line will be converted to scrubber
line shortly
machining of valve handle in progress
in Albanna's punch list by Projects /
Albanna agreed and will install shortly

Remark

Priority

awarded to M/S Albanna Eng / after


completing berth side they will start
working MM-1 west end

monitor already purchased and with


Marima Tech for programming
FNCT will start work after completing
CCR car shed
completed
awarded to M/S Albanna Eng / material
procurement in progress
70% completed only Kitchen Shelf's
door job pending
completed
analog pressure gauge gets spoil soon
due to viberation - so we propose to
monitor only pressure transmitor
(Digital) which is working fine
50% completed only pending is to
provide two switch / FNCT will check
and revert
M/S Albanna is working in it
B4 completed in B3 we need hot work
to be done so waiting for vessel to
getclear from Jetty
completed
closed on 09th Feb. '16
seal ordered LPO 415866 - expected to
receive on 20th March '16
BOLDed is completed / albanna is
working in it
completed
completed

common header will be


connected to Scrubber
vessel / no need oil pit at
west end

it was completed and observed still


leaking / will revert with good solution
completed
M/S Albanna is checking
already bulbs arrived and scheduled for
09th evening shift
M/S Albanna is working in it / on 09th
location will be finalized by FOTT
this work is included with OT-1 stripping
pump installation - pumps already
arrived, still contractor not finallized
(negotiation in progress)
completed
work in progress
waiting for spare by our contractor
(AMC)
completed
given out for repairing by purchase
completed
closed
work in progress
only hook stenceling balance/will
schedule shortly
in progress
completed
completed
completed
purchase handling will updated shortly
completed
investigation in progress
location not clear
completed

work in progress
will schedule shortly after vessel castoff
completed
completed
for WO pump pressure will fix shortly no stock in store

You might also like