GOVERNMENT OF KERALA
NOVEMBER 2015
MonthlyProgressBriefNovember2015
Page1
PU
UBLIC WORKS DE
EPART
TMENT
T
G
GOVE
ERNME
ENT OF
O KER
RALA
KER
RALA STAT
TE TR
RANSP
PORT PROJ
JECT - II
(UNDE
ER WORLD BANK ASSISTA
ANCE Lo
oan No. 8254)
8
MONT
THLY P
PROGR
RESS BRIEF
NO
OVEM
MBER
R 201
15
Projec
ct Mana
agemen
nt Team
m
Kerala State
S
Transport Proje
ect
T.C.11/339, JAGA
AD Buildin
ng
nthancode,,
Keston Road, Nan
hapuram - 6
695003
Kawdiarr P.O., Thirruvananth
TABLE OF CONTENTS
Kerala State Transport Project-II.................................................................................................................... 5
1.1
Introduction ........................................................................................................................................................... 6
1.2
Project Development Objectives....................................................................................................................... 6
1.3
Outline Project Data: ............................................................................................................................................ 6
1.4
Overall Implementation: ...................................................................................................................................... 8
1.5
Project Components ............................................................................................................................................. 9
2.1
Project Description ................................................................................................................................................ 9
2.2
Road Upgradation Under Item Rate Contract:- ......................................................................................... 9
2.3
Sub Component A1 (US$322 mn).................................................................................................................. 10
2.4
Supervision Consultancy.................................................................................................................................... 10
2.5
Sub Component A2 (US$ 91 mn) .................................................................................................................. 10
2.6
Component B Road Safety Management (US$ 22 mn) ....................................................................... 11
2.7
Component C Institutional Strengthening (US$ 10 mn) .................................................................... 11
2.8
Project Cost and Disbursement ....................................................................................................................... 12
2.9
Graphical Representation of the Progressive Expenditure and Amount Reimbursed Status as
on October 2015 ................................................................................................................................................................ 13
2.10 Physical Progress of Finished Pavement Works (km) .............................................................................. 14
3.0 Executive Summary............................................................................................................................................... 14
3.1
Upgradation Works ............................................................................................................................................. 14
3.2
Summary of Progress (works) .......................................................................................................................... 15
3.3
General Issues: ........................................................................................................................................................ 16
3.4
Stringent Actions for Breach of Contract: ................................................................................................. 17
4.1
CURRENT STATUS OF WORKS .................................................................................................................. 18
4.2
Contract Package I ................................................................................................................................................ 18
4.3
Contract Details ..................................................................................................................................................... 18
4.4
Progress of Works................................................................................................................................................ 19
4.5
Schedule of Culverts and Drainage works ................................................................................................. 20
4.6
Progress Considering the Contract price up to November 2015. ................................................... 20
4.7
Physical progress Bar Chart .............................................................................................................................. 21
4.8
S-Curve ...................................................................................................................................................................... 21
4.9
Strip map ................................................................................................................................................................. 22
4.10 Potential Issues ...................................................................................................................................................... 23
4.11
Payments to the Contractor ............................................................................................................................ 23
4.12 Implementation of EMP ..................................................................................................................................... 23
4.13 Photograph ............................................................................................................................................................ 24
4.14 Contract Package II.............................................................................................................................................. 25
4.15 Contract Details .................................................................................................................................................... 25
4.16 Progress of Works...............................................................................................................................................26
4.17 Work progress considering the contract price (end October 2015) ............................................... 27
4.18 Physical Progress .................................................................................................................................................. 28
4.21
4.22
4.23
4.24
4.25
4.27
5.1
5.2
5.3
5.4
4.26
MonthlyProgressBriefNovember2015
Page3
5.5
5.6
5.7
5.8
5.9
5.10
5.11
5.12
6.1
6.2
6.3
6.3.1
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
8.9
Photographs ........................................................................................................................................................... 53
Contract Package VI .......................................................................................................................................... 54
Contract details: ................................................................................................................................................... 54
Financial Progress: ................................................................................................................................................ 55
Structural Work .................................................................................................................................................... 55
Bar Chart of Physical Progress: .......................................................................................................................56
S-Curve .....................................................................................................................................................................56
Implementation of EMP ..................................................................................................................................... 57
Payment to contractor .......................................................................................................................................59
Photographs .......................................................................................................................................................... 60
10.1
15.1
16.1
17.1
18.1
19.1
MonthlyProgressBriefNovember2015
Page4
Kera
ala Sta
ate Trranspo
ort Pro
oject-III
1.1 Prroject location map
m
Introduction
Government of Kerala has decided to take up Phase-II upgradation component of KSTP
as a standalone project, the KSTP-II. The project envisages the upgradation of 363 km
of SH and MDR, Road Safety Management and Institutional Strengthening of PWD. The
total Project cost is 445 million USD out of which 216 million USD is loan assistance
from World Bank. The project loan agreement was signed on June 19, 2013 at the DEA
Office, New Delhi.
The project
1.3.0.1
Length - 27.76 km.Covers Kasargod, Pallikkara, manikoth and Kanhad areas and
Tourist destinations at Bakel Fort and Ezhimala come under this stretch.
1.3.0.2
Length
km.
Covers
Pilathara,
Cheruthayam,
Kunnupuram
and
Pappinissery.
MonthlyProgressBriefNovember2015
Page6
1.3.0.3
1.3.0.4
1.3.0.5
1.3.0.6
at
Kuttinad
Length: 41 kms.
Jn).
The
growth
centre
connected
is
Pattambi
town
Districts.
April 2013
19 June 2013
Sept 6, 2013
MonthlyProgressBriefNovember2015
Page7
Project
cost
approved
by
World -
US$445 ml
Bank
World Bank (IBRD) Loan Assistance
US$216 ml
Fiscal Year
Allocation
Annual
Cumulative
1.3.0.7
FY 2014
FY 2015
FY 2016
FY 2017
FY 2018
FY 2019
22
22
43
65
45
110
54
164
32
196
20
216
1.
2.
3.
4.
Construction of Head Quarter Building for PWD / KSTP under green building
concept
There is an
Evaluation Committee headed by the PWD Secretary and comprising the Project
MonthlyProgressBriefNovember2015
Page8
Director, KSTP and Chief Engineer (Projects), to make recommendations on any issues
on procurement as may require approval of the Steering Committee.
This component will include upgrading 363 kms of strategically important State
Highways to complete network connectivity in the state with the objective of reducing
travel time between key socio-economic centers.
1.5.0.2
This component will support the strengthening of the road safety management systems
in Kerala with the objective of arresting the increase of crash fatalities in the state. This
component will finance various initiatives building on the work already undertaken
during the first project including a safe corridor demonstration project, implementation of
local level programs utilizing the challenge fund and advisory support for road safety
activities. The road section improved under KSTP-I from Kazhakuttom - VenjaramooduAdoor is proposed to be developed as Safe Corridor Demonstration Project (80 km)
1.5.0.3
Institutional Strengthening:
The objective of this component is to improve the sustainability of Keralas state road
network with respect to its functional adequacy, financial viability and capacity of key
state road sector institutions to deliver road infrastructure and services that are
responsive to road user needs.
Sector.
20.90 km
2.
27.76 km
3.
53.10 km
4.
50.30 km
5.
41.00 km
6.
47.00 km
MonthlyProgressBriefNovember2015
Page9
2.2.0.1
2.2.0.2
CONTRACT PACKAGE
NAME OF WORK
LENGTH (KM)
1.
KSTP-II/UG-1
Kasargod Kanhangad
27.78
2.
KSTP-II/UG-2
Pilathara Pappinisery
20.90
3.
KSTP-II/UG-3
Thalassery Valavupara
54.00
4.
KSTP-II/UG-4
Chengannoor - Ettumannoor
45.40
5.
KSTP-II/UG-5
Ettumannoor- Muvattupuzha
40.96
6.
KSTP-II/UG-4A
2.3
7.
KSTP-II/UG-6
Ponkunnam - Thodupuzha
50
8.
KSTP-II/UG-
Punalur-Ponkunnam
82
9.
KSTP-II/UG-7
Perumbilavu - Perinthalmanna
41
Leader at Thiruvananthapuram near to Clients Office and started functioning from April
2013. Also RE offices at Kanhangad in Kasargod District for package - 1, Pazhyangadi in
Kannur District for package II and at Uliyil near Mattannur in Kannur District for
package III, Pallam in Kottayam for Package IV, for Package V atKoothattukulam.
M/s MSV International USA is the selected consultant for Construction Supervision for
the Ponkunnam Thodupuzha stretch (50 km) CSC-2.
Resident Engineer cum Team Leader office at Ponkunnam. The length of road covered is
50 km and the assignment commenced on 15 May 2014.
Page10
progress. The Investor Meet was held on March 2015 at Kochi. The bidding process for
pre-qualifying bidder is expected to commence by end December 2015.
The
preliminary project report was submitted to Government for posing for External
Financial Assistance.
3. Consultancy for Strategic Option Study (SOS) for 8570 Km newly declared MDR
was completed by M/s CDM Smith Associates Pvt. Ltd. Study report has been
handed over to PWD and further action to improve these roads will be taken by
them using their own funds.
4. Consultancy service for Developing Multi Model Integrated Transport Hub at 3
cities, Trivandrum, Kozhikode and Kochi was completed and report forwarded to
Government. This report was also shared with NATPAC for consideration while
preparing Comprehensive City Development Projects.
5. The ToR on Strategic Road Network in Package II, III and IV has been sent to
Bank for review. The Client Executive Program Sponsor has been identified and
contract signed and functioning. The EoIs for the Packages have been received
and evaluated. The RFP is being submitted to Bank.
6. Rebidding for the selection of consultant for Development of Integrated
Information management System is in progress.
MonthlyProgressBriefNovember2015
Page11
7. The Project Management Software has been installed and training given to CSC
and KSTP Engineers. The PMS is operationalized.
8. The assignment for Community Participatory Road Safety and Asset Management
is now proposed for re-bidding.
9. The ToR for PMC with Post Construction Audit functions has been prepared and
89th Steering Committee has not taken any decision as it has to be discussed at
the next mission of World Bank.
Sl
No
Claim
DISBURSED
AMOUNT
CLAIMED
USDin
inLakh
EXPENDITURE
inLakh
Date
millions
TOTAL
1
2
3
4
5
Frontend
fee
Retroactive
1stQuarter
2nd
Quarter
3rdquarter
4thquarter
1stQuarter
201415
2nd
Quarter
3rdQuarter
9.
4thQuarter
10.
4thQuarter
11.
1stQuarter
201516
12
13.
BALANCEFUNDS
AVAILABLEFOR
CLAIM(MUSD)
MonthlyProgressBriefNovember2015
TOTAL
15.06.12to
1,863.95
15.06.13
01.07.13to
1,355.79
30.9.13
01.10.13to
1,906.01
31.12.13
01.01.14to
2,696.00
20.03.14
21.03.14to
53.79
31.03.14
01.04.14to
1,826.41
18.06.14
19.06.14to
14.69
30.06.14
01.07.14to
1,405.61
30.09.14
30.09.14to
3,790.21
31.12.14
01.01.2015to
3,706.35
28.02.2015
01.03.2015to
31.03.2015
01.04.2015to
3,704.89
06.06.2015
3534.13
and
30.06.2015
154.40
2nd Quarter
30.09.2015
201516
01.10.2015to
3rdQuarter
30.11.2015
Total
TOTAL
TOTAL
1,043.00
764.00
1,071.00
1,510.00
30.00
1,023.00
8.23
787.00
2,124.00
2,076.00
216.00
0.54
1.69
1.23
1.71
2.50
0.05
1.70
0.01
1.27
3.44
3.32
215.46
213.77
213.77
212.54
210.82
208.32
208.27
206.57
206.56
205.29
201.85
201.85
2,075.00
3.32
195.21
1991.00
86.00
3.13
0.14
192.08
3527.06
1977.00
3.04
188.90
4695
188.90
30707
16,565.23
27.10
Page12
FY 2014
(Jan-Dec)
FY 2015
(Jan-Dec)
FY 2016
(Jan-Dec)
FY 2017
(Jan-Dec)
FY 2018
(Jan-Dec)
FY 2019
(Jan-Dec)
22
22
43
65
45
110
54
164
32
196
20
216
14.15
12.95
14.15
27.10
Cumulative Expenditure
(INR Crores)
78.75
223.23
Progressive Amount
Reimbursed (INR Crores)
44.42
125.40
307.07
165.91
350
300
250
200
CumulativeExpenditure(INR
Crores)
150
ProgressiveAmount
Reimbursed(INRCrores)
100
50
0
1
MonthlyProgressBriefNovember2015
Page13
2.10 Ph
hysical Proogress of Finished
F
P
Pavement Works
W
(km
m)
BC
15.35
DBM
44
4.08
K
KM
WMM
4
44.85
GSB
47.45
10
1
15
20
25
30
0
35
40
45
50
3.0 Ex
xecutiv
ve Sum
mmary
3.1 Up
pgradation Work
ks
The worrk for Pack
kages 1,2,4,4A,5 and 6 are in progress.
p
T
The work in
n Package 3 was
terminatted due to poor perfo
ormance off the contrractor, and
d under arrrangement as 3A
and 3B. The work
k for Packag
ge 8 is und
der PPP (Hy
ybrid Annuity) and bid
dding is ex
xpected
to comm
mence by end
e
Novem
mber 2015.
upgrada
ation due to non av
vailability of land.
This is b
being take
en up as Heavy
Mainten
nance within
n the availa
able land.
363 Km of upgrada
ation civil works
w
are d
divided into 9 Contractt packages..
SI.
CONTRAC
CT
NAM
ME OF WOR
RK
CO
ONTRACTOR
R
NO.
PACKAG
GE
1.
KSTP-II/UG-1
Kasarg
god Kanhangad
RDS Projects, Ko
ochi
2.
KSTP-II/UG-2
Pilatha
ara Pappinisery
RDS Projects, Ko
ochi
3.
KSTP-II/UG-3
Thalass
sery Valav
vupara
T
Terminated
4.
KSTP-II/UG-4
Chengann
noor - Ettumannoor
Delm
ma-Sreedhan
nya
JV
5.
KSTP-II/UG-5
Ettumann
noor- Muva
attupuzha
NAPC
C Ltd, Chenn
nai
6.
K
KSTP-II/UG
G-4A
Thiruva
alla Bypass
s along
(Chengann
noor Ettu
umannoor)
EKK
K & Co, Koch
hi.
7.
KSTP-II/UG-6
Ponkunnam - Thodupuzha
GHV EKK JV
8.
KSTP-II/UG-7
LA initiated
KSTP-II/UG-8
TA consultancy in
progress
The works are being executed under FIDIC (5th edition) Conditions of Contract.
The
granular sub-base, wet mix macadam base course, bituminous mix surfacing,
Provision of traffic safety features - road furniture and other road safety
appurtenances,
Contract packages
Contract value
(Rs. Crore)
Cumulative
Achieved
target in
cumulative
percentage up to
percentage upto
end of September
end of the
2015
September 2015
Balance period
(months)
KSTP/PMT/UG-I
1,33,05
77.51%
32.78%
7 (extended)
KSTP/PMT/UG-II
118.20
86.35%
30.50%
KSTP/PMT/UG-III
234.99
MonthlyProgressBriefNovember2015
Work terminated
and being
Page15
rearranged
KSTP/PMT/UG-V
171.49
45.43%
13.38%
31.80
77.80%
33.40%
KSTP/PMT/UG-VI
227.13
51.86%
56.54%
12
KSTP/PMT/UG-IV
293.58
21.85%
13.32%
23
KSTP/PMT/
UG-IVA
3.2.0.1
Name of
consultant
CSC-1 M/s Egis
International in
JV with M/s Egis
India Pvt. Ltd.
CSC-2 M/s MSV
International USA
Contract
Period
Commence
ment Date
Contract
Amount (Rs.)
28.02.201
3
42
months
04.04.2013
18,36,04,600
14.05.201
4
30
months
14.05.2014
4,41,88200
Work Package
I, II, III, IV,
IVA & V
(190 km)
VI
(50 km)
MonthlyProgressBriefNovember2015
Page16
All these issues are now sorted out and the works are in progress now. The contractors
were instructed to speed up the works to show better results.
Contract Package-III
The work is
being closely monitored on daily basis by CSC and PMT. For Package 1 and 2 notice
under Clause 15.1 was issued and the contractor has mobilized additional resources
and opened additional work fronts and the work has gained momentum now.
MonthlyProgressBriefNovember2015
Page17
Scope of Works
Viaduct
Major Bridge
Minor Bridge
Widening Bridge
New culverts
Widening Slab culverts
Reconstruction
Foot path
Drain
Solar Lights
_
_
1
2
2
2
16
16
9
6.7 Km
22.20 Km
06.03.2013
Agreement Date
01.04.2013
Name of Contractor
Contract Price
Rs.133,05,79,485/-
Notice to Commence
24.04.2013
Total Length
27.78 Km
Contract Period
24 months
Completion Date
23-04-2015 extended to
365 days
1st Milestone
2nd Milestone
3rd Milestone
MonthlyProgressBriefNovember2015
Page18
I
(Km. 1+000 to Km.
2+800 and Km.
3+800 to Km.
12+000)
(Km. 12+000 to
Km. 22+000)
Length in km
10
20
27.78
10
Unencumbered land
available to the
contractor in km
10
20
27.78
Stretch completed in
all respects in km
Milestone
II
20
27.78
FW
HW
FW
HW
FW
HW
GSB completed in km
9.300
0.445
0.990
0.380
0.340
0.110
WMM completed in
9.170
0.430
0.960
0.040
0.210
0.240
MonthlyProgressBriefNovember2015
Page19
III
II
Milestone
(Km. 12+000 to
Km. 22+000)
km
DBM completed in km
8.960
0.600
0.930
0.030
0.270
0.100
BC completed in km
5.775
0.620
0.895
0.000
0.000
CD completed in Nos.
22
05
Culverts
MilestoneI
(1to2.8Kmand3.80to12.0Km)
MilestoneII(12to22Km.)
Numberremaining
Numberinprogress
Numbercompleted
No.dwgsapproved
Totalnumber
Numberremaining
Numberinprogress
Numbercompleted
No.dwgsapproved
TotalNumber
Numberremaining
Numberinprogress
Numbercompleted
No.dwgsapproved
Natureofwork
Totalnumber
MilestoneIII
(0to1.0Km,2.80to3.80Kmand22to27.78Km.)
WideningSlab/BoxCulverts 9 9 9 1 1
ReconstructionSlab/Box
7 7 7 7 7 4 2 1 2 2
NewBoxCulvert/Pipe
culvert
6 6 6 3 1 1 2 4 4
Totalculverts
22 22 22 10 8 5 2 3 7 7
Bridges/ROBRetained**
2 2
BridgesWidening***
2 2 2
NewBridges/Viaduct*
1 1 1 1 1 1
31.82%
This Month
Target
Achieved
6.64%
0.96%
MonthlyProgressBriefNovember2015
32.78%
Page20
14334
18029
10046
Concreting (cum)
14823
10411
3710
BC (cum)
26990
DBM (cum)
13232
5773
79468
WMM (cum)
60747
27697
63492
GSB (cum)
49177
29717
94397
Subgrade (cum)
71902
13087
56510
Embankment (cum)
44138
28509
184052
Excavation (cum)
160657
94662
50000
100000
150000
200000
Achieved Progress
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
4.8 S-Curve
MonthlyProgressBriefNovember2015
Page21
Chainage (Km)
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
3600
3700
3800
3900
4000
4100
4200
4300
4400
4500
4600
4700
4800
4900
5000
5100
5200
5300
On
Cum.
Complet going
ed Work Work
(No/Km (No./K
m)
)
Miscellaneous Works
Bridges Nos
LEFT SIDE
Culverts Nos
Drains and Walls
## ## ##
Bituminous Concrete
##
1070.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3340.00
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3340.00
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3575.00
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3590.00
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3590.00
## ## ## ## ## ##
## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
Subgrade
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
EW - Embankment
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ##
RIGHT SIDE
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3420.00
Subgrade
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3420.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3380.00
## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3290.00
## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
3290.00
## ## ##
## ## ## ## ##
1225.00
Bituminous Concrete
## ## ## ## ## ##
##
## ## ##
## ## ##
## ## ##
##
Culverts Nos
Bridges Nos
Miscellaneous Works
Chainage (Km)
5400
5500
5600
5700
5800
5900
6000
6100
6200
6300
6400
6500
6600
6700
6800
6900
7000
7100
7200
7300
7400
7500
7600
7700
7800
7900
8000
8100
8200
8300
8400
8500
8600
8700
8800
8900
9000
9100
9200
9300
9400
9500
9600
9700
9800
9900
10000
10100
10200
10300
10400
10500
10600
10700
On
Cum.
Complet going
ed Work Work
(No/Km (No./K
m)
)
Miscellaneous Works
Bridges Nos
LEFT SIDE
Culverts Nos
##
##
##
##
##
## ## ## ##
##
## ## ##
## ## ## ## ## ## ##
## ##
Bituminous Concrete
## ## ## ## ## ## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
4780.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
Subgrade
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
EW - Embankment
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
EW - Embankment
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
Subgrade
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
5400.00
Bituminous Concrete
## ## ## ## ## ## ## ## ## ##
4405.00
##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
RIGHT SIDE
Culverts Nos
## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ##
##
## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##
## ## ##
##
## ## ##
##
## ##
##
Bridges Nos
Miscellaneous Works
16100
16000
15900
15800
15700
15600
15500
15400
15300
15200
15100
15000
14900
14800
14700
14600
14500
14400
14300
14200
14100
14000
13900
13800
13700
13600
13500
13400
13300
13200
13100
13000
12900
12800
12700
12600
12500
12400
12300
12200
12100
12000
11900
11800
11700
11600
11500
11400
11300
11200
11100
11000
10900
Chainage (Km)
10800
On
Cum.
Complet going
ed Work Work
(No/Km (No./K
m)
)
Miscellaneous Works
Bridges Nos
LEFTSIDE
Culverts Nos
##
##
##
Bituminous Concrete
## ## ## ##
## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ##
## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ##
## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ##
## ## ## ##
2150.00
Subgrade
## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ##
## ## ## ##
2150.00
EW - Embankment
## ## ## ## ##
## ## ##
## ## ## ## ## ## ## ## ## ##
## ## ## ##
2050.00
## ## ## ## ## ## ## ## ##
1750.00
1750.00
RIGHTSIDE
## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
1950.00
Subgrade
## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
1950.00
## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
1940.00
## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
1940.00
## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
1840.00
Bituminous Concrete
## ## ## ##
1205.00
## ## ## ## ## ## ## ## ##
## ## ##
##
##
##
Bridges Nos
Miscellaneous Works
MonthlyProgressBriefNovember2015
Page22
The poor cash flow of Contractor has seriously hampered the progress of works.
There were delays in shifting of utilities. However Employer and the Contractors
are coordinating with various Service Providers like KSEB, KWA, BSNL, Forest
and other departments for shifting of utilities and tree cutting along the project.
Monthly Achieved Progress is not improving and progress of works is not at all at
par with the targeted progress. Instructions are issued to the Contractor for
taking stringent measures to enhance the progress of works. Clause 15.1 Notice
to Correct issued on 23rd June 2015 and works speeded up.
Mobilization advance, Equipment advance and Interim payment Certificate for works up
to (IPC-13) was paid to the Contractor amounting to Rs. 442082448/-. Timely payments
are released to the contractor. The Steering Committee held on 28.06.2014 lowered the
threshold limit of minimum IPC amount for Rs. 1.5 crores from Rs. 3.00 crores to
facilitate the cash flow of contractor. There is no pending payment to contractor.
MonthlyProgressBriefNovember2015
Page23
procured 1500 saplings for planting but it was not started .The environmental
enhancement works proposed in front of thrikanad temple was not started so far.
4.13 Photograph
MonthlyProgressBriefNovember2015
Page24
4.14
Contract Package II
Scope of Works
New ROB
Repair of Bridge
New Box culverts
Widening Slab culverts
Reconstruction
Drain
Foot path
Solar Lights
_
-
2
2
9
20
8
26.04 Km
12.6 Km
05.03.2013
Agreement Date
01.04.2013
Name of Contractor
Contract Price
Rs.118,29,77,833/-
Notice to Commence
23.04.2013
Total Length
20.90 Km
Contract Period
24 months
Completion Date
365 days
Km. 0+000 Km. 08+000 - 22nd February 2014
Revised to 30 September 2015
Km. 0+000 Km. 14+000 - 13 February 2016
1st Milestone
2nd Milestone
3rd Milestone
MonthlyProgressBriefNovember2015
Page25
Structure
Test piling work started for Ramapuram Bridge @ Km.4+260 on 24th June -2015 and
completed on 08th July 2015.
Ramapuram Bridge @ Km.4+260, Piling Work 9 Nos out of 16 completed. Piles P1/D,
P1/A, P1/C, P2/A, P1/B, P2/B, P2/C, A1/C & P2/D completed.
Test pile casting has been done for ROB @KM7+420 and initial load test on pile is
completed. Routine Pile load test for A2/B and P1/D completed and results are
awaited.
ROB at Km. 7+420 Piling Work started on 18/12/14, Piling Work 24 Nos out of 24
Nos completed. Pile cap for A1, P4 completed and breaking of piles for A2 & P1 are in
progress. Abutment A1 completed up to abutment cap bottom level.
Test pile casting has been done for ROB @KM19+950 and initial load test on pile
completed.
9 Pile Cap for A1, P1, P2, P3, P4, P5, P9, P10, P21 & P22 (10Nos) Completed
& Abutment and Pier Wall P1 to P5 Completed.
9 Pier Cap P1, P2, P3, P4, P5 & P22 (6Nos) Completed.
9 Girder and deck slab for P3- P4 and P4-P5 completed.
9 Girder concrete for P2-P3 completed and shuttering & steel reinforcement
work for deck slab P2-P3 is in progress
Widening works of Slab Culverts in Milestone-II and Contractor has completed 2 Slab
Culvert @Km.10+064.71 RHS, Slab Culvert @Km11+582 RHS and Work in Progress
@Km.10+885.61 LHS, @Km.12+374 LHS and @Km.12+688 LHS. Box Culverts in
Milestone-II is also in progress for 1No culverts i.e. @ Km.9+600 BHS Slab completed
and Return wall balance.
There are 12 Nos. of Box Culverts in Milestone-I out of which 10Nos Culvert @Km0+118.60,
@Km.0+530.290,
MonthlyProgressBriefNovember2015
@Km.0+813.610,
@Km.1+122.390,
Page26
Considering the overall value of work 118.30 crores, Progress up to 30th November 2015
is as follows in comparison with revised programme based on EOT-2
For previous month
(October)
Target
Achieved
78.06%
28.99%
This month
(November)
Target
Achieved
8.28%
1.58%
86.35%
30.50%
Milestone
II
III
Length in km
8.000
14
20.9
8.000
14
8.000
14
FW
HW
FW
HW
GSB completed in km
7.81
0.00
1.31
0.35
WMM completed in km
7.81
0.00
1.23
0.23
DBM completed in km
7.81
0.00
1.17
0.23
BC completed in km
7.56
0.00
0.75
0.12
CD completed in Nos.
MonthlyProgressBriefNovember2015
13
Page27
5656
5657
4847
21139
Concreting (cum)
19703
3291
10442
BC (cum)
8426
3935
19202
DBM (cum)
11043
BOQ Quantity
5070
57501
WMM (cum)
50480
25039
42722
GSB (cum)
37709
23533
93145
Subgrade (cum)
81536
9269
13583
Embankment (cum)
39253
11217
180833
Excavation (cum)
147299
54431
50000
100000
150000
200000
Original Programme
(R-0)
60%
70%
80%
90%
100%
4.19 S-Curve
50%
Revised Programme
(R-5)
30%
40%
Target-86.35%
Achieved-30.51%
0%
10%
20%
Achieved Progress
MonthlyProgressBriefNovember2015
Page28
4700
4800
4900
5000
5100
Subgrade
EW - Embankment
5300
4600
5200
4500
4400
4000
4300
3900
4200
3800
1
1
4100
3700
3600
3500
3400
3300
3200
3100
3000
2900
2800
2700
2600
2500
2400
2300
2200
2100
1200
2000
1100
1900
900
1800
800
1000
1700
700
1600
600
1500
500
1400
400
1300
300
200
Chainage (Km)
100
Miscellaneous Works
Bridges Nos
LEFTSIDE
Culverts Nos
Drains and Walls
Bituminous Concrete
##
EW - Embankment
##
## 1
## 1
Bituminous Concrete
## 1
## ##
1
1
9400
9300
9200
9100
9000
1 1 1 1 1 1 1 1 1 ##
8900
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
10700
##
10600
8800
RIGHTSIDE
Subgrade
Culverts Nos
Bridges Nos
Miscellaneous Works
9500
9600
9700
9800
9900
10000
10100
10200
10300
10400
10500
8700
8600
8500
8400
8300
8200
8100
8000
7900
7800
7700
7600
7500
7400
7300
7200
7100
7000
6900
6800
6700
6600
6500
6400
6300
6200
6100
6000
5900
5800
5700
5600
Chainage (Km)
5500
5400
Miscellaneous Works
Bridges Nos
LEFTSIDE
Culverts Nos
Drains and Walls
Bituminous Concrete
## ## ## ## ## ## ## ## ## ## ## ##
## ## ## ## ## ## ## ## ## ## ## ##
Subgrade
EW - Embankment
EW - Embankment
Subgrade
RIGHTSIDE
## ## ## ## ## ##
Bituminous Concrete
## ## ## ## ## ## ## ## ##
##
##
## ## ## ## ##
## ##
##
Culverts Nos
Bridges Nos
Miscellaneous Works
Milestone - I(0-8km)
Culverts
Milestone - II(8-14km)
Number remaining
Number in progress
Number completed
Original number
Number remaining
Number in progress
Number completed
Original number
Number remaining
Number completed
Original number
Nature of work
Number in progress
Milestone - III(14-20.9km)
(1)
11
11
16
15
13
14
13
Bridges Retained*
New Bridges/ROB**
Reconstruction
New Box Culvert
Total culverts
MonthlyProgressBriefNovember2015
Page29
Lack of experienced staff at site which reflected in planning of works at site, delay in
preparing Mix designs, delay in submission of working cross sections, in preparation
of survey data etc.
The contractor has established one quarry, crusher and HM Plant for contract I and
II.
packages.
Now, tree cutting work in the Railway land is in progress for construction of RoB at
Thavam and Railway gate shifting works is to be carried out by the Railway
department so that the diversion road work for diverting traffic can be commenced by
the road Contractor.
Major activities during the current month are ROB works ,piling for Ramapuram bridge
and some road works. Reviewed the measures taken by the Contractor for implementing
the mitigation measures proposed in the EMP. Instructions were given to avoid
accumulation of debris along the project site and at ROB location and to remove the
debris from the site periodically. Regular sprinkling of water at active work phase are to
be continued. The Environmental management for Pappinissery ROB at Ch.19+950 to be
improved. The waste management systems in the Camp are being followed properly but
the new labour accommodation at the camp requires additional measures for improved
ventilation. . General housekeeping at Camp site is satisfactory. The surrounding of the
camp to be cleared and waste collection system to be continued. The dust accumulated
around the batching plant site is to be removed and sprinkling of water to be
continued.Direction to improve the management measures was given during the visit.
Even the measures adopted by the Contractor for implementing EMP is satisfactory,
some improvement is required in ROB sites and Road.
required measures to stop spills in future. The cut earth available is minimum and
borrow materials has to be brought from contract 1 site. This was delayed due to
restrictions imposed by government but no action taken by the contractor in this regard
MonthlyProgressBriefNovember2015
Page30
so far. Contractor has to produce documentary evidences that the contractor borrow
materials cannot be brought due to the restrictions by govt . The environmental
enhancement measures such as construction of parking bus bays noise barriers ox bow
land development, tree planting etc are to be taken along with the pavement works. The
access to the houses at flood prone areas to be verified and existing access to be reinstated after raising of the road. Contractor .The debris stocked at camp site is to be
removed and the same can be used for maintaining the access road to the camp which is
in a bad shape. The temporary camp established is not removed. The RE issued notices
to the contractor. Contractor informed that this will be immediately removed.
4.24.0.2
MonthlyProgressBriefNovember2015
Page31
4.25 Photographs
MonthlyProgressBriefNovember2015
Page32
4.26
Con
ntract Packa
age III
Up
pgradatio
on of Road from T
Thalasseryy to Valavvupara off SH 30
Scope of
o Works
Constru
uction of Ma
ajor Bridges
Constru
uction of Miinor Bridge
e
New Box
x culverts
Widenin
ng Slab culv
verts
Reconsttruction of C
Culverts
Drain
Footpath
h
Solar lig
ghts
3
4
21
88
50
65.30 Km
44Km
C
Details
4.27 Contract
Contractt with M/s
s SACYR-ESSAR JV, Mumbai was
w
Termin
nated on 22
2.04.2015 due to
non perfformance. The work in this Pac
ckage is sp
plit into tw
wo Packages
s 3A and 3B
3 and
bid for 3A has been
b
appro
oved by th
he Steerin
ng Committee bids for
f
3B is under
finalizatiion.
Scope of Works
Major Bridges
- Nil
Minor Bridge
- 1 no.
Flyovers
- 1 no.
Culverts
- 8 nos.
Pipe Culverts
- 2 nos.
Solar lights
- 1380 nos.
29.10.2013
Agreement Date
29.11.2013
Name of Contractor
Contract Price
Notice to Commence
Total Length
Contract Period
24 months
Completion Date
MonthlyProgressBriefNovember2015
365 days
Page34
5.3 Utilities
Utilities such as water lines, telephone cables and associated accessories, electrical lines
and associated accessories and trees are remaining to be removed / shifted. Contractor
has submitted item rates required for relocation of electrical utilities from the project
road in the absence of specific provision in the BOQ.
27.43%
Achieved
9.41%
5.90%
MonthlyProgressBriefNovember2015
33.40%
Page35
526
686
1451
Piling
6215
5401
1184
Concrete total
BC
1452
0
0
DBM
1815
0
0
BOQ Quantity
Cumulative target to end of this month
9275
WMM
0
0
8750
2500
85
GSB
20109
19600
Subgrade
0
148258
Embankment
130710
53077
21960
25490
Excavation
4444
154500
PVD
232000
227229
50000
100000
150000
200000
250000
100%
5.7 S-Curve
70%
80%
90%
S Curve ThiruvallaBypass
60%
68.4%
40%
50%
Original
Programme (R-0)
0%
10%
20%
30%
Achieved
Progress as on
Sept 2015
MonthlyProgressBriefNovember2015
Page36
Number completed
Pipe culvert
Total culverts
10
Fly over
Minor bridge
Nature of work
Number remaining
Total number
Number in progress
Culverts
5.10 Payment
Upto IPC-7 has been paid to the contractor Rs. 78215582/-
Page37
5.11.0.2
The contractor has establishing a base camps at the locations detailed in Table below.
Details of Construction Camps
Camp identity
Location
Village
Camp 1 Batching Pant about 50 cents of land owned Thiruvalla Town.
Muncipality,
,precast
yard
,Labour by Thiruvalla
and it is beside the project
camp, store, laboratory
site.
Debris Disposal site
Thiruvalla
municipal area Thuruvalla
approved by municipality.
Labour Camp
Thiruvalla Town
rented At Thiruvalla Town.
building.
Environment management facilities adopted at these ancillary facilities are detailed in
Environment Management Facilities at Ancillary facilities
Sl.No.
1
Details of
Camp/Plant
Construction
Camp
Contractor has mobilized the environmental cum safety engineer but CV of the person
was not submitted. The contractor was directed to submit monthly EMP reports. The
contractor is bringing borrow material from contract 6 .Site visit conducted by the
environmental Expert on 30th November 2015 and observation attached as annexure
to this report.Action taken for the lapses and notice issued.
MonthlyProgressBriefNovember2015
Page38
5.12 Photographs
Piezometer
MonthlyProgressBriefNovember2015
Page39
Reconstruction of Culverts
Foot path, Solar lights
3
5
9
8
59
21.08.2014
Agreement date
15.09.2014
Name of contractor
M/s Delma-Sreedhanya JV
Contract amount
Rs. 293,58,17987
Notice to commence
Total length
45-80
Contract period
36 months
Completion date
24.11.2017
365 days
I milestone
II milestone
III milestone
MonthlyProgressBriefNovember2015
Page40
2915 lm of 700mm, 560 lm of 200mm & 200 lm of 300mm DI pipe laid. 8700 lm
of 160mm PVC pipe laid. Work in progress.
The Contractor has started the process of mobilizing Plant and Equipment. They have
identified their base camp at Ettumannur. WMM plant has been set up at Pattithanam
and Hot mix plant is being installed at Chingavanam. Another camp is functional at
Thirumoolapuram where Batching plant, Pre casting yard is functional.
The Chingavanam QC Lab is established at Chingavanam.
Hot Mix Plant has been established and operational at Chingavanam
Construction Equipments are being brought to site.
6.4.1.2
Human resources
The Contractor has started mobilizing the required manpower. Most of the Key persons
are in place. Planning Engineer has to be placed immediately.
6.4.1.3
Materials
Material sources are being identified and materials being tested for suitability before
approval.
Preparatory works & mobilization has been in progress since the handing over of
site on 24th September 2014.
Survey work has been completed. FRLs have been re-designed and approved for
the entire stretch.
Test piles have been cast at the A1 side of the Kallissery Bridge at Km 1+558 & A1
side of the Varattar Bridge at Km4+008.
Page41
This Month
Target
Achieved
Target
Achieved
Target
Achieved
18.48%
11.33%
3.37%
1.99%
21.85%
13.32%
MonthlyProgressBriefNovember2015
Page42
60500
Precast Drains
14000
7811
37055
Concrete total
6581
5307
21000
BC
0
0
BOQ Quantity
30000
DBM
2813
1808
122071
WMM
11444
6343
96000
GSB
9000
7304
71921
Subgrade
10610
2970
67504
Embankment
42922
2644
375826
Excavation
148038
18622
50000
100000
150000
200000
250000
300000
350000
400000
18.48%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
6.7 S-Curve
MonthlyProgressBriefNovember2015
Page43
Total number
Number completed
Number in progress
Number remaining
Pipe culvert
81
47
13
10
58
Total culverts
82
48
14
10
58
Minor bridge
Major Bridge
Widening Bridge
Nature of work
Culverts
1
3
General
The Environment Management Plan (EMP) prepared for Package IV describes the
environmental issues anticipated during the execution of the project and suggests
mitigation measures to be carried out during the implementation to minimize the impact
on the environment. The EMP has been made an integral part of the construction
contract and is being implemented along with the execution of the project. The progress
of implementation of EMP during the execution of Package IV as October 2015 is
summarized below
The batching plant commissioned and the works for other facilities continuing.
Contractor has submitted the HSE plan and was also approved. Site specific
management plan was also submitted for each facility. The contractor has mobilized
Engineers for Environment and Safety but the Environmental engineer resigned.
Contractor has to appoint another person immediately. This was not done so far. The
bride work at Puthenveettilpady completed and will be open shortly. The vent way
clearance of the bridge is not completed fully. The waste disposal at batching plant site
is to be improved. Contractor has promised to establish a small plant to treat kitchen
waste. This was also not done. Ponding os water noticed at this camp site. The waste
dispoasal at this camp is not satisfactory. The contractor obtained consent to operate
the batching plant.
Culvert and Bridge works are in progress. Contractor has taken land for HM plant at
Chingavanam and the HM plant erecting completed and other works such as
construction of ramp, Generator and diesel bulk storage facility works are progressing..
WMM plant at Vembally installed and initial works started. The PCB clearance status
shown on the following table. Contractor informed that the consent for operate the HM
and WMM plant will be obtained shortly.
Staff engaged by the Contractor for EMP implementation.
MonthlyProgressBriefNovember2015
Page44
Name
Designation
Mobilisation Date
Rajan Piallai
Environmental Engineer
May2015,resigned on
Sept.2015
Ajo Abraham
Safety Officer
December 2014
6.9.1.2
Page45
6.10 Payments
The contractor has been paid IPC-5 Rs. 443604048/-
MonthlyProgressBriefNovember2015
Page46
6.11 Photographs
MonthlyProgressBriefNovember2015
Page47
7.1 Contrac
ct Pack
kage V
Upgradati
U
on of Roa
ad from E
Ettumann
noor to M
Muvattupu
uzha of SH
S 1
Constru
uction of Minor Bridge
e
New Bo
ox culverts
Widenin
ng Slab culveerts
14
Reconsttruction of Culverts
75
Foot pa
ath, Solar L
Lights
29.11.2
2013
Agreeme
ent Date
30.12.2
2013
M/s NAPC
C Ltd.,
Contractt Price
Rs. 171
1.49
Notice to
o Commenc
ce
04.02.2
2014
Total Len
ngth
40.60 km
Contractt Period
30 mon
nths
Complettion Date
03.08.2
2016
Defect Liability
L
Perriod
365 da
ays
1st Miles
stone
10 km
m BC leve
el 02.05.2015
2nd Miles
stone
30 km
m BC leve
el 03.02.2016
3rd Miles
stone
40.960 km
m whole worrks by 03.0
08.2016
7.3 Utilities
Relocation of electrical utilities and water supply line using materials issued by KSTP is
the responsibility of Contractor. Removal of stumps of trees cut by agencies engaged by
KSTP is also the responsibility of Contractor. KSTP/PMT has made arrangements with
BSNL and other private agencies for relocation of cables, telephone posts and telephone
pillars. KSTP has issued most of the items required for relocation of Electric and Water
utilities and relocation work is under progress. Non procurement of complete items
required for utility shifting is a constraint in carrying out utility shifting.
4 Nos.
OGL recorded
7210 m (Average)
6785 m (Average)
DBM
5405 m (Average)
Milestone
II
III
10000
20000
10960
GSB completed in km
7210
WMM completed in km
6785
DBM completed in km
6585
29
Length in km
Stretch completed in all respects in km
BC completed in km
CD completed in Nos.
Up to previous month
(October)
Target
Achieved
Target
Achieved
Target
Achieved
39.48%
11.93%
5.95%
1.35%
45.43%
13.38%
MonthlyProgressBriefNovember2015
Page49
26691
7433
2462
Concreting (cum)
19095
5400
0
BC (cum)
35840
20000
4865
DBM (cum)
BOQ Quantity
Cumulative Target to end of this month
134110
WMM (cum)
75882
16963
GSB (cum)
16143
64000
50515
Subgrade (cum)
9862
135501
Embankment (cum)
52980
7884
483045
Excavation (cum)
258327
82557
50000
100000
150000
200000
250000
300000
350000
400000
450000
500000
550000
30%
40%
50%
60%
70%
80%
90%
100%
7.6 S-Curve
Achieved
Progress
0%
10%
20%
As per R4 programme
on 06.01.15
MonthlyProgressBriefNovember2015
Page50
Milestone - I
Culverts
Widening Slab Culverts
Reconstruction Slab/Box
24
24
23
31
32
Total culverts
34
Bridges Retained
Milestone - II
5
1
28
1
3
5
49
27
Number remaining
Number in progress
Milestone - III
21
Number completed
Original number
Number remaining
Number in progress
Number completed
Original number
Number remaining
Number in progress
Number completed
Nature of work
Original number
22
11
11
43
27
5
0
27
1
Widening Bridges
Reconstruction Bridges
Total Bridges
Inadequate planning
Being very slow progress of work notice to improve has been given as per the contract
provisions and contractor has improved the performance
Status of Compliance
Remarks
Quarry
Crusher
MonthlyProgressBriefNovember2015
Page51
Hot
Plant
Establish-02.05.2014
and
Valid Upto 28.02.2017. No
major activities at crusher
site.
Date of Issue of Consent to
Establish-01.04.2014
and
Valid Upto 28.02.2017
Date of Issue of Consent to
Establish-01.04.2014
and
Valid Upto 28.02.2017.
Consent
to
operate
02.05.2014 and valid Upto
28.02.2017
Date of Issue of Consent to
Establish-01.04.2014
and
Valid Upto 28.02.2017
all the plants except crusher..
Considering the lapses on the part of the contractor on EMP management, Penalty
clauses invoked and recommended payment deductions. Tree planting air quality water
quality monitoring was also to be done. . The remaining works of parking area , bus
bays, noise receptors are to be taken along with the pavement works. Contactor has
taken full width of the road for construction This was created traffic management issues
.No traffic worthy road for the movement of traffic in construction zones provided. The
disposal of excavated earth is an issue, as large quantities of cut earth is available
.Disposal site has to be provided to the contractor by the employer Contractor has
identified two private temporary disposal site. At ch 0+500 the side of the abandoned
quarry to be protected urgently with retaining walls or crash barriers. At present the
safety engineer is entrusted the responsibility of safety and environment management.
Considering the works are spread over 40km, additional support staff is to be provided
to assist him.
MonthlyProgressBriefNovember2015
Page52
7.11 Photographs
MonthlyProgressBriefNovember2015
Page53
109 nos.
Widening
44nos.
New Construction
7 nos.
Drain
65 km
Foot Path
04.02.2014
Agreement date
05.05.2014
Name of Contractor
Contract price
Rs. 227,13,73,548
Notice to Commence
10.06.2014
Total Length
46.363 km
Contract Period
30 months
Completion date
09.12.2016
365 days
1st Milestone
10 km
2nd Milestone
25 km
3rd Milestone
MonthlyProgressBriefNovember2015
Page54
I
(85+000 to 95+000)
Milestone
Length in km
II
(84+000 to 85+000)
Bypass 2.57 km
(95+000 to 106+400)
10.000
III
(106+400 to 117+430)
(117+430 to 131+015)
14.970
24.615
Side
LHS
RHS
LHS
RHS
LHS
RHS
GSB completed in km
10.20
9.85
3.65
3.94
4.91
5.35
WMM completed in km
9.55
9.07
3.55
3.60
4.15
4.75
DBM completed in km
7.88
8.18
3.41
3.57
3.54
4.25
BC completed in km
CD works completed in
No.s
CD works in progress in
No.s
20 / 20
42 / 43
39 / 83
15
This month
(November)
Target
Achieved
Target
Achieved
Target
Achieved
47.12%
51.53%
4.74%
5.01%
51.86%
56.54%
S.
No.
1.
2.
3.
4.
5.
Work Description
Side
Chainage
RHS
LHS
RHS
LHS
LHS
129.022
119.760
129.470
123.692
119.750
MonthlyProgressBriefNovember2015
Page55
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
RHS
LHS
RHS
RHS
LHS
LHS
LHS
RHS
RHS
RHS
LHS
RHS
119.820
102.435
126.990
128.200
107.139
124.080
124.386
126.043
127.906
129.810
124.632
129.497
ConcretingM40(cum)
ConcretingM35(cum)
ConcretingM30(cum)
ConcretingM25(cum)
BC(cum)
DBM(cum)
8925
7950
42045
26862
15784
13100
14874
5750
730
28616
11600
9494
Looseningandrecompacting
67000
45438
Subgrade(cum)
76823
Embankment (cum)
0
145542
76350
42398
GSB(cum)
255685
156000
61452
WMM(cum)
Excavation(cum) inhardrock
29
0
0
102
102
0
3050
1555
1519
5092
2850
985
ConcretingM20(cum)
ConcretingM15(cum)
124075
140000
222161
41194
30500
25389
25000
68992
Excavation(cum)
212732
267600
397929
60%
70%
80%
90%
100%
8.6 S-Curve
30%
40%
50%
Original Programme
(R-0)m
0%
10%
20%
Achieved
Progress
MonthlyProgressBriefNovember2015
Page56
General
8.7.0.2
S.
No.
Enhancement Measure
1.
2.
3.
Noise Barrier
Hand pumps
Bus Shelter
4.
Sign Boards
5.
6.
7.
8.
9.
10.
11.
12.
Physical
target
(Nos.)
19
6
41
Quantity
not
estimated
Preserving
and
landscaping the cultural
7
properties like shrines
and hyundi
Constructing new well
3
Providing new water taps 33
Quantity
Parking space for auto
not
rickshaws, cars and jeep
estimated
Landscaping of type C
17
oxbow lands
Planting trees along road
864
side
Planting trees on inner
side of sound insulating 440
wall
Providing 1.2 m high Quantity
MonthlyProgressBriefNovember2015
Units
carried
over
from
previous
month
(a)
1
1
0
Units
Units
completed
started in
in
reporting
reporting
month
month
Units
carried
over to
next
month
(b)
2
0
0
(c)
0
1
0
(d)
3
0
0
0
0
0
0
0
0
0
0
0
Page57
13.
not
estimated
C.
S. No.
5.
6.
Yes
7.
Yes
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
MonthlyProgressBriefNovember2015
Yes
Page58
21.
22.
23.
I Submission Details
Submitted By
(Environmental Officer of CSC
Approved By
(Environmental Officer of PMT)
MonthlyProgressBriefNovember2015
Page59
8.9 Photographs
MonthlyProgressBriefNovember2015
Page60
selected and assignment commenced. The Transaction Advisory is M/s L&T Ramboll in
JV with M/s Fortress.
completed.
endorsed.
The review of DPR and RFQ, RFP and Financial modal are
permission for including provision for revolving LC towards payment of semi annuity.
The notification calling attention prospective bidders is being published.
9.1.0.1
Investor Meet:
On March 7, 2015 investor meet was conducted at Kochi in which more than 20
prospective concessionaires participated. They have shown good interest in the project.
Mr. Arnab, Task Team Leader, Mr. Bernard, Senior Transport Specialist and Ms. Carla
Gonzalez, of World Bank participated.
10.1
Contract Package VII
Upgradation of Road from Perumbilavu Pattambi Perintalmanna
Horizontal alignment finalized and boundary stone planted for land acquisition.
The
original proposal was to upgrade the project under EPC mode. But due to the delay
anticipated in acquiring the land invoking the provision of the new LA Act for which
rules are being finalized by the Government, it has been decided to provide a modest
level of improvement to the surface. It is also proposed to make use of the savings due
to the change in the improvement proposals for providing overlay to the KSTP-I roads.
Accordingly proposals have been submitted to the Government and to the Bank after
obtaining approval of the Steering Committee on 28th July 2014.
awarded.
Page61
the contractors. But contractor for Package III could not speed up the work and
hence terminated for non performance.
Management
Base Line Road Safety Survey for Safe Corridor Demonstration Project
Kazhakkoottam Adoor Study completed
prepared along with bid documents has been finalized as advised by the Bank.
The bidding for procuring traffic counters completed and the approval of Steering
Committee is being obtained.
progress.
::
::
::
::
::
::
MonthlyProgressBriefNovember2015
Page62
::
::
::
Rs. 167157697
Rs. 22296112
16.1
It has been proposed to provide overlay to 150 km of KSTP-I improved roads from the
savings anticipated from the Perumpilavu Perintalmanna road.
The Steering
Committee at its meeting held on 28 June 2014 approved the proposal and intimated to
the Bank. The DPR has been completed by the KHRI and economic evaluation was got
done through a specialist. The bidding documents completed and forwarded to Bank.
The documentation under review by Bank. The Bank has now informed to defer the
project.
17.1
Package-I
The Project Director KSTP inspected the Project on 30th Oct 2015.
Progress Review Meeting convened at REs site office on 06th Nov 2015, RE with
CSC Staffs and Contractors representative attended.
MonthlyProgressBriefNovember2015
Page63
The DB conducted meeting at the Office of the Executive Engineer, KSTP Divn.
Kannur on 13th Nov 2015 and visited the Project site on 14th Nov 2015
The Environmental Engineer, CSC Visited the Project site on 18th Nov 2015.
Team Leader Visited the Project Site on 23rd Nov 2015 to 26th Nov 2015.
Package-II
Dispute Board meeting conducted on 13th November 2015 at the office of the
Executive Engineer, Kannur. The chairman & board members visited the site on
14th November 2015.
on 07th
November 2015.
Package-IV
The Chief Engineer has visited the project site twice during the month.
Leader inspected the works in the project site on 18.11.2015.
The Team
Package-IVA
The Chief Engineer has visited the project site twice during the month.
Package-V
No progress review meeting was convened in the month of November 2015. Chief
Engineer KSTP inspected the site on 10th November and 14th November 2015. Team
Leader of CSC inspected the site on 18th November 2015.
18.1
Sl.
No
Total Required
Land (Hectare)
Extent
pending
LA stage
acquisition
Kasaragod-Kanhangad
2.9830
NA
Pilathara-Pappinissery
6.2340
NA
Thalassery-Valavupara
25.3200
0.4505
MonthlyProgressBriefNovember2015
Negotiated
purchase (NP)
Page64
in progress
4
Chengannur-Ettumanoor
Thiruvalla Bypass
EttumanoorMuvattupuzha
15.3680
0.0964
NP in progress
2.7801
0.4701
NP stalemate
17.8660
1.3189
NP in progress
Ponkunnam-Thodupuzha
35.7330
NA
Punalur-Ponkunnam
17.7050
0.0260
NP in Progress
9.7332
9.7332
Being initiated
PerumbilavuPerinthalmanna
Direct purchase proposal of land was approved by the Steering Committee on 28 June
2014
19.1
Bank
1.
2.
Award of Package-3B
3.
4.
5.
6.
MonthlyProgressBriefNovember2015
Page65
7.
8.
9.
Complete
Specialized
Recruitment in KRSA
Staff
EoI received:
Package-2 Thirteen numbers
Package-3 Eleven numbers
Package-4 Twelve numbers
Short listing commenced
direct
Road
asset
General Issue
Engage
Agency
for
direct
20. Stakeholder Engagement in Road :: This is same as item 17 above.
Safety
Enhancement and asset
MonthlyProgressBriefNovember2015
Page66
preservation
Start
using
the
e-project
KSTP has started using PMS software.
management system for improving
21.
:: The Finance Management is through
overall project management
Tally Software, now
Finance Management
22.
:: Submitted
:: For 14-15 completed.
::
:: To be done
27.
Page67
MonthlyProgressBriefNovember2015
Page68