PROJECT STAGE-II
ABSTRACT OF COST ESTIMATE
UNIT-III: Power House and Appurtenant Works
Sl. No.
Total Amount
(in
` Lakh)
Description
DIRECT CHARGES
I
II
III
IV
V
WORKS
A- Preliminary
B- Land
C- Works
D- Regulators
E- Falls
F- Cross Drainage Works
G- Bridges
H- Escape
J- Power Plant Civil works
K- Buildings
L- Earth Works
M- Plantation
O- Miscellaneous
P- Maintenance
Q- Special T&P
R- Communication
S- Power Plant Electromechanical System*
U- Distributaries
V-Watercourses
X- Environment & Ecology
Y- Losses on stock
Total of I - Works
Establishment
Tools & Plants
Suspense
Receipts & Recoveries
(-)
825.95
2588.91
143618.00
5884.00
32.82
842.25
2858.79
76.50
820.00
162624.83
60.00
714.70
320946.75
8144.28
3209.47
-219.45
332081.05
INDIRECT CHARGES
a
b
0.00
3209.47
3,209.47
335,290.52
Schedule: III-I-A
Particulars of works
Expenditure incurred on
previous investigations
1
carried upto Project
formulation
Detailed Pre-construction
2
survey for final location
Alignment Survey of
a) approach road
Survey for tunnels/ ADITs
b) including L section of HRT/
TRC/Pressure shaft etc
Qty
Unit
Rate
(in `)
On actual basis
Amount
(in Lakh `)
504.00
10
Km
41214
4.12
Km
223484
8.94
223484
4.47
Total
17.53
10785
129.42
25000
125.00
200000
2.00
100000
1.00
100000
257.42
1.00
1000000
10.00
400000
8.00
8.00
1500000
15.00
300000
3.00
150000
1.50
500000
100000
200000
5.00
1.00
2.00
150000
1.50
825.95
Schedule: III-I-B
Item
Qty.
Unit
Rate
(in `)
Amount
(in Lakh `)
ha
2668739.00
1794.73
538.42
112.17
17.95
2463.26
0
0.00
0.00
0.00
ha
ha
1000.00
0.02
0.02
17.95
Interest
charges
on
compensation
(25%
of
compensation for a period of 2
year '@12% per annum ) of
land cost
107.68
Total
2588.91
Schedule: III-I-J
Amount
(in Lakh `)
Description
Remarks
Intake Structure
24446.09
Schedule: III-I-J-1
Desilting Chamber
22090.57
Schedule: III-I-J-2
36413.95
Schedule: III-I-J-3
Surge Shaft
5832.62
Schedule: III-I-J-4
Pressure Shaft
12561.54
Schedule: III-I-J-5
Power House
12529.82
2675.29
Schedule: III-I-J-6
Schedule: III-I-J-7
Total 116549.88
Sl. No.
Amount
(in Lakh `)
Description
Remarks
Total
8866.64
Schedule: III-I-J-DT-3
Schedule: III-I-J-1
16
17
18
19
20
Description
Site Clearance
Open Excavation in Soil
Open Excavation in Rock
Tunnel Excavation
Overbreak @5%of Tunnel
Excavation
Rock bolts 25 in Intake Structure
Rock bolts 25 in Intake Tunnels
Shotcrete with wiremesh Intake
Structure
SFRS in Intake tunnels
Mass Concrete M-10 in Intake
Structure
Mass Concrete M-15 in Intake
Structure
Concreting M-25 in Intake
structure
Concreting lining M-20 in Intake
Tunnels
Reinforcement Steel
Concrete in geological overbreak
M-15
Drilling for Drainage Holes
Drainage pipes
Drilling for Grouting > 4.0 m long
Drilling for Grouting < 4.0 m long
Grouting
21
Rm
22
LS
23
H & M Works
a)
i)
MT
160
170000.00
272.00
ii)
Embedded parts
Super Structure and bridge
assembly
MT
52
170000.00
88.40
MT
104
170000.00
176.80
iv)
MT
10
170000.00
17.00
v)
MT
320
170000.00
544.00
b)
i)
MT
40
170000.00
68.00
5
6
7
8
9
10
11
12
13
14
15
iii)
Unit
LS
cum
cum
cum
Qty
5095
45857
173384
cum
8669
1948.47
168.91
Rm
Rm
8744
80444
854.00
836.00
74.67
672.51
cum
525
10322.70
54.19
cum
2586
14966.70
387.04
cum
46759
4044.00
1890.93
cum
61405
4861.00
2984.90
cum
36652
5919.00
2169.43
cum
49047
5505.00
2700.04
MT
5500
91185.00
5015.18
cum
8570
4468.00
382.91
Rm
Rm
Rm
Rm
Bags
4137
4137
45968
1724
71538
431.00
100.00
431.00
371.00
954.00
17.83
4.14
198.12
6.40
682.47
2000.00
8.20
410
Unit Rate
Total cost
5.00
165.00
8.41
377.00
172.88
1948.47
3378.34
20.00
ii)
Embedded parts
MT
52
170000.00
88.40
iii)
MT
10
170000.00
17.00
iv)
Gantry Crane
Trash Rack Cleaning
Machine(TRCM)
MT
55
170000.00
93.50
MT
LS
6000000.00
60.00
c)
24
SubTotal
22427.60
25
Instrumentation
3.0%
of Item 24
672.83
26
Dewatering
1.0%
of Item 24
224.28
27
Contingencies
3.0%
of Item 24
672.83
28
2.0%
of Item 24
448.55
Total
Grand Total (in Lacs)
2018.49
24446.09
Schedule: III-I-J-2
Sr. No.
Description
Unit
Qty
Rate
Amount in
lac
cum
29930
1847.89
553.07
cum
1497
1847.89
27.65
cum
36253
1792.25
649.74
cum
1813
1792.25
32.49
cum
16413
1997.69
327.88
cum
821
1997.69
16.39
Rm
171361
889.00
1523.40
10
Rm
12785
854.00
109.18
11
Rm
28093
854.00
239.91
12
Rm
9528
854.00
81.37
13
cum
12852 14966.70
1923.52
14
SFRS in Adits
cum
539 14966.70
80.67
15
cum
948 14966.70
141.88
16
cum
306 14966.70
45.80
17
cum
41518
5756.00
2389.78
18
cum
3651
5756.00
210.15
19
Reinforcement Steel
2700 91185.00
2462.00
20
cum
16523
4468.00
738.24
21
cum
1496
4044.00
60.50
22
Rm
25704
431.00
110.78
23
Rm
25704
100.00
25.70
24
Rm
1438
431.00
6.20
25
Rm
1438
100.00
1.44
26
Rm
2528
431.00
10.90
27
Rm
2528
100.00
2.53
Rm
490
431.00
2.11
28
cum
330458
1628.54
5381.64
cum
16523
1628.54
269.08
MT
29
Rm
490
100.00
0.49
30
Rm
33162
431.00
142.93
31
Rm
1244
371.00
4.62
32
Grouting
51609
954.00
492.35
33
H & M Works
a)
i)
MT
128
170000.00
217.60
ii)
Embedded parts
MT
44
170000.00
74.80
iii)
MT
24
170000.00
40.80
iv)
MT
10
170000.00
17.00
v)
MT
180
170000.00
306.00
b)
i)
MT
64
170000.00
108.80
ii)
MT
100
170000.00
170.00
iii)
MT
88
170000.00
149.60
iv)
MT
1600
170000.00
2720.00
34
Bags
SubTotal
21868.99
35
Instrumentation
3.0%
of Item 34
73.86
36
Dewatering
1.0%
of Item 34
24.62
37
Contingencies
3.0%
of Item 34
73.86
38
2.0%
of Item 34
49.24
39
TOTAL
221.58
Grand Total (in Lacs)
22090.57
Schedule: III-I-J-3
Sr. No.
Description
Unit
Qty
Rate
Amount in
lac
Tunnel Excavation
cum
524244
1731.26
9076.03
cum
26212
1731.26
453.80
cum
41390
1847.89
764.84
cum
2070
1847.89
38.24
Rm
180424
836.00
1508.34
Rm
17680
836.00
147.80
SFRS in tunnel
cum
6089 14966.70
911.32
SFRS in Adits
cum
746 14966.70
111.65
cum
MT
152860
5756.00
8798.62
9800 91185.00
8936.13
10
Reinforcement Steel
11
cum
26212
4468.00
1171.16
12
Rm
16238
431.00
69.99
13
Rm
16238
100.00
16.24
14
Rm
1989
431.00
8.57
15
Rm
1989
100.00
1.99
16
Rm
72170
431.00
311.05
17
Rm
2706
371.00
10.04
18
Grouting
112314
954.00
1071.48
19
SUB TOTAL
20
Instrumentation
3.0%
of Item 19
1002.22
21
Dewatering
1.0%
of Item 19
334.07
22
Contingencies
3.0%
of Item 19
1002.22
23
2.0%
of Item 19
668.15
24
TOTAL
Grand Total (in Lacs)
3006.66
36413.95
Bags
33407.29
Schedule: III-I-J-4
Description
Unit
Qty
Rate
Amount
cum
80452 1701.30
1368.73
cum
15435 1792.25
276.63
cum
772 1792.25
13.83
Rm
18439
889.00
163.92
Rm
11961
836.00
99.99
cum
3097 14966.70
463.52
cum
404 14966.70
60.47
cum
Reinforcement Steel
23009 5756.00
MT
1500 91185.00
637 4044.00
1324.40
1367.78
10
cum
11
Rm
5775
431.00
24.89
12
Drainage pipes
Rm
5775
100.00
5.78
13
Rm
1076
431.00
4.64
14
Rm
1076
100.00
1.08
15
Rm
7376
431.00
31.79
16
Rm
277
371.00
1.03
17
Grouting
Bags
11480
954.00
109.51
18
Grouting (Adits)
Bags
606
954.00
5.78
19
RM
404
371.00
1.50
20
SUB TOTAL
21
Instrumentation
3.0%
of Item 20
160.53
22
Dewatering
1.0%
of Item 20
53.51
23
Contingencies
3.0%
of Item 20
160.53
24
2.0%
of Item 20
107.02
25
TOTAL
25.76
5351.03
481.59
5832.62
Schedule: III-I-J-5
Sr. No.
Description
Unit
Qty
Rate
Amount
Tunnel Excavation
cum
47734
1926
919.36
cum
2387
1926
45.97
cum
25756
1629
419.45
cum
1288
1629
20.97
cum
34428
1848
636.19
cum
1721
1848
31.81
Rm
19182
836
160.36
Rm
7133
889
63.41
Rm
2923
836
24.44
10
Rm
14706
836
122.94
11
SFRS in tunnel
cum
1564
14967
234.08
12
SFRS in BV Chamber
cum
292
14967
43.70
13
SFRS in Adits
cum
620
14967
92.79
14
cum
25182
4468
1125.13
15
cum
628
5919
37.17
16
MT
100
91185
91.19
cum
2387
4861
116.02
18
Reinforcement Steel
Concrete in geological overbreak M-15 in
Tunnel
Concrete in BV Chamber M-15
cum
2007
4861
97.56
19
Rm
2911
431
12.55
20
Rm
2911
100
2.91
21
Rm
468
431
2.02
22
Rm
468
100
0.47
23
Rm
1654
431
7.13
24
Rm
1654
100
1.65
25
Rm
16540
431
71.29
26
Grouting
Bags
24810
954
236.69
27
28
SUB TOTAL
29
Instrumentation
3.0%
of Item 28
345.73
30
Dewatering
1.0%
of Item 28
115.24
31
Contingencies
3.0%
of Item 28
345.73
32
33
2.0%
of Item 28
230.49
1037.19
12561.54
17
MT
4063
170000
6907.10
11524.35
Schedule: III-I-J-6
Qty
Rate
(in `)
m3
26441
1792.25
473.89
b Cable Tunnel
m3
3832
1997.69
76.55
c Bust Duct
m3
9234
1739.82
160.65
d Machine Hall
m3
172240
1611.42
2775.51
e Transformer Cavern
m3
89872
1629.61
1464.56
f Draft Tubes
m3
27022
1957.03
528.83
m3
1322
1792.25
23.69
b Cable Tunnel
m3
192
1997.69
3.84
c Bust Duct
m3
462
1739.82
8.04
d Machine Hall
m3
8612
1611.42
138.78
e Transformer Cavern
m3
4494
1629.61
73.23
f Draft Tubes
m3
1351
1957.03
26.44
m3
692
14966.70
103.57
b Cable Tunnel
m3
191
14966.70
28.59
c Bust Duct
m3
276
14966.70
41.31
d Machine Hall
m3
1876
14966.70
280.78
e Transformer Cavern
m3
1060
14966.70
158.65
f Draft Tubes
m3
1432
14966.70
214.32
Rm
1844
431.00
7.95
b Cable Tunnel
Rm
220
431.00
0.95
c Bust Duct
Rm
315
431.00
1.36
d Machine Hall
Rm
1360
431.00
5.86
e Transformer Cavern
Rm
1208
431.00
5.21
f Draft Tubes
Rm
3460
431.00
14.91
Rm
1844
100.00
1.84
b Cable Tunnel
Rm
220
100.00
0.22
Sl. No.
1
Description
Underground Excavation in hard rock.
Amount
(in Lakh `)
SFRS
75 Drainage Holes
75 Drainage pipes
c Bust Duct
Rm
315
100.00
0.32
d Machine Hall
Rm
1360
100.00
1.36
e Transformer Cavern
Rm
1208
100.00
1.21
f Draft Tubes
Rm
3460
100.00
3.46
Rm
20490
836.00
171.30
b Cable Tunnel
Rm
3400
836.00
28.42
c Bust Duct
Rm
9070
836.00
75.83
d Transformer Cavern
Rm
7640
836.00
63.87
e Draft Tubes
Rm
31428
836.00
262.74
a Machine Hall
Rm
50380
1068.00
538.06
b Transformer Cavern
Rm
13096
1068.00
139.87
Rm
2295
1070.00
24.56
a Machine Hall
m3
1845
5848.00
107.90
b Transformer Cavern
m3
1096
5848.00
64.09
a Machine Hall
m3
2684
5505.00
147.75
b Transformer Cavern
m3
2161
5505.00
118.96
a Machine Hall
MT
300
91185.00
273.56
b Transformer Cavern
MT
300
91185.00
273.56
m3
1091
4044.00
44.12
a Cable Tunnel
m3
114
4861.00
5.54
b Bust Duct
m3
198
4861.00
9.62
a Machine Hall
m3
13675
5848.00
799.71
b Draft Tubes
m3
13060
5848.00
763.75
m3
3633
6283.00
228.26
25 RockBolts
32 RockBolts
Rockanchors in foundation
a Machine Hall
10
11
12
Reinforcement Steel
PCC M-10
a Main Access Tunnel
13
14
15
PCC M-15
PCC M-25
PCC M-30
a Machine Hall
16
L.S
Job
5.00
17
L.S
Job
5.00
18
19
H & M Works
a)
i)
L.S
Job
MT
120
###
204.00
ii)
Embedded parts
MT
42
###
71.40
iii)
MT
60
###
102.00
iv)
MT
15
###
25.50
v)
MT
180
###
306.00
20
L.S.
Job
21
5.00
4.00
Sub Total
11495.25
22
Instrumentation
3.0%
of Item 21
344.86
23
Dewatering
1.0%
of Item 21
114.95
24
Contingencies
3.0%
of Item 21
344.86
25
2.0%
of Item 21
229.91
26
TOTAL
Grand Total (in Lacs)
1034.57
12529.82
Schedule: III-I-J-7
Sl.
No.
Description
Unit
Qty
Unit Rate
Total cost
(in lacs)
Tunnel Excavation
cum
40206
1,727
694.35
cum
2010
1726.98
34.72
Rm
14578
836.00
121.87
SFRS in tunnel
cum
492
14966.70
73.64
cum
9683
5756.00
557.35
Reinforcement Steel
700
91185.00
638.30
cum
2010
4468.00
89.82
Rm
1312
431.00
5.65
Rm
1312
100.00
1.31
MT
10 H & M Works
a) TRT Outfall Gate
i)
MT
54
170000.00
91.80
MT
18
170000.00
30.60
MT
26
170000.00
44.20
MT
170000.00
4.25
MT
80
170000.00
136.00
2523.86
12 Instrumentation
3.0%
of Item 11
75.72
13 Dewatering
1.0%
of Item 11
25.24
14 Contingencies
3.0%
of Item 11
75.72
2.0%
of Item 11
50.48
16 TOTAL
151.43
Grand Total( in Lacs)
In Crores
2675.29
26.75
Schedule: III-I-J-DT-1
Description
Unit
Qty
cum
1394
5919.00
82.51
MT
100
1070.00
1.07
MT
25
170000.00
42.50
MT
13
170000.00
22.10
MT
170000.00
5.10
MT
55
170000.00
93.50
MT
25
170000.00
42.50
MT
10
170000.00
17.00
MT
12
170000.00
20.40
MT
35
170000.00
59.50
MT
LS
###
20.00
H & M Works
a)
SubTotal
406.18
Instrumentation
3.0%
of Item 4
12.19
Dewatering
1.0%
of Item 4
4.06
Contingencies
3.0%
of Item 4
12.19
2.0%
of Item 4
8.12
Total
Grand Total (in Lacs)
36.56
442.74
Schedule: III-I-J-DT-2
Sr. No.
Description
Unit
Qty
Rate
MT
8146
170000
SUB TOTAL
Instrumentation
3.0%
of Item 2
Dewatering
1.0%
of Item 2
Contingencies
3.0%
of Item 2
2.0%
of Item 2
TOTAL
Grand Total (in Lacs)
Schedule: III-I-J-DT-2
Amount
13848.20
13848.20
415.45
138.48
415.45
276.96
1246.34
15094.54
Schedule: III-I-J-DT-3
Description
Unit
Qty
Rate
(in `)
Amount
(in Lakh
`)5.00
Site Clearance
LS
m3
22890
165.00
37.77
m3
206010
377.00
776.66
Rock Anchors
P.C.C. M-15 Mix in Foundations an
backfilling
R.C.C. Concreting in M-25 Mix in Column
13600
1070.00
145.52
m3
101548
4861.00
4936.25
m3
886
5919.00
52.44
m3
1837
5505.00
101.13
Steel reinforcement
MT
174
91185.00
158.66
P.C.C. M-25
MT
1763
5848.00
103.10
SFRS
m3
480
14966.70
10
L.S
Job
4.00
11
L.S
Job
3.00
12
L.S
Job
2.00
13
L.S
Job
4.00
L.S
Job
4.00
15
60.00
16
H & M Works
a)
i)
MT
12
###
20.40
ii)
Embedded parts
MT
###
10.20
iii)
MT
###
13.60
iv)
MT
5.00
###
8.50
b)
i)
MT
20
###
34.00
ii)
Embedded parts
MT
10
###
17.00
iii)
MT
14
###
23.80
iv)
MT
5.00
###
8.50
17
L.S.
Job
3.00
18
L.S.
Job
20.00
19
m2
1250
5
6
14
2000.00
###
71.84
1.20
1568.96
20
Sub Total
8134.53
21
Instrumentation
3.0%
of Item 20
244.04
22
Dewatering
1.0%
of Item 20
81.35
23
Contingencies
3.0%
of Item 20
244.04
24
2.0%
of Item 20
162.69
25
TOTAL
Grand Total (in Lacs)
732.11
8866.64
Schedule: III-I-J-DT-4
Sl.
No.
Description
Unit
Qty
Unit Rate
Site Clearance
LS
m3
38913
165.00
m3
350217
377.00
m3
974
5505.00
m3
8,655
5848.00
Steel reinforcement
MT
616
91185.00
Railing
Rm
120
2000.00
Instrumentation
3.0%
of Item 8
10 Dewatering
1.0%
of Item 8
11 Contingencies
3.0%
of Item 8
2.0%
of Item 8
13 TOTAL
Grand Total( in Lacs)
Schedule: III-I-J-DT-4
re
Total cost
(in lacs)
5.00
64.21
1320.32
53.62
506.14
561.70
2.40
2513.39
75.40
25.13
75.40
50.27
150.80
2664.19
Schedule: III-I-K
Remarks
Type V (Special)
2
3
4
Type V
Type IV (special)
Type IV
2
4
12
300
556
1008
Type III
23
1518
Type II
20
1000
Type I
12
420
Total (A):
73
4802
B.
Non Residential
150
Circle office
200
Division office
625
Sub-division Office
10
250
Security office
60
Divn/Sub-Divn. Store
10
1000
Guest House/IB
800
Canteen
100
Recreation centre
150
10
Field Hostel
100
11
Enquiry Office
40
12
200
13
School
300
14
Hospital
Total (B) :
0
38
Total (A + B)
For CE
0
3975
8777
2. Temporary Buildings
A
Residential
Type V(special)
150
For CE
Type V
300
Type IV(special)
973
For EE/MO/AO
Type IV
17
1445
Type III
57
3762
Type II
31
1550
Type I
Total(A) :
18
612
133
8642
Non - Residential
Chief Engineer
150
SE Office
200
Div./Adm. office
525
Sub-Divn. office
16
400
Field Lab.
100
Labour shed
240
Stores
240
100
45
1955
178
10597
Qty
Rate (`)
Unit
Amount
(` Lakh)
4802.00
15080.00
m2
724.14
19760.00
785.46
Total (B) :
Total (A+B):
Sl.
Item
No.
I. Permanent Buildings
a) Residential
b)
Non-Residential
3975.00
1638.45
Sub Total :
II.
a)
b)
Temporary Buildings
Residential
Non-Residential
8642
7540.00
1955
9880.00
3148.05
m2
m2
651.61
193.15
916.86
1761.62
Total of I & II :
4909.67
98.19
98.19
49.10
49.10
36.21
19.64
26.06
3.86
36.21
19.64
2) Temporary buildings
(a) Residential @ 4% on
total cost
26.06
3.86
50.69
27.49
2) Temporary buildings
(a) Residential @ 5% on total cost
32.58
4.83
392.77
974.49
Total of K-Building
5884.16
Say
5884.00
The Plinth area rates have been adopted as per the CPWD, PAR-2012 with Cost Index as on
March, 2015 .
2
3
4
Schedule: III-I-M
Sl.No.
Item of work
Length
(in Km)
Unit Rate
per km in
`
Total cost
(in Lakh `)
15.00
117004.00
17.55
4.50
117004.00
5.27
LS
10.00
Total
32.82
Sl.No.
1
1
2
(a)
(b)
Item of work
2
Cleaning and pitching
Nursery cost
Filling of polethene bag
Treatment and showing of seeds
No. of
labour
Rate per
Total cost (`)
labour (`)
3
80
381.00
30480
16
4
381.00
381.00
6096
1524
3
Plantation
(a) Carriage and Plantation including
casualities
56
381.00
21336
4
(a)
(b)
(c)
(d)
(e)
Post Plantation
First Weeding
Second Weeding
Third Weeding
Soil working
Application of insecticides
16
12
12
16
4
381.00
381.00
381.00
381.00
381.00
6096
4572
4572
6096
1524
5
(a)
(b)
(c)
10
36
8
381.00
381.00
381.00
3810
13716
3048
6
Third year operation
(a) Weeding and Punning
10
381.00
3810
7
Miscellaneous
(a) Watering, Fire tracking and
inspection path
24
381.00
9144
8
(a)
(b)
(c)
(d)
(e)
Cost of material
Polythene bag
Manure and insecticides
Cow dung
Nurseries shade
Cost of soil
Contingencies
200
2.00
LS
LS
LS
LS
LS
Total
Say
400
400
200
50
30
100
117004
117004
Schedule: III-I-O
I- Works, O: Miscellaneous
Sl.
No.
1
Item
2
Qty
Unit
Rate in
`.
Amount
(`. Lakh)
Job
L.S.
25.00
Job
L.S.
15.00
Job
L.S.
10.00
Job
L.S.
2.00
Job
L.S.
5.00
Job
L.S.
15.00
Job
L.S.
15.00
Capital Cost
87.00
Qty
Sl.
Item
No.
2 Maintenance and Service Charges
Maintenance of internal &
2.1
5
external electrification
Maintenance of water supply
2.2 facilities to the staff and
5
labour colonies
Maintenance of Sanitation &
2.3 drainage facilities for various
colonies
Maintenance of fire fighting
2.4
equipments
Unit
Rate in
`.
Amount
(`. Lakh)
yrs
200000
10.00
yrs
150000
7.50
yrs
80000
4.00
yrs
16000
0.80
Sl.
No.
1
2.5
2.6
2.7
2.8
2.9
Item
2
Maintenance of Telephones
and wireless sets.
Maintenance of Research &
Quality Control Laboratory
Maintenance of Transit Camp
and hostels
Maintenance of Inspection
vehicles for 12 No. / year
Maintenance of Car 1 no.
Total of item No.2
Sl.
Item
No.
3 Others
Labour
welfare
3.1 compensation
&
Retrenchment benefits
Foundation
laying
stone
3.2
ceremony, inauguration
Procurement of Technical
3.3
Literatures
3.4 Model Exhibits
3.5 Canteen facilities
Photographic
and
3.6 cinematographic equipment
and their maintenance
Personnel Computer ,Laptop
3.7
etc
3.8 Award to Workers
Completion report & history
3.9
of the project
3.10 Co-operative stores
3.11 Library facilities
3.12 Visit of dignitaries
Sub Total item of 3:
Total of O-Miscellaneous:
Qty
Unit
Rate in
`.
Amount
(`. Lakh)
yrs
40000
2.00
yrs
120000
6.00
yrs
120000
6.00
yrs
650268
390.16
yrs
810828
283.79
710.25
Qty
Unit
Rate in
`.
Amount
(`. Lakh)
L.S.
10.00
L.S.
2.00
L.S.
1.00
L.S.
L.S.
6.00
4.00
L.S.
2.00
L.S.
10.00
L.S.
2.00
L.S.
1.00
L.S.
L.S.
L.S.
5.00
1.00
1.00
45.00
842.25
Schedule: III-I-P
H.E.
PROJECT STAGE-II
Unit- III :KIRTHAI
Power Plant
& Appurtenent
Structure
I-WORKS: P - MAINTENANCE
Sl.
No.
1
Name of Sub-head
2
Total Cost
(in Lakh `.)
3
J - Power Plant
116549.884
K - Building
R - Communication
162624.833
285878.717
2858.787
5884.000
820.000
Schedule: III-I-Q
Sl.
No.
Description of equipment
Capacity
Unit
Nos.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Hydraulic Excavator
Three boom Jumbo
side dump loader
Dumper
Dumper
Transit Mixer
B&M Plant
Concrete pump
Dozer
Crawler Drill
Jack hammer
crushing and processing plant
Tipper (4 X 4) axle drive, with 9"20" size tyre
Air compressor-Electric
Grout pump
Concrete vibrator
Water Tanker
Dewatering Pump
Generator Set
Welding Set
Car/ Scorpio
Jeep/ Bolero
Truck
Workshop Equipment
2
100
3.5
25
35
6
100
40
180
600
100
750
4.5
500
100
m3
m/hr
m3
T
T
cum
cum/hr
cum/hr
HP
cfm
cfm
tph
cum
cfm
kg/sqm
4
5
5
20
8
3
2
8
1
2
4
1
3
Unit
Rate
(in lakh
`)
85.00
340.00
105.00
50.00
80.00
30.00
132.00
42.00
42.00
15.00
0.30
1000
10.00
6
10.00
2
39.00
10
0.35
8
KL
1
7.50
10
HP
1
0.40
25
kVA
2
4.00
Each
1
2.00
Each
1
6.50
Each
10
6.00
Each
1
10.00
L.S.
30.00
Sub-Total (A)
Total Q-Special T&P
Provision to be made under Q-Spl. T&P
Cost of inspection vehicle
76.50
Other Equipments
6187.60
Provision under Q
76.50
Provision under Receipt &
-15.30
Recoveries
Schedule: III-I-Q
Amount (in
Lakh `)
340.00
1700.00
525.00
1000.00
640.00
90.00
264.00
336.00
42.00
30.00
1.20
1000.00
30.00
60.00
78.00
3.50
7.50
0.40
8.00
2.00
6.50
60.00
10.00
30.00
6264.10
6264.10
Schedule: III-I-R
Description
Construction and remodeling of
existing roads for approach to site
Construction of road to quarry
site and other working areas
Construction of temporary /
permanent river crossing, bridges,
connecting roads etc.
Amount
Rate (in
(in Lakh
Lakh `)
`)
Qty
Unit
13.00
km
40.00
520.00
5.00
km
20.00
100.00
L.S.
Job
L.S.
200.00
Total
820.00
Item
2
a)
b)
c)
d)
e)
f)
3
a)
b)
c)
d)
d)
300.00
69138.11
13721.55
2439.90
1705.99
5117.97
6540.83
98664.36
498.04
9.96
29.88
39.60
577.48
13933.97
278.68
836.04
1082.25
16130.94
5
6
7
8
9
10
11
12
1153.73
576.86
117403.37
5772.10
123175.47
307.94
12933.42
136416.83
Schedule: III-I-S
300.00
10705.56
79843.67
2589.62
16311.17
865.69
3305.59
283.22
1989.21
849.65
5967.63
1087.60
7628.43
16381.33
115045.68
2415.04
2913.08
48.30
58.26
144.90
174.78
188.10
227.70
2796.34
3373.82
2433.38
16367.34
48.67
146.00
327.35
982.04
189.00
1271.25
2817.05
18947.98
219.95
109.97
22324.63
1339.48
23664.11
59.16
2484.73
26208.00
1373.67
686.84
139728.00
7111.58
146839.58
367.10
15418.16
162624.83
Schedule: III-I-S-1A
Item Particulars
1
2
Rate
Qty
(`
lakhs)
3
LS
LS
200
100
Amount
Total
(`
(`
lakhs)
lakhs)
4
5
200.00
100.00
300.00
200.00
100.00
300.00
Schedule: III-I-S-2A
Item Particulars
Qty
Excise Duty
Amt Rate % Amount
Rate
4
Total
(` lakhs)
8
12.50
6541.50
58873.50
b)
c)
d)
e)
f)
g)
2..
3
4
5
6
7
8
9
12.5
327.075
2943.675
54948.60
2400.00
12.50
6868.58
300.00
61817.18
2700.00
LS
2400.00
12.50
300.00
2700.00
LS
450.00
12.50
56.25
506.25
400
2616.6
550
1100.00
12.50
137.50
1237.50
157.50
61456.10
12.50
19.69
7682.01
177.19
69138.11
Schedule: III-I-S
Sl.N
o.
Item Particulars
Qty
Rate
19 Nos.
` 850/KVA
9245.88
6 Nos.
`
1800/KVA
68.04
12.50
8.51
2 Nos.
`
1800/KVA
180.00
12.50
22.50
2 Nos.
`
1800/KVA
90.00
12.50
11.25
250.00
12.50
31.25
12
13
14
15
DG set (11kV,1000kVA)
Communication Equipments
Control and power cables
Cable racks & accessories
Ground system for power
house, Transformer yard &
switchyard
Illumination of power house &
switchyard
Electrical workshop & testing
equipment
Public address system
Security & surveillance system
LS
12.50 1155.73
2 Sets
200
400.00
12.50
50.00
2 Sets
LS
LS
LS
100
200.00
200.00
350.00
100.00
12.50
12.50
12.50
12.50
25.00
25.00
43.75
12.50
LS
200.00
12.50
25.00
LS
250.00
12.50
31.25
LS
150.00
12.50
18.75
LS
150.00
12.50
18.75
50.00
12.50
6.25
10433.92
313.02
12196.93
12.50
39.13
1524.62
Schedule: III-I-S-3A
10401.61
76.55
202.50
101.25
281.25
450.00
225.00
225.00
393.75
112.50
225.00
281.25
168.75
168.75
56.25
11738.15
352.14
13721.55
Schedule: III-I-S-4A
Sl.
Item Particulars
No.
1
Excise Duty
Qty
Rate %
Amount
270.00
540.00
12.50
67.50
110.00
110.00
12.50
13.75
50.00
50.00
12.50
6.25
40.00
160.00
400.00
12.50
12.50
20.00
50.00
LS
300.00
12.50
37.50
LS
200.00
12.50
25.00
200.00
12.50
25.00
150.00
12.50
18.75
4 Nos.
LS
Amount
Rate
1960.00
58.80
2168.80
245.00
12.50
7.35
271.10
Schedule: III-I-S-4A
Total
(` lakhs)
8
607.50
123.75
56.25
180.00
450.00
337.50
225.00
225.00
168.75
2205.00
66.15
2439.90
Schedule: III-I-S-5A
Qty
Rate
4
1
a)
b)
Capacitance voltage
transformers
Wave Traps
Galvanized steel
structures, fencing and
security
Foundation for structures
c)
2
4
5
6
Amount
5
Excise Duty
Rate % Amount
6
7
Total
(` lakhs)
8
36.00
12.50
4.50
40.50
5.00
30.00
12.50
3.75
33.75
4 Nos.
6.00
LS
200.00
24.00
200.00
12.50
12.50
3.00
25.00
27.00
225.00
LS
150.00
12.50
18.75
168.75
12.50
55.00
0.34
495.00
3.04
55.34
498.04
6 Nos.
150.00
440.00
2.70
442.70
Schedule: III-I-S-6A
1 a)
Qty
3
Rate
4
9 bays 750.00
Amount
5
6750.00
Custom Duty
Rate % Amount
6
12.50
843.75
bus arrangment
comprising of 6
transformer bays, 1 bus
coupler bay & 2 line bays.
b) 2nos. 400 kV GIS incomer 5 bays 750.00
3500.00 12.50
437.50
bays connected via 400kV
XLPE cable, 1 No. Shunt
Reactor Bay connected to
GIS-II and 2 nos. line
bays
2
Shunt Reactor including 3 Nos. 300.00
900.00
12.50
112.50
oil for 1st filling (41.67
MVAr, 400/3 kV, single
phase)
3
a) 400kV XLPE Cables
2500m 35000.00 875.00
12.50
109.38
b) 400kV XLPE Cable
termination accessories
Spares for above @ 3%
4
360.75
45.09
5
12385.75
1548.22
Total
Note:- Excise duty @ 12.5% on 400 KV GIS and XLPE cables have been considered with the
assumption that at the time of construction of Kirthai-II HEP indegenous 400 KV GIS and XLPE
cables will be available. Otherwise, Custom duty at prevailing rate may be considered in place
of 12.5% excise duty.
Schedule: III-I-S-6A
7593.75
3937.50
1012.50
984.38
405.84
13933.97
00 KV GIS and XLPE cables have been considered with the
struction of Kirthai-II HEP indegenous 400 KV GIS and XLPE
e, Custom duty at prevailing rate may be considered in place
Schedule: III-I-S-1B
1
2
Item Particulars
2
Rate
Qty
(`
lakhs)
3
LS
LS
Amount
Total
(`
(`
lakhs)
lakhs)
4
5
Schedule: III-I-S-2B
Item Particulars
Qty
1 a)
c)
d)
Total
(` lakhs)
8
2 sets
Rs.
5985.00
8550/K
W
12.50
748.13
6733.13
2 sets
Rs.
1940.00
9700/K
W
12.50
242.50
2182.50
Excise Duty
Amt Rate % Amount
Rate
Cooling
water
system
comprising pump sets, valves,
e) piping etc.
Drainage
and
dewatering
f) systems
LP & HP compressed air system
g) incl. pipes, valves
Spares @ 5% on item-1a to 1f
h) (incl. two spare runner)
Sub Total
2 a) 3150A, 12kV IPBD for GT 2 sets
connections
b) 800,12kV Segregated busduct 2 sets
for GT connections
12.5
49.53
445.78
180
8321.25
360.00
12.50
1040.16
45.00
9361.41
405.00
75
150.00
12.50
18.75
168.75
Sl.No
Item Particulars
Qty
Rate
Excise Duty
Amt Rate % Amount
Total
(` lakhs)
fuses
grounding
4
5
6
7
8
etc.,
cubicles
Neutral
with
LS
500.00
62.50
562.50
LS
150.00 12.50
18.75
included in 2 (a), 2(b)
168.75
34.80
9516.05
12.50
12.50
4.35
1189.51
39.15
10705.56
Schedule: III-I-S-3B
Item Particulars
Qty
Rate
Excise Duty
Amount Rate %
Amount
5
Total
(` lakhs)
8
2 Nos.
Rs.
1200/KVA
1032.00
12.50
129.00
1161.00
2 Nos.
Rs.
1200/KVA
300.00
12.50
37.50
337.50
2 Nos.
Rs.
1800/KVA
14.40
12.50
1.80
16.20
2 Nos.
Rs.
1800/KVA
9.00
12.50
1.13
10.13
Rs.
1800/KVA
72.00
12.50
9.00
81.00
Rs.
1800/KVA
72.00
12.50
9.00
81.00
100.00
12.50
12.50
112.50
100.00
12.50
12.50
112.50
50
50.00
12.50
cost not provided by CEA
6.25
56.25
100
50.00
100.00
50.00
50.00
12.50
12.50
12.50
12.50
6.25
12.50
6.25
6.25
56.25
112.50
56.25
56.25
50.00
12.50
6.25
56.25
100.00
12.50
12.50
112.50
50.00
50.00
12.50
12.50
6.25
6.25
56.25
56.25
218.68
1968.08
1749.40
Schedule: III-I-S-4B
Sl.
Item Particulars
No.
1
Excise Duty
Qty
Rate
Amount
Rate %
Amount
180.00
180.00
12.50
22.50
40.00
40.00
12.50
5.00
40.00
80.00
100.00
12.50
12.50
10.00
12.50
LS
100.00
12.50
12.50
LS
100.00
12.50
12.50
50.00
12.50
6.25
100.00
12.50
12.50
12.50
81.25
2.44
96.19
2Nos
LS
650.00
19.50
769.50
Schedule: III-I-S-4B
Total
(` lakhs)
8
202.50
45.00
90.00
112.50
112.50
112.50
56.25
112.50
731.25
21.94
865.69
Schedule: III-I-S-5B
1
a)
b)
2
4
5
6
Item Particulars
2
Qty
3
Rate
Amount
Excise Duty
Rate % Amount
6
7
Total
(` lakhs)
8
4.00
4.00
24.00
24.00
12.50
12.50
3.00
3.00
27.00
27.00
50.00
50.00
12.50
6.25
56.25
50.00
50.00
12.50
6.25
56.25
12.50
18.50
0.18
166.50
1.62
18.68
168.12
148.00
1.44
149.44
Schedule: III-I-S-6B
Qty
Custom Duty
Rate % Amount
50.00
4.00
50.00
12.00
12.50
12.50
6.25
1.50
9 Nos.
6.00
90.00
12.50
11.25
9 Nos.
9 Nos.
3 Sets
4.00
4.00
4.00
36.00
36.00
18.00
12.50
12.50
12.50
4.50
4.50
2.25
5 Km
50.00
250.00
12.50
31.25
3+1
150.00
600.00
12.50
75.00
1 No
LS
750.00
50.00
750.00
50.00
12.50
12.50
93.75
6.25
50.00
50.00
12.50
6.25
12.50
230.25
6.91
132 KV Switchyard
132 kV Bus Bar System 1 Set.
Bus Voltage transormers 3 Nos.
c)
Amount
1
a)
b)
d)
e)
f)
Rate
4
5
6
7
8
9
structures.
37MVA, 132/400kV,1
phaseAuto Transformer
with spare unit.
400 KV GIS -II Bay
Galvanized steel
structures
Foundation for structures
and misc. civil works
Sub Total ( 1 to 4)
Spares for Item ( 1 to 4)
@ 3%
Total
LS
1842.00
55.26
1997.26
249.66
Schedule: III-I-S-6B
cture
Services
Total
(` lakhs)
8
56.25
13.50
101.25
40.50
40.50
20.25
281.25
675.00
843.75
56.25
56.25
2072.25
62.17
2246.92
Schedule: III-I-S-7B
Qty
3
Rate
4
7 bays 300.00
Amount
5
2100.00
Custom Duty
Rate % Amount
6
12.50
262.50
bus arrangement
comprising of 4
transformer bays, 1 bus
2
3
63.00
2163.00
7.88
270.38
Schedule: III-I-S-7B
2362.50
70.88
2433.38
Schedule: III-I-X
Description of item
Qty.
2
Establishment of fuel deposits to meet fuel
requirement
of
labour
to
prevent
indiscriminate falling of trees
Catchment treatment for non-forest land to
be
taken
up
by
soil
conservation
department.
Catchment treatment for Forest land to be
taken up by Forest department.
Compensatory
afforestation
and
development of degraded forest etc.
Restoration of land in construction area &
borrow area by filling, grading etc. to
prevent further erosion
Control of aquatic weeds in submerged
areas to provide improved habitat for
aquatic life
Public health measures to control spread of
water & soil borne diseases
'Total cost of X-Environment & Ecology :
Cost
(in Lakh `)
4
LS
10.00
LS
8.000
LS
10.00
LS
10.00
LS
15.000
LS
2.000
LS
5.000
Total
60.000
Schedule: III-I-Y
Name of Sub-head
Amount
(in Lakh `)
0.25% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q Spl. T&P, X - Environment & Ecology, Y-Losses
on Stock )
1
J - Power Plant
K - Building
R - Communication
116549.884
5884.000
820.000
162624.833
0.25% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q Spl. T&P, X - Environment & Ecology, Y-Losses
on Stock )
285878.717
714.697
Schedule:III-II
Item
1 Establishment charges (Unit-I)
Designation
Av. Pay
Project Manager
Chief Engineer
Director/ SE
Chief Geologist
Chief Accounts Officer
Deputy Director/ Executive Eng
Senior Geologist
Financial Advisor
Senior Accounts Officer
Vigilance Officer
AEE/ AE
Accounts Officer
Assistant Vigilance Officer
JE
Assistant Accounts Officer
Assistant
Steno
UDC
LDC
Daftry/ MTS
Peon/ MTS
Chowkidar MTS
G. TOTAL
100500
56100
56100
56100
56100
23400
23400
23400
23400
23400
23400
13950
23400
13950
13950
13950
7800
7800
7800
7800
7800
7800
591300
Amount
(Rs lakh `)
8144.28
Pay Details of Regular Establishment
G. Pay
D.A.
H.R.A.
TPT.
D.A. on
TPT.
10000
8700
119595
78659
77112
20100
13220
12960
1600
1600
1600
1904
1904
1904
8700
8700
77112
77112
12960
12960
1600
1600
7600
7600
36890
36890
6200
6200
7600
7600
36890
36890
7600
5400
HCA
Total
3900
3900
3900
247599
165383
162276
0
1
3
0
165383
486828
1904
1904
3900
3900
162276
162276
0
1
0
162276
1600
1600
1904
1904
3900
3900
81494
81494
9
1
733446
81494
6200
6200
1600
1600
1904
1904
3900
3900
81494
81494
0
1
0
81494
36890
34272
6200
5760
1600
1600
1904
1904
3900
3900
81494
76236
0
25
0
1905900
5400
5400
23027
34272
3870
5760
1600
1600
1904
1904
3900
3900
53651
76236
2
2
107301
152472
4200
4800
21599
22313
3630
3750
800
800
952
952
3000
3000
48131
49565
44
2
2117742
99129
4600
4600
2800
22075
14756
12614
3710
2480
2120
800
800
400
952
952
476
3000
3000
3000
49087
34388
29210
7
5
18
343606
171940
525780
2000
2400
11662
12138
1960
2040
400
400
476
476
3000
3000
27298
28254
18
15
491364
423810
1800
1800
11424
11424
1920
1920
400
400
476
476
3000
3000
26820
26820
15
15
402300
402300
184
###
119300
30940
77700 2E+006
Salary for five years with average 20% increase every year due to hike in DA , TA, LTC, etc.
Regular staff
Medical, LTC etc of all regular and w/c staff
No. of
G. Total
posts
W.A
1st Year
1062.55
237.21
2nd Year
1275.06
3rd Year
1530.07
4th Year
1836.09
5th Year
2203.30
TOTAL
7907.07
G.Total
###
Schedule: III-III
Sl. No.
Item
Amount
(in Lakh `)
3
1.
320946.75
2.
Total amount required for T&P @ 1% of IWorks (as per the CWC guidelines for
preparation of project estimates of
multipurpose projects)
3209.47
3209.47
Schedule: III-V
Sl.
No.
1
1.
2.
3.
Item
2
Recoveries towards resale value of QSpecial T&P = 0.75[0.25(6187.6)]+
0.2(76.5)
Recoveries by resale/transfer of diesel
generator sets/electric lines,Telepone
lines & other accessories under Capital
Cost of O-Misc.@10%
Recoveries towards K-Building @15%
(Temporary Building)
Total
Amount
(in ` lakh)
3
1175.48
8.70
278.83
219.45
Indirect Charges
Sl. No.
1
1.
2.
Item
2
Abatement of land revenue @ 5% of
Private land cost
Audit & Accounts charges @ 1% of
total cost of I-Works
Total
Amount
(in ` lakh)
3
0.00
3209.47
3209.47