Unit III Khep II Estimate

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 63

KIRTHAI H.E.

PROJECT STAGE-II
ABSTRACT OF COST ESTIMATE
UNIT-III: Power House and Appurtenant Works
Sl. No.

Total Amount
(in
` Lakh)

Description

DIRECT CHARGES
I

II
III
IV
V

WORKS
A- Preliminary
B- Land
C- Works
D- Regulators
E- Falls
F- Cross Drainage Works
G- Bridges
H- Escape
J- Power Plant Civil works
K- Buildings
L- Earth Works
M- Plantation
O- Miscellaneous
P- Maintenance
Q- Special T&P
R- Communication
S- Power Plant Electromechanical System*
U- Distributaries
V-Watercourses
X- Environment & Ecology
Y- Losses on stock
Total of I - Works

Establishment
Tools & Plants
Suspense
Receipts & Recoveries

(-)

Total Direct Charges

825.95
2588.91

143618.00
5884.00
32.82
842.25
2858.79
76.50
820.00
162624.83

60.00
714.70
320946.75
8144.28
3209.47
-219.45
332081.05

INDIRECT CHARGES
a
b

Capitalisation of abatement of land revenue.


Audit & Account Charges

Total Indirect Charges


Total Cost of Project (UNIT-III)

0.00
3209.47
3,209.47
335,290.52

Schedule: III-I-A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, A: Preliminary
Sl. No.

Particulars of works

Expenditure incurred on
previous investigations
1
carried upto Project
formulation
Detailed Pre-construction
2
survey for final location
Alignment Survey of
a) approach road
Survey for tunnels/ ADITs
b) including L section of HRT/
TRC/Pressure shaft etc

Qty

Unit

Rate
(in `)

On actual basis

Amount
(in Lakh `)

504.00

10

Km

41214

4.12

Km

223484

8.94

223484

4.47

Grid survey of Power House,


c) Switch yard, Plant and
2
Sq.km
Colony grid survey
Total of Topographical Survey
3
Geological Investigation
Exploratory drilling of bore
a)
1200
m
holes
b) Exploratory drifting
500
m
Testing of rock for foundation
c)
Job
LS
etc
Misc charges
d)
Job
LS
Total of Geological Investigation
Construction Material Survey
Job
LS
EIA, EMP, R&R, SIA, Power
5
Utilisation & distribution
Job
study
6
Vehicle for site inspection
hiring of Jeep/ inspection
a)
2
Years
vehicle
Total for Vehicle
Design & Consultancy
7
Job
LS
charges
Preparation of Maps &
8
Job
LS
Reports
Photography &
9
Job
LS
documentation
10 Model studies etc
Job
11 Camp Equipments
LS
12 Training of Engineers
LS
Training of Skilled & Semi
13
LS
Skilled
4

Total

17.53
10785

129.42

25000

125.00

200000

2.00

100000

1.00

100000

257.42
1.00

1000000

10.00

400000

8.00
8.00

1500000

15.00

300000

3.00

150000

1.50

500000
100000
200000

5.00
1.00
2.00

150000

1.50

825.95

Schedule: III-I-B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, B: Land
Sl.
No.
1
a
i
ii
iii
b
i
ii
iii
iv

Item

Qty.

Land required for the Project


Forest Land
67.25
Solatium charges @30%
Establishment
charges
@6.25%
Demarcation charges@1%
Sub-Total
Government Land
182.25
Solatium charges - Nil
Establishment charges -Nil
LS
Demarcation charges
LS
Alineation proposal of Govt
land to be paid to Revenue
2
Department
Sub-Total
Other Charges
Legal Charges @1% of total
compensation

Unit

Rate
(in `)

Amount
(in Lakh `)

ha

2668739.00

1794.73
538.42
112.17
17.95
2463.26
0
0.00
0.00
0.00

ha

ha

1000.00

0.02
0.02
17.95

Interest
charges
on
compensation
(25%
of
compensation for a period of 2
year '@12% per annum ) of
land cost

107.68

Total

2588.91

Schedule: III-I-J

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
Abstract of Cost of J-Works
Sl. No.

Amount
(in Lakh `)

Description

Remarks

Intake Structure

24446.09

Schedule: III-I-J-1

Desilting Chamber

22090.57

Schedule: III-I-J-2

Head Race Tunnel

36413.95

Schedule: III-I-J-3

Surge Shaft

5832.62

Schedule: III-I-J-4

Pressure Shaft

12561.54

Schedule: III-I-J-5

Power House

Tail Race Tunnel

12529.82
2675.29

Schedule: III-I-J-6
Schedule: III-I-J-7

Total 116549.88

Sl. No.

Amount
(in Lakh `)

Description

Intake Structure (Dam Toe


PH)

Penstock (Dam Toe PH)

Power House (Dam Toe PH)

Tail Race Channel (Dam Toe


PH)

Remarks

442.74 Schedule: III-I-J-DT-1


15094.54 Schedule: III-I-J-DT-2

Total

8866.64

Schedule: III-I-J-DT-3

2664.19 Schedule: III-I-J-DT-4


27068.11

Schedule: III-I-J-1

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-1: Intake Structure
Sl. No.
1
2
3
4

16
17
18
19
20

Description
Site Clearance
Open Excavation in Soil
Open Excavation in Rock
Tunnel Excavation
Overbreak @5%of Tunnel
Excavation
Rock bolts 25 in Intake Structure
Rock bolts 25 in Intake Tunnels
Shotcrete with wiremesh Intake
Structure
SFRS in Intake tunnels
Mass Concrete M-10 in Intake
Structure
Mass Concrete M-15 in Intake
Structure
Concreting M-25 in Intake
structure
Concreting lining M-20 in Intake
Tunnels
Reinforcement Steel
Concrete in geological overbreak
M-15
Drilling for Drainage Holes
Drainage pipes
Drilling for Grouting > 4.0 m long
Drilling for Grouting < 4.0 m long
Grouting

21

Water stops (2Layers)

Rm

22

Turfing, Landscaping & other


Architectural Requirements

LS

23

H & M Works

a)

Power Intake Service Gate

i)

Vertical lift fixed wheel type gate

MT

160

170000.00

272.00

ii)

Embedded parts
Super Structure and bridge
assembly

MT

52

170000.00

88.40

MT

104

170000.00

176.80

iv)

Misc works, hand rails, ladder etc

MT

10

170000.00

17.00

v)

Electric Rope Drum Hoist

MT

320

170000.00

544.00

b)

Intake Bulkhead gate

i)

Vertical lift fixed wheel type gate

MT

40

170000.00

68.00

5
6
7
8
9
10
11
12
13
14
15

iii)

Unit
LS
cum
cum
cum

Qty
5095
45857
173384

cum

8669

1948.47

168.91

Rm
Rm

8744
80444

854.00
836.00

74.67
672.51

cum

525

10322.70

54.19

cum

2586

14966.70

387.04

cum

46759

4044.00

1890.93

cum

61405

4861.00

2984.90

cum

36652

5919.00

2169.43

cum

49047

5505.00

2700.04

MT

5500

91185.00

5015.18

cum

8570

4468.00

382.91

Rm
Rm
Rm
Rm
Bags

4137
4137
45968
1724
71538

431.00
100.00
431.00
371.00
954.00

17.83
4.14
198.12
6.40
682.47

2000.00

8.20

410

Unit Rate

Total cost
5.00
165.00
8.41
377.00
172.88
1948.47
3378.34

20.00

ii)

Embedded parts

MT

52

170000.00

88.40

iii)

Gantry rails and fixtures etc

MT

10

170000.00

17.00

iv)

Gantry Crane
Trash Rack Cleaning
Machine(TRCM)

MT

55

170000.00

93.50

MT

LS

6000000.00

60.00

c)
24

SubTotal

22427.60

25

Instrumentation

3.0%

of Item 24

672.83

26

Dewatering

1.0%

of Item 24

224.28

27

Contingencies

3.0%

of Item 24

672.83

28

Work Charge Establishment

2.0%

of Item 24

448.55

Total
Grand Total (in Lacs)

2018.49
24446.09

Schedule: III-I-J-2

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-2: Desilting Chamber

Sr. No.

Description

Unit

Qty

Rate

Amount in
lac

Underground Excavation for Desilting


Chamber
Overbreak @5%of Chamber Excavation

Excavation for Adits

cum

29930

1847.89

553.07

Overbreak @5%of Adit Excavation

cum

1497

1847.89

27.65

Excavation for Access Tunnel

cum

36253

1792.25

649.74

Overbreak @5%of Access Tunnel Excavation

cum

1813

1792.25

32.49

Excavation for Silt flushing Tunnel

cum

16413

1997.69

327.88

Overbreak @5%of Silt flushing Tunnel


Excavation

cum

821

1997.69

16.39

Rock bolts 38 in Desilting Chamber

Rm

171361

889.00

1523.40

10

Rock bolts 25 in Adits

Rm

12785

854.00

109.18

11

Rock bolts 25 in Access Tunnels

Rm

28093

854.00

239.91

12

Rock bolts 25 in Silt Flushing Tunnels

Rm

9528

854.00

81.37

13

SFRS in Desilting Chamber

cum

12852 14966.70

1923.52

14

SFRS in Adits

cum

539 14966.70

80.67

15

SFRS in Access Tunnels

cum

948 14966.70

141.88

16

SFRS in Silt flushing Tunnels

cum

306 14966.70

45.80

17

Concreting lining M-20 in Desilting Chamber

cum

41518

5756.00

2389.78

18

Concreting lining M-20 in Silt Flushing Tunnel

cum

3651

5756.00

210.15

19

Reinforcement Steel

2700 91185.00

2462.00

20

Concrete in geological overbreak M-15

cum

16523

4468.00

738.24

21

Concreting M-10 in Access Tunnel

cum

1496

4044.00

60.50

22

Drilling for Drainage Holes Desilting Chamber

Rm

25704

431.00

110.78

23

Drainage pipes for Desilting Chamber

Rm

25704

100.00

25.70

24

Drilling for Drainage Holes in Adits

Rm

1438

431.00

6.20

25

Drainage pipes for Adits

Rm

1438

100.00

1.44

26

Drilling for Drainage Holes in Access Tunnel

Rm

2528

431.00

10.90

27

Drainage pipes for Access Tunnel


Drilling for Drainage Holes in Silt flushing
Tunnel

Rm

2528

100.00

2.53

Rm

490

431.00

2.11

28

cum

330458

1628.54

5381.64

cum

16523

1628.54

269.08

MT

29

Drainage pipes for Silt flushing Tunnel

Rm

490

100.00

0.49

30

Drilling for Grouting > 4.0 m long

Rm

33162

431.00

142.93

31

Drilling for Grouting < 4.0 m long

Rm

1244

371.00

4.62

32

Grouting

51609

954.00

492.35

33

H & M Works

a)

Desilting Chamber Gate

i)

Vertical lift fixed wheel type gate

MT

128

170000.00

217.60

ii)

Embedded parts

MT

44

170000.00

74.80

iii)

Super Structure and bridge assembly

MT

24

170000.00

40.80

iv)

Misc works, hand rails, ladder

MT

10

170000.00

17.00

v)

Electric Rope Drum Hoist

MT

180

170000.00

306.00

b)

Silt flushing tunnel gate

i)

Slide type fabricated of SS

MT

64

170000.00

108.80

ii)

Gate body, bonnet, bonnet cover and liners


(Stainless Steel)

MT

100

170000.00

170.00

iii)

Liners stiffners, anchors etc

MT

88

170000.00

149.60

iv)

Hydraulic Hoist incl. power pack

MT

1600

170000.00

2720.00

34

Bags

SubTotal

21868.99

35

Instrumentation

3.0%

of Item 34

73.86

36

Dewatering

1.0%

of Item 34

24.62

37

Contingencies

3.0%

of Item 34

73.86

38

Work Charge Establishment

2.0%

of Item 34

49.24

39

TOTAL

221.58
Grand Total (in Lacs)

22090.57

Schedule: III-I-J-3

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-3: Head Race Tunnel

Sr. No.

Description

Unit

Qty

Rate

Amount in
lac

Tunnel Excavation

cum

524244

1731.26

9076.03

Overbreak @5%of tunnel Excavation

cum

26212

1731.26

453.80

Excavation for Adits

cum

41390

1847.89

764.84

Overbreak @5%of Adit Excavation

cum

2070

1847.89

38.24

Rock bolts 25 in tunnel

Rm

180424

836.00

1508.34

Rock bolts 25 in Adits

Rm

17680

836.00

147.80

SFRS in tunnel

cum

6089 14966.70

911.32

SFRS in Adits

cum

746 14966.70

111.65

Concreting lining M-20 in tunnel

cum
MT

152860

5756.00

8798.62

9800 91185.00

8936.13

10

Reinforcement Steel

11

Concrete in geological overbreak M-15

cum

26212

4468.00

1171.16

12

Drilling for Drainage Holes in tunnels

Rm

16238

431.00

69.99

13

Drainage pipes for tunnels

Rm

16238

100.00

16.24

14

Drilling for Drainage Holes in Adits

Rm

1989

431.00

8.57

15

Drainage pipes for Adits

Rm

1989

100.00

1.99

16

Drilling for Grouting > 4.0 m long

Rm

72170

431.00

311.05

17

Drilling for Grouting < 4.0 m long

Rm

2706

371.00

10.04

18

Grouting

112314

954.00

1071.48

19

SUB TOTAL

20

Instrumentation

3.0%

of Item 19

1002.22

21

Dewatering

1.0%

of Item 19

334.07

22

Contingencies

3.0%

of Item 19

1002.22

23

Work Charge Establishment

2.0%

of Item 19

668.15

24

TOTAL
Grand Total (in Lacs)

3006.66
36413.95

Bags

33407.29

Schedule: III-I-J-4

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-4: Surge Shaft
S. No.

Description

Unit

Qty

Rate

Amount

Surge Shaft Excavation

cum

80452 1701.30

1368.73

Excavation for Access Tunnel

cum

15435 1792.25

276.63

Overbreak @5%of Access Tunnel

cum

772 1792.25

13.83

Rock bolts 38 in surge shaft

Rm

18439

889.00

163.92

Rock bolts 25 in Adits

Rm

11961

836.00

99.99

SFRS in Surge Shaft

cum

3097 14966.70

463.52

SFRS in Access Tunnel

cum

404 14966.70

60.47

Concreting lining M-20

cum

Reinforcement Steel

23009 5756.00

MT

1500 91185.00
637 4044.00

1324.40
1367.78

10

Concreting M10 PCC in Access Tunnel

cum

11

Drilling for Drainage Holes

Rm

5775

431.00

24.89

12

Drainage pipes

Rm

5775

100.00

5.78

13

Drilling for Drainage Holes in Adits

Rm

1076

431.00

4.64

14

Drainage pipes for Adits

Rm

1076

100.00

1.08

15

Drilling for Grouting > 4.0 m long

Rm

7376

431.00

31.79

16

Drilling for Grouting < 4.0 m long

Rm

277

371.00

1.03

17

Grouting

Bags

11480

954.00

109.51

18

Grouting (Adits)

Bags

606

954.00

5.78

19

Drilling for Grouting (Adits)

RM

404

371.00

1.50

20

SUB TOTAL

21

Instrumentation

3.0%

of Item 20

160.53

22

Dewatering

1.0%

of Item 20

53.51

23

Contingencies

3.0%

of Item 20

160.53

24

Work Charge Establishment

2.0%

of Item 20

107.02

25

TOTAL

25.76

5351.03

Grand Total (in Lacs)

481.59
5832.62

Schedule: III-I-J-5

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-5: Pressure Shaft, BV Chamber & Penstock

Sr. No.

Description

Unit

Qty

Rate

Amount

Tunnel Excavation

cum

47734

1926

919.36

Overbreak @5%of tunnel Excavation

cum

2387

1926

45.97

Excavation for BV Chamber

cum

25756

1629

419.45

Overbreak @5%of BV Chamber Excavation

cum

1288

1629

20.97

Excavation for Adits

cum

34428

1848

636.19

Overbreak @5%of Adit Excavation

cum

1721

1848

31.81

Rock bolts 25 in tunnel

Rm

19182

836

160.36

Rock bolts 38 in tunnel

Rm

7133

889

63.41

Rock bolts 25 in BV Chamber

Rm

2923

836

24.44

10

Rock bolts 25 in Adits

Rm

14706

836

122.94

11

SFRS in tunnel

cum

1564

14967

234.08

12

SFRS in BV Chamber

cum

292

14967

43.70

13

SFRS in Adits

cum

620

14967

92.79

14

Concreting lining M-15 behind steel liner

cum

25182

4468

1125.13

15

Concreting M-25 for RCC Beams and columns

cum

628

5919

37.17

16

MT

100

91185

91.19

cum

2387

4861

116.02

18

Reinforcement Steel
Concrete in geological overbreak M-15 in
Tunnel
Concrete in BV Chamber M-15

cum

2007

4861

97.56

19

Drilling for Drainage Holes in tunnels

Rm

2911

431

12.55

20

Drainage pipes for tunnels

Rm

2911

100

2.91

21

Drilling for Drainage Holes in BV Chamber

Rm

468

431

2.02

22

Drainage pipes for BV Chamber

Rm

468

100

0.47

23

Drilling for Drainage Holes in Adits

Rm

1654

431

7.13

24

Drainage pipes for Adits

Rm

1654

100

1.65

25

Drilling for Grouting > 4.0 m long

Rm

16540

431

71.29

26

Grouting

Bags

24810

954

236.69

27

Steel Liner for Pressure Shaft

28

SUB TOTAL

29

Instrumentation

3.0%

of Item 28

345.73

30

Dewatering

1.0%

of Item 28

115.24

31

Contingencies

3.0%

of Item 28

345.73

32
33

Work Charge Establishment


TOTAL

2.0%

of Item 28

230.49
1037.19
12561.54

17

MT

4063

170000

6907.10
11524.35

Grand Total (in Lacs)

Schedule: III-I-J-6

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-6: Power House Complex
Unit

Qty

Rate
(in `)

a Main Access Tunnel

m3

26441

1792.25

473.89

b Cable Tunnel

m3

3832

1997.69

76.55

c Bust Duct

m3

9234

1739.82

160.65

d Machine Hall

m3

172240

1611.42

2775.51

e Transformer Cavern

m3

89872

1629.61

1464.56

f Draft Tubes

m3

27022

1957.03

528.83

a Main Access Tunnel

m3

1322

1792.25

23.69

b Cable Tunnel

m3

192

1997.69

3.84

c Bust Duct

m3

462

1739.82

8.04

d Machine Hall

m3

8612

1611.42

138.78

e Transformer Cavern

m3

4494

1629.61

73.23

f Draft Tubes

m3

1351

1957.03

26.44

a Main Access Tunnel

m3

692

14966.70

103.57

b Cable Tunnel

m3

191

14966.70

28.59

c Bust Duct

m3

276

14966.70

41.31

d Machine Hall

m3

1876

14966.70

280.78

e Transformer Cavern

m3

1060

14966.70

158.65

f Draft Tubes

m3

1432

14966.70

214.32

a Main Access Tunnel

Rm

1844

431.00

7.95

b Cable Tunnel

Rm

220

431.00

0.95

c Bust Duct

Rm

315

431.00

1.36

d Machine Hall

Rm

1360

431.00

5.86

e Transformer Cavern

Rm

1208

431.00

5.21

f Draft Tubes

Rm

3460

431.00

14.91

a Main Access Tunnel

Rm

1844

100.00

1.84

b Cable Tunnel

Rm

220

100.00

0.22

Sl. No.
1

Description
Underground Excavation in hard rock.

Amount
(in Lakh `)

Overbreak in Underground Excavation in


hard rock.

SFRS

75 Drainage Holes

75 Drainage pipes

c Bust Duct

Rm

315

100.00

0.32

d Machine Hall

Rm

1360

100.00

1.36

e Transformer Cavern

Rm

1208

100.00

1.21

f Draft Tubes

Rm

3460

100.00

3.46

a Main Access Tunnel

Rm

20490

836.00

171.30

b Cable Tunnel

Rm

3400

836.00

28.42

c Bust Duct

Rm

9070

836.00

75.83

d Transformer Cavern

Rm

7640

836.00

63.87

e Draft Tubes

Rm

31428

836.00

262.74

a Machine Hall

Rm

50380

1068.00

538.06

b Transformer Cavern

Rm

13096

1068.00

139.87

Rm

2295

1070.00

24.56

a Machine Hall

m3

1845

5848.00

107.90

b Transformer Cavern

m3

1096

5848.00

64.09

a Machine Hall

m3

2684

5505.00

147.75

b Transformer Cavern

m3

2161

5505.00

118.96

a Machine Hall

MT

300

91185.00

273.56

b Transformer Cavern

MT

300

91185.00

273.56

m3

1091

4044.00

44.12

a Cable Tunnel

m3

114

4861.00

5.54

b Bust Duct

m3

198

4861.00

9.62

a Machine Hall

m3

13675

5848.00

799.71

b Draft Tubes

m3

13060

5848.00

763.75

m3

3633

6283.00

228.26

25 RockBolts

32 RockBolts

Rockanchors in foundation
a Machine Hall

10

11

12

RCC M-25 in Beams, Columns and Slabs

RCC M-20 in Beams, Columns and Slabs

Reinforcement Steel

PCC M-10
a Main Access Tunnel

13

14

15

PCC M-15

PCC M-25

PCC M-30
a Machine Hall

16

Providing & fixing Doors.

L.S

Job

5.00

17

Providing glazed partition work.

L.S

Job

5.00

18

Providing glazed tiles for bath room &


control rooms.

19

H & M Works

a)

Draft Tube Gate

i)

L.S

Job

Vertical lift fixed wheel type gate

MT

120

###

204.00

ii)

Embedded parts

MT

42

###

71.40

iii)

Super Structure and bridge assembly

MT

60

###

102.00

iv)

Misc Works, Hand rails, ladder

MT

15

###

25.50

v)

Electric Rope Drum Hoist

MT

180

###

306.00

20

Extra For Expansion Joints

L.S.

Job

21

5.00

4.00

Sub Total

11495.25

22

Instrumentation

3.0%

of Item 21

344.86

23

Dewatering

1.0%

of Item 21

114.95

24

Contingencies

3.0%

of Item 21

344.86

25

Work Charge Establishment

2.0%

of Item 21

229.91

26

TOTAL
Grand Total (in Lacs)

1034.57
12529.82

Schedule: III-I-J-7

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-7: Tail Race Tunnel

Sl.
No.

Description

Unit

Qty

Unit Rate

Total cost
(in lacs)

Tunnel Excavation

cum

40206

1,727

694.35

Overbreak @5%of tunnel Excavation

cum

2010

1726.98

34.72

Rock bolts 25 in tunnel

Rm

14578

836.00

121.87

SFRS in tunnel

cum

492

14966.70

73.64

Concreting lining M-20 in tunnel

cum

9683

5756.00

557.35

Reinforcement Steel

700

91185.00

638.30

Concrete in geological overbreak M-15

cum

2010

4468.00

89.82

Drilling for Drainage Holes in tunnels

Rm

1312

431.00

5.65

Drainage pipes for tunnels

Rm

1312

100.00

1.31

MT

10 H & M Works
a) TRT Outfall Gate
i)

MT

54

170000.00

91.80

ii) Embedded parts

MT

18

170000.00

30.60

iii) Super Structure and bridge assembly

MT

26

170000.00

44.20

iv) Misc Works, Hand rails, ladder

MT

170000.00

4.25

v) Electric Rope Drum Hoist

MT

80

170000.00

136.00

Vertical lift fixed wheel type gate

11 SUB TOTAL (B)

2523.86

12 Instrumentation

3.0%

of Item 11

75.72

13 Dewatering

1.0%

of Item 11

25.24

14 Contingencies

3.0%

of Item 11

75.72

15 Work Charge Establishment

2.0%

of Item 11

50.48

16 TOTAL

151.43
Grand Total( in Lacs)
In Crores

2675.29
26.75

Schedule: III-I-J-DT-1

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-DT-1: Intake Structure (Dam Toe Power House)
Sl. No.

Description

Unit

Qty

cum

1394

5919.00

82.51

MT

100

1070.00

1.07

i) Vertical lift fixed wheel type gate

MT

25

170000.00

42.50

ii) Embedded parts

MT

13

170000.00

22.10

MT

170000.00

5.10

MT

55

170000.00

93.50

MT

25

170000.00

42.50

ii) Embedded parts


Super Structure & Bridge
iii) Assembly

MT

10

170000.00

17.00

MT

12

170000.00

20.40

iv) Electric Rope Drum Hoist


Trash Rack Cleaning
c)
Machine(TRCM)

MT

35

170000.00

59.50

MT

LS

###

20.00

Concreting M-25 in Intake


structure
Reinforcement Steel

H & M Works

a)

Power Intake Service Gate

iii) Hoist Support Structure & misc


works
Hydraulic Hoist including
iv) Powerpack
b)

Unit Rate Total cost

Power Intake Emergency Gate


i) Vertical lift fixed wheel type gate

SubTotal

406.18

Instrumentation

3.0%

of Item 4

12.19

Dewatering

1.0%

of Item 4

4.06

Contingencies

3.0%

of Item 4

12.19

Work Charge Establishment

2.0%

of Item 4

8.12

Total
Grand Total (in Lacs)

36.56
442.74

Schedule: III-I-J-DT-2

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-DT-2: Penstock (Dam Toe Power House)

Sr. No.

Description

Unit

Qty

Rate

MT

8146

170000

Steel liner for Pressure Shaft & Penstock

SUB TOTAL

Instrumentation

3.0%

of Item 2

Dewatering

1.0%

of Item 2

Contingencies

3.0%

of Item 2

Work Charge Establishment

2.0%

of Item 2

TOTAL
Grand Total (in Lacs)

Schedule: III-I-J-DT-2

Amount
13848.20
13848.20
415.45
138.48
415.45
276.96
1246.34
15094.54

Schedule: III-I-J-DT-3

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-DT-3: Power House (Dam Toe Power House)
Sl. No.

Description

Unit

Qty

Rate
(in `)

Amount
(in Lakh
`)5.00

Site Clearance

LS

Earth work in common excavation.

m3

22890

165.00

37.77

Excavation in hard rock.

m3

206010

377.00

776.66

Rock Anchors
P.C.C. M-15 Mix in Foundations an
backfilling
R.C.C. Concreting in M-25 Mix in Column

13600

1070.00

145.52

m3

101548

4861.00

4936.25

m3

886

5919.00

52.44

R.C.C. Concreting in M-20 Mix in Beam &


Slabs

m3

1837

5505.00

101.13

Steel reinforcement

MT

174

91185.00

158.66

P.C.C. M-25

MT

1763

5848.00

103.10

SFRS

m3

480

14966.70

10

Providing 300mmx300mm drain along


protection work of Power House.

L.S

Job

4.00

11

Providing Fixing rolling shutter.

L.S

Job

3.00

12

Providing & fixing Doors.

L.S

Job

2.00

13

L.S

Job

4.00

L.S

Job

4.00

15

Providing glazed partition work.


Providing glazed tiles for bath room &
control rooms.
Steel Railing in machine hall

60.00

16

H & M Works

a)

Draft Tube Gate

i)

Vertical lift fixed wheel type gate

MT

12

###

20.40

ii)

Embedded parts

MT

###

10.20

iii)

Super Structure and bridge assembly

MT

###

13.60

iv)

Misc Works, hand rails, ladder

MT

5.00

###

8.50

b)

Draft Tube Gate

i)

Vertical lift fixed wheel type gate

MT

20

###

34.00

ii)

Embedded parts

MT

10

###

17.00

iii)

Super Structure and bridge assembly

MT

14

###

23.80

iv)

Misc Works, hand rails, ladder

MT

5.00

###

8.50

17

Extra For Expansion Joints

L.S.

Job

3.00

18

Truss for P.H. & Transformer bay.

L.S.

Job

20.00

19

CGI Sheet Roofing for PH & transformer.

m2

1250

5
6

14

2000.00

###

71.84

1.20

1568.96

20

Sub Total

8134.53

21

Instrumentation

3.0%

of Item 20

244.04

22

Dewatering

1.0%

of Item 20

81.35

23

Contingencies

3.0%

of Item 20

244.04

24

Work Charge Establishment

2.0%

of Item 20

162.69

25

TOTAL
Grand Total (in Lacs)

732.11
8866.64

Schedule: III-I-J-DT-4

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I- Works, J: Power Plant Civil Works
J-DT-4: Tail Race Channel

Sl.
No.

Description

Unit

Qty

Unit Rate

Site Clearance

LS

Earth work in common excavation.

m3

38913

165.00

Excavation in hard rock.

m3

350217

377.00

R.C.C. Concreting in M-20 in slab

m3

974

5505.00

M-25 Concrete in Training Wall

m3

8,655

5848.00

Steel reinforcement

MT

616

91185.00

Railing

Rm

120

2000.00

SUB TOTAL (B)

Instrumentation

3.0%

of Item 8

10 Dewatering

1.0%

of Item 8

11 Contingencies

3.0%

of Item 8

12 Work Charge Establishment

2.0%

of Item 8

13 TOTAL
Grand Total( in Lacs)

Schedule: III-I-J-DT-4

re

Total cost
(in lacs)
5.00
64.21
1320.32
53.62
506.14
561.70
2.40
2513.39
75.40
25.13
75.40
50.27
150.80
2664.19

Schedule: III-I-K

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I-Works, K : Buildings
1. Permanent Buildings
No. of Plinth area
Sl.
Type of Accommodation quarters required
No.
required
(in m2)
A. Residential

Remarks

Type V (Special)

2
3
4

Type V
Type IV (special)
Type IV

2
4
12

300
556
1008

Type III

23

1518

For S.E/ Director


For EE
For AEE/Geologist/AE &
Equivalent
For JE & Equivalent

Type II

20

1000

For UDC / LDC / Steno-II

Type I

12

420

For Chowkidar, Peon etc

Total (A):

73

4802

B.

Non Residential

Chief Engineer office

150

Circle office

200

Division office

625

Sub-division Office

10

250

Security office

60

Divn/Sub-Divn. Store

10

1000

Guest House/IB

800

Canteen

100

Recreation centre

150

10

Field Hostel

100

11

Enquiry Office

40

12

Model / Exhibit Room

200

13

School

300

14

Hospital
Total (B) :

0
38
Total (A + B)

For CE

0
3975
8777

2. Temporary Buildings
A

Residential

Type V(special)

150

For CE

Type V

300

For S.E./ Director

Type IV(special)

973

For EE/MO/AO

Type IV

17

1445

For AE & Equivalent

Type III

57

3762

For JE & Equivalent

Type II

31

1550

For UDC/LDC & Equivalent

Type I
Total(A) :

18

612

133

8642

For Class-IV staff

Non - Residential

Project Manager Office

Chief Engineer

150

SE Office

200

Div./Adm. office

525

Sub-Divn. office

16

400

Field Lab.

100

Labour shed

240

Stores

240

Material Testing Laboratory

100

45

1955

178

10597

Qty

Rate (`)

Unit

Amount
(` Lakh)

4802.00

15080.00

m2

724.14

19760.00

785.46

Total (B) :
Total (A+B):
Sl.
Item
No.
I. Permanent Buildings
a) Residential
b)

Non-Residential

3975.00

Cost Index as on Mar 2015 (104) with PAR,2012

1638.45

Sub Total :
II.
a)
b)

Temporary Buildings
Residential
Non-Residential

8642

7540.00

1955

9880.00

3148.05
m2
m2

Cost Index as on Mar 2015 (104) with PAR,2012


Sub Total :

651.61
193.15
916.86
1761.62

Total of I & II :

4909.67

Add Service Charges:


(i)
(ii)
(iii)

Land development charges @ 2% on total cost


Colony roads @ 2% on total cost
Fencing, boundary walls & security/observation booths etc. @ 1%
totalGardens
cost
(iv) on
Lawns,
and Plantation etc. @ 1%
(v) Internal Water supply
1) Permanent buildings
(a) Residential @ 5% on total cost
(b) Non- Residential @ 2.5% on total cost
2) Temporary buildings
(a) Residential @ 4% on total cost
(b) Non- Residential @ 2% on total cost
(vi) Internal Sanitation
1) Permanent buildings
(a) Residential @ 5% on total cost
(b) Non- Residential @ 2.5% on total cost

98.19
98.19
49.10
49.10

36.21
19.64
26.06
3.86

36.21
19.64

2) Temporary buildings
(a) Residential @ 4% on

total cost

(b) Non- Residential @ 2% on total cost

26.06
3.86

(vii) Internal Electrification


1) Permanent buildings
(a) Residential @ 7% on total cost

50.69

(b) Non- Residential @3.5% on total cost

27.49

2) Temporary buildings
(a) Residential @ 5% on total cost

32.58

(b) Non- Residential @ 2.5% on total cost

4.83

(viii) Retaining walls and terracing @ 8% on total cost.

392.77

Total Service Charges

974.49
Total of K-Building

5884.16

Say

5884.00

The Plinth area rates have been adopted as per the CPWD, PAR-2012 with Cost Index as on
March, 2015 .

2
3
4

Permanent Buildings are proposed to be constructed Ground Floor +2 (G+2)


The Service charges adopted in the estimate are as per the CWC Guide lines for preparation
of
Estimates
for River
Valley Project
ForProject
temporary
buildings
are proposed
to be .Ground Floor only and PAR is 50% of Pmt
Building

Schedule: III-I-M

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I - Works, M: Plantation
ABSTRACT OF COST FOR PLANTATION

Sl.No.

Item of work

Length
(in Km)

Unit Rate
per km in
`

Total cost
(in Lakh `)

15.00

117004.00

17.55

4.50

117004.00

5.27

Plantation in the Powerhouse


area

Plantation in Power Colony

Provision for Gardening / Park

LS

10.00
Total

32.82

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I - Works, M: Plantation
SAMPLE ESTIMATE FOR PLANTATION OF 1 KM ROAD
Plant required = (1000/10) x 2 = 200 Nos.

Sl.No.
1
1
2
(a)
(b)

Item of work
2
Cleaning and pitching
Nursery cost
Filling of polethene bag
Treatment and showing of seeds

No. of
labour

Rate per
Total cost (`)
labour (`)

3
80

381.00

30480

16
4

381.00
381.00

6096
1524

3
Plantation
(a) Carriage and Plantation including
casualities

56

381.00

21336

4
(a)
(b)
(c)
(d)
(e)

Post Plantation
First Weeding
Second Weeding
Third Weeding
Soil working
Application of insecticides

16
12
12
16
4

381.00
381.00
381.00
381.00
381.00

6096
4572
4572
6096
1524

5
(a)
(b)
(c)

Second year operation


Casualities and replacement
Weeding and soil working
Punning

10
36
8

381.00
381.00
381.00

3810
13716
3048

6
Third year operation
(a) Weeding and Punning

10

381.00

3810

7
Miscellaneous
(a) Watering, Fire tracking and
inspection path

24

381.00

9144

8
(a)
(b)
(c)
(d)
(e)

Cost of material
Polythene bag
Manure and insecticides
Cow dung
Nurseries shade
Cost of soil
Contingencies

200

2.00
LS
LS
LS
LS
LS
Total
Say

400
400
200
50
30
100
117004
117004

Schedule: III-I-O

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure

I- Works, O: Miscellaneous
Sl.
No.
1

Item
2

Qty

Unit

Rate in
`.

Amount
(`. Lakh)

Job

L.S.

25.00

Job

L.S.

15.00

Job

L.S.

10.00

Job

L.S.

2.00

Job

L.S.

5.00

Job

L.S.

15.00

Job

L.S.

15.00

Capital Cost

Electrification including cost


1.1 of transformer, generator,
external electrification etc.
Water supply, purification,
and
distribution
arrangements
including
1.2
purchase of water tankers,
cost
of
tank
and
chlorination.
Providing sewage disposal
1.3 and storm water drains at
various colony sites.
Providing and fixing of fire
1.4
fighting equipments
Providing
Telephones,
1.5 Telegraphs, Post office,
wireless sets etc.
Purchase of equipment for
1.6 quality
control
/
field
laboratories
Furnishing & equipping of
1.7 Transit Camp & Hostels for
officer & staff.
Total of item (1)

87.00

Qty
Sl.
Item
No.
2 Maintenance and Service Charges
Maintenance of internal &
2.1
5
external electrification
Maintenance of water supply
2.2 facilities to the staff and
5
labour colonies
Maintenance of Sanitation &
2.3 drainage facilities for various
colonies
Maintenance of fire fighting
2.4
equipments

Unit

Rate in
`.

Amount
(`. Lakh)

yrs

200000

10.00

yrs

150000

7.50

yrs

80000

4.00

yrs

16000

0.80

Sl.
No.
1
2.5
2.6
2.7
2.8
2.9

Item
2
Maintenance of Telephones
and wireless sets.
Maintenance of Research &
Quality Control Laboratory
Maintenance of Transit Camp
and hostels
Maintenance of Inspection
vehicles for 12 No. / year
Maintenance of Car 1 no.
Total of item No.2

Sl.
Item
No.
3 Others
Labour
welfare
3.1 compensation
&
Retrenchment benefits
Foundation
laying
stone
3.2
ceremony, inauguration
Procurement of Technical
3.3
Literatures
3.4 Model Exhibits
3.5 Canteen facilities
Photographic
and
3.6 cinematographic equipment
and their maintenance
Personnel Computer ,Laptop
3.7
etc
3.8 Award to Workers
Completion report & history
3.9
of the project
3.10 Co-operative stores
3.11 Library facilities
3.12 Visit of dignitaries
Sub Total item of 3:
Total of O-Miscellaneous:

Qty

Unit

Rate in
`.

Amount
(`. Lakh)

yrs

40000

2.00

yrs

120000

6.00

yrs

120000

6.00

yrs

650268

390.16

yrs

810828

283.79
710.25

Qty

Unit

Rate in
`.

Amount
(`. Lakh)

L.S.

10.00

L.S.

2.00

L.S.

1.00

L.S.
L.S.

6.00
4.00

L.S.

2.00

L.S.

10.00

L.S.

2.00

L.S.

1.00

L.S.
L.S.
L.S.

5.00
1.00
1.00
45.00
842.25

Schedule: III-I-P

H.E.
PROJECT STAGE-II
Unit- III :KIRTHAI
Power Plant
& Appurtenent
Structure
I-WORKS: P - MAINTENANCE

Sl.
No.
1

Name of Sub-head
2

Total Cost
(in Lakh `.)
3

1% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q


- Spl. T&P, X - Environment & Ecology, YLosses on Stock )
1

J - Power Plant

116549.884

K - Building

R - Communication

S -Power Plant Electromechanical System*

162624.833

1% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q


- Spl. T&P, X - Environment & Ecology, YLosses on Stock )

285878.717

P - Maintenance @ 1% of above cost

2858.787

5884.000
820.000

Schedule: III-I-Q

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I-Works Q: Special T & P

Sl.
No.

Description of equipment

Capacity

Unit

Nos.

(A) General Purpose Equipment and Inspection Vehicles

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Hydraulic Excavator
Three boom Jumbo
side dump loader
Dumper
Dumper
Transit Mixer
B&M Plant
Concrete pump
Dozer
Crawler Drill
Jack hammer
crushing and processing plant
Tipper (4 X 4) axle drive, with 9"20" size tyre
Air compressor-Electric
Grout pump
Concrete vibrator
Water Tanker
Dewatering Pump
Generator Set
Welding Set
Car/ Scorpio
Jeep/ Bolero
Truck
Workshop Equipment

2
100
3.5
25
35
6
100
40
180
600
100
750
4.5
500
100

m3
m/hr
m3
T
T
cum
cum/hr
cum/hr
HP
cfm
cfm
tph
cum
cfm
kg/sqm

4
5
5
20
8
3
2
8
1
2
4
1
3

Unit
Rate
(in lakh
`)

85.00
340.00
105.00
50.00
80.00
30.00
132.00
42.00
42.00
15.00
0.30
1000
10.00

6
10.00
2
39.00
10
0.35
8
KL
1
7.50
10
HP
1
0.40
25
kVA
2
4.00
Each
1
2.00
Each
1
6.50
Each
10
6.00
Each
1
10.00
L.S.
30.00
Sub-Total (A)
Total Q-Special T&P
Provision to be made under Q-Spl. T&P
Cost of inspection vehicle
76.50
Other Equipments
6187.60
Provision under Q
76.50
Provision under Receipt &
-15.30
Recoveries

Schedule: III-I-Q

HAI H.E. PROJECT STAGE-II

ower Plant & Appurtenent Structure


I-Works Q: Special T & P

Amount (in
Lakh `)

340.00
1700.00
525.00
1000.00
640.00
90.00
264.00
336.00
42.00
30.00
1.20
1000.00
30.00
60.00
78.00
3.50
7.50
0.40
8.00
2.00
6.50
60.00
10.00
30.00
6264.10
6264.10

Schedule: III-I-R

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, R: Communication
Sl.
No.
1
2
3

Description
Construction and remodeling of
existing roads for approach to site
Construction of road to quarry
site and other working areas
Construction of temporary /
permanent river crossing, bridges,
connecting roads etc.

Amount
Rate (in
(in Lakh
Lakh `)
`)

Qty

Unit

13.00

km

40.00

520.00

5.00

km

20.00

100.00

L.S.

Job

L.S.

200.00

Total

820.00

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, S: Power Plant & Electrical System
Abstract of Cost
Sl.No

Item

Preliminary (cost of consultancy & model tests)Annexure S(I A) & S (I B)


Generating Plant and Equipment
Generator, turbine and accessories-Annexure S(II A)
& S ( II B)
Auxiliary electrical equipment for power station Annex S(III A ) & (S III B)
Auxiliary mechanical equipment and services for
power station - Annex S(IV A ) & S (IV B)
Central Sales Tax on 2(a), (b) & (c) @ 2%
Transportation,handling and Insurance charges @
6% of 2(a),(b) & (c)
Erection and commissioning charges @ 8 % of
2(a),(b) & (c), excluding spares
Sub-Total (Generating Plant and Equipment)
Pothead yard Equipment and Auxiliary
Equipment & Service for Switchyard
Pothead yard and Switchyard Equiment - Annex S(V
A), (S (V B) and S (VI B)
Central Sales Tax @ 2 % on 3(a)
Transportation, handling and insurance charges @
6% of 3(a)
Erection and commissioning charges @ 8% of 3(a),
excluding spares

2
a)
b)
c)
d)
e)
f)

3
a)
b)
c)
d)

Sub-Total (Substation equipment and auxiliary


equipment and service of Switchyard)
4
a)
b)
c)

d)

GIS & XLPE CABLE


420 KV and 132 kV GIS & XLPE Cable - Annex
S(VI A) & S( VII B)
Central sales Tax @ 2% on 4 (a)
Freight & insurance @ 6% on 4(a)
Erection & Commissioning charges @ 8% of 4(a)
excluding spares
Sub-Total (GIS & XLPE Cable )

Amount for Main


Power House
(6x140 MW)
(` Lakhs)

300.00

69138.11
13721.55
2439.90
1705.99
5117.97
6540.83
98664.36

498.04
9.96
29.88
39.60
577.48

13933.97
278.68
836.04
1082.25
16130.94

5
6
7
8
9
10
11
12

Contingencies @ 1% in items 2, 3 & 4


Tools & Plants @ 0.5% of 2, 3 & 4
Sub-Total (Item 1 to 6)
Establishment
Sub-Total (Item 7 & 8)
Audit and account charges @ 0.25% on item 7
J & K Works Tax @10.5 % on item 7
TOTAL ( in Lakh Rs. )

1153.73
576.86
117403.37
5772.10
123175.47
307.94
12933.42
136416.83

Schedule: III-I-S

HAI H.E. PROJECT STAGE-II

Power Plant & Appurtenent Structure


, S: Power Plant & Electrical System
Abstract of Cost
Amount for Dam Total Amount
Toe Power House
( 2x35 MW+ 2x10
(` Lakhs)
MW)
(` Lakhs)
0.00

300.00

10705.56

79843.67

2589.62

16311.17

865.69

3305.59

283.22

1989.21

849.65

5967.63

1087.60

7628.43

16381.33

115045.68

2415.04

2913.08

48.30

58.26

144.90

174.78

188.10

227.70

2796.34

3373.82

2433.38

16367.34

48.67
146.00

327.35
982.04

189.00

1271.25

2817.05

18947.98

219.95
109.97
22324.63
1339.48
23664.11
59.16
2484.73
26208.00

1373.67
686.84
139728.00
7111.58
146839.58
367.10
15418.16
162624.83

Schedule: III-I-S-1A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, S: Power Plant & Electrical System
PRELIMINARY WORKS
Sl. No.

Item Particulars

1
2

Design and Consultancy Charges


Model test for Turbine
Total

Rate
Qty
(`
lakhs)
3

LS
LS

200
100

Amount

Total
(`
(`
lakhs)
lakhs)
4
5

200.00
100.00
300.00

200.00
100.00
300.00

Schedule: III-I-S-2A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, S: Power Plant & Electrical System
GENERATOR, TURBINE AND ACCESSORIES
Sl.No

Item Particulars

Qty

Excise Duty
Amt Rate % Amount

Rate
4

1 a) Generating units of 140 MW rated


output comprising of Vertical
Francis turbine with rated speed of
250rpm operating under a rated
head of 225m and 13.8 kV, 0.9 pf
generators
complete
with
Rs.
assoicated equipment such as 6 sets
52332.00
6230/KW
spherical valve type MIVs, AVRs &
excitation
equipment,
water
sprinkler
fire
protection
for
generators, unit auxiliaries.

Total
(` lakhs)
8

12.50

6541.50

58873.50

b)

Digital governing system

included in (a) above.

c)
d)

Unit control boards


Cooling water system comprising
pump sets, valves, piping etc.
Drainage and dewatering systems

included in (a) above.


included in (a) above.

LP & HP compressed air system


incl. pipes, valves
Spares @ 5% on item-1a to 1h
(incl. one spare runner)
Sub Total
8000A,13.8kV phase Bus Duct for 6 sets
GT connections
Surge protection & VT cubicles
with CTs, PTs, Surge absorber,
CBs, fuses etc., Neutral grounding
cubicles
with
grounding
transformer resistor

included in (a)) above.

e)
f)
g)

2..
3

4
5
6
7

8
9

Supervisory control and Data


acquisition system
Control and protection system

included in (a) above.

12.5

327.075

2943.675

54948.60
2400.00

12.50

6868.58
300.00

61817.18
2700.00

included in item 2 above

LS

2400.00

12.50

300.00

2700.00

LS

450.00

12.50

56.25

506.25

Lubricating oil & Governor oil for


first filling
Butterfly Valves(5.25 m dia) with
upstream
and
downstream
extension
pieces,
by-pass 2 Nos
arrangement, air release and antivacuum valve etc.
Spares @ 3% of item 2,4 &5
Total

400

2616.6

included in 2 (a), 2(b) & 2(c )

550

1100.00

12.50

137.50

1237.50

157.50
61456.10

12.50

19.69
7682.01

177.19
69138.11

Schedule: III-I-S

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
AUXILIARY ELECTRICAL EQUIPMENT & SERVICES FOR POWER STATION
Excise Duty
Rate
%
Amount
Amount

Sl.N
o.

Item Particulars

Qty

Rate

1 Step up transformers including


oil for 1st Filling (57.25 MVA,
13.8/400/ 3kV, Single phase)

19 Nos.

` 850/KVA

9245.88

2 Unit Auxiliary transformers 3 ,


13.8/0.415kV, 630 kVA Dry type

6 Nos.

`
1800/KVA

68.04

12.50

8.51

2 Nos.

`
1800/KVA

180.00

12.50

22.50

2 Nos.

`
1800/KVA

90.00

12.50

11.25

250.00

12.50

31.25

3 Station auxiliary transformer


(SAT) 3, 13.8/11kV, 5000 kVA
dry type
4 Station Service transformers
11/ 0.415kV, 2500 kVA dry type
5 HT/LT AC Switchgear for aux.
Power supply to PH and outdoor
switchyard.
6 220V, 1400AH batteries, battery
chargers, DC distribution board
with DC switchgear
7
8
9
10
11

12
13
14
15

DG set (11kV,1000kVA)
Communication Equipments
Control and power cables
Cable racks & accessories
Ground system for power
house, Transformer yard &
switchyard
Illumination of power house &
switchyard
Electrical workshop & testing
equipment
Public address system
Security & surveillance system

16 Sub Total (Iteam 1 to7)


17 Spares @ 3% (Iteam 1 to 7)
18 Total

LS

12.50 1155.73

2 Sets

200

400.00

12.50

50.00

2 Sets
LS
LS
LS

100

200.00
200.00
350.00
100.00

12.50
12.50
12.50
12.50

25.00
25.00
43.75
12.50

LS

200.00

12.50

25.00

LS

250.00

12.50

31.25

LS

150.00

12.50

18.75

LS

150.00

12.50

18.75

50.00

12.50

6.25

10433.92
313.02
12196.93

12.50

39.13
1524.62

Schedule: III-I-S-3A

H.E. PROJECT STAGE-II


Plant & Appurtenent Structure
Plant & Electrical System

UIPMENT & SERVICES FOR POWER STATION


Total
(` lakhs)
8

10401.61

76.55

202.50

101.25

281.25

450.00
225.00
225.00
393.75
112.50
225.00
281.25
168.75
168.75
56.25
11738.15
352.14
13721.55

Schedule: III-I-S-4A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
AUXILIARY MECHANICAL EQUIPMENT AND SERVICES FOR POWER STATION

Sl.
Item Particulars
No.
1

Excise Duty
Qty

Rate %

Amount

270.00

540.00

12.50

67.50

110.00

110.00

12.50

13.75

c) Electrically operated Overhead 1 Nos.


travelling crane for GIS (10T)

50.00

50.00

12.50

6.25

2 Electric lifts and elevators


3 Fire protection system with
storage tanks, pupms, pipes
valves etc.
4 Air conditioinig , venilation and
heating equipments
5 Oil handling system with pipes,
valves, tanks & purifiers

40.00

160.00
400.00

12.50
12.50

20.00
50.00

LS

300.00

12.50

37.50

LS

200.00

12.50

25.00

6 Clean water supply system for LS


power house
7 Mechnical workshop equipment LS

200.00

12.50

25.00

150.00

12.50

18.75

4 Nos.
LS

Amount

1 a) Electrically operated Overhead 2 Nos.


travelling crane for PH (capacity
165/30/10T)
b) Electrically operated Overhead 1 Nos.
travelling crane for BEValve
Chamber (75/20T)- Tentative

8 Sub Total (Item 1 to 6)


9 Spares @ 3% (Iteam 1 to 6)
10 Total

Rate

1960.00
58.80
2168.80

245.00
12.50
7.35
271.10

Schedule: III-I-S-4A

AI H.E. PROJECT STAGE-II


r Plant & Appurtenent Structure
r Plant & Electrical System

QUIPMENT AND SERVICES FOR POWER STATION

Total
(` lakhs)
8

607.50

123.75

56.25

180.00
450.00

337.50
225.00

225.00
168.75
2205.00
66.15
2439.90

Schedule: III-I-S-5A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
220 kV Auxiliary Equipment for Pothead yard
Sl.No Item Particulars
1

Qty

Rate
4

1
a)

420 kV Pothead yard Equipments


Lightning arrestors
6 Nos.
6.00

b)

Capacitance voltage
transformers
Wave Traps
Galvanized steel
structures, fencing and
security
Foundation for structures

c)
2

4
5
6

and misc. civil works


Sub Total ( 1 to 5)
Spares for Item ( 1 ) @
3%
Total

Amount
5

Excise Duty
Rate % Amount
6
7

Total
(` lakhs)
8

36.00

12.50

4.50

40.50

5.00

30.00

12.50

3.75

33.75

4 Nos.
6.00
LS
200.00

24.00
200.00

12.50
12.50

3.00
25.00

27.00
225.00

LS

150.00

12.50

18.75

168.75

12.50

55.00
0.34

495.00
3.04

55.34

498.04

6 Nos.

150.00

440.00
2.70
442.70

Schedule: III-I-S-6A

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
400 KV GIS, Equipment & Services

Sl.No. Item Particulars


1

1 a)

420 kV GIS with double

Qty
3

Rate
4

9 bays 750.00

Amount
5

6750.00

Custom Duty
Rate % Amount
6

12.50

843.75

bus arrangment
comprising of 6
transformer bays, 1 bus
coupler bay & 2 line bays.
b) 2nos. 400 kV GIS incomer 5 bays 750.00
3500.00 12.50
437.50
bays connected via 400kV
XLPE cable, 1 No. Shunt
Reactor Bay connected to
GIS-II and 2 nos. line
bays
2
Shunt Reactor including 3 Nos. 300.00
900.00
12.50
112.50
oil for 1st filling (41.67
MVAr, 400/3 kV, single
phase)
3
a) 400kV XLPE Cables
2500m 35000.00 875.00
12.50
109.38
b) 400kV XLPE Cable
termination accessories
Spares for above @ 3%
4
360.75
45.09
5
12385.75
1548.22
Total
Note:- Excise duty @ 12.5% on 400 KV GIS and XLPE cables have been considered with the
assumption that at the time of construction of Kirthai-II HEP indegenous 400 KV GIS and XLPE
cables will be available. Otherwise, Custom duty at prevailing rate may be considered in place
of 12.5% excise duty.

Schedule: III-I-S-6A

AI H.E. PROJECT STAGE-II


r Plant & Appurtenent Structure

wer Plant & Electrical System

V GIS, Equipment & Services


Total
(` lakhs)
8

7593.75

3937.50

1012.50

984.38

405.84
13933.97
00 KV GIS and XLPE cables have been considered with the
struction of Kirthai-II HEP indegenous 400 KV GIS and XLPE
e, Custom duty at prevailing rate may be considered in place

Schedule: III-I-S-1B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, S: Power Plant & Electrical System
(DAM TOE POWER HOUSE)
PRELIMINARY WORKS
Sl. No.
1

1
2

Item Particulars
2

Design and Consultancy Charges


Model test for Turbine
Total

Rate
Qty
(`
lakhs)
3

LS
LS

Amount

Total
(`
(`
lakhs)
lakhs)
4
5

Included in Annexure S-1A


Included in Annexure S-1A
0.00
0.00

Schedule: III-I-S-2B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
I: Works, S: Power Plant & Electrical System
(DAM TOE POWER HOUSE)
GENERATOR, TURBINE AND ACCESSORIES
Sl.No

Item Particulars

Qty

1 a)

c)
d)

Total
(` lakhs)
8

2 sets

Rs.
5985.00
8550/K
W

12.50

748.13

6733.13

2 sets

Rs.
1940.00
9700/K
W

12.50

242.50

2182.50

Generating units of 35 MW rated


output comprising of Vertical
Francis turbine with rated speed
of 300rpm operating under a
rated head of 98.04m and 11kV,
0.9Pf generators complete with
associated equipment such as
Butterfly type MIVs(dia 2.38m),
AVRs & excitation equipment,
water sprinkler fire protection for
generators, unit auxiliaries.
b)

Excise Duty
Amt Rate % Amount

Rate

Generating units of 10 MW rated


output comprising of Vertical
Francis turbine with rated speed
of 500rpm operating under a
rated head of 98.04m and 11 kV,
0.9Pf generators complete with
associated equipment such as
Butterfly type MIVs,(dia 1.34),
AVRs & excitation equipment,
water sprinkler fire protection for
generators, unit auxiliaries.
Digital governing system
Unit control boards

Cooling
water
system
comprising pump sets, valves,
e) piping etc.
Drainage
and
dewatering
f) systems
LP & HP compressed air system
g) incl. pipes, valves
Spares @ 5% on item-1a to 1f
h) (incl. two spare runner)
Sub Total
2 a) 3150A, 12kV IPBD for GT 2 sets
connections
b) 800,12kV Segregated busduct 2 sets
for GT connections

included in (a), (b) above.


included in (a), (b) above.
included in (a), (b) above.

included in (a), (b) above.


included in (a), (b) above.
396.25

12.5

49.53

445.78

180

8321.25
360.00

12.50

1040.16
45.00

9361.41
405.00

75

150.00

12.50

18.75

168.75

Sl.No

Item Particulars

Qty

Surge protection & VT cubicles

Rate

Excise Duty
Amt Rate % Amount

Total
(` lakhs)

included in 2 (a), & 2(b )

with CTs, PTs, Surge absorber,


CBs,

fuses

grounding
4
5
6
7
8

etc.,
cubicles

Neutral
with

grounding transformer resistor


Supervisory control and Data
acquisition system
Control and protection system
Lubricating oil & Governor oil for
first filling
Spares @ 3% of item 2,4 &5
Total

LS

500.00

62.50

562.50

LS

150.00 12.50
18.75
included in 2 (a), 2(b)

168.75

34.80
9516.05

12.50

12.50

4.35
1189.51

39.15
10705.56

Schedule: III-I-S-3B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
(DAM TOE POWER HOUSE)
AUXILIARY ELECTRICAL EQUIPMENT & SERVICES FOR POWER STATION
Sl.N
o.

Item Particulars

1 Step up transformers including


oil for 1st Filling (43
MVA,11/132 kV, three phase)
2 Step up transformers including

Qty

Rate

Excise Duty
Amount Rate %
Amount
5

Total
(` lakhs)
8

2 Nos.

Rs.
1200/KVA

1032.00

12.50

129.00

1161.00

2 Nos.

Rs.
1200/KVA

300.00

12.50

37.50

337.50

11/132 kV, three phase)


3 Unit Auxiliary transformers dry

2 Nos.

Rs.
1800/KVA

14.40

12.50

1.80

16.20

type (11/0.433 kV, 400kVA)


4 Unit Auxiliary transformers dry

2 Nos.

Rs.
1800/KVA

9.00

12.50

1.13

10.13

Rs.
1800/KVA

72.00

12.50

9.00

81.00

Rs.
1800/KVA

72.00

12.50

9.00

81.00

100.00

12.50

12.50

112.50

100.00

12.50

12.50

112.50

50
50.00
12.50
cost not provided by CEA

6.25

56.25

oil for 1st Filling (12.5 MVA,

type (11/0.433 kV, 250kVA)


5 Station auxiliary transformer
2 Nos.
(SAT) 3, 11/0.433 kV, 2000
kVA dry type
6 Station service Dry Type
2 Nos.
transformers (11/0.433kV,
2000kVA)
7 HT/LT AC Switchgear for aux.
LS
Power supply to PH and outdoor
switchyard.
8
220V, 600AH batteries, battery
chargers, DC distribution board
with DC switchgear
9 DG set (0.433kV, 500 kVA)
1 Sets
10
LS
OPGW & associated equipment
11 Communication Equipments
LS
12 Control and power cables
LS
13 Cable racks & accessories
LS
14 Ground system for power
LS
house, Transformer yard &
switchyard
15 Illumination of power house &
LS
switchyard
15 Electrical workshop & testing
LS
equipment
16 Public Address System
17 Security & Surveillance system
18 Sub Total (Iteam 1 to9)

100

50.00
100.00
50.00
50.00

12.50
12.50
12.50
12.50

6.25
12.50
6.25
6.25

56.25
112.50
56.25
56.25

50.00

12.50

6.25

56.25

100.00

12.50

12.50

112.50

50.00
50.00

12.50
12.50

6.25
6.25

56.25
56.25

218.68

1968.08

1749.40

Schedule: III-I-S-4B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
(DAM TOE POWER HOUSE)

AUXILIARY MECHANICAL EQUIPMENT AND SERVICES FOR POWER STATION

Sl.
Item Particulars
No.
1

Excise Duty
Qty

Rate

Amount

Rate %

Amount

180.00

180.00

12.50

22.50

40.00

40.00

12.50

5.00

40.00

80.00
100.00

12.50
12.50

10.00
12.50

LS

100.00

12.50

12.50

LS

100.00

12.50

12.50

6 Clean water supply system for LS


power house
7 Mechnical workshop equipment LS

50.00

12.50

6.25

100.00

12.50

12.50

12.50

81.25
2.44
96.19

1 a) Electrically operated Overhead 1 Nos.


travelling crane for PH (capacity
125/10T)
b) Electrically operated Overhead 1 Nos.
travelling crane for GIS (5T)
2 Electric lifts and elevators
3 Fire protection system with
storage tanks, pumps, pipes
valves etc.
4 Air conditioinig , ventilation and
heating equipments
5 Oil handling system with pipes,
valves, tanks & purifiers

8 Sub Total (Item 1 to 6)


9 Spares @ 3% (Iteam 1 to 6)
10 Total

2Nos
LS

650.00
19.50
769.50

Schedule: III-I-S-4B

AI H.E. PROJECT STAGE-II


r Plant & Appurtenent Structure
r Plant & Electrical System

AM TOE POWER HOUSE)

QUIPMENT AND SERVICES FOR POWER STATION

Total
(` lakhs)
8

202.50

45.00

90.00
112.50

112.50
112.50

56.25
112.50
731.25
21.94
865.69

Schedule: III-I-S-5B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
(DAM TOE POWER HOUSE)
132 kV Auxiliary Equipment for Pothead yard
Sl.No
1

1
a)
b)
2

4
5
6

Item Particulars
2

Qty
3

132 kV pothead Equipment


Lightning Arresters
6 nos.
Capacitance voltage
6 nos.
transformer
Galvanized steel
LS
structures, fencing and
security
Foundation for structures LS
and misc. civil works
Sub Total ( 1 to 5)
Spares for Item ( 1) @
3%
Total

Rate

Amount

Excise Duty
Rate % Amount
6
7

Total
(` lakhs)
8

4.00
4.00

24.00
24.00

12.50
12.50

3.00
3.00

27.00
27.00

50.00

50.00

12.50

6.25

56.25

50.00

50.00

12.50

6.25

56.25

12.50

18.50
0.18

166.50
1.62

18.68

168.12

148.00
1.44
149.44

Schedule: III-I-S-6B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
(DAM TOE POWER HOUSE)
132 KV Switchyard & Pothead yard, Equipment & Services

Sl.No. Item Particulars


1

Qty

Custom Duty
Rate % Amount

50.00
4.00

50.00
12.00

12.50
12.50

6.25
1.50

9 Nos.

6.00

90.00

12.50

11.25

9 Nos.
9 Nos.
3 Sets

4.00
4.00
4.00

36.00
36.00
18.00

12.50
12.50
12.50

4.50
4.50
2.25

5 Km

50.00

250.00

12.50

31.25

3+1

150.00

600.00

12.50

75.00

1 No
LS

750.00
50.00

750.00
50.00

12.50
12.50

93.75
6.25

50.00

50.00

12.50

6.25

12.50

230.25
6.91

132 KV Switchyard
132 kV Bus Bar System 1 Set.
Bus Voltage transormers 3 Nos.

c)

132 kV SF6m circuit


breaker
Lightning Arresters
Current Transformers
Isolator with Earthing
Switch
132kV D/C Transmission

Amount

1
a)
b)

d)
e)
f)

Rate

line from Dam Toe


pothhead yard single
alongwith 132kV single
circuit Transmission Line
(from 132kV switchyard to
autotransformer) alonwith
associated equipments &
3

4
5
6

7
8
9

structures.
37MVA, 132/400kV,1
phaseAuto Transformer
with spare unit.
400 KV GIS -II Bay
Galvanized steel
structures
Foundation for structures
and misc. civil works
Sub Total ( 1 to 4)
Spares for Item ( 1 to 4)
@ 3%
Total

LS

1842.00
55.26
1997.26

249.66

Schedule: III-I-S-6B

cture

Services
Total
(` lakhs)
8

56.25
13.50
101.25
40.50
40.50
20.25
281.25

675.00

843.75
56.25
56.25

2072.25
62.17
2246.92

Schedule: III-I-S-7B

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure
S - Power Plant & Electrical System
(DAM TOE POWER HOUSE)
132 KV GIS, Equipment & Services

Sl.No. Item Particulars


1

132kV GIS with double

Qty
3

Rate
4

7 bays 300.00

Amount
5

2100.00

Custom Duty
Rate % Amount
6

12.50

262.50

bus arrangement
comprising of 4
transformer bays, 1 bus
2
3

coupler bay & 2 line bays.


Spares for above @ 3%
Total

63.00
2163.00

7.88
270.38

Schedule: III-I-S-7B

AI H.E. PROJECT STAGE-II


r Plant & Appurtenent Structure

wer Plant & Electrical System


AM TOE POWER HOUSE)
V GIS, Equipment & Services
Total
(` lakhs)
8

2362.50

70.88
2433.38

Schedule: III-I-X

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenent Structure

I: Works, X - Environment & Ecology


Sl.
No.
1
1
2
3
4
5
6
7

Description of item

Qty.

2
Establishment of fuel deposits to meet fuel
requirement
of
labour
to
prevent
indiscriminate falling of trees
Catchment treatment for non-forest land to
be
taken
up
by
soil
conservation
department.
Catchment treatment for Forest land to be
taken up by Forest department.
Compensatory
afforestation
and
development of degraded forest etc.
Restoration of land in construction area &
borrow area by filling, grading etc. to
prevent further erosion
Control of aquatic weeds in submerged
areas to provide improved habitat for
aquatic life
Public health measures to control spread of
water & soil borne diseases
'Total cost of X-Environment & Ecology :

Cost
(in Lakh `)
4

LS

10.00

LS

8.000

LS

10.00

LS

10.00

LS

15.000

LS

2.000

LS

5.000

Total

60.000

Schedule: III-I-Y

KIRTHAI H.E. PROJECT STAGE-II

Unit- III : Power Plant & Appurtenent Structure

I-Works: Y: Losses on Stock & Unforseen


Sl.
No.
1

Name of Sub-head

Amount
(in Lakh `)

0.25% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q Spl. T&P, X - Environment & Ecology, Y-Losses
on Stock )
1

J - Power Plant

K - Building

R - Communication

S -Power Plant Electromechanical System*

116549.884
5884.000
820.000

162624.833

0.25% of I - Works ( Less A - Preliminary, B Land, M - Plantation, O - Miscellaneous, Q Spl. T&P, X - Environment & Ecology, Y-Losses
on Stock )

285878.717

Y-Losses on Stock @ 0.25% of above cost

714.697

Schedule:III-II

KIRTHAI H.E. PROJECT STAGE-II


Unit- III : Power Plant & Appurtenent Structure
II - Establishment
Sl. No.

Item
1 Establishment charges (Unit-I)

Designation

Av. Pay

Project Manager
Chief Engineer
Director/ SE
Chief Geologist
Chief Accounts Officer
Deputy Director/ Executive Eng
Senior Geologist
Financial Advisor
Senior Accounts Officer
Vigilance Officer
AEE/ AE
Accounts Officer
Assistant Vigilance Officer
JE
Assistant Accounts Officer
Assistant
Steno
UDC
LDC
Daftry/ MTS
Peon/ MTS
Chowkidar MTS
G. TOTAL

100500
56100
56100
56100
56100
23400
23400
23400
23400
23400
23400
13950
23400
13950
13950
13950
7800
7800
7800
7800
7800
7800
591300

Amount
(Rs lakh `)
8144.28
Pay Details of Regular Establishment
G. Pay

D.A.

H.R.A.

TPT.

D.A. on
TPT.

10000
8700

119595
78659
77112

20100
13220
12960

1600
1600
1600

1904
1904
1904

8700
8700

77112
77112

12960
12960

1600
1600

7600
7600

36890
36890

6200
6200

7600
7600

36890
36890

7600
5400

HCA

Total

3900
3900
3900

247599
165383
162276

0
1
3

0
165383
486828

1904
1904

3900
3900

162276
162276

0
1

0
162276

1600
1600

1904
1904

3900
3900

81494
81494

9
1

733446
81494

6200
6200

1600
1600

1904
1904

3900
3900

81494
81494

0
1

0
81494

36890
34272

6200
5760

1600
1600

1904
1904

3900
3900

81494
76236

0
25

0
1905900

5400
5400

23027
34272

3870
5760

1600
1600

1904
1904

3900
3900

53651
76236

2
2

107301
152472

4200
4800

21599
22313

3630
3750

800
800

952
952

3000
3000

48131
49565

44
2

2117742
99129

4600
4600
2800

22075
14756
12614

3710
2480
2120

800
800
400

952
952
476

3000
3000
3000

49087
34388
29210

7
5
18

343606
171940
525780

2000
2400

11662
12138

1960
2040

400
400

476
476

3000
3000

27298
28254

18
15

491364
423810

1800
1800

11424
11424

1920
1920

400
400

476
476

3000
3000

26820
26820

15
15

402300
402300

184

###

119300

845614 142120 26000

Salary for 1 year = 106254774

30940

77700 2E+006

say 1062.6 Lacs

Salary for five years with average 20% increase every year due to hike in DA , TA, LTC, etc.

Regular staff
Medical, LTC etc of all regular and w/c staff

No. of
G. Total
posts

W.A

1st Year
1062.55
237.21

2nd Year
1275.06

3rd Year
1530.07

4th Year
1836.09

5th Year
2203.30

TOTAL
7907.07

G.Total

###

Schedule: III-III

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenant Works
III - Tools & Plants

Sl. No.

Item

Amount
(in Lakh `)
3

1.

Total Cost of I - Works

320946.75

2.

Total amount required for T&P @ 1% of IWorks (as per the CWC guidelines for
preparation of project estimates of
multipurpose projects)

3209.47

Total Chargeable to III-T&P

3209.47

Schedule: III-V

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenant Works

V - Receipts & Recoveries on Capital Account

Sl.
No.
1
1.

2.

3.

Item
2
Recoveries towards resale value of QSpecial T&P = 0.75[0.25(6187.6)]+
0.2(76.5)
Recoveries by resale/transfer of diesel
generator sets/electric lines,Telepone
lines & other accessories under Capital
Cost of O-Misc.@10%
Recoveries towards K-Building @15%
(Temporary Building)
Total

Amount
(in ` lakh)
3
1175.48

8.70

278.83
219.45

KIRTHAI H.E. PROJECT STAGE-II


Unit- III: Power Plant & Appurtenant Works

Indirect Charges

Sl. No.
1
1.
2.

Item
2
Abatement of land revenue @ 5% of
Private land cost
Audit & Accounts charges @ 1% of
total cost of I-Works
Total

Amount
(in ` lakh)
3
0.00
3209.47
3209.47