November15,2016
TABLE OF CONTENTS
PROJECT CONTEXT
PROJECT LOCATION
PROJECT GOALS
MAJOR DESTINATIONS
EXISTING CONDITIONS
DESIGN ISSUES
PROPOSED SOLUTION
QUESTIONS
Project Context
Bronx River Alliance - Greenway
Master Plan
23 mile Trail (8 miles in the Bronx
from mouth at East River to border of
Westchester County)
Divided into 5 Segments
Segment B Bruckner Boulevard to
East Tremont Avenue includes
Starlight Park
Project location
Project Goals
Complete a component of the Bronx
River Greenway
Improve Pedestrian Facilities
Improve intersection safety
Upgrade street lighting, signals and
signage
Install new water distribution mains
Rehabilitate Sewers
Maintain or improve existing Vehicle
Level of Service
Major Destinations
Bronx Zoo
Parks
Starlight Park
Bronx Road Park
Bronx Zoo
Cultural / Government
Post Office
Bronx River Arts Center
School
Commercial
Carwash
McDonalds
Vehicular
Arthur
Sheridan
Expressway
OTHER
Bronx River
Parkway
Subway
|
Design Issues
East Tremont Ave / Boston Road / West Farms Road
Complexfivelegintersectionwithlongpedestriancrossings
Pedestriancrossingsmisalignedwithdesirelines
Highvolumepedestriancrossings
Pedestrian/motoristconflict
|
Design Issues
East Tremont Ave / Devoe Ave / East 177th St
Complexfivelegintersectionwithlongpedestriancrossings
Unnecessarypedestrian/motoristconflict
Poorsiteofpedestrians
Unnecessarypedestrian/motoristconflict
Nopedestrianrefugeareas
|
Design Issues
Sheridan Expressway / Devoe Ave / East 177th St
Complexintersectionwithlongpedestriancrossings
Highspeedtrafficalwaysusingonelegortheother
Unnecessarypedestrian/motoristconflict
Nopedestrianrefugeareas
Proposed Solution
Overview of the
Proposed Solution
Organized Pedestrian / Vehicle
Movements
Shorter pedestrian crossings with
refuge medians
Bronx River Greenway Connection
complete between Starlight Park
and Bronx River Park
Upgrade infrastructure (street
lighting, signals, water main,
sewers and signage)
10
Proposed Solution
East Tremont Ave / Boston Rd/ West Farms Rd
ExistingConditions
ProposedConditions
Combined
11
Proposed Solution
East Tremont Ave / Boston Rd/ West Farms Rd
12
Proposed Solution
East Tremont Ave / Devoe Ave / East 177th St
ExistingConditions
ProposedConditions
Combined
13
Proposed Solution
East Tremont Ave / Devoe Ave / East 177th St
14
Proposed Solution
Sheridan Expressway / Devoe Ave / East 177th St
ExistingConditions
ProposedConditions
Combined
15
Proposed Solution
Sheridan Expressway / Devoe Ave / East 177th St
16
Questions