Issues SR.# Work Component Issues/ Observations Target Date Action Required

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

Issues

Sr.#
01

02
03
04

Work
Issues/ Observations
component
Testing
of Bricks should be tested from departmental
bricks
approved labs and these should be as per contract
specifications. Following tests to be required
i)
Compressive strength
ii)
Water absorption test
Mixing
of Steel trays to be arranged at site for clean mixing of
components for components to form mortar
mortar
Curing
Drums should be arranged for soaking of bricks and
curing purposes.
Daily progress Progress of work to be noted on daily basis.
report

05

Material

All material cement, aggregate-fine and course,


steel, bricks, clay etc should confirm to the contract
specifications of the subject subproject.

07

Workmanship

Keep frog of brick always up and joints should be


filled with mortar.
Alignment of brick courses should be truly
maintained.

08

Work program

For monitoring purpose work program is required


at site. The work schedule showing the items of
work with target dates to its completion should be
prepared in real sense.

Target
Date

Action Required
Collect the sample,
send to labs for
testing and get the
reports.
Ask the contractor
to arrange.
Ask the contractor
to arrange.
Advise
the
Contractor
to
submit the daily
progress of works
at site and it
should
be
checked/verified
by your engineer
at site.
Advise
the
Contractor to work
accordingly.

Direct
the
Contractor
to
depute the skilled
persons for the
job.
Ask the Contractor
to submit
the
construction work
program.