DOMESTIC COLD WATER SUPPLY (phasing) CALCULATIONS

Project name:
Project number:
Prepared by:
Date:
P3 to Level 1
TYPE OF FIXTURE

P3

P2

P1

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

FUs

phase phase phase phase phase phase phase phase phase phase phase phase phase
1

Level 2 to Level 5

Level 6 to Level 10

Whole Building

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

phase

phase

phase

phase

phase

phase

phase

Total FUs
phase

WC Flush Valve - public

10

WC Flush Valve - private

Lavatory - public

Lavatory - private

1.5

Urinal Flush Valve

Bath - public

Shower - public

Foot Bath

Lounge / Kitchen sink

Sink - Utility

Sink - Hand Wash

Lab Sink

2-comp. Scrub-up sink

3-comp. Scrub-up sink

Clinic service sink

10

Service / Mop sink

Hose Bibb

Cart Wash

Bedpan

10

Ice Maker

Disinfector

Sterilizer

Grand Total FUs


Add safety factor:

10%

Summary:
1

Main cold water supply for to :


is FUs, i.e. usgpm. ( mm pipe);
2 is FUs, i.e. usgpm ( mm pipe);
FUs, i.e. usgpm ( mm pipe)

phase 1
phase
phase 1 + 2 is

Main cold water supply for to :


is FUs, i.e. usgpm. ( mm pipe);
is FUs, i.e. usgpm ( mm pipe);
FUs, i.e. usgpm ( mm pipe)

phase 1
phase 2
phase 1 + 2 is

Main cold water supply for to :


is FUs, i.e. usgpm. ( mm pipe);
2 is FUs, i.e. usgpm ( mm pipe);
FUs, i.e. usgpm ( mm pipe)

Main cold water supply for whole building :


phase 1 is FUs, i.e. usgpm. ( mm pipe);
phase 2 is FUs, i.e. 4 usgpm ( mm pipe);
+ 2 is FUs, i.e. usgpm ( mm pipe)

phase 1
phase
phase 1 + 2 is

phase 1

DOMESTIC COLD WATER RISERS (phasing) CALCULATIONS


Project name:
Project number:
Prepared by:
Date:
P3 to Level 1
TYPE OF FIXTURE

P3

P2

P1

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

FUs

phase phase phase phase phase phase phase phase phase phase phase phase phase
1

Level 2 to Level 5

Level 6 to Level 10

Whole Building

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

phase

phase

phase

phase

phase

phase

phase

Total FUs
phase

WC Flush Valve - public

10

WC Flush Valve - private

Lavatory - public

1.5

Lavatory - private

Urinal Flush Valve

Bath - public

Shower - public

Foot Bath

Lounge / Kitchen sink

1.5

Sink - Utility

2.5

Sink - Hand Wash

1.5

Lab Sink

1.5

2-comp. Scrub-up sink

3-comp. Scrub-up sink

Clinic service sink

10

Service / Mop sink

2.5

Hose Bibb

Cart Wash

Bedpan

10

Ice Maker

Disinfector

Sterilizer

Grand Total FUs


Add safety factor:

10%

Summary:
1

Main cold water riser for to :


FUs, i.e. usgpm. ( mm pipe);
FUs, i.e. usgpm ( mm pipe);
FUs, i.e. usgpm ( mm pipe)

Main cold water riser for to :


FUs, i.e. usgpm. ( mm pipe);
phase 2 is FUs, i.e. usgpm ( mm pipe);
phase 1 + 2 is FUs, i.e. usgpm ( mm pipe)

phase 1 is

Main cold water riser for to :


FUs, i.e. usgpm. ( mm pipe);
2 is FUs, i.e. usgpm ( mm pipe);
1 + 2 is FUs, i.e. usgpm ( mm pipe)

phase 1 is
phase
phase

Main cold water riser for whole building :


phase 1 is FUs, i.e. usgpm. ( mm pipe);
phase 2 is FUs, i.e. usgpm ( mm pipe);
phase 1 + 2 is FUs, i.e. usgpm ( mm pipe)

phase 1 is
phase 2 is
phase 1 + 2 is

DOMESTIC HOT WATER RISERS (phasing) CALCULATIONS


Project name:
Project number:
Prepared by:
Date:
P3 to Level 1
TYPE OF FIXTURE

P3

P2

P1

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

FUs

phase phase phase phase phase phase phase phase phase phase phase phase phase
1

Level 2 to Level 5

Level 6 to Level 10

Whole Building

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

Total FUs

Total fixtures

phase

phase

phase

phase

phase

phase

phase

Total FUs
phase

WC Flush Valve - public

WC Flush Valve - private

Lavatory - public

1.5

Lavatory - private

Urinal Flush Valve

Bath - public

Shower - public

Foot Bath

Lounge / Kitchen sink

1.5

Sink - Utility

2.5

Sink - Hand Wash

1.5

Lab Sink

1.5

2-comp. Scrub-up sink

3-comp. Scrub-up sink

Clinic service sink

Service / Mop sink

2.5

Hose Bibb

Cart Wash

Bedpan

Ice Maker

Disinfector

Sterilizer

Grand Total FUs


Add safety factor:

10%

Summary:
1

Main hot water riser for to :


FUs, i.e. usgpm. ( mm pipe);
FUs, i.e. usgpm ( mm pipe);
FUs, i.e. usgpm ( mm pipe)

Main hot water riser for to :


FUs, i.e. usgpm. ( mm pipe);
usgpm ( mm pipe);
i.e. usgpm ( mm pipe)

phase 1 is
phase 2 is FUs, i.e.
phase 1 + 2 is FUs,

Main hot water riser for to :


FUs, i.e. usgpm. ( mm pipe);
i.e. usgpm ( mm pipe);
i.e. usgpm ( mm pipe)

phase 1 is
phase 2 is FUs,
phase 1 + 2 is FUs,

Main hot water riser for whole building :


phase 1 is FUs, i.e. usgpm. ( mm pipe);
phase 2 is FUs, i.e. usgpm ( mm pipe);
1 + 2 is FUs, i.e. usgpm ( mm pipe)

phase 1 is
phase 2 is
phase 1 + 2 is

phase

DOMESTIC COLD WATER FLOOR BRANCHES (phasing) CALCULATIONS


Project name:
Project number:
Prepared by:
Date:
Total Fixtures Units
TYPE OF FIXTURE

P3

P3

P2

P1

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

phase phase phase phase phase phase phase phase phase phase phase phase phase

phase

phase

phase

phase

phase

phase

phase

phase

phase

phase

phase

phase

phase

P2
1

P1
1

L1
1

L2
2

L3
2

L4
2

L5
2

L6
1

L7
2

L8
2

L9
2

L10
2

FUs

WC Flush Valve - public

10

WC Flush Valve - private

Lavatory - public

1.5

Lavatory - private

Urinal Flush Valve

Bath - public

Shower - public

Foot Bath

Lounge / Kitchen sink

1.5

Sink - Utility

2.5

Sink - Hand Wash

1.5

Lab Sink

1.5

2-comp. Scrub-up sink

3-comp. Scrub-up sink

Clinic service sink

10

Service / Mop sink

2.5

Hose Bibb

Cart Wash

Bedpan

10

Ice Maker

Disinfector

Sterilizer

Grand Total FUs


Add safety factor:

10%

Flow in usgpm
pipe size in mm

DOMESTIC HOT WATER FLOOR BRANCHES (phasing) CALCULATIONS


Project name:
Project number:
Prepared by:
Date:
Total Fixtures Units
TYPE OF FIXTURE

P3

P2

P1

L1

L2

L3

L4

L5

L6

L7

L8

L9

L10

FUs

P2

P3

L1

P1

L3

L2

L5

L4

phase phase phase phase phase phase phase phase phase phase phase phase phase

phase

phase

phase

phase

phase

phase

phase

phase

WC Flush Valve - public

WC Flush Valve - private

Lavatory - public

1.5

Lavatory - private

Urinal Flush Valve

Bath - public

Shower - public

Foot Bath

Lounge / Kitchen sink

1.5

Sink - Utility

2.5

Sink - Hand Wash

1.5

Lab Sink

1.5

2-comp. Scrub-up sink

3-comp. Scrub-up sink

Clinic service sink

Service / Mop sink

2.5

Hose Bibb

Cart Wash

Bedpan

Ice Maker

Disinfector

Sterilizer

Grand Total FUs


Add safety factor:

10%