Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

REVISION

REVISIONCERTIFICATION
CERTIFICATE

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

04/08/16

10-01402

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

00B

ISSUED FOR 90% FEED REVIEW

10-01402

8/7/15

00A

DESCRIPTION

10-01402

JO/EWO

02-14

DATE

REV
NO.

JF

JF

JAF

DB

DB

DKB

ENGG CERT

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

BI-10-01402

EXPEC ADVANCED RESEARCH CENTER EXPANSION


DHAHRAN, SAUDI ARABIA

Radio Frequency, Electro Magnetic and X-ray Shielding Studies

DISCIPLINE
ENGINEER
DS

IFB LSTK LAB & TUNNEL


APRIL 08, 2016

04/08/16
DATE:
PROJECT
ENGINEER

04/08/16
JF

CERTIFIED

DB

04/08/16

PREPARED BY:

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

KLINGSTUBBINS (KS)
PHILADELPHIA, PENNSYLVANIA, USA

DATE:

Radio Frequency, Electro Magnetic & X-Ray Shielding


EXPEC ADVANCED RESEARCH CENTER EXPANSION

DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502

JO / EWO:

DRAWING NO.

HE-348877

10-01402

EDSD/2616-0399.doc

SHT.NO.

REV.NO.

1
of
2

00B

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DATE:

BY:

CONTROL NUMBER

DATE:

APPROVAL/CERTIFICATION REQUIREMENTS,

EDSD
VERIFICATION
DATE:

OF THIS DRAWING IS COVERED, FOR ALL

THIS INDICATES THAT REV. NO.__________

Saudi Aramco 2616-ENG (03/99)

DB
JF

At this stage in the building design process, specific rooms are now located at reasonably certain locations
within the Imaging Suite on the Basement level. As the design progresses into detailed design, it is
recommended that the Owner arrange to retain professional engineering consultant(s) who have a
professional expertise in the design for electro-magnetic (EM), radio frequency (RF) and ionizing radiation
(X-Ray) shielding. Their role(s) are to analyze and assess the need for EM/RF or X-Ray shielding at
selected imaging equipment rooms within the Imaging Suite. The primary goal for these studies is to
determine the recommended scope and extent of EM/RF or ionizing radiation room shielding that needs to
be incorporated into the detailed architectural and engineering design.
The EM/RF study should include a pre-construction site analysis of the site, as well as an analysis of the
latest version of architectural floor plans. Furthermore, the EM/RF assessment should initially focus on the
general region where the Imaging Suite is to be located, including laboratories immediately above, nearby
mechanical and electrical rooms, elevators as well as any element nearby that is found exterior of the
building, near the Imaging Suite. Specific equipment that may require such shielding may include scanning
electron microscopes (SEM) and atomic force (AF) microscopes. Other additional sensitive microscopy
equipment may be identified by the Owners representatives during detailed discussion.
An industrial hygienist consultant, or other qualified professional consultant should be retained by the
Owner to determine the need for and recommended extent and detailed design concepts and strategies
required to safely shield the work areas where research equipment that produces Ionizing Radiation (XRays) will be placed. Specific equipment includes the CT-Scanners, proposed to be located within the
Imaging Suite on the basement level.

04/08/16

10-01402

IFB LSTK LAB & TUNNEL

10-01402

00B

8/7/15
00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Radio Frequency, Electro Magnetic and X-ray Shielding Studies

DISCIPLINE
ENGINEER
DS

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

04/08/16

CERTIFIED
DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

Radio Frequency, Electro Magnetic & X-Ray Shielding


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348877

10-01402

SHT.NO.

REV.NO.

2
of
2

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

You might also like