Activity

Phase`

Depth

ML Days

Days

Order

Phase 1 - Completion Recovery & Plug & Abandon Reservoir

0.00

5.73

5.73

Phase 2 - Cut and Recover Casing & Wellhead

0.00

3.40

9.13

Well Tangibles

Well Tangible

Cost

9-5/8" Bridge Plugs x 2

24000.00

13-3/8" Bridge Plug x 2

20000.00

Summary Costs

Summary Cost

Cost

Rig rate

3545000.00

Non Rig Spread Rate

1917300.00

Skips, Waste Disposal & Inhibition Chemicals

60000.00

Rig BOP Spares

60000.00

Assumptions

No

Assumptions

Rig Rates are based on North Sea (Mid Range Capabilities)

Operations Team only accounts for DSV, NDSV, Project Manager, Drilling Superintendent, DE, Logistics

Applies a general 15% contingency to the Most Likely Times

2 Boats and Fuel are accounted and Helicopter Operations

A Lumpsum for skips and Inhibited Chemicals ~USD 60,000 is added

BOP spares are accounted due to cutting of casing and more likelihood of metal swarf USD ~60,000

Summary of Selected Offset Well NPT

Phase

Code

Offset Well Ref

NPT Hrs

NPT Cause

Description

No data available in table

Identified Hazards